TABLE OF CONTENTS

ABBREVIATIONS v EXECUTIVESUMMARY 1 1 INTRODUCTION 1-1 2 CONSTRUCTIONPROGRESS 2-1 2.1 INTRODUCTION 2-1 2.2 CONSTRUCTIONWORKFORCE 2-1 2.3 AZERBAIJAN 2-2 2.3.1 PERMANENT FACILITIES 2-3 2.3.2 TEMPORARY FACILITIES 2-3 2.4 GEORGIA 2-3 2.4.1 PERMANENT FACILITIES 2-4 2.4.2 TEMPORARY FACILITIES 2-4 2.5 TURKEY 2-5 2.5.1 PERMANENT FACILITIES 2-8 2.5.2 TEMPORARY FACILITIES 2-8

3 CONSTRUCTIONPHASEENVIRONMENTALANDSOCIAL

STUDIESANDSURVEYS

3-1

3.1 AZERBAIJAN 3-1

3.1.1 HOST GOVERNMENT RELATED ACTIVITIES 3-1

3.1.2 POST ESIASTUDIES 3-1

3.2 GEORGIA 3-3

3.2.1 HOST GOVERNMENT RELATED ACTIVITIES 3-3

3.2.2 POST ESIASTUDIES 3-3

3.3 TURKEY 3-4

3.3.1 HOST GOVERNMENT RELATED ACTIVITIES 3-4

3.3.2 POSTEIASTUDIES 3-4

4 MANAGEMENTOFCHANGE 4-1

4.1 AZERBAIJAN 4-1

4.1.1 CLASS I CHANGES 4-1

4.1.1 CLASS II AND III CHANGES 4-1

4.2 GEORGIA 4-1

4.2.1 CLASS I CHANGES 4-2

4.2.2 CLASS II AND III CHANGES 4-2

4.3 TURKEY 4-4

4.3.1 CLASS I CHANGES 4-4

4.3.2 CLASS II AND III CHANGES 4-4

5 ENVIRONMENTALANDSOCIALTRAININGACTIVITIES 5-1

5.1 PROJECT WIDE APPROACH 5-1

5.2 AZERBAIJAN 5-1

5.2.1 BTC 5-1

5.2.2 CONTRACTORS 5-2

5.2.3 TRAINING PROVIDED TO THIRD PARTIES 5-3

5.3 GEORGIA 5-3

5.3.1 BTC 5-3

(2)

5.4 TURKEY 5-4

5.4.1 CONTRACTORS 5-4

5.4.2 BOTAŞ AND BILTRAINING 5-5

6 CONSULTATIONANDCOMMUNICATION 6-1

6.1 CONSULTATION APPROACH 6-1

6.2 PROJECT WIDE CONSULTATION 6-1

6.3 PROJECT WIDE COMMUNICATION 6-1

6.4 AZERBAIJAN 6-1

6.4.1 PROJECT AFFECTED COMMUNITIES 6-1

6.4.2 NATIONAL NGOS AND TECHNICAL ORGANISATIONS 6-2

6.4.3 INTERNATIONAL NGOS 6-3

6.4.4 GOVERNMENT MINISTRIES AND DEPARTMENTS 6-3

6.4.5 MEDIA 6-3

6.4.6 DONOR ORGANISATIONS 6-3

6.5 GEORGIA 6-4

6.5.1 PROJECT AFFECTED COMMUNITIES 6-4

6.5.2 ROW BLOCKAGES 6-6

6.5.3 NATIONAL NGO’S AND TECHNICAL ORGANISATIONS 6-6

6.5.4 GOVERNMENT MINISTRIES AND DEPARTMENTS 6-6

6.5.5 MEDIA 6-6

6.5.6 DONOR ORGANISATIONS 6-6

6.5.7 DIPLOMATIC CORPS 6-7

6.6 TURKEY 6-7

6.6.1 PROJECT AFFECTED COMMUNITIES 6-7

6.6.2 OTHER COMMUNITY CONSULTATION 6-9

6.6.3 PROJECT AFFECTED VILLAGE COMPLAINTS 6-9

6.6.4 REGIONAL STAKEHOLDER ENGAGEMENT MEETINGS 6-10

6.6.5 NATIONAL NGOS AND ACADEMIC INSTITUTIONS 6-11

6.6.6 GOVERNMENT MINISTRIES AND DEPARTMENTS 6-11

6.6.7 MEDIA 6-11

6.6.8 OTHER 6-11

7 LAND ACQUISITION AND COMPENSATION 7-1

7.1 AZERBAIJAN 7-1

7.1.1 ACQUISITION AND COMPENSATION 7-1

7.1.2 LAND USE RETURN 7-2

7.2 GEORGIA 7-3

7.2.1 ACQUISITION AND COMPENSATION 7-3

7.2.2 RAPFUND 7-4

7.2.3 LAND USE RETURN 7-5

7.3 TURKEY 7-5

7.3.1 ACQUISITION AND COMPENSATION 7-5

7.3.2 ARTICLE 10CASES AND MISIDENTIFICATION OF LAND OWNERS 7-6

7.3.3 RAPFUND 7-7

7.3.4 LAND USE RETURN 7-8

7.3.5 RAPMONITORING 7-8

8 INTERNAL AND EXTERNAL MONITORING 8-1

8.1 INTERNAL MONITORING 8-3

8.1.1 MANAGEMENT TOOLS 8-3

8.1.2 CROSS PROJECT REVIEW 8-3

8.1.3 AZERBAIJAN 8-4

8.1.4 GEORGIA 8-6

(3)

8.2 EXTERNAL MONITORING 8-11 8.2.1 AZERBAIJAN 8-12 8.2.2 GEORGIA 8-12 8.2.3 TURKEY 8-13 8.2.4 SRAP 8-13 8.2.5 CDAP 8-13

8.2.6 HOST GOVERNMENT MONITORING 8-14

8.2.7 NGOMONITORING 8-15

9 HEALTH AND SAFETY 9-1

9.1 PERFORMANCE AND ACHIEVEMENTS 9-1

9.1.1 GENERAL 9-2 9.1.2 AZERBAIJAN 9-2 9.1.3 GEORGIA 9-3 9.1.4 TURKEY 9-3 9.2 HEALTH ACHIEVEMENTS IN 2004 9-3 9.2.1 GENERAL 9-3 9.2.2 AZERBAIJAN 9-4 9.2.3 GEORGIA 9-4 9.2.4 TURKEY 9-5

9.3 HEALTH AND SAFETY INCIDENTS 9-5

9.3.1 MAJOR INCIDENTS IN 2004 9-6

9.3.2 OTHER INCIDENTS IN 2004-Q4 9-6

9.4 2005 H&S KEY FOCUS AREAS 9-8

9.4.1 DRIVING 9-8

9.4.2 OPERATION OF HEAVY PLANT AND EQUIPMENT 9-8

9.4.3 OVERHEAD POWER LINES 9-8

9.4.4 IMPROPER POSITION OF PEOPLE 9-9

10 ADDITIONALITY AND OFFSET PROGRAMMES – CIP, EIP, OFFSET AND OTHER INITIATIVES

10-1

10.1 OFFSET AND EIP 10-1

10.1.1 CROSS-CAUCASUS PROJECT 10-3

10.1.2 AZERBAIJAN 10-3

10.1.3 GEORGIA 10-4

10.1.4 TURKEY 10-7

10.2 COMMUNITY INVESTMENT PROGRAMMES 10-10

10.2.1 AZERBAIJAN COMMUNITY INVESTMENT PROGRAMME 10-10 10.2.2 GEORGIA COMMUNITY INVESTMENT PROGRAMME 10-13

10.2.3 TURKEY COMMUNITY INVESTMENT PROGRAMME 10-16

10.3 OTHER INVESTMENT INITIATIVES 10-21

10.3.1 AZERBAIJAN 10-21

10.3.2 GEORGIA 10-22

(4)

A1 APPENDIX1:INTERNALMONITORING-NON-COMPLIANCES ANDFOLLOW-UP

A1-1

A1.1 AZERBAIJAN A1-1

A1.1.1 LEVEL INON-COMPLIANCES A1-1

A1.1.2 LEVEL IINON-COMPLIANCES A1-1

A1.2 GEORGIA A1-7

A1.2.1 LEVEL INON-COMPLIANCES A1-7

A1.2.2 LEVEL IINON-COMPLIANCES A1-7

A1.3 TURKEY A1-10

A1.3.1 LEVEL INON-COMPLIANCES A1-10

A1.3.2 LEVEL IINON-COMPLIANCES A1-10

A2 APPENDIX2:CLOSEOUTSTATUSOFACTIONSRELATEDTO NONCOMPLIANCESRAISEDTHROUGHIECMONITORING

A2-1

APPENDIX2A AZERBAIJANACTIONSTATUSAGAINSTAUDIT

NON-COMPLIANCESANDRECOMMENDATIONS A2-2 APPENDIX2B GEORGIAACTIONSTATUSAGAINSTAUDIT

NON-COMPLIANCESANDRECOMMENDATIONS A2-12 APPENDIX2C TURKEYACTIONSTATUSAGAINSTAUDIT

NON-COMPLIANCESANDRECOMMENDATIONS A2-17

LIST OF CASE STUDIES

CHAPTER 2.CONSTRUCTION PROGRESS:

CASE STUDY 2.1 – MICRO TUNNEL OF KURA WEST RIVER,AZERBAIJAN

CASE STUDY 2.2 – REINSTATEMENT OF ZAMANTI WET MEADOW

CASE STUDY 2.3 – COMMUNITY INVOLVEMENT IN REINSTATEMENT

CASE STUDY 2.4 – HASSAN SU RIVER CROSSING

CHAPTER 5.ENVIRONMENTAL AND SOCIAL TRAINING ACTIVITIES:

CASE STUDY 5.1 – ADAY IN THE LIFE OF A BTCFIELD ENVIRONMENTAL COORDINATOR,

GEORGIA

CASE STUDY 5.2 – CURATORIAL WORKSHOPS -INSTITUTE OF ARCHAEOLOGY,BAKU, AZERBAIJAN

CHAPTER 6.CONSULTATION AND COMMUNICATION:

CASE STUDY 6.1 – BORJOMI VISITOR CENTRE

CHAPTER 10.ADDITIONALITY AND OFFSET PROGRAMMES –CIP,EIP,OFFSET AND OTHER

INITIATIVES:

CASE STUDY 10.1 – IMPORTANT BIRD AREAS IN TURKEY –RAISING PUBLIC AWARENESS OF

BIRDS

CASE STUDY 10.2 – KALKANKAYA VILLAGE COMMUNITY INVESTMENT PROGRAMME

CASE STUDY 10.3 – KURTPINARI AND GOLOVASI TRANSPORT COOPERATIVE CASE STUDY –

BUILDING SUSTAINABLE LOCAL BUSINESSES IN TURKEY

CASE STUDY 10.4 – RECONSTRUCTION OF THE GORANBOY DISTRICT MUSEUM OF HISTORY AND

(5)

ABBREVIATIONS

ACG - Azeri, Chirag, Gunashli (offshore oil fields) AE - Agricultural Extension experts

AGI - Above Ground Installation

AGT - Azerbaijan, Georgia, Turkey pipelines project AGT - Azerbaijan-Georgia-Turkey

(usually refers to the combination of the BTC and SCP projects) AIM - Agro Information Centre

AIOC - Azerbaijan International Operating Company APLR - Association for the Protection of Landowners Rights AWDC - Azerbaijan Women and Development Centre

AzBU - Azerbaijan Business Unit (BP)

BIAA - British Institute of Archeology (Ankara) BIL - Botaş International Ltd

BTC - Baku-Tbilisi-Ceyhan Pipeline Project BU - Business Unit

BVS - Block Valve Station CAG - Community Action Group

CAS - Center for Archeological Studies, Georgia CBG - Caucasian Black Grouse

CBO - Community Base Organization

CCIC - Consolidated Contractors International Company CCP - Contractor Control Plan

CDAP - Caspian Development Advisory Panel CDH - Central District Hospitals

CHARM - Chemical Hazard Assessment and Risk Management CIF - Small Investment Fund

CIP - Community Investment Programme CLO - Community Liaison Officer

CMT - Core Management Team CP - Communication Plan

DAFWCF - Days Away From Work Case Frequency

DFID - Department for International Development (UK) DNA - DeoxyriboNucleic Acid

DRC - Development Resource Center DSA - Designated State Authority (Turkey) E&S - Environmental and Social

EBRD - European Bank of Reconstruction and Development EE - Environmental Education

(6)

EIA - Environmental Impact Assessment EIP - Environmental Investment Programme ELF - Environmentally Sound Livestock Farming EMMP - Environmental Monitoring and Management Plan

EMS - Environmental Management System

EPC Engineering, Procurement and Construction ERA - Environmental Risk Assessment

ESA - Environmentally Sensitive Area ESAP - Environmental and Social Action Plan

ESIA - Environmental and Social Impact Assessment ESMS - Environmental and Social Management System FINCA - Foundation for International Community Assistance

GBG - Ganja Business Group GBI - Greater Borjomi Initiative

GCCW - Georgian Centre for the Conservation of Wildlife GEF - Global Environmental Facility

GHSER - Getting HSE Right

GIOC - Georgian International Oil Company GIS - Geographical Information System GoG - Government of Georgia

GRSCC - Gobustan Reserve Stakeholder Consultative Committee GTZ - Deutsche Gesellschaft fur Technische Zusammerarbeit HAPP - HIV/AIDS Prevention Programme

HDD - Horizontal Directional Drilling HEUs - Health Education Units

HGA - Host Government Agreement

HSE(S) - Health, Safety and Environment (Social) HTWMP - Hydrostatic Test Water Management Plan

IBA - Important Bird Areas IBC - International Blue Crescent

ICCN - International Center on Conflict and Negotiation ICT - Information Communication Technology

IEC - Lenders’ Independent Environmental Consultant IFI - International Finance Institutions

IFI - International Funding Institution IG - Ijma Group (community action group) IGA - Income Generating Activities

ILCs - Internet Learning Centers IMC - International Medical Corps

IOA - Institute of Archaeology (Azerbaijan) IP - Implementing Partners

(7)

IPLOCA - International Pipeline and Offshore Contractors Association IPMT - Integrated Project Management Team (the BTC organization)

IPT - Intermediate Pigging Station (Turkey) IRC - International Rescue Committee ISGs - Intermediate Support Grants

ISO - International Standards Organization ISP - Improved Schools Project

KP - Kilometer Point

MENR - Azerbaijan Ministry of Ecology and Natural Resources MoC - Ministry of Culture (Azerbaijan)

MoE - Ministry of Environment (Georgia)

MOEF - Ministry of Environment and Forestry (Turkey) MoU - Memorandum of Understanding

NABU - German Bird NGO

NACRES - Noah’s Ark Center for Recovery of Endangered Species NGL line - Natural Gas Pipeline (Turkey)

NGO - Non-Governmental Organisation NROW - Necessary Right of Way

NSC - National Security Council

OHH - Occupational Health and Hygiene Ops - Operations (the BTC Operations team) OSI(A) - Open Society Institute (Azerbaijan)

OSRP - Oil Spill Response Plan

PAC - Pipeline Affected Communities

PCIP - Project Community Investment Programmes PEIP - Project Environmental Investment Programmes

PHC - Primary Health Care PHSER - Project HSE Review

PIMS - Pipeline Integrity Monitoring System PL - Punj Lloyd

PLL - Punj Lloyd Limak (Joint venture) PMI - Pipeline Micro-finance Initiative PNA - Participatory Needs Assessment

PoE - Panel of Experts

PPE - Personal Protective Equipment PRA - Participatory Rapid Assessments PSG1 - Pump Station 1 (Georgia)

PSG2 - Pump Station 2 (Georgia) PT - Pump Station, Turkey PTW - Permit to Work

(8)

RAP - Resettlement Action Plan RDI - Regional Development Initiative RFP - Request for Proposal

RLP - Rural Loan Product ROW - Right of Way

RSPB - Royal Society for the Protection of Birds RUDF - Rural and Urban Development Foundation SARMS - Special Area Reinstatement Method Statement

SC - Save the Children SCA - Stars Crescent Alliance SCP - South Caucasus Pipeline

SEL - Small Enterprise Loan

SME - Small and Medium (Sized) Enterprises SOCAR - State Oil Company of Azerbaijan Republic

SPJV - (Amec) Spie Petrofac Joint Venture SRAP - Social and Resettlement Action Plan

STI - Sexually Transmitted Infection TAG - Technical Assistance in Georgia

UNDP - United Nations Development Programme VDA - Village Development Associations

VPI - Vulnerable People Initiative WGs - Working Groups

WPA - World Pheasant Association WVI - World Vision International WWF - World Wildlife Fund

References

Related documents

The government co ll ect s revenue f rom taxes on capital and labour income and value-added taxes on fina l demand , production taxes on intermediate inputs, and...

It is the (education that will empower biology graduates for the application of biology knowledge and skills acquired in solving the problem of unemployment for oneself and others

Histology Technician/technologist See Procedures (section 7) Laboratory Technician/technologist See Procedures (section 7) Operating Room Nurse See Procedures (section 7)

On behalf of all members of the Seoul Organizing Committee of the Architectural Institute of Korea, I would like to express my gratitude to the Council on Tall Buildings

 Transportation  activities  include  personnel  and   freight  movements  and  mobile  plant  activities..  Intertwined  with  these  BMPs  are  enforceable

The performances of the generated protein-protein docking scoring potentials were evaluated on a separate test set (77 complexes) by three different assessments: (i) the probability

Work Order: Create work orders automatically according to existing scheduling information, or create them manually when unexpected maintenance is required.. Each work order can

This means that the parts being anodized will spend less time in the sulfuric acid bath and will have less outer surface oxide dissolution due to the proximity of the oxide to