• No results found

IBS Resume

N/A
N/A
Protected

Academic year: 2021

Share "IBS Resume"

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

(1)

SATISH JADAV SATISH JADAV

I-59, NAVGRAH CO-OP SOCIETY, I-59, NAVGRAH CO-OP SOCIETY, FLAT N0:203,2

FLAT N0:203,2ndnd FLOOR,FLOOR,

POONAM SAGAR COMPLEX POONAM SAGAR COMPLEX MIRAROAD (E), MIRAROAD (E), Mumbai-401107. Mumbai-401107. +919167671378 +919167671378 Email:[email protected] Email:[email protected] Objective Objective Objective

Objective Seeking a challenging environment that encourage continuous learning andSeeking a challenging environment that encourage continuous learning and

creativity, provides exposure to new ideas, and stimulates personal and professional creativity, provides exposure to new ideas, and stimulates personal and professional growth. growth. Professional Professional Professional Professional experience experience experience experience

Total Experience: 9years. Of rich exp. In GSM 2G / UMTS /CDMA 2000 / (RF Indoor  Total Experience: 9years. Of rich exp. In GSM 2G / UMTS /CDMA 2000 / (RF Indoor  Planning & Optimization 800/900 /1800/2100Mhz TRI band/ Dual band)

Planning & Optimization 800/900 /1800/2100Mhz TRI band/ Dual band) Indoor Planning and Optim

Indoor Planning and Optimization & ization & Physical OptimizatiPhysical Optimization of field experience of 9 years of on of field experience of 9 years of  combined experience in, network , implementation, and Network optimization phases with combined experience in, network , implementation, and Network optimization phases with spe

speciacial l empemphashasis is on on ProProjecject t PlPlan an devdeveloelopmepment, nt, ResResourource ce plaplanninning, ng, coscost t and and budbudgetget control, quality control, time management and project reporting.

control, quality control, time management and project reporting. Expertise in 2G/3G DriveExpertise in 2G/3G Drive test and Post processing in NOKIA/Ericsson/Motorola Equipments.

test and Post processing in NOKIA/Ericsson/Motorola Equipments. Intermediate in

Intermediate in using RF planning tools like), Asset 5.0, Tems, and Post processing &using RF planning tools like), Asset 5.0, Tems, and Post processing & Optimization drive tools, Tems Investigation 9.3, , MapInfo, Actix GSM Analysis, Optimization drive tools, Tems Investigation 9.3, , MapInfo, Actix GSM Analysis, Agilent

Agilent, Nect Act., Nect Act. Feb 2006 –Dec2010 Feb 2006 –Dec2010 RF Optimization L

RF Optimization Lead Engineer: ead Engineer: Qatar Telecom Qatar Telecom LtdLtd Dept: Indoor Planning and Optimization

Dept: Indoor Planning and Optimization Preparing the nominal cell plan for

Preparing the nominal cell plan for the building.the building.

♣ Conducting initial RF survey of the building from design point of view.Conducting initial RF survey of the building from design point of view. ♣

♣ Preparing RF design/technical proposal for Preparing RF design/technical proposal for In-building Solutions.In-building Solutions. ♣

♣ Preparing RF BOQ for the Preparing RF BOQ for the site designed.site designed. ♣

♣ Preparing DAS (Distributed Antenna System) Solution for Preparing DAS (Distributed Antenna System) Solution for In building Coverage.In building Coverage.

Calculating the Link Budget/EIRP table and designing of the schematic

Calculating the Link Budget/EIRP table and designing of the schematic♣♣diagram for IBCdiagram for IBC

solutions and deciding the cable routing. solutions and deciding the cable routing.

Designing the Schematic Diagram and deciding the

Designing the Schematic Diagram and deciding the cable routing.cable routing.

♣ Preparing the RF Technical Proposal.Preparing the RF Technical Proposal. ♣

♣ Preparing the RF BOQ.Preparing the RF BOQ.

Meetings withVendor Team to discuss the technical aspects

Meetings withVendor Team to discuss the technical aspects for implementation of thefor implementation of the design according to the requirements that they

design according to the requirements that they need to be fulfilled.need to be fulfilled. Checking existing coverage using TEMS

Checking existing coverage using TEMS Investigation GSM.Investigation GSM. Preparing RF design/technical proposal for

Preparing RF design/technical proposal for In-building SolutionsIn-building Solutions

Analyzing the post installation coverage, spillage, and Handover tests using TEMS Analyzing the post installation coverage, spillage, and Handover tests using TEMS Investigation Light.

Investigation Light.

♣ Optimization of the design, by implementing necessary changes in design to Optimization of the design, by implementing necessary changes in design to meet themeet the

KPIs.. KPIs..

Managed the regional Site Acquisition teams, Civil and Implementation teams for sites. Managed the regional Site Acquisition teams, Civil and Implementation teams for sites. Managed Site Audits.

Managed Site Audits.

Managing the Regional O&M Team.. Managing the Regional O&M Team.. Team Management.

(2)

Providing technical support to teams.

iBwave The Standard for In-Building Design RF-vu Software(v 4.2.4)

RF Designing in IBS Site, Inspection at the Implementation of IBS site. using iBwave The Standard for In-Building Design RF-vu Software(v 4.2.4).

RF Designing in IBS Site, Inspection at the Implementation of IBS site.

Oct-2004 to Feb 2006:

Global Telecom Ltd: Mumbai (India). IBS Planning and Design -Engineer .

Preparing the nominal cell plan for the building.

♣ Conducting initial RF survey of the building from design point of view. ♣ Preparing RF design/technical proposal for In-building Solutions. ♣ Preparing RF BOQ for the site designed.

♣ Preparing DAS (Distributed Antenna System) Solution for In building Coverage.

Calculating the Link Budget/EIRP table and designing of the schematic♣ diagram for IBC

solutions and deciding the cable routing.

Designing the Schematic Diagram and deciding the cable routing.

♣ Preparing the RF Technical Proposal. ♣ Preparing the RF BOQ.

Meetings withVendor Team to discuss the technical aspects for implementation of the design according to the requirements that they need to be fulfilled.

Checking existing coverage using TEMS Investigation GSM. Preparing RF design/technical proposal for In-building Solutions

Analyzing the post installation coverage, spillage, and Handover tests using TEMS Investigation Light.

♣ Optimization of the design, by implementing necessary changes in design to meet the

KPIs..

Managed the regional Site Acquisition teams, Civil and Implementation teams for sites. Managed Site Audits.

Managing the Regional O&M Team.. Team Management.

Managing the Regional O&M Team.. Team Management.

Providing technical support to teams.

iBwave The Standard for In-Building Design RF-vu Software(v 4.2.4).

RF Designing in IBS Site, Inspection at the Implementation of IBS site. using iBwave The Standard for In-Building Design RF-vu Software(v 4.2.4).

RF Designing in IBS Site, Inspection at the Implementation of IBS site.

Overseas Project: 1Worked on an International Project as a Optimization Engineer for  Motorola in Bangladesh,

2 Done also Technical Site Survey for Siemens for Microwave Transmission in Bangladesh, also done RF Survey for Motorola in Bangladesh

3. Worked for Alcatel in Doha (Qatar) as Drive Test Engineer for outdoor as well as Indoor Sites, Also involved in the Planning of Indoor Sites for Alcatel.

4.Also done IBS Planning, Survey for Motorola in Dubai, Sharjah and Abu Dhabi 5. Worked as the Core Team Member in Optimization Team of Leading Operator in Srilanka (Dialog) Through Erricson, Responsible for Physical, and Hardware as well as Optimization in the network, Nawras (Oman).

(3)

May2003 to Oct 2004:

Reliance Infocomm Ltd: Mumbai (India).

IBS Engineer . Lucent Technologies-Client)(CDMA2000) .

(

 Preliminary surveys of the identified buildings using an engineering handset and opting for the appropriate solution i.e. .RF repeater, optical repeater or a micro cell.

 Design Survey of the building which includes putting up distribution antenna systems (DAS) i.e. fixing up the positions of yagi antenna,omni directional and patch panel antennas as per requirement.

 Implementation of the system as per design survey. Preparing the nominal cell plan for the building.

♣ Conducting initial RF survey of the building from design point of view. ♣ Preparing RF design/technical proposal for In-building Solutions. ♣ Preparing RF BOQ for the site designed.

♣ Preparing DAS (Distributed Antenna System) Solution for In building Coverage.

Calculating the Link Budget/EIRP table and designing of the schematic♣ diagram for IBC

solutions and deciding the cable routing.

Designing the Schematic Diagram and deciding the cable routing.

♣ Preparing the RF Technical Proposal. ♣ Preparing the RF BOQ.

Meetings withVendor Team to discuss the technical aspects for implementation of the design according to the requirements that they need to be fulfilled.

Checking existing coverage using TEMS Investigation GSM. Preparing RF design/technical proposal for In-building Solutions

Analyzing the post installation coverage, spillage, and Handover tests using TEMS Investigation Light.

♣ Optimization of the design, by implementing necessary changes in design to meet the

KPIs..

Managed the regional Site Acquisition teams, Civil and Implementation teams for sites. Managed Site Audits.

Managing the Regional O&M Team.. Team Management.

Managing the Regional O&M Team.. Team Management.

Providing technical support to teams.

iBwave The Standard for In-Building Design RF-vu Software(v 4.2.4)

RF Designing in IBS Site, Inspection at the Implementation of IBS site. using iBwave The Standard for In-Building Design RF-vu Software(v 4.2.4).

(4)

Sept2000– May 2003

Indoor Implementation Engineer  Microqual Techno Pvt Ltd .

 Ibs survey.

 Antenna planning.

 Implementation of the the planned sites as per the design

 Walk test for In-building sites

 Drive test using Pen Tablet investigation tool

 Optimization

 Check the load bearing capacity of foundation, ducting, cable routing as per the design requirement

 To plan for Cable Routing of the design sites and to get the work done from the contractor as per the design, Check for any damage of the cable after the completion of the work.

 VSWR Measurements& Azimuth Calculation & Power Measurement

 Drive Test Performed for Call Origination, Call Termination, Handoff Test& Markov Test, Functionality Test

 Designing of Losses, Link Budget etc.

 Carrying out site maintenance checks.

♣ Providing support and assistance to customers. ♣ Installation and configuration of NMS for the network. ♣ Loading and swapping traffic

 Project handled: Done Projects for In Building Solutions for Airtel, BPL, Orange,

 BSNL, and MTNL, Tata Indicom etc.

 Outdoor and Indoor drive test on Agilent E6474A (NITRO).CAIT Lucent Drive test tool.

Tools Handled

Tools Handled GIS Tools:

• MapInfo • Google Earth • Street and Trips

Planning Tools: Asset

• Drive test Tools

• Tems Investigation-6.1, 8.1, 9.1

• Radient(Tools Propriety to Motorola(Bangladesh)

• Agilent E6474A

• A954WD(Alcatel)

Post processing Tool Actix

(5)

A954P(Alcatel) Ran opt (Aircom)

Performance Monitoring A9156

Net act Mars

Training

Training  Training given on 1xEVDO at GTL Mumbai, India.

 Training given on CDMA Basics and drive test using CAIT by Eric Guzman (Senior RF Engineer- Lucent) at Reliance Infocomm Ltd. Mumbai, India.

 Training Given by Alcatel Qatar for Optimization (A9156).

 Training Given by Motorola (Bangladesh) for RF Planning as well as optimization.

 Training given on Planet EV in GTL Ltd.

 Tems 6.1 Data and Route Analysis (QATAR TELECOM)

 Attended Training for SYS 2(Motorola) in Qatar telecom Ltd

 UMTS Core Network Training in Qatar Telecom Ltd.

 BSS Overview Training for Nokia Siemens in Qatar 

 Ran opt and Advantage Training from Aircom in Qatar.

Achievements Achievements

Responsible for the optimization for North Part (Alcatel) of Doha Area which Includes prime area like Corniche and Emir (The King Route), also Playing Key Role in the optimization of  Forthcoming Asian Games Venue to be held in December 2006.

Awards: Received Appreciation award for participating in Asian Games.

Received Appreciation Award for Installing Repeater Solution for H.H Emir Palace.

Qualification

Qualification Bachelor of Engineering  –Mumbai university DIPLOMA:

Bhausaheb Vartak College- Mumbai

Computer  Computer  Fundamentals

Fundamentals Microsoft office: Excel (Expertise) , Word , Powerpoint OPERATING SYSTEMS : Windows 2000 Professional PACKAGES : Office 97, 2000, 2003 & 2007

Date of Birth

(6)

Passport Status

Passport Status Available

References

References Will be provided as per the request

II

I hereby declare that all the particulars mentioned above are true to the best of my knowledge and information.

References

Related documents

As a website design company, we offer a full-circle approach in Website design & development where the actual Web designing effort covers only 40% of the entire project pie; our

help state workforce agencies (SWAs) determine eligibility for the Work Opportunity Tax Credit (WOTC) Program. The form may be completed, on behalf of the applicant, by: 1)

The managed services offering uses a variety of indicators as the basis of service; two of the most prevalent are energy outliers (sites consuming materially more energy than they

This paper discusses the School and Institutional- wide response that was initiated to address the issue of student attrition and how this led to a significant changes to the FYE

Decides on and a town of grande bylaws and tourism are stationed in grande cache does make the current token for the most region that remain the first.. Prices fell a council of

Treebank Automatic F-structure Annotation Probabilistic CFG-type Parsers LDD Resolution Subcate- gorisation Frame, LDD Extraction Constraint Solver CFG trees CFG trees

This research is designed to investigate the relationship service experience equity (i.e. service convenience, service environment, employee service and hedonic

It was originally funded through a research grant awarded by the National Science Foundation (USA) to SRI Internationals Center for Technology in Learning to establish a test