• No results found

IT Service Management

N/A
N/A
Protected

Academic year: 2021

Share "IT Service Management"

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

(1)

IT Service Management

Change Management Methods and

Implementation Best Practices

White Paper

Prepared by:

Rick Leopoldi

June 19, 2002

People • Process • Technology Organization • Integration

(2)

C

Ch

h

an

a

ng

g

e

e

M

Ma

a

na

n

ag

g

em

e

me

en

nt

t

I

Im

mp

pl

le

em

me

e

n

n

ta

t

at

ti

io

on

n

M

M

et

e

th

h

od

o

d

s

s

Change Management is the process of planning and coordinating the implementation of all changes (any planned alteration or addition to the operating environment including application systems) into the production environment in a logical and orderly fashion. It does not develop changes, nor does it implement them.

C

C

h

h

a

a

n

n

g

g

e

e

M

M

a

a

n

n

a

a

g

g

e

e

m

m

e

e

n

n

t

t

O

O

b

b

j

j

e

e

c

c

t

t

i

i

v

v

e

e

s

s

:

:

1) To minimize the adverse impact of necessary changes on system integrity, security and the service level agreements.

2) To allow the coordination and planning of changes in order to provide a stable production environment.

3) To maximize the productivity of persons involved in the planning, coordinating and implementation of "quality" changes.

C

C

h

h

a

a

n

n

g

g

e

e

M

M

a

a

n

n

a

a

g

g

e

e

m

m

e

e

n

n

t

t

M

M

i

i

s

s

s

s

i

i

o

o

n

n

:

:

1) To ensure the documentation of all proposed changes prior to installation in the production environment.

2) To ensure verification of technical completeness: • Accuracy of Technical impact and risk analysis • Plans for final test, install, backout and recovery

• Identification and review of all technical dependencies including effect on concurrent changes

3) To ensure that the timing of change executions does not conflict with the business cycles or priorities.

4) To ensure appropriate management involvement and approval:

• Required sign-offs (i.e. justification, user acceptance, affected areas) • Approval, deferral, or disapproval of change installations

5) To ensure the verification of successful testing to the degree required by organization standards before change introduction to the production environment.

6) To ensure the documentation of actual change installations and/or change backouts: • To enable communication of change results

• To provide a history of changes

• To support the maintenance of systems documentation

C

C

h

h

a

a

n

n

g

g

e

e

M

M

a

a

n

n

a

a

g

g

e

e

m

m

e

e

n

n

t

t

G

G

u

u

i

i

d

d

e

e

l

l

i

i

n

n

e

e

s

s

:

:

1) All changes (including those to application systems) must be monitored and controlled. 2) In the information business, change is the normal mode of operation, not the exception.

3) One formal Change Management system, with "system wide" scope and influence must be in place.

4) A Change Coordination function with "clout" (backed by senior management) must be established to control the day-to-day activities of the Change Management system, with authority to reject those changes that do not adhere to the guidelines.

C

C

h

h

a

a

n

n

g

g

e

e

M

M

a

a

n

n

a

a

g

g

e

e

m

m

e

e

n

n

t

t

L

L

i

i

f

f

e

e

C

C

y

y

c

c

l

l

e

e

F

F

u

u

n

n

c

c

t

t

i

i

o

o

n

n

s

s

:

:

1) Change Request Initiation

The person or group requesting a change will complete the submitter section of Request for Change Template (displayed later). If a user is involved, IT can help complete the form or screen.

(3)

The impact the change will have on the production environment and the services provided to the user and the business reasons for the change are determined and approved (see Sample Change Priority Guidelines).

3) Change Development

As part of the change development, based on the installation's standards, a plan for installation is required. A suggested checklist of items to include in the plan is:

- Test procedures followed, with results - Backout procedures (must be available) - Resource plan

- Description of any training required - Required and supplied documentation - Proposed installation schedule - Business reason for the change - Management approvals

4) Change Coordination

This function controls the day-to-day activities of the Change Management system with the goal of meeting the Change Management Objectives. A weekly Change Management meeting (see Suggested Change Management Meeting Agenda) is chaired by the Change Coordinator.

O

O

t

t

h

h

e

e

r

r

C

C

h

h

a

a

n

n

g

g

e

e

C

C

o

o

o

o

r

r

d

d

i

i

n

n

a

a

t

t

i

i

o

o

n

n

F

F

u

u

n

n

c

c

t

t

i

i

o

o

n

n

s

s

:

:

- Change request forms are filed and a Change Log kept current (or this is done through a Problem/Change Management system, if applicable).

- All items listed in the Change Management Mission are reviewed for all major (High and Medium risk) changes. Based on installation standards, all items must be acceptable for the change to be scheduled for installation.

- All approved changes are scheduled for installation.

- A ten day detailed change installation schedule and three-month major change schedule are updated and produced weekly.

- All changes are tracked and when required, follow-up is done.

- Other Management reports such as Highlights of Major Changes Planned and Results of Major Changes Installed (History of Changes) are produced.

S

S

u

u

g

g

g

g

e

e

s

s

t

t

e

e

d

d

C

C

h

h

a

a

n

n

g

g

e

e

M

M

a

a

n

n

a

a

g

g

e

e

m

m

e

e

n

n

t

t

M

M

e

e

e

e

t

t

i

i

n

n

g

g

A

A

g

g

e

e

n

n

d

d

a

a

1) To review the effects of significant changes (high and medium risk) and confirm schedules for implementing these changes. The meeting is the focal point for all planned change information and management controls.

2) To review planned changes for the next ten days. Based on the day of the change meeting, this ten-day projection should cover two (2) weekends or PM windows. Discuss any emergency changes since the last change meeting.

3) To review any schedule or procedural violations within the past week along with the results of the changes.

4) Accurate minutes should be taken, distributed to all attendees and saved for history purposes.

Purpose:

The meeting is conducted to review the suitability of changes scheduled for implementation and to verify the coordination and cooperation of participating areas. The results of this meeting will be the basis for a summary report for Management.

It is the function of this meeting to review the business and technical assessment and to review and approve the schedule of each change; to verify that the change meets the business objectives, and will not have a negative effect on the business community. In

(4)

addition, all changes are reviewed to see if and how they affect the Disaster Recovery Plan or recovery strategy. If it is determined that the change is not needed or is untimely, it will be canceled or rescheduled.

This meeting marks the change request deadline. All change requests that are issued after the meeting begins will be deferred until the next meeting. If the request cannot be postponed (i.e. emergency), it may be discussed at the current meeting.

Meeting Participants:

- Change Coordinator (meeting chairperson) - Technical Support - Operations Management - Processing Services - Applications Group - Help Desk - Network Management - Change Requestors/Implementers - Hardware Group

- Vendors (if applicable)

S

S

a

a

m

m

p

p

l

l

e

e

C

C

h

h

a

a

n

n

g

g

e

e

P

P

r

r

i

i

o

o

r

r

i

i

t

t

y

y

G

G

u

u

i

i

d

d

e

e

l

l

i

i

n

n

e

e

s

s

Change Risk Level

Risk Lead

Level Time Description _____ ____ ___________

H 3 wks Very Difficult or impossible to backout. Major impact if it fails. Involves several or critical systems. Large staff involved in implementation. Will disrupt hardware, software, data if unsuccessful.

M 2 wks Backout is difficult or lengthy. Involves several systems. May disrupt hardware, software, data if unsuccessful.

L 1 wk Small impact on failure. Involves non-critical systems. Backout is simple or not needed.

E None Immediate business requirement with no advance warning. High severity. These MUST result from a Severity 1 problem and have been entered in the system with a Problem number assigned.

Sample: C H A N G E P R I O R I T Y G R I D

Change --- Problem Impact ---

-Risk- CRITICAL HIGH MEDIUM LOW

HIGH +1 1 2 3 Changes receive priority for resources and scheduling based on priority assigned.

MEDIUM 1 2 3 4

LOW 2 3 4 5

(5)

S

S

u

u

g

g

g

g

e

e

s

s

t

t

e

e

d

d

C

C

h

h

a

a

n

n

g

g

e

e

P

P

l

l

a

a

n

n

n

n

e

e

r

r

/

/

D

D

e

e

v

v

e

e

l

l

o

o

p

p

e

e

r

r

R

R

e

e

s

s

p

p

o

o

n

n

s

s

i

i

b

b

i

i

l

l

i

i

t

t

i

i

e

e

s

s

Note: The Change Planner/Developer's responsibilities differ from those of the Change Coordinator so they are listed here for comparison.

Change Planner/Developer: One who requests/creates a change to be moved into production. Objective: To supply the Change Management system (or Change Coordination Function) with a

change description, dates requested and purpose of the change. This includes testing and supplying all supporting documentation. To communicate the difficulty and/or success of the development process back to the change management system or Change Coordination Function.

Responsibilities:

- Obtain approvals from their management before the request for change is scheduled. - Review the testing results from change development.

- Develop and/or prepare the change for production.

- Complete and supply all required documentation to appropriate personnel. - Update all affected procedures (i.e. operational, user and offsite if applicable). - Develop backout and recovery procedures so Operations personnel can use them if

necessary.

- Develop test procedures.

- Schedule and run test procedures.

- Use test results as part of change documentation.

- Notify all individuals that will be impacted by the change (i.e. Help Desk staff, Operations, Technical Support, the Client Community, etc.).

- Update the change system (or notify Change Coordination) throughout the development process.

- Notify management affected by the change of any adjustment to the planned schedule.

S

S

u

u

g

g

g

g

e

e

s

s

t

t

e

e

d

d

C

C

h

h

a

a

n

n

g

g

e

e

C

C

o

o

o

o

r

r

d

d

i

i

n

n

a

a

t

t

o

o

r

r

R

R

e

e

s

s

p

p

o

o

n

n

s

s

i

i

b

b

i

i

l

l

i

i

t

t

i

i

e

e

s

s

Change Management Coordinator: The person responsible for maintaining the Change Management process.

Objective: To ensure that policies and procedures are adhered to and that senior management has the information (i.e. reports, feedback) needed to ensure that the Change

Management approach is meeting all objectives. Responsibilities:

- Chair the Change Management meetings.

- Mediate all conflicts regarding scheduling, lack of approval or lack of documentation prior to implementation of the change.

- Revise the change procedures if needed and advise management. - Act as focal point for suggestions regarding change procedures.

- Audit the Change Log or mainframe system reports to ensure that the changes are being updated properly.

- Produce statistical and trend reports for managements use to analyze Change Management system effectiveness.

(6)

- Maintain an awareness of all projects that will introduce change to the production environment.

- Provide advice on change process techniques and contribute to change implementation decisions.

- Distribute the change schedule prior to the weekly meeting or instruct attendees to print off their own copy for personal use.

- Review documentation that accompanies each change and verify that it is complete, including management approvals.

References

Related documents

• Speed of weaning: induction requires care, but is relatively quick; subsequent taper is slow • Monitoring: Urinary drug screen, pain behaviors, drug use and seeking,

Cast iron motors in sizes 71-225 are greased for life and motors in sizes 250-355 have a regreasing device as a standard.. Strong

We further interrogate the impact of estrous cycle and introduction of the human vaginal pathobiont, group B Streptococcus (GBS) on community state type and stability, and

Službena državna topografska karta kodirana je slika prirodnih i izgrađenih objekata zemljine površine koja se izrađuje za cjelokupno područje Republike Hrvatske.. Osnovni

Franklin and Associates Ltd.’s study, Comparative Energy Evaluation of Plastic Products and Their Alternatives for the Building and Construction and Transportation Industries,

The PROMs questionnaire used in the national programme, contains several elements; the EQ-5D measure, which forms the basis for all individual procedure

(B) the adsorption at a single site on the surface may involve multiple molecules at the same time.. (C) the mass of gas striking a given area of surface is proportional to the

The key segments in the mattress industry in India are; Natural latex foam, Memory foam, PU foam, Inner spring and Rubberized coir.. Natural Latex mattresses are