Steelwork

(2)

Most coating failures

Most coating failures

result from poor or inadequate:

result from poor or inadequate:

• Steel preparationSteel preparation

• CleaningCleaning

• Surface preparationSurface preparation

• • ApplicationApplication • • AccessAccess • • VentilationVentilation •

• Coating selectionCoating selection

• Inspection and controlInspection and control

• Premature exposurePremature exposure

(Exposed too soon)

(3)

Investigation by a Guarantee

Investigation by a Guarantee

Insurance company has shown:

Insurance company has shown:

••

95

95 %

% of

of all

all coating

coating failures

failures result

result from

from

 – 

 – 

Poor surface preparation

Poor surface preparation

 – 

 – 

Poor application

Poor application

••

85

85 %

% of

of all

all failures

failures appear

appear within

within 1-2

1-2 years

years

This fits in well with

(4)

Rounding or smoothing of: Rounding or smoothing of:

Sharp Sharp edgesedges

   CornersCorners

   WeldsWelds Grinding of: Grinding of:

   LaminationsLaminations

Flame Flame cut cut edgesedges

Weld Weld spatterspatter

Steelwork preparation

Steelwork preparation

involves the following activities

involves the following activities

Notches minimum diameter: 30 mm Notches minimum diameter: 30 mm

Inspected and approved before cleaning Inspected and approved before cleaning

See ISO 8501

(5)

Coating applied to a square-cut section Coating applied to a square-cut section

Steelwork preparation

Steelwork preparation

Rounding sharp edges

Rounding sharp edges

Reduced coating thickness at

Reduced coating thickness at

sharp edges due to tension

sharp edges due to tension

created during drying / curing

created during drying / curing

Coating Coating Sharp edge Sharp edge Rounded edge Rounded edge Even coating Even coating thickness thickness

Steel

Steel

(6)

Manholes in a Tank

Manholes in a Tank

• •

Section

Section

manholes

manholes

Well grinded

Well grinded

edges

edges

Cd-4932-13 Cd-4932-13

(7)

Weld with pinhole.

Weld with pinhole.

Visible through the paint system

Visible through the paint system

• Will lead to initiation of corrosionWill lead to initiation of corrosion

• Remedial actions: Remove the paint, re-weld and grind. Remedial actions: Remove the paint, re-weld and grind. ApplyApply

 paint  paint Cd-4930-42 Cd-4930-42 NOTE: NOTE:

Such defects may

Such defects may

 be difficult

 be difficult to findto find

during inspection

(8)

Early corrosion on

Early corrosion on

sharp edge and spot welds

sharp edge and spot welds

• Paint has newly been appliedPaint has newly been applied

• Exposed to wind and weather for approximately 2 weeksExposed to wind and weather for approximately 2 weeks

Cd-4930-78 Cd-4930-78

(9)

Severe corrosion due to a

Severe corrosion due to a

combination of several effects

combination of several effects

• Sharp edgesSharp edges

• Rough welds (not grinded)Rough welds (not grinded)

• Missing stripe coatingMissing stripe coating

Cd-4930-71 Cd-4930-71

(10)

Construction after steelwork preparation.

Construction after steelwork preparation.

Grinded edge and weld

Grinded edge and weld

• Sharp edgeSharp edge

has been

has been

rounded

rounded

• Welding fluxWelding flux

and smoke has

and smoke has

 been removed

 been removed

• Grinded weldGrinded weld

 bead

 bead

Cd-4932-15 Cd-4932-15

(11)

Construction with sharp edge,

Construction with sharp edge,

weld flux and weld beads

weld flux and weld beads

Pre-blasting preparation

Pre-blasting preparation

to be carried out:

to be carried out: •

• Round sharp edgeRound sharp edge

• Remove welding fluxRemove welding flux

with water

with water

• Grinding of weld beadGrinding of weld bead

Cd-4932-14 Cd-4932-14

(12)

Steel preparation

Steel preparation

Weld spatter, welding smoke

Weld spatter, welding smoke

Weld

Weld

Weld

Weld

spatter

(13)

Small weld spatters

Small weld spatters

Even only one small weld spatter may

Even only one small weld spatter may be sufficient to initiatebe sufficient to initiate

corrosion which with time may lead to severe problems

corrosion which with time may lead to severe problems

Cd-4930-45 Cd-4930-45 NOTE: NOTE: Small failures Small failures

like this are

like this are

difficult to find

(14)

Cd-4930-39 Cd-4930-39

Unacceptable weld.

Unacceptable weld.

Too rough and full of pinholes/pores

Too rough and full of pinholes/pores

• Weld spatters close to weldWeld spatters close to weld

• Re-welding and grinding must be carriRe-welding and grinding must be carried outed out

 prior to re-blasting and painting

(15)

Paint on a very poor weld.

Paint on a very poor weld.

Pinholes and

Pinholes and

holidays visible after second stripe coating

holidays visible after second stripe coating

•  Neither re-welding nor grinding  Neither re-welding nor grinding have beenhave been

carried out prior to application

carried out prior to application •

• Remedial Actions: Re-blasting, re-welding,Remedial Actions: Re-blasting, re-welding,

grinding and blast -cleaning: COSTLY

grinding and blast -cleaning: COSTLY

Cd-4930-41 Cd-4930-41

(16)

Early corrosion of welds

Early corrosion of welds

in a water ballast tank

in a water ballast tank

• Rough weld seams.Rough weld seams.

Should have been

Should have been

grinded grinded • • Probably inProbably in combination with combination with

 poor stripe coating

 poor stripe coating •

• Mud can be seen,Mud can be seen,

 particularly on the  particularly on the  bottom  bottom Cd-4930-75 Cd-4930-75

(17)

Inside a tank after good steelwork

Inside a tank after good steelwork

and paint application

and paint application

Steelwork preparation and application of the paint have

Steelwork preparation and application of the paint have

 been carried out well

 been carried out well

Cd-4930-51 Cd-4930-51

(18)

Steel support after good steelwork

Steel support after good steelwork

and paint application

and paint application

Pre-blasting preparation and application

Pre-blasting preparation and application

of the paint have been carried out well

of the paint have been carried out well

Cd-4930-52 Cd-4930-52

References

Related documents

Technigaz system Inner hull Insulation secondary barrier Membrane Membrane Plywood Secondary barrier Polyurethane foam Plywood Mastic Stainless steel By expansion and contraction

In a summary of the impact of Baumrind’s (1971) parenting styles on adolescents, Baumrind (1991; 1995) states that for White, middle- to upper- class families, adolescent children

In response to ABA and other drought stress signals, root cells rapidly adjust osmotically in order to reduce internal water potential lower than external water potential and

Using a tagging approach, we investigated the possible associations between longevity and the common genetic variation at the three bitter taste receptor gene clusters on chromosomes

Figure 31: Cropped horizon time map (top of basement) which is focused on the area of interest.. In order to have a good horizon interpretation, the interpretation was

Data that is stored after ToolsNet 4000 is installed and put into backup mode can be viewed in the both the ToolsNet 3000 and ToolsNet 4000 web applications... Configuration

Marsh, PD and Zaura, E (2017) Dental biofilm: ecological interactions in health and disease.. In: Journal of

While initially considered a sterile fluid, several investigations have since identified breast milk as an integral source of microbes for the developing infant [ 171 ]. To date,