• No results found

FirstPlay Toddler Design #1

N/A
N/A
Protected

Academic year: 2021

Share "FirstPlay Toddler Design #1"

Copied!
13
0
0

Loading.... (view fulltext now)

Full text

(1)

Equipment Manufacturer

FP-505-FTD

(2)

Equipment Manufacturer

FP-505-FTD

(3)

Equipment Manufacturer

FP-505-FTD

(4)

Equipment Manufacturer

FP-505-FTD

(5)

Equipment Manufacturer

FP-505-FTD

(6)

Equipment Manufacturer

FP-505-FTD

(7)

CLIMB &

SLIDE PANEL

SUPPORT

POST W/

FILLER

SUPPORT

POST W/

FILLER

12'-8"

[3.86M]

3'

[0.91M]

3'

[0.92M]

3'

[0.92M]

3'-1"

[0.94M]

12'-2"

[3.71M]

0

.5

1.0

0

5'

Meters

2.0

3.0

10'

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road Lewisburg, PA 17837-9795 USA

B

Paper Size DATE: SCALE: PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

USER CAPACITY: AGE GROUP: AREA: PERIMETER:

EQUIPMENT SIZE:

USE ZONE:

FALL HEIGHT:

FIRSTPLAY TODDLER DESIGN #1

CATALOG PRE-DESIGN

FP-505N-FTD 3/8"=1'-0" SCOTT KUHNS 13-NOV-17

6'8" x 6'2" x 5'0"

2,03M x 1,88M x 1,52M

12'8" x 12'2"

3,87M x 3,72M

155 SqFt.

14,4 SqM.

50 Ft.

15,24M

1'5"

0,46M

4

6-23mos

ASTM F2373-08

(8)

12'-8"

[3.86M]

3'

[0.91M]

3'

[0.92M]

3'

[0.92M]

3'-1"

[0.94M]

12'-2"

[3.71M]

3

4

3

1

2

5

1

4

0

.5

1.0

0

5'

Meters

2.0

3.0

10'

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road Lewisburg, PA 17837-9795 USA

B

Paper Size DATE: SCALE: PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

USER CAPACITY: AGE GROUP: AREA: PERIMETER:

EQUIPMENT SIZE:

USE ZONE:

FALL HEIGHT:

FIRSTPLAY TODDLER DESIGN #1

CATALOG PRE-DESIGN

FP-505N-FTD 3/8"=1'-0" SCOTT KUHNS 13-NOV-17

6'8" x 6'2" x 5'0"

2,03M x 1,88M x 1,52M

12'8" x 12'2"

3,87M x 3,72M

155 SqFt.

14,4 SqM.

50 Ft.

15,24M

1'5"

0,46M

4

6-23mos

ASTM F2373-08

(9)

DATE:

SCALE:

DRAWN BY:

SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)

SUPPORT POST FOOTING (DETAIL 1 or 4) INDICATES POST LENGTH)

CANTILEVER, "T" POST, AND COMPONENT POST FOOTING (DETAIL 2) (ZZCH1850 INDICATES PART NUMBER)

GROUND ZERO POST FOOTING (DETAIL 2) INDICATES POST LENGTH) COMPONENT FOOTING (DETAIL 3)

(136"

(148"

SHADE HAT POST FOOTING (DETAIL 5) INDICATES POST LENGTH)(210"

(10)

CLIMB & SLIDE

PANEL

55"

26"

51"

4007

FP

4007

FP

4008

FP

50"

45"

51"

47"

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road Lewisburg, PA 17837-9795 USA

B

Paper Size DATE: SCALE: PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY: FOOTING LEGEND

112"

1850 ZZCH 144" GZ

SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)

SUPPORT POST FOOTING (DETAIL 1 or 4) (112" INDICATES POST LENGTH)

CANTILEVER, "T" POST, AND COMPONENT POST FOOTING (DETAIL 2) (ZZCH1850 INDICATES PART NUMBER)

GROUND ZERO POST FOOTING (DETAIL 2) (144" INDICATES POST LENGTH) COMPONENT FOOTING (DETAIL 3)

FIRSTPLAY TODDLER DESIGN #1

CATALOG PRE-DESIGN

FP-505N-FTD 3/8"=1'-0"

SCOTT KUHNS

(11)

FirstPlay

ZZFP4000 2

1 SUPPORT POST

ZZFP4002 1

2 CLIMB AND SLIDE PANEL

ZZFP4006 2

3 SUPPORT POST FILLER

ZZFP4007 2

4 SUPPORT POST FOOTING

ZZFP4008 1

5 COMPONENT FOOTING

Additional Tool & Maintenance Kits

ZZUN9910 1

6 SURFACING WARNING LABEL KIT

Part No. Description

Design Number: FP-505N-FTD - Bill Of Material

FirstPlay Toddler Design 1 - Footed

Ref.

No. Quantity

(12)

Certified ZZFP4000

1 2 SUPPORT POST 34.72 369 2 1.00 0.00 2

Certified ZZFP4002

2 1 CLIMB AND SLIDE PANEL 65.02 423 2 0.50 0.00 1

Certified ZZFP4006

3 2 SUPPORT POST FILLER 9.78 127 0 0.50 0.00 0

Certified ZZFP4007

4 2 SUPPORT POST FOOTING 22.98 39 0 1.50 0.24 0

Certified ZZFP4008

5 1 COMPONENT FOOTING 12.59 16 0 0.75 0.12 0

Certified ZZUN9910

6 1 SURFACING WARNING LABEL KIT 0.05 1 0 0.25 0.00 0

Description Concrete (Yds3) Total Weight (lbs) Users

Design Number: FP-505N-FTD - Compliance and Technical Data

FirstPlay Toddler Design 1 - Footed

Pre-Consumer Recycled Content (lbs) CO2e Footprint (kgs) Install Hours Ref. No.

Reference Document: ASTM F1487

Unit ASTM Status Active Play Events

Post-Part No. Qty.

7 14 975 4 4.50 0.36 145.14 3 Totals: 1 Metric Tons 6 Kg 3 Kg 65.31 Kg 0.27m3

(13)

Description Concrete (Yds3) Total Weight (lbs) Users

Design Number: FP-505N-FTD - Compliance and Technical Data

FirstPlay Toddler Design 1 - Footed

Pre-Consumer Recycled Content (lbs) CO2e Footprint (kgs) Install Hours Ref. No.

Reference Document: ASTM F1487

Unit ASTM Status Active Play Events

Post-Part No. Qty.

The lay-out for this custom playscape, design number FP-505N-FTD, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.

The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.

The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as

ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.

Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]

A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.

A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.

** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.

ASTM F1487

2010 ADA Standards for Accessible Design

Installation Times

Carbon Footprint

Pre-Consumer Recycle Content

Post-Consumer Recycle Content

References

Related documents

Regions of the Brain Clivus/ Pituitary Area Clivus/ Pituitary Area Midbrain Frontal Parietal & Occipital Temporal Temporal Cerebellum Clivus/ Pituitary Area Clivus/

Silent letters cause difficulties for three native speakers and English learners, because it make the spelling of words different state their pronunciation.. American Association

You could also apply in an IPO using your Zerodha demat account and ASBA facility offered by any bank like ICICI, the IPO shares are directly credited to your demat account

NATO must be prepared to create a strong deterrence to aggressive actions by the Russians while providing active support, reassurance, moderation, and defense to the Baltic States

c) Further Funding: If you return to Full-Time Student status after the Payment Trigger Date, and you apply for Financial Assistance, funding may be disbursed to you under this

This calculator that has a mortgage rates are selling price, and sell it costs for example of property that sold via short of sales.. They took equity is never know what

Drag and direction of motion is called a quantity, it does not work with these quantities, speed and direction attached to be broken down and.. The magnitude both a direction that

If the Contractor later establishes that he would not be liable for such injury or damage by virtue of Clause 26.2 or otherwise, the Superintending Officer's