(1)

Professional planning and realization of Data Centers

and Server Rooms

(2)
(3)

The proRZ Rechenzentrumsbau GmbH

Headquarters in Betzdorf (Germany)

Subsidiary in Hallein (Austria) and Rotkreuz (Switzerland)

> 100 employees, with more than 50 engineers and technicians of more than

25 years experience in planning and realization of Data Centers

Comprehensive and professional knowledge in analysing, planning, the

construction and operation of Data Centers and Server Rooms

Our philosophy is to define individual, customized solutions for our customers

in the field of Data Center environments

proRZ plans and realizes Data Centers and Server Rooms of any sizes,

identifies customized, individual security- and availability demands. proRZ

consults in case of optimizations either for existing or new Data Center

requirements considering floor space requirements, energy-efficiency and

state-of-the-art cooling solutions.

(4)

The proRZ business activities

Planning and realization of Data Centers and Server Rooms –

neutral and independent

 Consulting  Risk analysis

 Conception  Steering of certification processes  Planning  Project management  Project control  Prime contractorship  Energy-management  ROI evaluation  Service

(5)
(6)
(7)

Functional IT Security affects all business sectors

Today’s successful companies

are depending upon the

(8)

Definition of your security requirements !

Highest security level Certified security concepts Adequate security level

Suitable and economic security concepts

Basic security level

Basic protection concepts according to ruling building laws

Undefined security level

IT infrastructures without security concept No protection Basic protection Profi Level Highest availability

(9)

Data Center Infrastructures – alterations of requirements

Important factors until 2005

• Floor space • Security • Infrastructure • Redundancies • Access • 10-years‘ forecast

1970

1980

1990

2000

2011

2020

2030

De

pe

nd

en

cie

s

of comp

an

ie

s

Important factors today

• Power capacities • Green / Sustainability • Innovative

• Costs / ROI / TCO • Modularity / Scalability

• R+ Redundancy

• Certification

• Infrastructure-management and monitoring

(10)

Result: Fire protective Data Centers !

Beneficial fire preventive planning !

„ Releasing the fire extinguishing system can be too late

for your Data Center “

Location Constructional fire protection Early fire warning systems Reduction of fire loads

(11)

Classification of Data Centers – physical security

Fire Debris Dust Water Corrosive gases Vandalism Unauthorized access Electro-magnetic

(12)
(13)

From planning to the handover of keys – proRZ realizes Data Centers

Too many cooks spoil the Data Center!

Trust and benefit from our know-how as prime

contractor for the realization and implementation of

(14)

Cost

reduction

Analysis Optimiza-tion Controlling

3 steps towards energy-efficient Data Centers

Analysis of current situation

Target:

Creating transparency on the basis of valid

measurement results

Optimization:

Target:

Identification of optimization potentials

Controlling:

Target:

Permanent control and improvement of

energetic indicators

(15)

Specific measures to increase energy efficiencies

Costs

le ss in ten si ve in ten si ve Containment of cold and warm areas

Virtualization and consolidation of IT-environment

Cooling (e.g. free-cooling adsorption) Energy monitoring Determination of indicators Scalable energy supply Increase of hardware efficiency Temperature increase

Conducted air flow by sealings Energy-efficiency potentials High Medium Low

Time

(16)

References – an excerpt of more than 1,000 projects

 IT-service provider for agriculture

 70 employees

 4.500 users

 Outdoor Data Center

 30 sqm

 System-tested room-in-room system following EN 1047-2

 Installation period 12 weeks

 Coolign concept with DCDC SideCooler

 Security gate and finger print access control

 Novec 1230 fire extinguishing unit

LAND-DATA GmbH Germany

(17)

 Environment and waste disposal provider  70 locations throughout Europe  3.300 employees  1.100 vehicles

 Outdoor Data Center

 100 sqm

 TÜV level 3 certification

 IT functionality of utmost priority

Tönsmeier Dienstleistung GmbH & Co. KG

Germany

Project details

(18)

 Auditor, tax and legal advisor

 10 locations throughout Germany

 more than 400 employee

 ECB•S certified GranITe-Room.cert (centralized IT)

 40 sqm

 TÜV level 3 certification

 Redundant power supply and cooling

 High availability demand due to sensitive client‘s data  Implementation during running IT operations

DHPG

Dr. Harzem & Partner KG Germany

Project details

(19)

 Manufacturer of standard and special tools

 540 employees

 Analysis, concept and realization of a new Data Center

 Integration room-in-room system incl. infrastructure

 45 sqm

 TÜV level 3 certification

 Redundant N+1 energy supply

 Early fire detecting and extinguishing system

 Cooling concept with hot/cold aisle containment

Ingersoll Werkzeuge GmbH Germany

Project details

(20)

 Manufacturer of

seamless hot rolled steel tubes

 4 locations throughout Germany

 world market leader for premium solutions

 Realization of a room-in-room system

 260 sqm

 TÜV level 3 certification -Stufe 3 zertifiziert

 Implementation during running IT operation

 Energy-efficient cooling by air-water heat exchanger and cold/hot aisle containment

V & M Deutschland GmbH Germany

Project details

(21)

Your competent, reliable partner – independent and neutral

pro

RZ

Rechenzentrumsbau GmbH

Industriestraße 41

D-57518 Betzdorf

Tel.: +49 (0) 2741 93 21 0

Fax: +49 (0) 2741 93 21 111

www.proRZ.com

[email protected]

References

Related documents

We validated the effectiveness of our architecture by pre- senting a characterization of Amazon Web Services (AWS) traffic from passive measurements. By digging into the

Free ROBUX generators might have worked a while ago, before ROBLOX moderators upped their game and decided to stop these sketchy websites from supplying working promo codes.. Now

 The applicant should be able to give a detailed description of the subject using theoretical fundamentals and specific examples..  The applicant should understand and be able

The main output of the case studies will be a framework to present knowledge diffusion across the construction supply chains taking full cognisance of both the technical

Actually all CMAs in southern Ontario (except Kitchener and Windsor) experienced a higher employment growth rate in 1996-2001 than in 1991-1996. With strengthened job

By combining a convergent mobile device with an affordable unlimited plan, "Mobile Desktop" presents an attractive option to travelling vendors or small business

Cross-functional, employee-led Lean Green Teams help USPS build a conservation culture through more efficient resource use and conservation in five sustainability performance

Schuck reported on the activities of the Executive Committee’s May 23, 2007, meeting, noting the committee approved the DDH Search Committee’s recommendation to hire the Mercer