• No results found

Maintain Training Facilities

N/A
N/A
Protected

Academic year: 2021

Share "Maintain Training Facilities"

Copied!
11
0
0

Loading.... (view fulltext now)

Full text

(1)

TOOLS and EQUIPMENT MAINTENANCE SCHEDULE

Qualification: Computer Hardware

Servicing NCII Equipment Type: Desktop Computer

Area/Section: Practical Work Area/Computer

Laboratory Equipment Code: CHS NC II

In-Charge: Jonel G. Lambayan

ACTIVITIES Responsible Person

Schedule for the Month of November, 2013 Daily Every other Day Weekly Every 15th

Day Monthly Remarks SOFTWARE Checking Computer for possible Virus infection Trainee Assigned  Checking and deleting unwanted or unnecessary files Trainee Assigned  Removing or Uninstalling Unnecessary Software Trainee Assigned  Checking for

hard disk error Assigned Trainee  Updating Installed Software Trainee Assigned  HARDWARE Cleaning Computer hardware Devices(Monitor , Keyboard, Mouse, Monitor, System Unit, Printer, AVR) Trainee Assigned  Prepared by: JONEL G. LAMBAYAN Trainer Approved by:

ENGR. ROLANDO V. ANDAYA

(2)

HOUSEKEEPING INSPECTION CHECKLIST

Qualification:

Computer

Hardware Servicing

NCII Station: Practical Work Area

Area/Section: CHS NC II Workshop Equipment Code: PC & Other Equipment needed for CHS training

In-Charge: Jonel G. Lambayan Services: Training Use

YES NO INSPECTION ITEMS

 Are the Floors, Tables, Chairs, Boards and Printers Cleaned

 Are all computer units checked and cleaned?

 Is the garbage disposed?

 Are of ceiling and walls cleaned?

 Are all chairs, tables, tools and cabinets arranged? Inspected by:

Jonel G. Lambayan

Date:

November, 2014

MAINTENANCE INSPECTION CHECKLIST

(3)

Prepared by:

JONEL G. LAMBAYAN

Trainer

Approved by:

ENGR. ROLANDO V. ANDAYA

PTC Administrator

Qualification: Computer Hardware Servicing

NCII Equipment Type: Desktop Computer

Area/Section: Practical Work Area Equipment Code:

In-Charge: Trainees

YES NO INSPECTION ITEMS

 Are all Computer checked for possible Virus infection?

 Are all unwanted or unnecessary files checked and deleted?

 Are all unnecessary Software removed or uninstalled?

 Are all for hard disk error checked?

 Are all Installed Software Updated?

 Are all Computer hardware Devices(Monitor, Keyboard, Mouse, Monitor, System Unit, Printer, AVR) Cleaned? Inspected by:

(4)

EQUIPMENT RECORD WITH CODE AND DRAWING

No. Location Equipment

No. Qty Title Description

PO No.

Drawing Ref.

1 Practical

work area PC 1 5 Desktop PC

Oxy-Acetylene cutting outfit (Heavy Duty)

A 01-1

2 Practical

work area PC 2 5 Desktop PC

Recovery/ Recycle equipment, 220V(Van Steenburgh) B 01-1 3 Practical

work area PC 3 5 Desktop PC

Split Type Air Conditioner,

1.5HP

C 01-1

4 Practical

work area PC 4 5 Desktop PC

Vacuum Pump, 1/4

HP, 220V (Snap=On)

(5)

TAG-OUT BILL

DANGER/CAUTION TAG-OUT INDEX AND RECORD AUDITS

LOG SERIAL DATE ISSUED TYPE ( Danger/ Caution) DESCRIPTION (System Components, Test reference, etc.) DATE COMPLETED 01 01/10/14 DANGER Power Chord Damage Danger of shocks, burns, or fire. 01/11/14 02 01/10/14 WARNING Computer AVR 300watts Don’t overload, it may explode and

create fire

01/12/14

03 01/10/14 CAUTION

Desktop PC 1 Don’t connect any

External Storage device like USB

flash drives No antivirus

installed

(6)

WASTE SEGREGATION LIST

Section Area Hardware Servicing NC II Workshop Practical Work Area/Computer

GENERATED/ACCUMULATED WASTE WASTE SEGRATION METHOD

Recycle Compost Dispose

1. Bags, Plastic 

2. Batteries 

3. Books  

4. Brochures, Glossy  

5. Cans 

6. Printer Inkjet Cartridges 

7. Wrapping paper  8. Fluorescent Tubes   9. Plastic bottles  10. Used RJ45  Prepared by: JONEL G. LAMBAYAN Trainer Approved by:

ENGR. ROLANDO V. ANDAYA

(7)

BREAKDOWN/REPAIR REPORT

Area Section Practical Work Area

In-Charge Jonel G. Lambayan

FACILITY

TYPE INCIDENT RECOMMENDATION

Printer –

Epson LX300 Overheating Send to Epson Service Center

Monitor of

PC no. 1 Blackout Sent to Computer Technician

Reported by:

Jonel G. Lambayan Date: January 10, 2014

Prepared by:

JONEL G. LAMBAYAN

Trainer

Approved by:

ENGR. ROLANDO V. ANDAYA

(8)

WORK REQUEST

Unit No. PCSYSTEM1

Description

PC System unit unable to produce output video display to the monitor

Observation/s:

PC System unit unable to produce output display to the monitor or the video card is damaged

Date Reported:

January 10, 2014

Reported by:

Jonel G. Lambayan

Activity:

PC System unit should be diagnosed to identify the cause of the problem and replace the damage part immediately

Date Completed:

Signature:

Spare parts used:

Nvidia GeForce GTX PCI 1Gb Video Card

Prepared by:

JONEL G. LAMBAYAN

Trainer

Approved by:

ENGR. ROLANDO V. ANDAYA

(9)

SALVAGE REPORT

Area Section Practical Work Area / Computer Hardware Servicing Workshop

In-Charge Jonel G. Lambayan

FACILITY

TYPE PART ID RECOMMENDATION

Printer –

Epson LX300 Overheating Forward to CHS workshops as Instructional Materials Monitor of

PC no. 1 Blackout Forward to CHS workshops as Instructional Materials

Reported by:

Jonel G. Lambayan Date: January 10, 2014

Prepared by:

JONEL G. LAMBAYAN

Trainer

Approved by:

ENGR. ROLANDO V. ANDAYA

(10)

INSPECTION REPORT

Area Section Practical Work Area / Computer Hardware Servicing Workshop

In-Charge Jonel G. Lambayan

FACILITY

TYPE INCIDENT ACTION TAKEN PROGRESS / REMARKS

Printer – Epson

LX300 Overheating Sent to Epson Service Center

Cannot be repaired;

replace printer Monitor of

PC no. 1 Blackout Sent to Computer Technician

Cannot be repaired; replace printer Reported by: Jonel G. Lambayan Date: January 10, 2014 Prepared by: JONEL G. LAMBAYAN Trainer Approved by:

ENGR. ROLANDO V. ANDAYA

(11)

HOUSEKEEPING SCHEDULE

Qualification: Computer Hardware Servicing

NCII Station Practical Work Area

Area/Section: CHS NC II Workshop Tools/Equipment PC & Other Equipment needed for CHS training In-Charge: Jonel G. Lambayan Services Training Use

ACTIVITIES Responsible Person Schedule for the Month of November, 2013 DAYS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Cleaning 5S Floors, Tables, Chairs,

Boards and Printers Trainees

x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x Checking and cleaning all computer units Trainees x x x Disposing/Emptying the garbage/trash can Trainees x x Cleaning of Ceiling

and walls Trainees x x x

Arranging chairs, tables, tool cabinets

& Waste Disposal

References

Related documents

To date, no studies have examined typologies in Chinese premarital couples except one exploration using 204 Chinese married couples in Hong Kong (Young, 1995). Therefore, the

While the effect of dust pollution on the yield of solar panels have been confirmed and documented in the Middle East and North African (MENA) regions, studies on

The balancing of these factors will determine whether institutions of higher education in the United States continue to be the world leaders in graduate education and research and

Averaging is used to reduce the status to two-second updates, then the status is stored in the DrillByte Common Data Area (E_ST_SLIP_ST). from Possible Stick-Slip to

IL-7 induces surface IL-7Rα downregulation in a dose-dependent manner (A) HPB-ALL cells were cultured in the presence of increasing doses of IL-7 (0 to 100ng/ml) in culture

Measure for Measure and the author of its Prologue, make it evident that if extra music had been needed for The Loves of Dido and Aeneas, Daniel Purcell was the most likely person to

In the following, the research question on the depiction of refugees as Muslims is addressed by outlining three major discursive strands that were uncovered in the media analysis:

The DC Real Estate Licensure Law requires pre-licensing education for consumers interested in obtaining a Salesperson or Broker license. Pre-licensing education