PPT ON DISASTER AFFECTED AREAS OF UTTARKASHI
IN FRONT OF
INTER MINISTERIAL CENTRAL TEAM
HONRABLE JOINT SECRETORY (IS –II)
SHRI M. GOPAL REDDY IAS
MINISTRY OF HOME AFFAIRS
GOVERNMENT OF INDIA
PPT ON DISASTER AFFECTED AREAS OF UTTARKASHI
IN FRONT OF
INTER MINISTERIAL CENTRAL TEAM
HONRABLE JOINT SECRETORY (IS –II)
SHRI M. GOPAL REDDY IAS
MINISTRY OF HOME AFFAIRS
GOVERNMENT OF INDIA
WELCOME
TO
Flood disaster hits
to Uttarkashi at a
UTTARKASHI 2012 SEQUENCE OF EVENTS
Natural Calamity (03.08.2012 )
District Uttarkashi (Uttarakhand) at a Glance
Area
8016 Sq. Km.
Population
329686
Blocks
6
Tehsils
6
Villages
668
Rivers
Ganga &Yamuna
Tributaries
Assi Ganga , Swari Gad
Hanuman Ganga, Rupin,
Supin , Tons etc.
Area
8016 Sq. Km.
Population
329686
Blocks
6
Tehsils
6
Villages
668
Rivers
Ganga &Yamuna
Tributaries
Assi Ganga , Swari Gad
Hanuman Ganga, Rupin,
Supin , Tons etc.
Detail of losses due to Flash Flood During monsoon 2012
Villages affected 192 Total Families Affected 2383 Population affected 12115 Agri. Land area affected 71.288 ha. Public Properties damaged 61244.12 Lacs
House Damaged (Pucca)
A- Fully damaged Houses 132 B- Severely damaged 149 C- Partially damaged houses 313
(Kachha) Fully damaged 09 Livestock losses 436 Dead Persons 35 Injured Persons 20 Villages affected 192 Total Families Affected 2383 Population affected 12115 Agri. Land area affected 71.288 ha. Public Properties damaged 61244.12 Lacs
House Damaged (Pucca)
A- Fully damaged Houses 132 B- Severely damaged 149 C- Partially damaged houses 313
(Kachha)
Fully damaged 09
Livestock losses 436 Dead Persons 35 Injured Persons 20
Tehsil Name Affected villages Affected families No. of People affected Bhatwari 13 1319 5322 Dunda 39 372 1860
Details of affected villages / families/ Peoples up to 06/10/2012
Chinyalisaur 31 72 372
Barkot 43 228 985
Purola 30 41 255
Mori 36 351 3321
Department wise Demand of Fund for repair /Restoration of damaged Infrastructure District Uttarkashi Year 2012-13
S.N o. Department No of Scheme Total Money Required for Restoration (`in Lacs) Money Required for Repairs of Immediate Nature as per SDRF Norms (`in Lacs) Additional Fund Requirement for Complete Restoration (4-6) (`in Lacs)
1 UTTARAKHAND JAL VIDYUT NIGAM Ltd. 8 14939.70 347.90 14591.80
2 UTTARAKHAND LOK NIRMAN VIBHAG (6th Circle
P.W.D. Uttarkashi) 160 9650.96 2799.85 6851.11
3 BORDER ROAD ORGANISATION 15 9000.00 900.00 8100.00 4 IRRIGATION DEPARTMENT UTTARKASHI 327 8980.77 8973.77 7.00 4 IRRIGATION DEPARTMENT UTTARKASHI 327 8980.77 8973.77 7.00 5 UTTARAKHAND JAL SANSTHAN, (WATER SUPPLY
SCHEMES) 285 4468.50 1970.00 2498.50
6 NAGAR PALIKA PARISHAD UTTARKASHI 32 3910.85 3545.85 365.00 7 FOREST DEPARTMENT UTTARKASHI 270 3763.08 1365.39 2397.69
8 RURAL DEVLOPMENT 432 1365.51 1365.51 0.00
9 ZILA PANCHYAT 433 1352.77 1040.19 312.58
10 CONSTRUCTION DIVISION, UTTARAKHAND
PEYAJAL NIGAM, UTTARKASHI 127 982.00 482.40 499.60
11 UTTARANCHAL POWER CORPORATION
12 REVENUE DEPARTMENT TEHSIL
BHATWARI, UTTARKASHI 1 500.00 20.00 480
13
CONSTRUCTION AND MAINTENANCE UNIT (GANGA) UTTARAKHAND PEYJAL NIGAM UTTARKASHI
5 425.00 275.00 150.00
14 MINOR IRRIGATION 302 401.87 281.31 120.56
15 FISHERIES DEPARTMENTS UTTARKASHI 2 255.00 0.00 255.00
16 TOURISM DEPARTMENT UTTARKASHI 6 202.00 0.00 202.00
17 EDUCATION DEPARTMENT UTTARKASHI 42 150.97 142.82 8.15
18 FIRE SERVICE GANGORI UTTARKASHI 1 116.57 0.00 116.57
19 NAGAR PANCHYAT GANGOTRI 1 15.85 15.85 0.00
20 BHARAT SHANCHAR NIGAM LTD
UTTARKASHI 1 10.96 0.00 10.96
21 UTTARAKHAND RENEWABLE ENERGY
DEVELOPMENT AUTHORITY UTTARKASHI 6 6.85 63.18 03.67
22 ANIMAL HUSBANDRY 2 3.56 0.00 3.56
23 HEALTH DEPARTMENT 1 0.55 0.00 0.55
Uttaranchal Jal Vidut Nigam
No. of Damaged Scheme 08
Total restoration Cost Rs. 14939.70
LacsDamage of retaining wall /Fencing /Flushing conduit outlet at Joshiyara Barrage
UJVNL road from Joshiyara Barrage to Manera
Damaged portion of approach Road to Tiloth Motor Bridge Uttarkashi
Damage portion length 55meter
Restoration Cost Rs. 300.00 Lacs
U.J.V.N.Ltd .
(Small Hydro Projects Division, Maneri
)
Assi Ganga -1
St
Total Damage Restoration Cost
Rs. = 2263.48 Lac
View of Trench Weir & Power duct location before &
View of Trench Weir & Power duct location before &
after flash flood.
after flash flood.
Restoration cost Rs. 483.61
Restoration cost Rs. 483.61 Lacs
Lacs
Before After Before After
A View of RCC De
A View of RCC De--silting Tank before & after flood.
silting Tank before & after flood.
Restoration cost Rs. =197.84
Restoration cost Rs. =197.84 Lacs
Lacs
Before After Before After
View of Powerhouse Building
View of Powerhouse Building
Restoration Cost Rs. =360.03
Restoration Cost Rs. =360.03 Lacs
Lacs
Before flood After flood Before flood After flood
Inside view of Powerhouse Building before & after flood.
iew of Powerhouse Building before & after flood.
Before After Before After
View of machine hall before & after flood.
Restoration Cost Rs. = 1000.00
Restoration Cost Rs. = 1000.00 Lacs
Lacs
Before After Before After
View of Control panels in Control Room before & after
flood.
Before After Before After
DAMAGES OF SMALL HYDRO ELECTRIC
DAMAGES OF SMALL HYDRO ELECTRIC
PROJECT
PROJECT
ASSI
ASSI--GANGA
GANGA--II
II
INSTALLED CAPACITY
INSTALLED CAPACITY –
– 2x2.25 MW
2x2.25 MW
Total Project Cost
Total Project Cost Rs
Rs =
=
3404.00
3404.00 Lacs
Lacs
Damaged Cost
Damaged Cost Rs
Rs =
=
511.35.00
511.35.00
Lacs
Lacs
DAMAGES OF SMALL HYDRO ELECTRIC
DAMAGES OF SMALL HYDRO ELECTRIC
PROJECT
PROJECT
ASSI
ASSI--GANGA
GANGA--II
II
INSTALLED CAPACITY
INSTALLED CAPACITY –
– 2x2.25 MW
2x2.25 MW
Total Project Cost
Total Project Cost Rs
Rs =
=
3404.00
3404.00 Lacs
Lacs
Damaged Cost
Damaged Cost Rs
Rs =
=
511.35.00
511.35.00
Lacs
Lacs
DAMAGED TRENCH WEIR AND INTAKE STRUCTURES
Restoration cost Rs. 445.03 Lacs
Before 03/08/2012
View after 03/08/2012
Damaged Power Duct
Power Duct before 03/08/2012
Power Duct after 03/08/2012
Damaged de-silting Tank
-Restoration cost Rs. 20.33 Lacs
Power Channel Before 03/08/2012 Power Channel after 03/08/2012
Damaged Power channel
Power Channel before 03/08/12 Landslide below Power Channel after 03/08/12 and still continue
Power House location
Penstock alignment
Switchyard
Damaged Power House raft
Restoration cost Rs. 65.13 Lacs
Power House Draft tube Raft before 03/08/12
TRC outfall Switchyard
U.J.V.N.Ltd .
(Small Hydro Projects Division, Maneri
)
Kaldi Gad
Total Damage Restoration
Cost Rs. = 369.10 Lacs
Total Damage Restoration
POWER HOUSE & TRC : COST OF DAMAGES=
102.00 LACS 9.0MW
KALDIGAD SHP
KALDIGAD WEIR
Cost of Damages : 151.00 Lacs
DEAD PORTION OF
WEIR BEFORE FLOOD
DEAD PORTION OF
WEIR AFTER FLOOD
Details of Affected PWD Roads, Bridges and Buildings
Tehsil / Div. Division Name Total No. of damaged Roads Total Bridges damaged Immediate Amount needed to openning communica tion (Under SDRF) Additional Fund for restoration of roads /Building/Bri dges Total amount needed for restoration of roads /Building/ Bridges
Prov Div PWD Bhatwari PWD Bhatwari 13 6 446.61 3023.96 3470.57
Prov Div PWD Uttarkashi PWD Uttarkashi 14 1 277.98 833.30 1111.28
Cosnt Div PWD Uttarkashi Cosnt Div PWD
Uttarkashi PWD Joshiyara 17 0 389.00 292.00 681.00
Cosnt . Div PWD Barkot PWD Barkot 39 2 370.00 400.50 770.50
Const. Div. PWD Purola PWD Purola 25 5 159.11 666.00 825.86 National Highway Div.
PWD, Barkot N/H. Division 2 0 824.06 1135.32 1959.38
Irrig. Div. PWD .
uttarkashi PMGSY DIV. 12 0 264.30 205.00 469.30
A.D.B. Asian Dev. Bank 2 0 68.79 294.28 363.07
Damaged
Damaged Joshiyara
Joshiyara Suspension Bridge
Suspension Bridge
Old Span 140 Meter
Old Span 140 Meter
Proposed span 160 meter
Proposed span 160 meter
Estimated restoration cost = Rs 1000
Estimated restoration cost = Rs 1000 Lacs
Lacs
Joshiyara Suspension Bridge during Damage
Joshiyara Suspension Bridge after Damage
NH-94 (Dharasu-Phoolchatti Section), KM-216 Hect.(6-8) 150m Road Washed-Out (Along AsnolGad River)
Protection with C.C. Block, wire crates, Retaining Wall, 150m c.c. road to be constructed
Border Road Task Force
•
Total damaged schemes = 15
Damaged BRO Gangori Motor Bridge
Span 55 meter
Estimated restoration cost 625.00LacsAffacted Gangori Town
DAMAGE OF B/BRIDGE DUE TO LAND SLIDE AT
SAWARIGAD ON D-G ROAD
& Construction of new Bridge SPAN 33 meter Restoration
cost 4000 lac
Damaged BRO by pass road near Manera
Damaged BRO Road near Tambakhani
Damaged BRO Gangotri Motor Road at Laldang (near maneri)
Affected length 250 meter
Restoration cost Rs. 150 lacs
ROAD WASHED OUT AT KM 45.900 (Ongi) ON D- ROAD Affected length 500 meter Restoration cost 30 lac
ROAD WASHED OUT AT KM 31.700 (Gangori) ON D-G ROAD Damage length 200 meter Restoration cost 2.5 Crore
DAMAGE KM 52.900 (MALLA) ON D-G ROAD Damage
Length 150 meter
Restoration cost 35 Lac
Damages with Irrigation Department (UKI)
Total Division
03
•
Total Restoration Cost for Damaged Schemes
Rs. =
8980.77
Lacs
• Irrigation Division, Uttarkashi
Restoration Cost . Rs.
8053.39
LacsTubewell Division Dehradun
Restoration Cost . Rs. 75.83
LacsIrrigation Division, Purola
Restoration Cost . Rs. 851.55
LacsTotal Division
03
•
Total Restoration Cost for Damaged Schemes
Rs. =
8980.77
Lacs
• Irrigation Division, Uttarkashi
Restoration Cost . Rs.
8053.39
LacsTubewell Division Dehradun
Restoration Cost . Rs. 75.83
LacsIrrigation Division, Purola
Damaged Flood Protection wall River side Tiloth Damaged
Length 330 Mtrs, Restoration Cost Rs. 50.00 Lacs
Irrigation Depatt. damaged flood protection works river side at Mando
After Flood ( 3-8-12) Irrigation Depatt. damaged flood protection works river side at Mando
Before Flood
Damaged Flood protection wall at Left Bank of Assi Ganga in Gangori
Length 1000 Mtrs.
Restoration Cost Rs. 981.46 Lacs
Damaged Flood protection wall at Left Bank of Assi Ganga in Gangori
Damaged Flood protection wall at Left Bank of Bhagirathi River in Joshiyara
Damaged site Tiloth Flood Protection works
Length 330 Mtrs. Restoration Cost Rs. 50.00 Lacs
• Tehsil Bhatwari
Total schemes Damaged = 51
• Tehsil Dunda
Total schemes Damaged = 69
• Tehsil Chinyalisaur
Total schemes Damaged = 36
• Tehsil Barkot
Total schemes Damaged = 31
• Tehsil Purola
Total schemes Damaged = 25
• Tehsil Mori
Total schemes Damaged = 44
• Total Schemes (Nos.)
285
• Restoration cost. Rs.4468.50
Lacs
Tehsil Wise Damaged
Drinking Water Pipe Line SchemesDamages of Uttaranchal Jal Snasthan
Uttarkashi
• Tehsil Bhatwari
Total schemes Damaged = 51
• Tehsil Dunda
Total schemes Damaged = 69
• Tehsil Chinyalisaur
Total schemes Damaged = 36
• Tehsil Barkot
Total schemes Damaged = 31
• Tehsil Purola
Total schemes Damaged = 25
• Tehsil Mori
Total schemes Damaged = 44
• Total Schemes (Nos.)
285
Damaged 200mm dia, water supply Pipe
line Length-600 Mtrs. At Kohri Gad.
Damaged 250 mm dia pipe line at Kohari Gad (UKI –III)
Length- 60Mtrs
.
Restoration cost Rs.= 2.30 Lacs
Damaged Water Collecting Chamber at Rawada
capacity 10,000 Liter .
Restoration cost Rs.= 2.80 Lacs
Damaged Pipe line 250 mm dia at Jangara
Length-60Mtr.
Restoration cost Rs.= 1.70 Lacs
Damaged Pipe line 250 mm dia at Jangara
Length- 350Mtrs.
Restoration cost Rs.-8.50 Lacs
Damaged UKI-III W/S (250 mm dia) Pipe line near W.T.P
Assi-ganga Length-60 Mtr
.
Restoration cost Rs.=1.30 Lacs
UKI-II W/S Damaged Pipe line 200 mm dia at
Assiganga , Length 480 Mtr.
Nagar Palika Parishad ,
Uttarkashi
Details of Damaged Assets
Total No. of Schemes Damaged = 32
Total restoration cost Rs. = 3910.85Lacs
Total No. of Schemes Damaged = 32
Damaged Shopping Complex & Barat Ghar Near Tiloth Bridge
(Restoration cost 180 lacs)
Affected Nagar Palika Ghat down side the river at
Manikarnika in Uttarkashi Restoration cost 50 lakh
Total Damages – Rs. 12.00Lacs
Forest Department
Bebara Bridge (On Agora-Dodital Track)
–
Barahat Range
Heavy Landslide in forest area Dodital Early
span of stream 12 mtr. Span after flood > 80 mtrs.
Kaldi stream
Gajoli Stream
Asi ganga Kaldi stream
Total Damage of 33 KV, 11 KV/LT line &
Transformers
•
Length of damaged 33 KV line
: 16.50 Km.
•
Length of damaged 11 KV line
: 53.05 Km.
•
Length of damaged LT line
: 56.80 Km
•
Damaged T/F of 16 KVA
: 03 Nos.
•
Damaged T/F of 25 KVA
: 12 Nos.
•
Damaged T/F of 63 KVA
: 03 Nos.
•
Damaged T/F of 100 KVA
: 02 Nos.
•
Damaged T/F of 250 KVA
: 05 Nos.
Restoration Cost for Total Damage Rs. 740.80 Lacs
ELECTRICITY DISTRIBUTION DIVISION UTTARKASHI.
•
Length of damaged 33 KV line
: 16.50 Km.
•
Length of damaged 11 KV line
: 53.05 Km.
•
Length of damaged LT line
: 56.80 Km
•
Damaged T/F of 16 KVA
: 03 Nos.
•
Damaged T/F of 25 KVA
: 12 Nos.
•
Damaged T/F of 63 KVA
: 03 Nos.
•
Damaged T/F of 100 KVA
: 02 Nos.
•
Damaged T/F of 250 KVA
: 05 Nos.
Restoration Cost 24.16 Lacs
Damaged LT line Pole at Gangori,
Tehsil Bhatwari Flood damaged 11 KV line/Poles at Gangori
Damaged 11 KV/LT line & Transformers in different
locations of Tiloth Area.
Restoration Cost 8.37 Lacs
Damaged 11 KV line near Balmiki Basti Barahat Damaged / flow away L.T. line Pole
Damaged 11 KV/LT line & Transformers at
Joshiyara Areas
Restoration Cost 9.10 Lacs
Damaged basement area of T/F at Joshiyara
Damaged 33 KV,11 KV/LT line & Transformers
at Bhatwari Area.
Damaged 33 KV line at Bhatwari Feeder
Sainj & Aungi.
Restoration Cost Rs. 82.95 Lacs
Damage of 33 KV, 11 KV/LT line & Transformers at
Uttarkashi Town
RESTORATION COST Rs. 21.40 Lacs
Damaged 33 KV, 11 KV/LT line &
Transformers at Sangamchatti
RESTORATION COST OF Rs. 58.35 Lacs
Damage 33/11 KVA S/S
at Hanumanchatti
Washed-out power supply sub-station
Damaged L.T. power line
at Rajgahri, Tehsil Barkot
Washed-out power supply sub-station
Sl. No. Name of Item Total Executed Works Damaged Works Restoration cost (RS in Lacs) 1- Sewer Line 8.17 Km. 2.00 Km. 70.00 2- Rising Main 1.96 Km. 0.20 Km. 60.00
OFFICE OF THE PROJECT MANAGER, CONSTRUCTION & MAINTENANCE UNIT (GANGA), UTTARAKHAND PEYJAL NIGAM, UTTARKASHI
(Formerly Known as – Ganga Pollution Control Unit)
2- Rising Main 1.96 Km. 0.20 Km. 60.00
3- Sewage Pumping Station 4 No. 2 No. 10.00
4- Septic Tank Cum Upflow Filter (4x0.05 mld) 4 No. 4 No. 250.00
5- Sewage Treatment Plant 2.00 Mld 1 No. - 35.00
SEPTIC TANK CUM UPFLOW FILTER (NEAR FOREST CHOUKI, GANGORI)
(ESTT. COST OF RESTORATION = ` 35.00 Lacs)
SEWEGE PUMPING STATION (TAMBAKHANI)
(ESTT. COST OF RESTORATION = `25.00 Lacs)
Fisheries Department, Uttarkashi
Detail of losses
• Damaged Trout Hatcheries , Buildings
Tanks , Laboratory in Kaldiyani
(SangamChatti
) &
Fish Farm Gangori
• Total Damaged Area 1.10 hectare
• Total Damaged cost Rs. 255.00 Lacs
• Damaged Trout Hatcheries , Buildings
Tanks , Laboratory in Kaldiyani
(SangamChatti
) &
Fish Farm Gangori
• Total Damaged Area 1.10 hectare
Trout Fish Farm Kaldiyani before Damage
Tehsil Name Total agriculture area affected (Ha.) Bhatwari 27.686 Dunda 13.652
Damages in Agriculture Sector (Uttarkashi)
Total Area sown - 26984. Hect. Total area affected- 71.282 Hect.
Dunda 13.652 Chinyalisaur 0.23 Barkot 19.937 Purola 0.98 Mori 8.803 Total 71.288
Damaged Agricultural land in Nald Gangori -Sangam Chatti Area
Total Damaged land 85( ha) Restoration cost 16.525 lakh
Damaged agriculture land with paddy crop in Uttaroun village Total damaged land 102 (ha) Restoration cost 21.34 lakh
Landslide affected Tourist rest house at
Bhatwari Restoration cost 150.00 lakh
Miscellaneous Flood Damages
Damaged house
Ganga Vihar
Damaged house in
GhatuSaur
Houses Damaged at Gaongri
due to Flood on 3-8-12
Damaged Cooperative Bank
building in Gangori
Emergency meeting called by District Magistrate
on flood Disaster
Dated 04/08/2012•
Hon’ble C.M. Visit to affected areaS
Visit of Hon’ble Chief Minister,
Uttarakhand
Sri Vijay
Bahuguna in Flood affected area
of
Uttarkashi
on
16-8-12
(
Gangori
)
Flood protection action plan for Uttarkashi city and Gangori
Approximate cost 45 Crore
NOT IN SCALE N
Disaster affacted Dodital –
Sangamchatti Area
Forest Dept.
Sl. No.
Name of the scheme Proposed works Quantity Require d Fund
(in Lacs) 1. River Bank Protection construction on both
banks of Assi ganga river at outlet
400 Mtr. 100.00
2. Repair & Reconstruction of Periferri Track.
Bridle path & lake bank protection.
800 Mtr. 150.00
Fund Requirement for Proposed Restoration
Repair & Reconstruction of Periferri Track.
Bridle path & lake bank protection.
3. Water shed treatment Planting, Land slide & Habitat restoration works
300 Hact. 700.00
4. Soil & Water Conservation
Check Dams & River bank protection works 18 to 20 streams 500.00 5. Dodital Lake Restoration
Removal of Slurry & Disposal of muck & trees
> 1000 MT.
200.00
6. Restoration of Dayara, Darwa, Bakriya Top meadows
Protection of land slides & restoration of habitat
500 Hact. 500.00