POLOKWANE MUNICIPALITY

• URBAN RENEWAL & INNER CITY REGENERATION: TAX INCENTIVES PROGRAMME : POLOKWANE MUNICIPALITY • PRESENTER; MABOTJA M.S

(2)

Contents

PART A

1. Purpose

2. Polokwane in Context 3. Why the Tax Incentive

3.1 Demarcated Area 4. Conclusion PART B 5. Progress Implementation 6. Institutional arrangements 7.CBD plans (Framework)

8.Pictures of CBD buildings under construction 9. Challenges

(3)

Purpose

• To provide opportunity for extension on

proposed demarcation of an area within

the city as an Urban Development Zone

as introduced in the city.

(4)

Polokwane in Context

• Jurisdiction Area: 377 529 ha(3% of the

provincial area) with 170 settlements.

• Population: 508 277 , which constitutes

(5)

Regional and Provincial

Context

• Economic Hub of Limpopo Province

• Sporting Hub and venue for major

conferences and events in the Province

• Shopping, trade and industrial centre

(6)

Regional and Provincial

Context

• Trans-Africa corridor

• Of the four Provincial Spatial

Development Initiatives(development

corridors); three converge in Polokwane

(7)

Polokwane in Context

Significance within the provincial context

Significance within the national context:

• Classified as a high capacity municipality

• Participation in the UDZ tax incentive

(8)

Main Drivers of the local

economy

9,2% Transport 12,4% Manufacturing 14% Finance & real estate

18% Trade and catering

30,3% Government and

professional services

Percentage Sector

(9)

4. Why the tax incentive

extension?

• Decay setting in as a result of poor planning that separated residences and places of

work. Since it was introduced significant buildings have undergone renovations or totally new buildings were erected

• Encourage investment within the areas that contribute significantly to the local economy.

(10)

Why the tax incentive..

cont’d

Encourage investments and thereby

leading to :

• Job Creation

• Economic growth

(11)

3.1. DEMARCATED UDZ FOR POLOKWANE

Polokwane CBD;

• Identified in SDF as Primary Activity Node (P1);

• Highest order activity node in Regional & municipal context.

• Proposed UDZ (Option 1).

Whole CBD - Covers 186ha (including roads);

Proposed UDZ [Fig 10].

• Proposed UDZ (Option 2).

Requirements of Nat. Treasury = 150ha

(12)
(13)

THABO MBEKI S TREET THABO MB EKI STREET GROBLER STR EET GROBLER S TREET CBD SPATIAL CBD SPATIAL CBD SPATIAL CBD SPATIAL STRUCTURE STRUCTURE STRUCTURE STRUCTURE AND AND AND AND DEVELOPMENT DEVELOPMENT DEVELOPMENT DEVELOPMENT ZONES ZONES ZONES ZONES

6

(14)

Economic growth & role of

CBD

Government & proff. services: >30%.(Office accommodation)

Trade & commercial: >18%. The largest remuneration to labour force in this sector.

(Shops accommodation)

Financial & real estate: 14%. Also large

contributions to labour remuneration. (Office accommodation)

(NB: R1,00 increase in trading activities in Polokwane – R1,40 increase in output in total provincial

(15)

CBD Precinct Areas

185,8518ha TOT:

35,4638ha Roads, open space

Other 12,2394ha Infill zone 8 10,2780ha Transitional zone 7 10,2780ha Western office/trading zone

6 7,7653ha Motor town/Accommodation zone 5 15,3980ha Eastern office/retail zone

4 58,2923ha Trading zone 3 27,4690ha Institutional zone 2 8,6680ha Low density office zone

1

Area Precincts within CBD

(16)

Leasable floor area in CBD

721 324m² 100% TOTAL: 69 983m² 10% Other 111 111m² 15%

Offices & trading

315 971m² 44%

Trading only

(Retail, service indust., wholesale)

224 257m² 31%

(17)

POLOKWANE CBD – BUILDING FLOOR AREA BY FUNCTIONAL ZONE 0 0 50000 50000 100000 100000 150000 150000 200000 200000 250000 250000 300000 300000 1 1 22 33 44 55 66 77 88 Retail

(18)

14

ZONING ZONINGZONING ZONING 2005 20052005 2005

(19)

34

Precinct 1 Precinct 1 34.56% land sold 34.56% land sold R1,239/m R1,239/m22 (buildings) (buildings) Precinct 2 Precinct 2 14.98% land sold 14.98% land sold R1,806/m R1,806/m22 (buildings) (buildings) Precinct 3 Precinct 3 38.15% land sold 38.15% land sold R1,159/m R1,159/m22 (buildings) (buildings) Precinct 5 Precinct 5 36.92% land sold 36.92% land sold R1,412/m R1,412/m22 (buildings) (buildings) Precinct 6 Precinct 6 19.42% land sold 19.42% land sold R1,349/m R1,349/m22 (buildings) (buildings) Precinct 7 Precinct 7 18.70% land sold 18.70% land sold R870/m R870/m22(buildings)(buildings) Precinct 4 Precinct 4 18.33% land sold 18.33% land sold R1,222/m R1,222/m22 (buildings) (buildings) 5 5 3 3 1 1 2 2 6 6 8 8 7 7 44 % SOLD % SOLD% SOLD % SOLD AND R/m² AND R/m²AND R/m² AND R/m² (BUILDINGS) (BUILDINGS)(BUILDINGS) (BUILDINGS) 2003 2003 2003 2003 ---- 2004200420042004

(20)

Development potential on vacant

land & econ.opportunities in CBD

273 444m² TOTAL: -33 465m² Infill zone 8 -112 470m² Transitional zone 7 Part of 1;2;3 49 134m² Western office/trading zone

6

Part of 3.

19 417m² Motor town zone

5

Part of 1.

20 413m² Eastern office/retail zone

4 R47,5mil. 8 566m² Trading zone 3 R10,2mil. 19 835m² Institutional zone 2 R25mil. 10 144m² Low density office zone

1 Increase in local econ. production Area (m²) Precinct within CBD *

(21)

15

VACANT VACANT VACANT VACANT ERVEN ERVEN ERVEN ERVEN

(22)

Trends to consider

• Decay in certain parts of CBD already setting in – Urban renewal, investor confidence & development is critical to maintain viability of CBD & municipal tax

base;

• Urban renewal within other parts of the CBD well underway

• Municipality strict on uncontrolled decentralisation-attempts to prevent urban sprawl and promote

compact city/clusters;

• Polokwane/Mankweng Complex as medical

(23)

Demarcated Area…

cont’d

Polokwane Municipality’s initiatives:

• Provision of infrastructure- widening of major streets within the CBD to ease traffic flow,

• Provision of secure parking space within the CBD,

• Hawker Management: African Market and

Limpopo Mall Projects to provide location and infrastructure for hawkers within the CBD.

• Second Electricity supply line at a cost of R25 million to ensure reliable electricity supply

(24)

Other projects which will

impact on the CBD

Itsoseng Entrepreneurial/Bus Terminus

Complex

• Adjacent to the CBD on the western

part

• Forms a great link between the CBD,

industrial area and residential area

(25)

Projects..cont

• African Market and Limpopo Hawkers

Mall

Land identified within the CBD for the

provision of infrastructure as part of

hawker management and support

programme;

(26)

Projects..cont

for development R500 000 set aside for

for development

review of CBD Development Plan

(2004/05 budget), which will

inter alia

address a

dditional measures to

dditional measures to

re

re

-

-vitalize

vitalize

inner city and

inner city and

determine

determine

incentives

(27)

Other projects which will

impact on CBD

• Development of an Industrial

Development Zone (IDZ);

• 2010 Soccer World Cup.

• Development of an integrated transport hub(an international coach centre)

• Development of an International Convention Centre

(28)

Subsection (6) (cont.)

(e): Fiscal measures in support of regeneration, namely:

Funds committed for infrastructure development and maintenance

(29)

Fiscal measures:

Infrastructure Development

2006/07 R208 million 2005/06 R188 million 2004/05 R146 million Budget 16.55% 6.94% 6.82% Water and Sanitation 0.96 1.06% 1.02% Roads 0.57% 7.29% 9.47% Electricity

(30)

CAPITAL PROJECTS 2007/8

ELECTRICITY

• CBD Developments = R500 00

• Upgrading of Voortrekker park = R500 000

• Buite Street feeder cable = R500 000

• Replacement of 2 circuit breakers = R500

000

• 40% Second Eskom supply = R17 000 000

(31)

CAPITAL PROJECTS 2007/8

ROADS AND STORMWATER

• Council Chamber paving = R200 000

• Bus terminus (Retarring, paving and repairs

of driveways)= 500 000

• Public Transport Infrastructure System

(Widening of Dorp Street) = R10 500 000

• Multi Storey parking (Design)

(32)

Legisl. Compliance (cont.)

Subsection (7):

(a)(i): Hectare limitation:

Census 2001 Population 508 277 people;

Limitation i.t.o. population = 150ha;

Current CBD covers 186ha (incl. roads);

CBD excluding some areas/zones= 150ha;

TOT. AREA PROPOSED UDZ = 150ha (Incl. roads)

(33)
(34)

4. Conclusion

• Polokwane is the economic hub of the Limpopo Province.

• Identified as a provincial growth point.

• Major investments will therefore benefit the entire Province.

• Main drivers of the local economy located within the CBD

• South Eastern parts of the CBD developing • The Western and North Western Part

(35)

PROGRESS

IMPLEMENTATION

• Total number of enquiries- 46 • Total number of applications- 20

• Total number of completed projects- 5

• Total value of development (i.e. value of approved applications)Future projects on the pipeline

(nature and value)Challenges/Constraints

(36)

Institutional arrangement

• Marketing through media done by LED SBU investment promotion section

• Application for rezoning is handled by Spatial planning SBU

• Building plans approved by Building section

• Building section provides statistical information to SARS & LED for evaluation

(37)

Challenges/Constraints

• Funding for marketing

• Process needs a lot of administration

(38)

Conclusion

• A need to encourage both renewal and new investments is imminent.

• Polokwane Municipality has started with implementation of various projects to

counteract decay and encourage investments.

• Review of the CBD Plan during 2004/05 will look at other initiatives necessary to

References

Related documents

For all other patients at high-risk for having common bile duct (CBD) stones, options include ERCP with stone removal followed by elective.. cholecystectomy or cholecystectomy

Cannabidiol CBD is an active ingredient in cannabis derived from the hemp plant It you help treat conditions like pain insomnia and anxiety.. Best CBD Oil for outdoor Sleep

[r]

[r]

Uvođenje procjene tržišta potražnje (predviđanje) svakako je napredak u planiranju u turizmu, ali to je samo djelomični tržišni pristup, jer zbog toga što nema

how to identify the forces acting on an object how a resultant force changes the motion of an object the difference between mass and weight how a resultant force can give rise to

[r]