WORKPACKAGES

Month:

1

2 3

4

5

6

7

8

9 10 11 12 13 14 15 16 17 18

Oct

11 Nov Dec Jan 12 Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan 13 Feb Mar

WP1: Repository Process Development

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

WP2: Training and advisory support

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

WP3: Policy development *

X

X

X

X

X

X

X

X

X

X

X

X

WP4: Sustainability

X

X

X

X

X

X

X

X

X

X

X

WP5: EPSRC Platform (NEW) **

X

X

X

X

X

X

X

X

Project start dates: October 2011 (JISC), August 2012 (EPSRC)

Project completion dates: March 2013 (both)

Duration: 18 months (JISC), 8 months (EPSRC)

Changes since July 2012:

(2)

Page 2 of 6

WORKPACKAGE 1: Repository Process Development

1. Faculty-specific deposit interface Jan 12 Dec 12

þ

þ

þ

þ ☐

Resumed as planned Oct 12 at 0.5 FTE.

2. machine and web server setup Jan 12 Feb 12

þ

þ

þ

þ

þ

Addition: Changes to RDSF project directories now

in progress to enable efficient publishing of data sets. 3. review of repository software Jan 12 Jan 12

þ

þ

þ

þ þ

Documented on blog and wiki.

4. technical design Jan 12 Jan 12

þ

þ

þ

þ þ

Documented on blog and wiki. 5. implementation Feb 12 Dec 12

þ

þ

þ

þ ☐

Repository launch 1 Nov 2012.

6. user experience and testing Mar 12 Dec 12

þ

þ

þ

þ ☐

Paused awaiting deployment of repository.

7. Minimal set of mandatory metadata Feb 12 Apr 12

þ

þ

þ

þ þ

8. review and choice of metadata Feb 12 Mar 12

þ

þ

þ

þ þ

9. documentation Mar 12 Apr 12

þ

þ

þ

þ þ

10. Human access portal May 12 Dec 12

þ

þ

þ

þ ☐

Basic version: launch 1 Nov 2012. 11. Machine access portal Mar 12 Feb 13

þ

þ

þ

þ ☐

Basic version: launch 1 Nov 2012.

12. Integration of PURE and data.bris Aug 12 Jan 12

þ

þ

þ

þ þ

Loose coupling via DOI references only. No further work until data.bris 3-year implementation project.

(3)

WORKPACKAGE 2: Training and advisory support

13. MRD training programme Jul 12 Nov 12

þ

þ

14. Stage 1 - New staff induction (DataSafe) Jul 12 Sep 12

þ

þ

þ

þ þ

15. Stage 2 - Using data.bris Oct 12 Nov 12

þ

þ

þ

☐ ☐

16. Data management guidance pages Nov 11 Apr 12

þ

þ

þ

þ þ

Maintenance revisions continue but essentially done. 17. Stage 1 - RED Intranet referral to DSO Nov 11 Dec 11

þ

þ

þ

þ þ

18. Stage 2 - Deposit guidance on data.bris site Mar 12 Apr 12

þ

þ

þ

þ

þ

19. Data surgeries Oct 11 May 12

þ

þ

þ

þ þ

20. Stage 1 - Digital Support Surgeries Oct 11 Apr 12

þ

þ

þ

þ þ

21. Stage 2 - Deposit Surgeries using data.bris Apr 12 May 12

þ

þ

þ

þ þ

22. data.bris integrated with Faculty REAP Feb 12 Feb 12

þ

þ

þ

þ þ

(4)

Page 4 of 6

WORKPACKAGE 3: Policy development

24. Amendments to existing policy Mar 12 Dec 12

þ

þ

25. Identify relevant policies for update Mar 12 Aug 12

þ

þ

þ

þ ☐

Listed on wiki. 26. Liaise with policy owners to draft updates May 12 Dec 12

þ

☐ ☐

27. Research Data Management policy Mar 12 Dec 12

þ

þ

þ

þ ☐

Published on web for open consultation. URC to revisit document at later date (to be decided). 28. Begin drafting procedures with RED Mar 12 Dec 12

þ

þ

þ

þ þ

29. Begin drafting procedures with Library Mar 12 Dec 12

þ

þ

þ

þ þ

(5)

WORKPACKAGE 4: Sustainability

31. Business Plan Oct 11 Mar 13

þ

þ

þ

þ þ

32. Steering Group agree to develop Stage 0 Oct 11 Feb 12

þ

þ

þ

þ þ

33. Draft Stage 0 BC to Steering Group Jul 12 Jul 12

þ

þ

þ

þ þ

34. Stage 0 BC approved by Steering Group Aug 12 Aug 12

þ

þ

þ

þ þ

35. Stage 0 BC to Portfolio Executive Sep 12 Oct 12

þ

þ

þ

þ þ

Awaiting outcome. Portfolio Executive meets 17 Oct. 36. Draft Stage 1 BC to Steering Group Oct 12 Oct 12

þ

☐ ☐

37. Stage 1 BC approved by Steering Group Oct 12 Nov 13

☐ ☐

(6)

Page 6 of 6

WORKPACKAGE 5: EPSRC Platform

39. Research Platform (Hub) Aug 12 Feb 12

þ

þ

þ

40. Code hand-over and knowledge transfer Aug 12 Sep 12

þ

þ

þ

þ þ

41. Security audit of Hub and fix vulnerabilities Aug 12 Dec 12

þ

☐ ☐

Audited but vulnerabilities not yet fixed. 42. Provenance tracking and metadata capture Nov 12 Dec 13

☐☐

☐ ☐

43. Update Hub in response to user consultation Dec 12 Feb 13

☐☐

☐ ☐

44. Help and advice pages Nov 12 Feb 13

☐☐

☐ ☐

45. Account Management Aug 12 Sep 13

þ

þ

þ

þ ☐

46. UoB single-sign on Aug 12 Sep 12

þ

þ

þ

þþ

47. Integration of ACRC Data Steward database

and data.bris account management

Sep 12 Oct 12

þ

þ

þ

þ☐

48. Live Research Data Sharing Aug 12 Jan 13

þ

þ

☐ ☐

49. Non-UoB, cross-institutional authentication Aug 12 Jan 13

þ

☐ ☐

Options listed on wiki. Basic FLUFF-like completed. 50. Large-scale data transfer Aug 12 Dec 12

þ

þ

☐ ☐

Options listed on wiki. Basic HTTP transfer done.

51. Deployment and Evaluation Nov 12 Feb 13

þ

52. Pilot Platform with EPSRC projects at UoB Nov 12 Feb 13

þ

☐ ☐

Call out via ACRC users' lists. 53. Deploy Platform for UoB and external users Feb 12 Mar 13

Cardiff has agreed to evaluate. 54. Dissemination workshop Jan 12 Mar 13

References

Related documents

2013 Best Adaptive Reuse Finalist / Randolph Tower City Apartments 2012 Property Management Company of the Year Finalist / Village Green 2012 Best Corporate Website Finalist /

Base: EU 27 countries – all those taking a holiday for a minimum 4 consecutive nights in 2012..

Determine the largest allowable square cross section of a steel shaft of length 20 ft if the maximum shearing stress is not to exceed 10 ksi when the shaft is twisted through

"Other investments" include private pension funds' and state and local government employee retirement funds' unidentified miscellaneous assets, private pension funds'

Intro  Guide http://macadmincorner.com/setting-­‐up-­‐reposado-­‐and-­‐margarita-­‐on-­‐linux-­‐part-­‐1/ Rating þ Apache  2  License. þ Linux

[r]

Table 1 illustrates patient demo- graphics, duration of anti-TB therapy until occurrence of neuro- logical TB mass lesions, site of the lesions, clinical presentation,

Tekonsha prodigy brake to the jeep liberty trailer wiring instructions were unable to confirm your shopping with installation.. Tucked up everything does it is with the