Asset Maintenance Integrated Management Plan (AMIMP)

N/A
N/A
Protected

Academic year: 2021

Share "Asset Maintenance Integrated Management Plan (AMIMP)"

Copied!
24
0
0

Loading.... (view fulltext now)

Full text

(1)

 

 

 

 

Asset  Maintenance  

Integrated  Management  Plan  

(AMIMP)  

 

for  

 

(2)

Ref: Asset Maintenance Integrated

Management Plan.docx Revised: Dec 2013 Version: 1.0 Page 2 of 24

 

Table  of  Contents  

 

Table  of  Contents

 ...  2

 

1.

 

Document  Control  and  Records

 ...  3

 

2.

 

Project  Details  and  Introduction

 ...  4

 

3.

 

Policy  Directive

 ...  5

 

4.

 

Objectives  and  Targets

 ...  6

 

5.

 

Authority  and  Responsibility

 ...  8

 

6.

 

Site  Induction  &  Training

 ...  11

 

7.

 

Consultation  and  Project  Communication

 ...  12

 

8.

 

Subcontractors

 ...  13

 

9.

 

Materials

 ...  14

 

10.

 

Hazard  Identification,  Risk  Assessment  and  Control

 ...  15

 

11.

 

Plant  and  Equipment

 ...  17

 

12.     Inspection  Testing  and  Servicing

 ...  18

 

13.

 

Incident  Management

 ...  20

 

14.

 

Emergency  Management

 ...  21

 

15.

 

Corrective  Action,  Defects  and  Reporting

 ...  22

 

16.

 

Internal  Reviews  and  Project  Document  Control

 ...  23

 

17.

 

Work  Completion  and  Client  Feedback

 ...  24

                                   

(3)

Ref: Asset Maintenance Integrated

Management Plan.docx Revised: Dec 2013 Version: 1.0 Page 3 of 24

 

1.

Document  Control  and  Records  

This  Project  Management  Plan  is  maintained  by  Buri  Building  &  Design  and  kept  up  to  date  through  regular   reviews  carried  out  on  a  monthly  basis.  At  all  times  an  up  to  date  copy  of  this  plan  shall  be  kept  in  the   project   folder   and   made   available   to   all   employees   and   subcontractors   involved   in   the   project.   Amendments  that  are  made  to  this  document  are  recorded  on  the  register  of  amendments  below  and  shall   be  approved  by  the  Managing  Director.  Superseded  versions  of  this  document  shall  be  maintained  for  a   period  of  7  years  to  demonstrate  record  of  WHS  management  and  compliance.  

 

This   document   shall   be   created   prior   to   commencement   of   the   project   and   a   controlled   copy   shall   be   supplied   to   all   interested   parties.   Distribution   of   controlled   copies   shall   be   recorded   on   the   distribution   register   below.   When   changes   are   made   to   this   document,   parties   listed   below   shall   be   provided   with   updates.  

 

General  documentation  shall  be  controlled  through  use  of  dates  and  version  numbering  as  applicable.    

Each  section  in  this  manual  identifies  records  that  will  be  produced.  All  records  shall  be  maintained  on  site   and   then   kept   for   7   years   after   completion   of   the   project.   If   records   are   produced   relating   to   injuries,   employee  health  monitoring  or  employee  medical  information,  these  shall  be  maintained  indefinitely.      

 

Register  of  Amendments  

Date   Page/Form  No.   Version  No.   Description  of  Amendments   Prepared  by   Approved  by  

                                                              Distribution  Register   Version  

No.   Date  of  Issue   Name  of  Recipient   Position  /  Organisation  

                                               

(4)

Ref: Asset Maintenance Integrated

Management Plan.docx Revised: Dec 2013 Version: 1.0 Page 4 of 24

 

2.

Project  Details  and  Introduction    

Project   Job  Number    

Project  Name     Project  Address     Project  Manager    

Contact  Number   Business  Hours:                                                                                                          Mobile:     Email    

WHS  Representative     First  Aid  officer      

 

Description  of  Works    

Commencement  date:                                /                  /                                                                                                                            

Planned  completion  date:                    /                  /                                                                                                                      Project  Duration:  

 

(enter  scope  of  works  for  project)                                     Work  Hours  

(as  per  contract/  Council   requirements)      

(5)

Ref: Asset Maintenance Integrated

Management Plan.docx Revised: Dec 2013 Version: 1.0 Page 5 of 24

 

3.

Policy  Directive  

Buri  Building  &  Design  Pty  Ltd,  as  an  Aboriginal  owned  and  managed  building  company  is  committed  to   protecting   the   environment   and   ensuring   the   health   and   safety   of   its   employees   whilst   delivering   the   highest   level   of   quality   to   the   client.   Our   company   recognises   and   accepts   its   responsibility   towards   personnel,  the  environment  and  client  welfare  and  interest.  

 

In   achieving   our   corporate   responsibilities,   Buri   Building   &   Design   ensures   our   operations   comply   with   legislative,   contractual   and   regulatory   requirements.   Buri   management   will   demonstrate,   through   policy   development,   compliance   with   current   Acts,   Regulations,   Standards   and   Codes   of   Practice,   and   reviews   that  our  integrated  management  system  receives  priority  attention  on  a  continual  basis.      

 

Buri’s   commitment   is   communicated   through   this   policy   to   employees,   subcontractors   and   relevant   stakeholders  and  displayed  in  our  office.  The  Policy  is  endorsed  by  senior  management  and  reviewed  to   ensure   ongoing   suitability   and   effectiveness.   Managers   will   be   responsible   for   the   implementation,   promulgation  and  communication  of  the  concepts  in  this  Plan  to  all  personnel  under  their  management.    

All  employees,  contractors,  subcontractors  and  visitors  will  be  expected  to  demonstrate  a  willingness  to   embrace   the   models   outlined   in   this   Plan   with   the   vision   of   working   towards   effective   and   efficient   implementation,  management  and  improvement.  All  personnel  will  be  responsible  for  discouraging  others   from  working  in  a  manner  that  does  not  align  with  this  Plan.  

 

Resources   conducive   to   the   company's   emphasis   towards   Work,   Health   and   Safety,   Environmental   Management  and  Quality  Management  have  been  made  available  to  meet  and  exceed  the  objectives  and   targets  outlined  in  this  Plan.  

 

Education   and   training   of   all   employees,   contractors   and   subcontractors   is   considered   to   be   a   natural   course  of  employment,  and  all  will  be  encouraged  to  embrace  this  concept  to  ensure  compliance  with  the   stated  integrated  system  management.  

    Signed,             Will  Morgan   Managing  Director   17/12/2013  

 

(6)

Ref: Asset Maintenance Integrated

Management Plan.docx Revised: Dec 2013 Version: 1.0 Page 6 of 24

 

4.

 Objectives  and  Targets  

Buri  Building  &  Design  have  developed  the  following  objectives  and  targets  in  order  to  comply  with  our   policy  and  continually  improve  the  performance  of  all  our  management  systems.  

 

Ref   Objective   Target   Policy  Area   Responsibility   Time  Frame   Record  

1   Comply  with  all   relevant  legislative   requirements  

Update  Integrated   Management  System   (IMS)  as  legislative   changes,  alerts  and   audit  reports  occur  

WHS,  QMS  

&  EMS   Systems  Manager   Ongoing   Audit  Reports  Record  &   document   register   2   Ensure  that  all  

employees  and   subcontractors  are   aware  of  site   requirements  and   risks    

All  personnel  working   on  site  to  be  inducted  

WHS,  QMS   &  EMS   Project  Manager   &  Subcontractor   Liaison  Officer   Project   commencement   Online   Induction  &   Induction   register   All  personnel  working  

on  site  to  hold  a   current  construction   industry  induction  card  

WHS   Project  Manager   &  Subcontractor   Liaison  Officer  

Project  

commencement   Online  Induction  &   Induction   register   All  personnel  working  

on  site  to  read  and  sign   the  relevant  Safe  Work   Method  Statements   (SWMS)   WHS   Project  Manager   &  Subcontractor   Liaison  Officer   Project   commencement   SWMS  Checklist   Regular  email   communication   throughout  the  project   with  monthly  tool  box   talks  and  safety  alerts   as  required   WHS,QMS  &   EMS   Project  Manager   &  Subcontractor   Liaison  Officer  

Monthly   Tool  Box   Meeting   Minutes  

3   Zero  Incidents   Report  all  near  misses  

&  Incidents   WHS  &  EMS   All  personnel   Ongoing   Incident  Investigation   Report  Form   &  Register   Analyse  all  incidents  

and  develop  corrective   action  to  prevent   reoccurrence  

WHS  &  EMS   All  personnel   Ongoing   Incident   Investigation   Report  Form   &  Register   Carry  out  Asset  

Maintenance   inspections    

WHS  &  EMS   Project  Manager   Monthly   Asset   Maintenance   Inspection   Nil  waste  to  waterways   EMS   All  personnel   Ongoing   Incident  

Investigation   Report  Form   &  Register   4   Reduce   environmental   footprint  

Reduce  baseline  data   EMS   Systems  Manager   Ongoing   Energy,   Water,  Waste   Receipts                

(7)

Ref: Asset Maintenance Integrated

Management Plan.docx Revised: Dec 2013 Version: 1.0 Page 7 of 24

 

Ref   Objective   Target   Policy  Area   Responsibility   Time  Frame   Record  

5   Maintain  positive  

client  satisfaction   Monitor  Project  Performance  Reports     QMS   Systems  Manager     Completion  of  project   Project  Performance   Report   Seek  and  monitor  

client  feedback  on  a   regular  basis  and  as   required  

QMS   Managing   Director  &  Project   Manager  

Ongoing   Interim,  Pre   handover  &   Handover   Minutes   6   Maintain  high  

quality  of  work  

Zero  defects  at   handover  

QMS   Project  Manager   Handover   Scopes,   Defects   register,   Interim,  Pre   handover  &   Handover   Minutes   Maintain  zero  non  

conformances   WHS,  QMS  &   EMS   Systems  Manager   &  Project   Manager   Ongoing   Non   Conformance   Register            

(8)

Ref: Asset Maintenance Integrated

Management Plan.docx Revised: Dec 2013 Version: 1.0 Page 8 of 24

 

5.

Authority  and  Responsibility  

Organisation  structure:  

                                               

 

 

Roles  and  Responsibilities:  

The  above  mentioned  personnel  have  their  roles  outlined  below:    

Managing  Director  

 

o Defining  Integrated  Management  System  (IMS)  Policies,  Objectives  and  Procedures.  

o Ensuring  that  adequate  human,  technical  and  financial  resources  are  allocated  to  the  project  

o Defining  roles  &  responsibility  of  personnel.  

o Ensuring   that   adequate   human   resources   and   training   hours   are   allocated   to   implement   the   findings  of  the  internal  reviews  and  audits.  

o Monitor  customer  satisfaction  and  take  action  to  ensure  that  it  remains  positive.    

Systems  Manager      

o Ensuring  compliance  with  legislation,  regulations  and  approval/permit/licensing  conditions.  

o Developing  appropriate  IMS  procedures.  

o Determine  and  plan  IMS  verification  requirements  such  as  audits,  inspections  and  reviews.  

o Undertaking  and  implementing  findings  of  the  internal  reports,  inspections,  incidents,  reviews  and   audits  of  the  IMS.  

o Implementing  the  Integrated  Management  Plan  (IMP).  

o Deciding  when  IMS  training  is  required,  planning  and  coordinating  training.  

o Carrying  out  Aspect  and  Impact  assessments  and  establishing  control  activities  to  minimise   impacts  prior  to  commencement  of  the  project  and  at  times  of  change  during  the  project.  

Managing   Director   Systems   Manager   Injury   Management   Co-­‐ordinator   Project   Manager   Employees/   Subcontractors   Subcontractor   Liaison  Officer   First  Aid     Officer  

(9)

Ref: Asset Maintenance Integrated

Management Plan.docx Revised: Dec 2013 Version: 1.0 Page 9 of 24

 

o Conduct  Risk  Assessment  using  the  Hierarchy  of  Controls  and  construct  activities  to  minimise  WHS   risks  prior  to  commencement  of  the  project  and  at  times  of  change  during  the  project.  

o Coordinating  IMS  meetings,  programs  and  reviews.  

o Act  as  the  management  representative  for  Quality,  Environment  and  WHS  matters.  

o Maintain  and  update  the  management  plan  as  required  and  ensure  updates  are  communicated  to   interested  parties.  

o Monitor  customer  satisfaction  and  take  action  to  ensure  that  it  remains  positive.   o Developing  and  implementing  emergency  procedures.  

o Communicate  information,  policy  and  procedures  to  staff  and  subcontractors  as  required  (eg   changes  to  legislation,  updates  to  management  system  procedures  etc).  

o Providing  advice  on  IMS  management  to  all  employees  &  subcontractors  as  required.   o Ensuring  toolbox  talks  are  conducted  on  a  monthly  basis.  

o Closing  out  incident  investigations  and  reporting  to  the  Managing  Director  and  relevant   authorities,  as  required.  

o Making  sure  records  are  kept  as  required.  

o Reporting  on  IMS  performance  to  Managing  Directors.    

Project  Manager  

o Oversee  all  site  activities.  

o

Plan  the  delivery  of  the  project  to  be  on  time  and  within  budget.

 

o

Maintaining  all  records  and  documentation  for  the  project.

 

o Ensuring  compliance  with  procedures,  rules  and  regulations  of  the  AMIMP,  including  Safe  Work   Methods  Statements  (SWMS).  

o Reviewing  reports  and  inspections  and  follow  up  on  recommendations  and  implementing   corrective  actions.  

o Report  to  the  Director  and  Systems  Manager  on  compliance  and  effectiveness  of  the  AMIMP.  

o Plan  for  financial  resources  as  required.  

o

Ensure  all  changes  to  project  documentation  are  communicated  and  provided  to  Systems  

Manager,  Buri  team,  Subcontractors,  relevant  stakeholders  and  interested  parties.

 

o Leading  by  example  and  promoting  sound  practices  at  every  opportunity.  

o Ensuring  safe  equipment  and  plant  is  provided  and  maintained.  

o Coordinating  incident  investigations  and  reporting  to  the  Systems  Manager  and  relevant   authorities,  as  required.  

o Coordinating  and  carrying  out  site  meetings  and  programs  including  tool  box  talks  monthly.  

o Monitoring  and  managing  compliance  with  AMIMP,  workplace  injury  management  and  workers   compensation  legislation,  regulations,  standards  and  codes.  

o Providing  advice  and  assistance  on  IMS  matters  to  employees  and  subcontractors.  

o Carrying  out  workplace  inspections  and  reports  and  communicating  unsafe  practices  and   reassessing  changes  in  site  status.  

o Removing  /  quarantining  any  unsafe  materials  on  site  and  implementing  the  hazardous  materials   procedure.  

o Helping  to  prepare  Safe  Work  Method  Statements  for  the  organisation’s  work  activities.  

o Verifying  by  way  of  inspections  that  work  areas,  work  methods,  materials,  plant  and  equipment   comply  with  legislation  and  applicable  requirements  where  appropriate.  

o Establishing  and  implementing  WHS  Consultation  arrangements  in  accordance  with  legislation.   o Review  subcontractor  safe  work  method  statements  and  risk  assessments  and  liaise  outcomes  

with  Subcontractor  Liaison  Officer.  

o Liaise  with  Systems  Manager  in  regards  to  information  to  communicate  in  site  inductions  and   toolbox  talks  via  email  to  subcontractors.  

o Collect  quality  documents  from  suppliers  including  delivery  documentation  for  materials,   certificates  of  conformance  etc,  where  appropriate.  

(10)

Ref: Asset Maintenance Integrated

Management Plan.docx Revised: Dec 2013 Version: 1.0 Page 10 of 24

Subcontractor  Liaison  Officer  

o Collect  and  liaise  with  subcontractors  in  regards  to  safe  work  method  statements,  risk   assessments,  Safety  Data  Sheets  (SDS),  tool  maintenance,  induction  details,  Subcontractor   Agreements,  licences,  insurances  and  certificates  of  conformance.  

o Communicate  with  Project  Manager  regarding  outcomes  of  subcontractor  liaisons.   o Collect  quality  documents  from  suppliers  including  delivery  documentation  for  materials,  

certificates  of  conformance  etc,  where  appropriate.    

 

Injury  Management  Coordinator  

INSERT  NAME  is  responsible  for  the  management  of  injuries  at  the  workplace.  

 

o Assisting  injured  employees  to  return  to  their  pre-­‐injury  duties  as  soon  as  practicable  after  a  work-­‐ related  injury.  

o Ensuring  that,  where  appropriate,  the  injured  employee  is  given  access  to  occupational   rehabilitation  services.  

o Liaising  with  any  parties  involved  in  the  occupational  rehabilitation  of,  or  provision  of  medical   services,  to  the  injured  employee.  

o Monitoring  the  progress  of  the  injured  employee’s  capacity  to  work.  

o Taking  steps  to  prevent  recurrence  or  aggravation  of  the  relevant  injury  upon  the  injured   employee's  return  to  work.  

o Providing  assistance  to  meet  all  legal  requirements  regarding  injury  management  and  return  to   work.    

 

First  Aid  Officer  

INSERT  NAME  is  responsible  for  administering  first  aid  and  maintains  the  first  aid  kit  for  Buri  employees.     Subcontractors  INSERT  NAME  are  responsible  for  carrying  their  own  first  aid  kits  and  administering  their   own   first   aid.   Subcontractors   are   required   to   identify   is   they   are   working   alone   on   site   and   the   Lone   Worker  Communication  Plan  will  be  implemented.  

 

Employees  and  Subcontractors  

o Working  in  a  safe  manner  without  risk  to  themselves,  others  or  the  environment.  

o Complying  with  site  rules.  

o Complying  with  the  AMIMP  including  all  Safe  Work  Method  Statements.  

o Reporting  all  incidents,  hazards,  faulty  equipment  and  near  misses  to  the  Project  Manager.  

o Reporting  all  injuries  and  illnesses  to  the  designated  First  Aid  Officer/  Project  Manager.  

o Providing  suggestion,  where  appropriate,  on  how  to  improve  WHS  issues.  

o Seeking  assistance  if  unsure  of  AMIMP  rules.  

o Correct  use  of  personal  protective  equipment/environmental  controls  where  appropriate.  

o Complying  with  emergency  and  evacuation  procedures.  

o Subcontractors  to  provide  Buri  with:    

• SDS  Register  (see  section  9  -­‐  Materials)  

• SWMS  (see  section  10  –  Hazard  Identification,  Risk  Assessment  and  Control)   • Copy  of  Insurance  Policies  

• Copy  of  White  Card  

• Tools  &  Equipment  Maintenance  Register  (see  section  11  –  Plant  &  equipment)  

(11)

Ref: Asset Maintenance Integrated

Management Plan.docx Revised: Dec 2013 Version: 1.0 Page 11 of 24

6.

Site  Induction  &  Training  

Site  Induction  

All  persons  working  on  the  project  shall  be  inducted  into  the  Asset  Maintenance  Integrated  Management   Plan   (AMIMP).   An  online   induction   will   be   carried   out   by   subcontractors   and   employees   to   induct   all   personnel   into   the   Buri   Building   &   Design   IMS   requirements   for   Asset   Maintenance   projects.   Only   subcontractors   that   have   passed   the   online   induction   will   be   able   to   carry   out   work   on   Buri   sites.   An   additional  Toolbox  Talk  will  be  undertaken  at  the  commencement  of  the  project  to  provide  an  opportunity   to  communicate  additional  site  specific  requirements  and  hazards,  risk  control  measures  and  site  rules.      

The  Project  Manager  shall  complete  the  Site  Induction  Record.  The  Site  Induction  Record  shall  be  kept  as   a  record  of  the  induction.  A  register  shall  be  maintained  that  identifies  all  persons  inducted  into  Repairs   and  Maintenance  Projects.    

 

Visitors  that  will  not  be  carrying  out  work  shall  be  inducted  using  the  Visitor  Induction  Form.    

Training  

Training   needs   and   competence   shall   be   identified   by   Project   Manager   during   the   induction,   tool   box   meetings,   and   through   day   to   day   activities   and   communicated   to   the   Systems   Manager   for   training   coordination.  Appropriate  training  shall  be  provided  as  required  by  suitably  qualified  people.    

 

No  person  may  operate  equipment  or  carry  out  a  task  without  receiving  training  from  a  suitably  qualified   person  or  being  assessed  as  competent.  

 

Toolbox  meetings  shall  also  be  used  to  provide  training  and  refresher  training.  Record  of  training  will  be   maintained   in   the   form   of   Toolbox   Meeting   Minutes,   Training   Register,   Induction   Records   and   photocopies  of  tickets,  licenses  and  certificates.  

 

The  table  below  documents  the  minimum  competence  for  each  position.  Where  deficiency  is  identified,   staff  shall  undertake  training  by  a  suitably  qualified  person  before  undertaking  work  on  the  project.  

 

Position   Training  Required  

Project  Manager   Buri  Asset  Maintenance  Online  Induction   Site  Specific  Tool  Box  Talk  

Trade  Certificate  

WHS  general  induction  for  construction  work  in  NSW   First  Aid  certificate  

10  years  industry  experience  

Carpenter   Buri  Asset  Maintenance  Online  Induction   Site  Specific  Tool  Box  Talk  

Trade  Certificate  

WHS  general  induction  for  construction  work  in  NSW   First  aid  certificate  (optional)  

Labourers   Buri  Asset  Maintenance  Online  Induction   Site  Specific  Tool  Box  Talk  

WHS  general  induction  for  construction  work  in  NSW   Visitors   Visitor  Induction  

Must  remain  with  inducted  person  at  all  times  

 

 

(12)

 

Ref: Asset Maintenance Integrated

Management Plan.docx Revised: Dec 2013 Version: 1.0 Page 12 of 24

7.

WHS  Consultation  and  Project  Communication  

WHS  Consultation  Arrangements  

Buri  Building  &  Design  promotes  the  active  participation  of  all  employees  in  WHS  decisions.    

At  the  beginning  of  the  year  a  staff  meeting  is  held  to  elect  the  consultation  arrangements  for  that  year.   This  may  be  to  form  a  WHS  committee  (if  20  or  more  staff  are  working  on  site  and  the  majority  elect),   the  use  of  a  WHS  employee  representative,  or  other  agreed  arrangements.    

 

For  all  WHS  Consultation  please  contact:    

Name:  __Buri  Building  &  Design  Office  ___Phone:____02  9355  2800______________    

Project  Communication  

Toolbox  meetings  are  held  as  a  minimum,  throughout  the  term  of  the  Asset  Maintenance  contract  on  a   monthly   basis   via   face   to   face,   telephone   or   email   communication   and   documented   on   the  Toolbox   Meeting   Minutes   Form.   Tool   box   meetings   are   held   to   communicate   with   Employees   and   Subcontractors  about  relevant  risks  and  controls  onsite,  as  well  as,  to  provide  a  method  of  consultation,   reporting   and   training.   Toolbox   meetings   may   be   held   more   frequently   if   required   in   the   event   of   an   incident   or   changes   to   site.   Minutes   of   the   tool   box   meeting   will   be   taken   by   the   Project   Manager/   Systems  Manager  as  appropriate  and  maintained  in  the  Project  folder  as  evidence  of  the  process.    

 

Safety  Alerts  are  used  to  inform  Employees  and  Subcontractors  on  matters  that  affect  their  health  and   safety.  These  alerts  will  be  communicated  by  the  Buri  office  via  email  or  telephone.  If  required  a  toolbox   meeting  or  follow  up  email  will  be  sent  to  inform  personnel  of  the  control  measures  taken  to  negate  the   risk.  All  Safety  Alerts  provided  during  a  project  will  be  kept  in  the  Project  Folder.  

(13)

 

Ref: Asset Maintenance Integrated

Management Plan.docx Revised: Dec 2013 Version: 1.0 Page 13 of 24

8.

Subcontractors    

Buri  Building  &  Design  insists  that  all  service  providers  working  on  the  project  comply  with  the  AMIMP   requirements.  

 

All  subcontractors  have  been  assessed  and  selected  based  on  their  ability  to  comply  with  requirements   as   per   our   corporate   procedures.   All   service   providers   are   provided   with   a   copy   of   this  Asset   Maintenance  Integrated  Management  Plan  (AMIMP)  and  expected  to  comply  with  its  requirements.    

Prior  to  commencement  of  the  project,  Subcontractors  are  required  to  submit  the  following  documents:   1. SWMS  (see  section  10  –  Hazard  Identification,  risk  assessment  &  control)  

2. Insurance  policy/policies   3. SDS  Register  (as  required)   4. White  Card  

5. Tools  &  Equipment  Maintenance  Register  (as  required)   6. Subcontractor  Agreement  with  an  agreed  margin    

A   scope   of   works   shall   be   provided   to   the   Subcontractor.   This   scope   of   works   clearly   describes   the   product   or   service   to   be   supplied.   Work   outside   this   scope   will   require   a   variation   approval   by   the   Project  Manager  prior  to  commencement  of  work.  Work  that  has  been  completed  by  the  Subcontractor   shall   be   inspected   by   the   Project   Manager   prior   to   approving   the   Subcontractor’s   invoice/progress   claim.    

 

Subcontractors  are  requested  to  identify  in  the  Subcontractor  Agreement  if  they  are  working  alone  on   site  and  the  Lone  Worker  Communication  Procedure  will  be  implemented.  Subcontractors  also  need  to   carry  a  first  aid  kit  to  the  project.  

 

At  completion  of  the  project,  Subcontractors  are  required  to  submit  the  following  documents:   1. Relevant  warranties  and  certificates  of  conformance  (as  required)  

2. Invoice  with  itemised  completed  scope  of  works   3. Separate  invoice  for  variations  

 

For  more  payment  information  please  refer  to  Buri  Payment  Cycle  document  sent  in  the  Subcontractor   Information  Pack.  

 

At  completion  of  the  project,  the  project  Manager  will  carry  out  reviews  of  Subcontractor  performance   using  the  Subcontractor  Performance  Appraisal  Form  including  review  of  the  Subcontractors  Safe  Work   Method  Statement  to  determine  compliance  to  its  requirements.  Where  Subcontractors  are  found  to  be   in  breach  of  requirements  they  will  be  presented  with  a  formal  Corrective  Action  Request  (CAR).  

 

Design  Consultants  

For  design  changes  required  during  the  project,  the  corporate  procedures  for  design  management  and   hazard  identification  and  risk  assessment  shall  be  followed.  Any  design  changes  that  occur  during  the   project  shall  be  assessed  for  WHS  hazards  that  the  design  introduces.  See  section  4.8  of  the  corporate   WHS  manual  and  the  Hazard  identification  and  Risk  Assessment  Procedure  for  more  information.  

(14)

 

Ref: Asset Maintenance Integrated

Management Plan.docx Revised: Dec 2013 Version: 1.0 Page 14 of 24

9.

Materials    

Purchasing  of  Materials    

Prior  to  purchasing  materials  (from  suppliers  that  have  been  assessed  as  being  able  to  comply  with  WHS   requirements  for  supply  and  delivery  of  materials),  Buri  Building  &  Design  ensures  that  a  risk  assessment   is  carried  out  to  identify  potential  WHS  hazards  and  hazardous  materials.  When  hazards  are  identified,   controls  are  implemented  based  on  the  hierarchy  of  control.  First  control  will  always  be  to  eliminate  the   use  of  the  material  or  substitute  with  a  different  material  that  may  be  less  hazardous.    

 

All  materials  utilised  by  employees  are  to  specifications  outlined  by  clients.  If  materials  and  equipment   are  found  to  be  non  conforming,  they  will  be  returned  to  the  supplier.    

 

Materials  Delivery    

Delivery   of   materials   on   site   will   be   organised   between   the   Project   Manager   and   Supplier/   Subcontractor.  For  all  materials  purchased  by  Buri  or  delivered  to  site,  delivery  dockets  will  be  signed   and  dated  by  the  Buri  representative  and  then  kept  as  a  hard  copy  record  and  filed  in  the  project  folder.   All  purchased  materials  shall  be  inspected  on  delivery  to  check  that  the  delivery  matches  the  purchase   order.  For  materials  that  present  a  health  hazard  such  as  chemicals  and  substances,  Safety  Data  Sheets   will  be  collected  and  kept  on  file.  For  materials  that  have  specific  performance  requirements,  certificates   of   compliance   will   be   requested   from   the   supplier   and   kept   as   record.   For   concrete   pours   and   other   materials  requiring  traceability,  the  work  area  will  be  recorded  on  the  delivery  docket.  

 

Handling  and  Storage  of  Materials    

Consideration  of  general  material  handling  including  manual  handling  shall  be  identified  and  assessed  in   the   SWMS.   Where   materials   have   been   identified   as   presenting   significant   risk,   controls   shall   be   developed  to  manage  these  risks,  such  as  two  man  lifting,  mechanical  aids,  PPE  etc.  Controls  shall  be   developed  using  the  Hierarchy  of  Control.  

 

For  materials  that  are  regularly  carried  to  site  by  Buri  Employees,  Safety  Data  Sheets  (SDS)  are  included   in  a  SDS  booklet,  kept  in  vehicles.  All  SDS  information  in  the  booklet  is  dated  within  the  last  5  years  and   comply  with  Australian  standard  requirements.  For  all  materials  identified  as  hazardous  substances  on   the   SDS,   a   documented  Risk   Assessment   shall   be   completed   and   kept   with   the   SDS   booklet.   The   hazardous   substance   shall   also   be   recorded   on  the  Hazardous   Substances   Register.   For  materials  not   regularly  carried  to  site,  SDS  is  visible  on  packaging.  

 

For  materials  bought  onsite  by  Subcontractors,  SDS  hard  copy  is  required  to  be  with  the  Subcontractor.    

No   storage   of   materials   including   hazardous   substances   will   occur   on   the   R&M   Sites.   Storage   of   materials  will  be  away  from  site  in  accordance  with  the  manufacturer  recommendations.  

 

If  a  material  or  substance  requires  quarantining,  then  a  Corrective  Action  Request  Form  will  be  issued   to  the  Subcontractor  or  person  responsible  for  the  item.  Disposal  of  the  material  or  substance  will  be   the  responsibility  of  the  owner  or  person  who  brought  the  item  to  the  site.  

 

Hazardous  Materials    

Where   hazardous   materials   such   as   asbestos,   hazardous   chemicals,   lead   etc   are   present   on   site,   specialised  contractors  or  qualified  people  will  be  used  to  handle  these  materials.  Hazmat  personnel  will   be  inducted  into  the  site  as  per  the  planned  arrangements  and  copies  of  tickets  and  licenses  shall  be   maintained  in  the  project  folder.  Where  required,  individual  management  plans  for  hazardous  materials   shall   be   developed   by   the   contractor.   Please   refer   to   the  Hazardous   Substances   –   Identification,  

(15)

 

Ref: Asset Maintenance Integrated

Management Plan.docx Revised: Dec 2013 Version: 1.0 Page 15 of 24

10.

Hazard  Identification,  Risk  Assessment  and  Control    

In  order  to  comply  with  the  NSW  Work,  Health  and  Safety  Regulation,  Buri  Building  &  Design  requires   that  all  potential  hazards  and  risks  shall  be  identified,  assessed  and  controls  shall  be  developed  based  on   the  hierarchy  of  controls.  

 

Risk  Assessment  

Before  commencing  works  on  site,  an  initial  project  Risk  Assessment  shall  be  completed  to  consider  all   potential   hazards   that  Buri   Building   &   Design   Employees   and   Subcontractors   will   be   exposed   to.   This   must  be  completed  by  the  Systems  Manager  or  Project  Manager  as  per  the  Identify  Hazard  and  Risk   Assessment  Procedure.  The  outcomes  of  this  assessment  shall  be  recorded  on  the  Hazard  Register.  This  

Risk   Assessment   forms   part   of   planning   for   the   project   including   identifying   what  SWMS   will   be   required  and  what  training  needs  may  exist.  

 

This  process  follows  these  steps:  

o Identify   hazards:   Use   the  Hazard   categories   as   a   guide   and   write   down   all   potential   hazards   that  

exist   from   a   broad   level   for   delivery   of   the   project   (on   the  Hazard   Register).   These   will   include   things  such  as  use  of  plant,  use  of  electricity,  excavation,  trades,  members  of  the  public,  etc.  The   purpose  of  this  activity  is  to  identify  all  activities  that  may  require  control.  This  is  also  how  we  know   what  activities  we  should  have  SWMS  for.  

o Assess  the  risk:  Using  the  Risk  Matrix  to  assess  the  likelihood  and  consequence  for  each  hazard  and  

look  up  the  corresponding  risk  rating  to  determine  the  level  of  risk.    

o Enter  this  information  in  the  Hazard  Register.  

o Develop  controls:  Controls  shall  then  be  considered  following  the  hierarchy  of  control  (elimination,  

substitution,  engineering  controls,  administration,  PPE).  The  first  consideration  is;  do  we  need  to  do   the   activity?   Can   we   change   the   design   to   remove   the   risk?   Then   we   need   to   consider   ways   of   substituting  with  a  less  risky  activity  (e.g.  use  of  a  non  toxic  chemical).  If  that  can’t  be  achieved  then   we  consider  engineering  controls  such  as  machine  guarding,  barriers  etc.  If  these  are  not  possible   then   we   consider   administration   such   as   work   instructions   and   signage.   The   last   type   of   control   used  is  PPE  (note  that  PPE  may  also  be  used  with  other  controls).  

Please   refer   to   Hazardous   substances   Identification,   Assessment,   Control   and   Documentation   Procedure.  

 

Safe  Work  Method  Statements  (SWMS)  

SWMS   shall   be   completed   for   all   the   activities   that   are   carried   out   by   any   person   on   site   (Including   Employees   and   Subcontractors).   SWMS   provides   information   on   control   measures   for   the   activity   the   Employee/Subcontractor   will   be   undertaking.   All   Buri   and   Subcontractor   SWMS   shall   be   kept   in   the   project  folder.  

 

Buri   SWMS   shall   outline   activities   undertaken   by   Buri   employees.   Buri   employees   need   to   read,   understand  &  sign  the  SWMS,  prior  to  commencing  work  onsite.  If  there  are  any  questions  in  regards  to   the  SWMS  they  should  be  directed  to  the  Project  Manager.  

 

Subcontractor   SWMS   shall   outline   activities   undertaken   by   the   subcontractor.   SWMS   need   to   be   completed  &  provided  to  the  project  manager  prior  to  commencement  of  the  project  work.  The  Project   Manager  shall  review  against  a  SWMS  checklist  and  provide  approval  for  commencement  of  the  work.   Subcontractor  SWMS  that  have  been  signed  by  the  Subcontractor  will  be  kept  in  the  Project  folder.  

(16)

 

Ref: Asset Maintenance Integrated

Management Plan.docx Revised: Dec 2013 Version: 1.0 Page 16 of 24

The  procedure  for  completing  SWMS  is  as  follows:   o Complete  the  information  on  page  1;  

o Identify  applicable  legislation  and  codes  of  practice  and  record  on  page  1;   o Break  the  activity  down  into  steps;  

o Write  down  the  hazards  associated  with  each  step;  

o Use  the  Risk  Matrix  to  assess  the  risk  associated  with  each  hazard;  and  

o Using  the  Hierarchy  of  control  (for  risk  assessment),  develop  the  best  control  that  is  reasonably   practicable.  

 

No  person  may  commence  work  unless  a  SWMS  has  been  completed,  reviewed  by  the  Project  Manager   and   signed   off   by   the   worker   carrying   out   the   activity   to   say   they   have   read   and   understand   its   requirements.   In   the   case   of   an   incident   or   emergency   situation,   all   SWMS   and   Risk   Assessments   applicable  to  the  incident  shall  be  reviewed  to  consider  future  mitigation  methods.  

 

Reporting  Hazards  

When  hazards  are  identified  through  day  to  day  activities,  personnel  are  required  to  alert  the  Project   Manager.  The  Employee  reporting  the  hazard  or  the  Project  Manager  collecting  the  information  from   personnel  is  required  to  complete  the  Hazard  Report  Form.  This  form  shall  be  completed  to  ensure  that   the  hazard  is  removed  or  controlled.  The  form  shall  be  filed  in  the  project  folder.  

 

PPE  

Employees   shall   be   provided   with   the   required   PPE.   This   shall   be   recorded   on   the   Buri  PPE   Register.

 

Subcontractors  are  required  to  supply  their  own  PPE.  

 

Site  Safety  Rules  

Any  additional  Site  Safety  Rules  are  prepared  by  the  Systems  Manager/Project  Manager  and  included  in   the   project   commencement   toolbox   talk   or   distributed   as   a   Safety   Alert   for   people   working   on   the   project.    

 

(17)

 

Ref: Asset Maintenance Integrated

Management Plan.docx Revised: Dec 2013 Version: 1.0 Page 17 of 24

11.

Plant  and  Equipment  

Plant  

Plant   that   is   owned   by   Buri   must   have   the   following   records   checked   by   the   Employee   using   the   plantprior  to  its  use:    

o Copy  of  plant  Work  Cover  Registration  (if  applicable);  

o Copy  of  detailed  plant  risk  assessment  and  safe  work  method  statements  detailing  that  prestart   inspections  will  be  carried  out  on  the  plant  each  day  it  is  used;  

o Copy  of  plant  maintenance  records;  

o Copy  of  SDS  for  fluids  associated  with  the  plant  (diesel,  grease  etc)  ;   o Copy  of  relevant  licences/permits  

 

Plant  that  is  owned  and  operated  by  Subcontractors  must  have  the  following  information  provided  to   Buri  Building  &  Design  prior  to  commencement  onsite    

o Copy  of  plant  Work  Cover  Registration  (if  applicable);  

o Copy  of  detailed  plant  risk  assessment  and  safe  work  method  statements  detailing  that  prestart   inspections  will  be  carried  out  on  the  plant  each  day  it  is  used;  

o Copy  of  plant  maintenance  records;  

o Copy  of  operators  tickets  or  training  records  for  persons  that  will  be  operating  the  plant;   o Copy  of  SDS  for  fluids  associated  with  the  plant  (diesel,  grease  etc)  ;  

o Copy  of  relevant  licences/permits    

Prior  to  operating  plant  on  site,  the  above  documents  must  be  available.  No  person  shall  operate  plant   without   a   valid   ticket   and   being   assessed   as   competent.   Operator   tickets   shall   be   kept   in   the   Employee/Subcontractor  file.    

 

Prior  to  commencing  excavation,  the  Permit  to  Excavate  Form  must  be  completed  and  signed  off  by  the   Project  Manager.  

 

Equipment  

All   Buri   electrical   equipment   shall   be   tested   and   tagged   on   a   quarterly   basis   in   accordance   with   the   Work  Cover  Code  of  Practice  and  recorded  on  the  Electrical  Tools  and  Equipment  Register.  

 

For  all  Electrical  equipment  utilised  by  subcontractors,  evidence  of  testing  shall  be  provided  to  Buri  prior   to  operating  onsite.    

(18)

 

Ref: Asset Maintenance Integrated

Management Plan.docx Revised: Dec 2013 Version: 1.0 Page 18 of 24

12.  Inspection  Testing  and  Servicing

Various   levels   of   inspection   and   testing   are   required   to   be   provided   on  Buri   Building   &   Design   Asset   Maintenance  projects.  Inspection  and  testing  may  include  but  not  limited  to  the  following  inspections   Safety   and   Environmental,   Scaffold,   Excavation,   Testing   and   Tagging   of   Electrical   and   Fire   Fighting   Equipment  as  well  as  lifting  chains,  slings,  harnesses  and  other  applicable  activities  to  control  risks  and   comply  with  WHS  legislation.  

 

The   following  Inspection   schedule   defines   the   requirements   and   frequency   for   inspection,   testing   and   approvals  on  the  project.  This  schedule  shall  be  updated  on  commencement  of  the  project  and  then  on   a  regular  basis  to  ensure  that  all  requirements  for  testing  and  inspections  are  being  met.  The  frequency   of   inspections   has   been   determined   according   to   the   risk   level   of   the   item.   This   schedule   must   be   implemented  on  the  project  and  shall  be  regularly  checked  by  the  Project  Manager  to  ensure  inspection   and  testing  is  being  completed.    

 

Equipment   that   does   not   pass   inspection   and   testing   shall   be   labelled   DO   NOT   USE   or   disposed   of   to   prevent  unintended  use.  

 

All  equipment  used  for  testing  of  equipment  shall  be  calibrated  to  the  manufacturer  recommendations.   Equipment  that  requires  calibration  will  be  logged  into  the  Calibration  Register.  This  register  has  details   of  last  calibration  date,  as  well  as,  due  date  of  next  calibration.  

 

All   equipment   will   be   serviced   according   to   the   manufacturers’   recommendations.   Equipment   that   requires   servicing   will   be   tagged   in   the   equipment   register.     This   register   has   details   of   last   date   of   service,  as  well  as,  due  date  of  next  service.  

 

Inspection  Schedule  

 

Item   Frequency   Record   Record  kept  /  

Identification   (Qualification)  Responsibility   Standard  /  Guideline   Asset   Maintenance   Safety  and   Environmental   Inspection   Monthly     Asset   Maintenance   Safety  and   Environmental   Inspection   Checklist  

Project  Folder   Project  Manager   (Workcover  WHS   General  Construction   Induction)   NA   Prestart  work   areas   inspection   Commencement  

of  Project   SWMS  Amendment  if   required  

Project  Folder     All  Employees  and   Subcontractors   (Workcover  WHS   General  Construction   Induction)   NA   Assessment  of   Subcontractor   SWMS   At  

Commencement   SWMS  Checklist   Project  Folder   Project  Manager   SWMS  for  activity   Buri  SWMS     Prior  to  

Employee   commencement   onsite  

Signed  SWMS   Project  Folder   Project  Manager   SWMS  for   activity   Plant  Inspection   Before  daily  use  

of  plant   Look  at  Plant  prestart   checklist  

On  Server  

On  Equipment   Project  Manager,  Employee  or  User   Excavation  Code  of  Practice   Risk  Assessment   Plant  

Maintenance   As  required  by  manufacturer   Maintenance  records  and  log   books  

On  Server   Project  Manager,  

(19)

 

Ref: Asset Maintenance Integrated

Management Plan.docx Revised: Dec 2013 Version: 1.0 Page 19 of 24

 

Item   Frequency   Record   Record  kept  /   Identification   Responsibility   (Qualification)   Standard  /   Guideline   Electrical   Equipment   Testing  and   Tagging   Quarterly   Electrical   equipment   register   On  Server   On  electrical   equipment  

Project  Manager   Electrical   Practices  for   Construction   Work  Code  of   Practice   Fire  Fighting  

Equipment   6  Monthly   Fire  equipment  register   (provided  by  fire   testing  

contractor)  

On  fire   equipment   On  server  

Systems  Manager   AS1851:2005  

Emergency   Procedures   (evacuation   drill)   Commencement   of  Project  

Record  on  Tool   Box  meeting   minutes  

Project  Folder   Project  Manager   (Work  Cover  WHS   General  Construction   Induction)   Risk   Assessment,   WHS  Regulation   Harnesses   Visual   inspection   before  each  use,   hooks  inspected   before  each  use.   (If  required)  

Not  recorded     User    

Incoming  

Materials   On  arrival  includes   materials,  plant   and  equipment  

Record  on   delivery  docket   and  file.  Plant   inspection  use   plant  checklist  

Project  Folder   Buri  Representative    

Form  Work   Before  pouring   concrete  

    Concrete  contractor,   Project  Manager  

  Project  internal  

audit   Completion   Project  report   Project  Folder   Systems  Manager   This  Manual  

Insert   additional   items                    

(20)

 

Ref: Asset Maintenance Integrated

Management Plan.docx Revised: Dec 2013 Version: 1.0 Page 20 of 24

13.

Incident  Management    

Incidents  

All  incidents  and  injuries  that  occur  on  Buri  Building  &  Design  projects  shall  be  reported  to  the  First  Aid   Officer/  Project  Manager  and  recorded  on  the  Incident  Investigation  Form  and  Incident  Register.  This   includes  all  major  and  minor  injuries  /  incidents.  The  reason  that  minor  injuries/Incidents  are  recorded  is   to  enable  Buri  Building  &  Design  to  analyse  the  data  to  identify  trends  that  occur.  By  identifying  these   trends  preventative  action  can  be  implemented  to  prevent  further  injury.      

 

All   incidents,   near   misses   or   accidents   involving   damage   to   plant/equipment/materials   shall   be   investigated  and  documented  on  the  Incident  Investigation  Form.    

 

Corrective  action  shall  be  immediately  determined  and  implemented  following  an  incident.  Root  cause   analysis  shall  then  be  carried  out  following  the  principal  of  the  “5  whys”.  When  the  cause  is  identified   preventative   action   shall   be   determined   and   recorded   on   the  Incident   Investigation   Form.   Following   implementation   of   the   corrective   and   preventative   actions,   the   follow   up   section   of   the  Incident   Investigation  Form  will  be  completed  to  verify  that  the  action  taken  has  been  effective.  

 

Corrective   and   preventative   action   and   information   about   the   incident   shall   be   communicated   to   all   personnel   through   toolbox   meetings   and   recorded   on   the   Toolbox   Meeting   Minutes   Form   or   distributed  via  memos  and  Safety  Alerts  through  email  communication.    

 

Notification  

Work  Cover  shall  be  notified  of  serious  injuries  immediately  on  13  10  50  following  the  incident.  For  less   serious  incidents  Work  Cover  must  be  notified  within  7  days.  Insurers  shall  be  notified  within  48  hrs.    

Injury  Statistics  

Injury   statistics   shall   be   recorded   and   monitored   on   an   ongoing   basis   to   identify   trends   that   may   be   developing.    

 

Return  to  Work  

The   Injury   Management   Coordinator   will   communicate   the   return   to   work   process   to   the   injured   employee.   The   injured   employee   will   be   offered   the   assistance   of   a   Work   Cover-­‐accredited   rehabilitation  provider  if  it  becomes  evident  that  they  are  not  likely  to  resume  their  pre-­‐injury  duties,  or   cannot  do  so  without  changes  to  the  workplace  or  work  practices.  An  individual  return  to  work  plan,   including   hours   of   work   and   duties   will   be   developed   in   line   with   medical   advice   at   the   time   the   employee  is  able  to  return  to  work.    

 

All   records   relating   to   the   management   of   injuries   such   as   meeting   minutes,   investigations,   doctors   certificates  and  insurance  records  will  be  maintained  indefinitely.  

 

Dispute  Resolution  

Disputes   that   arise   regarding   decisions   that   relate   to   the   health   and   welfare   of   Employees   and   Subcontractors  shall  be  handled  in  the  following  way:    

1. The  problem  shall  first  be  reported  to  the  Project  Manager.  If  a  satisfactory  resolution  does  not   occur;    

2. The   problem   shall   be   reported   to   the   WHS   Representative   and   Managing   Director.   The   WHS   Representative  and  Managing  Director  shall  attempt  to  resolve  the  issue;  

3.  If   a   satisfactory   resolution   is   not   made,   then   Work   Cover   may   be   contacted.   Work   Covers   decision  will  be  accepted  and  changes  implemented.  

(21)

 

Ref: Asset Maintenance Integrated

Management Plan.docx Revised: Dec 2013 Version: 1.0 Page 21 of 24

14.

 Emergency  Management  

Buri   Building   &   Design   ensures   that   emergency   plans   are   in   place   on   each   project.   In   most   cases,   emergency  situations  such  as  fire,  atmospheric  contamination,  gas  leak  etc.  will  result  in  site  evacuation.   The  Project   Evacuation   Plan   identifies   two   muster   /   assembly   points.     If   it   unsafe   for   personnel   to   proceed  to  Muster  Point  1  then  as  a  contingency  proceed  to  muster  point  2  

 

The  2  muster  points  are  as  follows:    

o The  first  muster  point  is  the  closest  telegraph  pole  to  the  front  right  hand  side  of  the  property.    

o The  second  muster  point  is  the  rear  fence  of  the  property.      

The  Emergency   Contact   Information   Form   will   be   developed   and   distributed   prior   to   the   project   commencement   providing   information   on:     emergency   contacts,   responsibilities,   emergency   services   details  and  the  communications  strategy,  including  notification.    

 

Other   emergency   situations,   i.e.   where   there   is   a   failure   of   existing   controls   in   the   Aspects/Impacts   register   or   ECPs   (such   as   major   spills,   intensive   dust,   large   scale   failure   of   sediment/erosion   controls,   impact  on  environmentally  sensitive  lands)  are  to  be  controlled  though  he  following  procedure:  

1. Check  for  danger  to  self  and  others.  Ensure  area  is  safe  to  access;   2. Notify  Project  Management;  

3. Assess  the  situation  and  isolate  the  area/activity/aspect  to  prevent  further  release/damage;   4. Intensify  aspect/impact  controls  that  are  identified  in  the  aspects/impacts  register;  

5. Utilise  appropriate  equipment/materials  and  clean  up  area  as  much  as  possible;  

6. Project   Management   will   organise   further   assistance   if   required   (including   notification   of   authorities  as  appropriate);  

7. Complete  Incident  Report  and  submit  to  Project  Manager;  

8. Incident  to  be  recorded,  investigated  and  corrective/preventative  actions  implemented;  and   9. Follow  up  corrective  and  preventative  actions  to  ensure  effectiveness.  

 

If  a  pollution  incident  occurs,  all  necessary  action  should  be  taken  to  minimise  the  size  and  any  adverse   effects  of  the  release.  If  adequate  resources  are  not  available  to  contain  the  release  and  if  it  threatens   public  health,  property  or  the  environment,  the  NSW  Fire  Brigades  should  be  contacted  for  emergency   assistance  -­‐  phone  000.  

 

In   addition,   if   you   need   urgent   advice   on   cleaning-­‐up   the   incident   or   on   the   disposal   of   any   resulting   waste   materials   the   NSW   Office   of   Environment   and   Heritage   can   be   contacted   24-­‐hours/day   via   the   Pollution  Line  on  131  555.  

 

Fire   fighting   equipment   is   located   in   employee   vehicles,   including   portable   fire   extinguishers.   All   fire   fighting  equipment  shall  be  tested  every  6  months  as  per  the  Australian  standard.  This  testing  shall  be   carried  out  by  a  licensed  contractor  and  a  register  shall  be  maintained  of  testing  and  tagging.  Refer  to   Section  12  -­‐  Inspection  Testing  and  Servicing.  

 

A  folder  shall  be  maintained  in  Employee  vehicles  containing  SDS  for  common  chemicals  and  substances   used  onsite.  This  shall  also  include  a  register  at  the  front  of  the  folder  to  assist  with  quick  access  to  the   SDS.  All  SDS  shall  be  within  dated  within  the  past  5  years  and  shall  be  available  in  hard  copy  (not  just   electronic).  –  Refer  to  Section  8  Materials.  

 

First  Aid  kits  (type  A)  shall  be  maintained  in  Employee  vehicles.  All  subcontractors  are  expected  to  carry   and  stock  first  aid  kits.    

References

Related documents

numerous awards from Qualis Health, a  CMS initiative, the Washington  State Hospital Association, and the Institute for Healthcare Improvement  (

Benefits of Asset Management Information Technology Operations & Maintenance Engineering/ CIP Finance Integrated Asset Management Plan Integrated Asset Management

The Purchase Order Processing system is concerned with the production and management of orders placed with suppliers of materials, plant, etc and the subsequent

• Asset performance (including condition) management • Asset failures and asset maintenance management • Whole of life costing & Asset risk management • Asset

Asset Register Asset Care Plan Developer On Key Analytics Maintenance Manager Planning and Scheduling On Key Interface Tool.. Materials Manager On

• Operating Plan : a comprehensive plan that defines and governs how the asset will be used and operated over its entire life cycle. –

Hardware design lessons learned documents, certification plan your certificate verifies a certificated mentor teacher candidates for courses for student pilot; they are made..

The pattern of results is consistent with high quality research being linked to teaching quality, but chi-square analysis generates no statistically significant association