PPT ON DISASTER AFFECTED AREAS OF UTTARKASHI

IN FRONT OF

INTER MINISTERIAL CENTRAL TEAM

HONRABLE JOINT SECRETORY (IS –II)

SHRI M. GOPAL REDDY IAS

MINISTRY OF HOME AFFAIRS

GOVERNMENT OF INDIA

PPT ON DISASTER AFFECTED AREAS OF UTTARKASHI

IN FRONT OF

INTER MINISTERIAL CENTRAL TEAM

HONRABLE JOINT SECRETORY (IS –II)

SHRI M. GOPAL REDDY IAS

MINISTRY OF HOME AFFAIRS

GOVERNMENT OF INDIA

WELCOME

TO

(2)

Flood disaster hits

to Uttarkashi at a

(3)

UTTARKASHI 2012 SEQUENCE OF EVENTS

(4)
(5)

Natural Calamity (03.08.2012 )

District Uttarkashi (Uttarakhand) at a Glance

Area

8016 Sq. Km.

Population

329686

Blocks

6

Tehsils

6

Villages

668

Rivers

Ganga &Yamuna

Tributaries

Assi Ganga , Swari Gad

Hanuman Ganga, Rupin,

Supin , Tons etc.

Area

8016 Sq. Km.

Population

329686

Blocks

6

Tehsils

6

Villages

668

Rivers

Ganga &Yamuna

Tributaries

Assi Ganga , Swari Gad

Hanuman Ganga, Rupin,

Supin , Tons etc.

(6)

Detail of losses due to Flash Flood During monsoon 2012

Villages affected 192 Total Families Affected 2383 Population affected 12115 Agri. Land area affected 71.288 ha. Public Properties damaged 61244.12 Lacs

House Damaged (Pucca)

A- Fully damaged Houses 132 B- Severely damaged 149 C- Partially damaged houses 313

(Kachha) Fully damaged 09 Livestock losses 436 Dead Persons 35 Injured Persons 20 Villages affected 192 Total Families Affected 2383 Population affected 12115 Agri. Land area affected 71.288 ha. Public Properties damaged 61244.12 Lacs

House Damaged (Pucca)

A- Fully damaged Houses 132 B- Severely damaged 149 C- Partially damaged houses 313

(Kachha)

Fully damaged 09

Livestock losses 436 Dead Persons 35 Injured Persons 20

(7)

Tehsil Name Affected villages Affected families No. of People affected Bhatwari 13 1319 5322 Dunda 39 372 1860

Details of affected villages / families/ Peoples up to 06/10/2012

Chinyalisaur 31 72 372

Barkot 43 228 985

Purola 30 41 255

Mori 36 351 3321

(8)

Department wise Demand of Fund for repair /Restoration of damaged Infrastructure District Uttarkashi Year 2012-13

S.N o. Department No of Scheme Total Money Required for Restoration (`in Lacs) Money Required for Repairs of Immediate Nature as per SDRF Norms (`in Lacs) Additional Fund Requirement for Complete Restoration (4-6) (`in Lacs)

1 UTTARAKHAND JAL VIDYUT NIGAM Ltd. 8 14939.70 347.90 14591.80

2 UTTARAKHAND LOK NIRMAN VIBHAG (6th Circle

P.W.D. Uttarkashi) 160 9650.96 2799.85 6851.11

3 BORDER ROAD ORGANISATION 15 9000.00 900.00 8100.00 4 IRRIGATION DEPARTMENT UTTARKASHI 327 8980.77 8973.77 7.00 4 IRRIGATION DEPARTMENT UTTARKASHI 327 8980.77 8973.77 7.00 5 UTTARAKHAND JAL SANSTHAN, (WATER SUPPLY

SCHEMES) 285 4468.50 1970.00 2498.50

6 NAGAR PALIKA PARISHAD UTTARKASHI 32 3910.85 3545.85 365.00 7 FOREST DEPARTMENT UTTARKASHI 270 3763.08 1365.39 2397.69

8 RURAL DEVLOPMENT 432 1365.51 1365.51 0.00

9 ZILA PANCHYAT 433 1352.77 1040.19 312.58

10 CONSTRUCTION DIVISION, UTTARAKHAND

PEYAJAL NIGAM, UTTARKASHI 127 982.00 482.40 499.60

11 UTTARANCHAL POWER CORPORATION

(9)

12 REVENUE DEPARTMENT TEHSIL

BHATWARI, UTTARKASHI 1 500.00 20.00 480

13

CONSTRUCTION AND MAINTENANCE UNIT (GANGA) UTTARAKHAND PEYJAL NIGAM UTTARKASHI

5 425.00 275.00 150.00

14 MINOR IRRIGATION 302 401.87 281.31 120.56

15 FISHERIES DEPARTMENTS UTTARKASHI 2 255.00 0.00 255.00

16 TOURISM DEPARTMENT UTTARKASHI 6 202.00 0.00 202.00

17 EDUCATION DEPARTMENT UTTARKASHI 42 150.97 142.82 8.15

18 FIRE SERVICE GANGORI UTTARKASHI 1 116.57 0.00 116.57

19 NAGAR PANCHYAT GANGOTRI 1 15.85 15.85 0.00

20 BHARAT SHANCHAR NIGAM LTD

UTTARKASHI 1 10.96 0.00 10.96

21 UTTARAKHAND RENEWABLE ENERGY

DEVELOPMENT AUTHORITY UTTARKASHI 6 6.85 63.18 03.67

22 ANIMAL HUSBANDRY 2 3.56 0.00 3.56

23 HEALTH DEPARTMENT 1 0.55 0.00 0.55

(10)

Uttaranchal Jal Vidut Nigam

No. of Damaged Scheme 08

Total restoration Cost Rs. 14939.70

Lacs

Damage of retaining wall /Fencing /Flushing conduit outlet at Joshiyara Barrage

(11)

UJVNL road from Joshiyara Barrage to Manera

(12)

Damaged portion of approach Road to Tiloth Motor Bridge Uttarkashi

Damage portion length 55meter

Restoration Cost Rs. 300.00 Lacs

(13)

U.J.V.N.Ltd .

(Small Hydro Projects Division, Maneri

)

Assi Ganga -1

St

Total Damage Restoration Cost

Rs. = 2263.48 Lac

(14)

View of Trench Weir & Power duct location before &

View of Trench Weir & Power duct location before &

after flash flood.

after flash flood.

Restoration cost Rs. 483.61

Restoration cost Rs. 483.61 Lacs

Lacs

Before After Before After

(15)

A View of RCC De

A View of RCC De--silting Tank before & after flood.

silting Tank before & after flood.

Restoration cost Rs. =197.84

Restoration cost Rs. =197.84 Lacs

Lacs

Before After Before After

(16)

View of Powerhouse Building

View of Powerhouse Building

Restoration Cost Rs. =360.03

Restoration Cost Rs. =360.03 Lacs

Lacs

Before flood After flood Before flood After flood

(17)

Inside view of Powerhouse Building before & after flood.

iew of Powerhouse Building before & after flood.

Before After Before After

(18)

View of machine hall before & after flood.

Restoration Cost Rs. = 1000.00

Restoration Cost Rs. = 1000.00 Lacs

Lacs

Before After Before After

(19)

View of Control panels in Control Room before & after

flood.

Before After Before After

(20)

DAMAGES OF SMALL HYDRO ELECTRIC

DAMAGES OF SMALL HYDRO ELECTRIC

PROJECT

PROJECT

ASSI

ASSI--GANGA

GANGA--II

II

INSTALLED CAPACITY

INSTALLED CAPACITY –

– 2x2.25 MW

2x2.25 MW

Total Project Cost

Total Project Cost Rs

Rs =

=

3404.00

3404.00 Lacs

Lacs

Damaged Cost

Damaged Cost Rs

Rs =

=

511.35.00

511.35.00

Lacs

Lacs

DAMAGES OF SMALL HYDRO ELECTRIC

DAMAGES OF SMALL HYDRO ELECTRIC

PROJECT

PROJECT

ASSI

ASSI--GANGA

GANGA--II

II

INSTALLED CAPACITY

INSTALLED CAPACITY –

– 2x2.25 MW

2x2.25 MW

Total Project Cost

Total Project Cost Rs

Rs =

=

3404.00

3404.00 Lacs

Lacs

Damaged Cost

Damaged Cost Rs

Rs =

=

511.35.00

511.35.00

Lacs

Lacs

(21)

DAMAGED TRENCH WEIR AND INTAKE STRUCTURES

Restoration cost Rs. 445.03 Lacs

Before 03/08/2012

View after 03/08/2012

(22)
(23)

Damaged Power Duct

Power Duct before 03/08/2012

Power Duct after 03/08/2012

(24)

Damaged de-silting Tank

-Restoration cost Rs. 20.33 Lacs

(25)

Power Channel Before 03/08/2012 Power Channel after 03/08/2012

Damaged Power channel

(26)

Power Channel before 03/08/12 Landslide below Power Channel after 03/08/12 and still continue

(27)

Power House location

Penstock alignment

Switchyard

Damaged Power House raft

Restoration cost Rs. 65.13 Lacs

Power House Draft tube Raft before 03/08/12

TRC outfall Switchyard

(28)

U.J.V.N.Ltd .

(Small Hydro Projects Division, Maneri

)

Kaldi Gad

Total Damage Restoration

Cost Rs. = 369.10 Lacs

Total Damage Restoration

(29)

POWER HOUSE & TRC : COST OF DAMAGES=

102.00 LACS 9.0MW

KALDIGAD SHP

(30)

KALDIGAD WEIR

Cost of Damages : 151.00 Lacs

DEAD PORTION OF

WEIR BEFORE FLOOD

DEAD PORTION OF

WEIR AFTER FLOOD

(31)

Details of Affected PWD Roads, Bridges and Buildings

Tehsil / Div. Division Name Total No. of damaged Roads Total Bridges damaged Immediate Amount needed to openning communica tion (Under SDRF) Additional Fund for restoration of roads /Building/Bri dges Total amount needed for restoration of roads /Building/ Bridges

Prov Div PWD Bhatwari PWD Bhatwari 13 6 446.61 3023.96 3470.57

Prov Div PWD Uttarkashi PWD Uttarkashi 14 1 277.98 833.30 1111.28

Cosnt Div PWD Uttarkashi Cosnt Div PWD

Uttarkashi PWD Joshiyara 17 0 389.00 292.00 681.00

Cosnt . Div PWD Barkot PWD Barkot 39 2 370.00 400.50 770.50

Const. Div. PWD Purola PWD Purola 25 5 159.11 666.00 825.86 National Highway Div.

PWD, Barkot N/H. Division 2 0 824.06 1135.32 1959.38

Irrig. Div. PWD .

uttarkashi PMGSY DIV. 12 0 264.30 205.00 469.30

A.D.B. Asian Dev. Bank 2 0 68.79 294.28 363.07

(32)

Damaged

Damaged Joshiyara

Joshiyara Suspension Bridge

Suspension Bridge

Old Span 140 Meter

Old Span 140 Meter

Proposed span 160 meter

Proposed span 160 meter

Estimated restoration cost = Rs 1000

Estimated restoration cost = Rs 1000 Lacs

Lacs

Joshiyara Suspension Bridge during Damage

Joshiyara Suspension Bridge after Damage

(33)

NH-94 (Dharasu-Phoolchatti Section), KM-216 Hect.(6-8) 150m Road Washed-Out (Along AsnolGad River)

Protection with C.C. Block, wire crates, Retaining Wall, 150m c.c. road to be constructed

(34)

Border Road Task Force

Total damaged schemes = 15

(35)

Damaged BRO Gangori Motor Bridge

Span 55 meter

Estimated restoration cost 625.00Lacs

Affacted Gangori Town

(36)

DAMAGE OF B/BRIDGE DUE TO LAND SLIDE AT

SAWARIGAD ON D-G ROAD

& Construction of new Bridge SPAN 33 meter Restoration

cost 4000 lac

(37)

Damaged BRO by pass road near Manera

(38)

Damaged BRO Road near Tambakhani

(39)

Damaged BRO Gangotri Motor Road at Laldang (near maneri)

Affected length 250 meter

Restoration cost Rs. 150 lacs

(40)

ROAD WASHED OUT AT KM 45.900 (Ongi) ON D- ROAD Affected length 500 meter Restoration cost 30 lac

(41)

ROAD WASHED OUT AT KM 31.700 (Gangori) ON D-G ROAD Damage length 200 meter Restoration cost 2.5 Crore

(42)

DAMAGE KM 52.900 (MALLA) ON D-G ROAD Damage

Length 150 meter

Restoration cost 35 Lac

(43)

Damages with Irrigation Department (UKI)

Total Division

03

Total Restoration Cost for Damaged Schemes

Rs. =

8980.77

Lacs

• Irrigation Division, Uttarkashi

Restoration Cost . Rs.

8053.39

Lacs

Tubewell Division Dehradun

Restoration Cost . Rs. 75.83

Lacs

Irrigation Division, Purola

Restoration Cost . Rs. 851.55

Lacs

Total Division

03

Total Restoration Cost for Damaged Schemes

Rs. =

8980.77

Lacs

• Irrigation Division, Uttarkashi

Restoration Cost . Rs.

8053.39

Lacs

Tubewell Division Dehradun

Restoration Cost . Rs. 75.83

Lacs

Irrigation Division, Purola

(44)

Damaged Flood Protection wall River side Tiloth Damaged

Length 330 Mtrs, Restoration Cost Rs. 50.00 Lacs

(45)

Irrigation Depatt. damaged flood protection works river side at Mando

After Flood ( 3-8-12) Irrigation Depatt. damaged flood protection works river side at Mando

Before Flood

(46)

Damaged Flood protection wall at Left Bank of Assi Ganga in Gangori

Length 1000 Mtrs.

Restoration Cost Rs. 981.46 Lacs

(47)

Damaged Flood protection wall at Left Bank of Assi Ganga in Gangori

(48)

Damaged Flood protection wall at Left Bank of Bhagirathi River in Joshiyara

(49)

Damaged site Tiloth Flood Protection works

Length 330 Mtrs. Restoration Cost Rs. 50.00 Lacs

(50)

• Tehsil Bhatwari

Total schemes Damaged = 51

• Tehsil Dunda

Total schemes Damaged = 69

• Tehsil Chinyalisaur

Total schemes Damaged = 36

• Tehsil Barkot

Total schemes Damaged = 31

• Tehsil Purola

Total schemes Damaged = 25

• Tehsil Mori

Total schemes Damaged = 44

• Total Schemes (Nos.)

285

• Restoration cost. Rs.4468.50

Lacs

Tehsil Wise Damaged

Drinking Water Pipe Line Schemes

Damages of Uttaranchal Jal Snasthan

Uttarkashi

• Tehsil Bhatwari

Total schemes Damaged = 51

• Tehsil Dunda

Total schemes Damaged = 69

• Tehsil Chinyalisaur

Total schemes Damaged = 36

• Tehsil Barkot

Total schemes Damaged = 31

• Tehsil Purola

Total schemes Damaged = 25

• Tehsil Mori

Total schemes Damaged = 44

• Total Schemes (Nos.)

285

(51)

Damaged 200mm dia, water supply Pipe

line Length-600 Mtrs. At Kohri Gad.

(52)

Damaged 250 mm dia pipe line at Kohari Gad (UKI –III)

Length- 60Mtrs

.

Restoration cost Rs.= 2.30 Lacs

(53)

Damaged Water Collecting Chamber at Rawada

capacity 10,000 Liter .

Restoration cost Rs.= 2.80 Lacs

(54)

Damaged Pipe line 250 mm dia at Jangara

Length-60Mtr.

Restoration cost Rs.= 1.70 Lacs

(55)

Damaged Pipe line 250 mm dia at Jangara

Length- 350Mtrs.

Restoration cost Rs.-8.50 Lacs

(56)

Damaged UKI-III W/S (250 mm dia) Pipe line near W.T.P

Assi-ganga Length-60 Mtr

.

Restoration cost Rs.=1.30 Lacs

(57)

UKI-II W/S Damaged Pipe line 200 mm dia at

Assiganga , Length 480 Mtr.

(58)

Nagar Palika Parishad ,

Uttarkashi

Details of Damaged Assets

Total No. of Schemes Damaged = 32

Total restoration cost Rs. = 3910.85Lacs

Total No. of Schemes Damaged = 32

(59)

Damaged Shopping Complex & Barat Ghar Near Tiloth Bridge

(Restoration cost 180 lacs)

(60)
(61)

Affected Nagar Palika Ghat down side the river at

Manikarnika in Uttarkashi Restoration cost 50 lakh

(62)

Total Damages Rs. 12.00Lacs

Forest Department

Bebara Bridge (On Agora-Dodital Track)

Barahat Range

(63)
(64)
(65)
(66)
(67)
(68)

Heavy Landslide in forest area Dodital Early

span of stream 12 mtr. Span after flood > 80 mtrs.

Kaldi stream

Gajoli Stream

Asi ganga Kaldi stream

(69)

Total Damage of 33 KV, 11 KV/LT line &

Transformers

Length of damaged 33 KV line

: 16.50 Km.

Length of damaged 11 KV line

: 53.05 Km.

Length of damaged LT line

: 56.80 Km

Damaged T/F of 16 KVA

: 03 Nos.

Damaged T/F of 25 KVA

: 12 Nos.

Damaged T/F of 63 KVA

: 03 Nos.

Damaged T/F of 100 KVA

: 02 Nos.

Damaged T/F of 250 KVA

: 05 Nos.

Restoration Cost for Total Damage Rs. 740.80 Lacs

ELECTRICITY DISTRIBUTION DIVISION UTTARKASHI.

Length of damaged 33 KV line

: 16.50 Km.

Length of damaged 11 KV line

: 53.05 Km.

Length of damaged LT line

: 56.80 Km

Damaged T/F of 16 KVA

: 03 Nos.

Damaged T/F of 25 KVA

: 12 Nos.

Damaged T/F of 63 KVA

: 03 Nos.

Damaged T/F of 100 KVA

: 02 Nos.

Damaged T/F of 250 KVA

: 05 Nos.

(70)

Restoration Cost 24.16 Lacs

Damaged LT line Pole at Gangori,

Tehsil Bhatwari Flood damaged 11 KV line/Poles at Gangori

(71)

Damaged 11 KV/LT line & Transformers in different

locations of Tiloth Area.

Restoration Cost 8.37 Lacs

Damaged 11 KV line near Balmiki Basti Barahat Damaged / flow away L.T. line Pole

(72)

Damaged 11 KV/LT line & Transformers at

Joshiyara Areas

Restoration Cost 9.10 Lacs

Damaged basement area of T/F at Joshiyara

(73)

Damaged 33 KV,11 KV/LT line & Transformers

at Bhatwari Area.

Damaged 33 KV line at Bhatwari Feeder

Sainj & Aungi.

Restoration Cost Rs. 82.95 Lacs

(74)

Damage of 33 KV, 11 KV/LT line & Transformers at

Uttarkashi Town

RESTORATION COST Rs. 21.40 Lacs

(75)

Damaged 33 KV, 11 KV/LT line &

Transformers at Sangamchatti

RESTORATION COST OF Rs. 58.35 Lacs

(76)

Damage 33/11 KVA S/S

at Hanumanchatti

Washed-out power supply sub-station

Damaged L.T. power line

at Rajgahri, Tehsil Barkot

Washed-out power supply sub-station

(77)

Sl. No. Name of Item Total Executed Works Damaged Works Restoration cost (RS in Lacs) 1- Sewer Line 8.17 Km. 2.00 Km. 70.00 2- Rising Main 1.96 Km. 0.20 Km. 60.00

OFFICE OF THE PROJECT MANAGER, CONSTRUCTION & MAINTENANCE UNIT (GANGA), UTTARAKHAND PEYJAL NIGAM, UTTARKASHI

(Formerly Known as – Ganga Pollution Control Unit)

2- Rising Main 1.96 Km. 0.20 Km. 60.00

3- Sewage Pumping Station 4 No. 2 No. 10.00

4- Septic Tank Cum Upflow Filter (4x0.05 mld) 4 No. 4 No. 250.00

5- Sewage Treatment Plant 2.00 Mld 1 No. - 35.00

(78)

SEPTIC TANK CUM UPFLOW FILTER (NEAR FOREST CHOUKI, GANGORI)

(ESTT. COST OF RESTORATION = ` 35.00 Lacs)

(79)

SEWEGE PUMPING STATION (TAMBAKHANI)

(ESTT. COST OF RESTORATION = `25.00 Lacs)

(80)

Fisheries Department, Uttarkashi

Detail of losses

• Damaged Trout Hatcheries , Buildings

Tanks , Laboratory in Kaldiyani

(SangamChatti

) &

Fish Farm Gangori

• Total Damaged Area 1.10 hectare

• Total Damaged cost Rs. 255.00 Lacs

• Damaged Trout Hatcheries , Buildings

Tanks , Laboratory in Kaldiyani

(SangamChatti

) &

Fish Farm Gangori

• Total Damaged Area 1.10 hectare

(81)

Trout Fish Farm Kaldiyani before Damage

(82)

Tehsil Name Total agriculture area affected (Ha.) Bhatwari 27.686 Dunda 13.652

Damages in Agriculture Sector (Uttarkashi)

Total Area sown - 26984. Hect. Total area affected- 71.282 Hect.

Dunda 13.652 Chinyalisaur 0.23 Barkot 19.937 Purola 0.98 Mori 8.803 Total 71.288

(83)

Damaged Agricultural land in Nald Gangori -Sangam Chatti Area

Total Damaged land 85( ha) Restoration cost 16.525 lakh

(84)

Damaged agriculture land with paddy crop in Uttaroun village Total damaged land 102 (ha) Restoration cost 21.34 lakh

(85)

Landslide affected Tourist rest house at

Bhatwari Restoration cost 150.00 lakh

(86)

Miscellaneous Flood Damages

(87)

Damaged house

Ganga Vihar

Damaged house in

GhatuSaur

(88)

Houses Damaged at Gaongri

due to Flood on 3-8-12

Damaged Cooperative Bank

building in Gangori

(89)

Emergency meeting called by District Magistrate

on flood Disaster

Dated 04/08/2012

(90)

Hon’ble C.M. Visit to affected areaS

Visit of Hon’ble Chief Minister,

Uttarakhand

Sri Vijay

Bahuguna in Flood affected area

of

Uttarkashi

on

16-8-12

(

Gangori

)

(91)

Flood protection action plan for Uttarkashi city and Gangori

Approximate cost 45 Crore

(92)
(93)

NOT IN SCALE N

Disaster affacted Dodital –

Sangamchatti Area

(94)

Forest Dept.

(95)

Sl. No.

Name of the scheme Proposed works Quantity Require d Fund

(in Lacs) 1. River Bank Protection construction on both

banks of Assi ganga river at outlet

400 Mtr. 100.00

2. Repair & Reconstruction of Periferri Track.

Bridle path & lake bank protection.

800 Mtr. 150.00

Fund Requirement for Proposed Restoration

Repair & Reconstruction of Periferri Track.

Bridle path & lake bank protection.

3. Water shed treatment Planting, Land slide & Habitat restoration works

300 Hact. 700.00

4. Soil & Water Conservation

Check Dams & River bank protection works 18 to 20 streams 500.00 5. Dodital Lake Restoration

Removal of Slurry & Disposal of muck & trees

> 1000 MT.

200.00

6. Restoration of Dayara, Darwa, Bakriya Top meadows

Protection of land slides & restoration of habitat

500 Hact. 500.00

(96)

Figure

Fig. :Daily rainfall received in Uttarkashi in the month of August2012.  (source : DMMC Uttarakhand)

References

Related documents

However, due to the differences in aspects of philosophy, ethics and values, religious beliefs and political opinions, the individualistic heroism in two cultures has their

Construction knowledge to create checklist work progress report checklist is best suitable for site is check the room?. Soap and time of rcc columns, wear protective glasses

A specific type of CVT is the infinitely variable transmission (IVT), in which the range of ratios of output shaft speed to input shaft speed includes a zero

processing. The current study addressed this gap in the literature by examining the relationship between executive function abilities and affective empathic responding, measured

Конструктивните решенија во сите елементи и фази на куќата дефинира сложен систем на ускладување на сите елементи, преку примена на бондручен систем

Teddy Wilson - Ain't Misbehavin' Teddy Wilson - Alice Blue Gown Teddy Wilson - Body And Soul Teddy Wilson - Cheek To Cheek ver.1 Teddy Wilson - Cheek To Cheek ver.2 Teddy Wilson

In the Appendix we present a corollary of Proposition 4 which establishes that, to a …rst-order approximation, a change in the subsidy to process or product innovation indi-

The segmented document regions are then labelled with respect to different classes of the document layout (text are- as, images, separators and tables) thanks to a