• No results found

Work Breakdown Structure

N/A
N/A
Protected

Academic year: 2021

Share "Work Breakdown Structure"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

(1)

Work Breakdown Structure

September 25, 2005

Work Breakdown Structure

Copyright 2000, The Ivory Owl Learning Company, Ltd., All Rights Reserved pm-scope-wbs-v10

Page 1 of 5

S C O P E T I M E C O S T Q U A L I T Y R I S K H U M A N C O M M P R O C U R E

projectMethod

The Ultimate Methodology

Current Step: Next Step: Prev Step:

Define Scope Develop Schedule Assign Project Manager

Work Breakdown Structure

Use this template to create a Work Breakdown Structure. The Work Breakdown Structure is a deliverable-oriented grouping of all of the major elements defined in the project. A WBS organizes the deliverables into detailed project elements that encompass all aspects of the project scope. Anything not defined in the WBS is outside the scope of the project. PMBOK 5.3.3.1

© The Ivory Owl Learning Company, Ltd. 2000, All Rights Reserved (All dotted underlined text is Hidden and will not print unless specified)

IDENTIFICATION

PROJECT NAME PROJECT DESCRIPTION PROJECT ID DATE

{An organization name for the project}

WEB SITE

{A short description of the project. The detailed description will be elaborated in the following sections.}

Build a WEB SITE for Company ABC.

{A unique project id} 2000-1 {Date doc was created} Jun 30, 2000

VERSION STRATEGIC GOAL

{The current version number for this

document}

Version 1.0

{All projects should be supportive of the organizations goals.PMBOK 5.1.1.2}

Goal 2000-2: Increase the sales of all products by 20%.

Goal 2000-12: Increase marketing efforts, specifically on the Internet.

I. APPROACH

The Work Breakdown Structure for this project has identified the deliverables that are associated with the product (WEB Site) and Project Management. The deliverables have been broken down into the smallest Work Packages that can then be assigned to the appropriate resources.

(2)

Work Breakdown Structure

S C O P E T I M E C O S T Q U A L I T Y R I S K H U M A N C O M M P R O II. CHART

{Use this section to create a graphical representation of the WBS.}

Requirements Definition 1.1 Detailed Design 1.2 Design 1.0 Environment Configuration 2.1 Software 2.2 User Manual 2.3 Build 2.0 Active Site 3.1 Testing 3.2 Training 3.3 Live Site 3.4 Install 3.0 Project Charter 4.1 Scope Statement 4.2.1 WBS 4.2.2 Schedule 4.2.3 Budget 4.2.4 Risk Assessment 4.2.5 Project Plan 4.2 Weekly Report 4.3.1 Status Reports 4.3 Project Management 4.0 WEB Site

(3)

Work Breakdown Structure

September 25, 2005

Work Breakdown Structure

Copyright 2000, The Ivory Owl Learning Company, Ltd., All Rights Reserved pm-scope-wbs-v10

Page 3 of 5

S C O P E T I M E C O S T Q U A L I T Y R I S K H U M A N C O M M P R O C U R E III. WBS DICTIONARY

{Use this section to describe each element in the WBS. The lowest levels (2ndand 3rd) are the work packages and should have the greatest amount of detail associated with them.}

CODE / NAME DESCRIPTION

1.0 Design 1.1 Requirements

Definition A formal Requirements Definition Document explaining what the business requirements are that theproject must address. 1.2 Detailed Design A formal detailed Design Document explaining how the site will be built and how the site will satisfy

the requirements previous identified. 2.0 Build

2.1 Environment

Configuration Prepare the environment for the new WEB Site. Server, URL, etc.

2.2 Software The WEB Pages, Graphics and CGI scripts, etc. that make up the finished product for the WEB Site. 2.3 User Manual The manual that explains the overall design of the WEB Site and provides instructions on how to

maintain the WEB site 3.0 Install

3.1 Active Site The actual functioning WEB Site in a protected environment. This will allow the user to test for functionality and errors.

3.2 Testing Users acceptance testing to ensure that the product does what they want and is free of errors. This should be an ongoing process throughout the build stage.

3.3 Training Provide the WEB Administrator with the necessary information required to assume responsibility for the WEB site.

3.4 Live Site An unprotected full accessible WEB Site that is now available to the Internet public. 4.0 Project

Management

4.1 Project Charter The document that announces that this project can begin. A high level budget has been allocated and a Project Manager has been assigned.

4.2 Project Plan

4.2.1 Scope Statement The document that explains the boundaries of what is to be included and excluded in this project. 4.2.2 WBS The document that breaks down the major deliverables into manageable assignable chunks. These

chinks (Work Packages) have been also been assigned a budget. The Work Packages have also been assigned.

4.2.3 Schedule The document that identifies all the activities that are required to be executed to achieve the deliverables identified in the WBS.

4.2.4 Budget The resources are allocated and the costs are estimated. Once calculated, the cost should be baselined.

(4)

Work Breakdown Structure

S C O P E T I M E C O S T Q U A L I T Y R I S K H U M A N C O M M P R O

CODE / NAME DESCRIPTION

4.2.5 Risk Assessment A document which identifies the risks that are associated with the project, what the impact of those risks are and what should be done, if anything, to mitigate them.

4.3 Status Reports

4.3.1 Weekly Report Weekly status reports which are provided at the weekly status meetings.

IV. WORK PACKAGES

{A work package must be created for each lowest level in the WBS. These could also be created in a separate document so that they easier to distribute and manage. If this approach were taken, pointers could replace the information in this document. Create one work package for each of the lowest level element in the WBS.}

WORK PACKAGE

WBS CODE / NAME DESCRIPTION COST CODE

1.1.1 Requirements

Definition A formal Requirements Definition Document explaining what the businessrequirements are that the project must address. SP53421 DETAILED WORK

DESCRIPTION {Include as much information as possible to ensure that the Work Package cane be assigned to someone external to the project}

To ensure that the project will properly address the requirements of the organization. There must be input from the different representatives from the various departments.

1.0 A Joint Application Design (JAD) session will be held to facilitate the gathering of the requirements.

2.0 Development of the Requirements Definition document. 3.0 Requirements Definition review session.

COST $5,000 RESOURCES

{What types of resources are required to execute this work package?}

(5)

Work Breakdown Structure

September 25, 2005

Work Breakdown Structure

Copyright 2000, The Ivory Owl Learning Company, Ltd., All Rights Reserved pm-scope-wbs-v10

Page 5 of 5

S C O P E T I M E C O S T Q U A L I T Y R I S K H U M A N C O M M P R O C U R E ACCEPTANCE

ROLE PROJECT SPONSOR PROJECT MANAGER DATE

NAME

TITLE {An individual external to the project who hasa vested interest in the successful completion

of the project.PMBOK 5.1.3.1}

Joe Sponsor, VP Finance

{The person responsible for managing the project. This document grants the PM the authority required.PMBOK 5.1.3.2}

Jim Project, Director New Projects

{Date WBS is accepted} Jul 1, 2000 SIGNATURE {Date signed} Jul 1, 2000

VERSION CHANGE DESCRIPTION DATE

{New version number}

Version 1.0

{Details of change, including person(s) responsible for change, reasons for change and any other information. One line for each new version of document.}

Created work breakdown Structure.–Jim Project

{Date of change}

References

Related documents

Based on this, the ability of architecture to aid the project manager in setting a reasonable schedule (and associated deliverables such as a work breakdown structure,

The project management deliverables of the project include – a business case based on needs assessment, a project charter, statement of scope, work breakdown structure

Location provides the container for all project data and is used as the primary work division through a location breakdown structure (LBS).. The LBS provides

–The Project Scope Statement is a description of the project scope, including major deliverables, project objectives, project assumptions, project constraints, and a statement

In particular, the lack of helpful information about the processes used to apply deliverable- oriented Work Breakdown Structures to project scheduling is seen as the primary obstacle

The 100% Rule...states that the WBS includes 100% of the work defined by the project scope and captures ALL deliverables – internal, external, interim – in terms of the work to

The Project Management Institute Inc (2001) defines a few of the deliverables as Project Charter, Project Management Plan, Resource Requirement, Work Breakdown

Project Management Plan Work Breakdown Structure Agile Guiding Principles. Project