• No results found

Commercial Storm Restoration

N/A
N/A
Protected

Academic year: 2021

Share "Commercial Storm Restoration"

Copied!
19
0
0

Loading.... (view fulltext now)

Full text

(1)

Our Clients

(2)

Who Are We & What We Do

We are a commercial storm restoration contractor that started our business in Texas in 2005. Our

diverse experience base and unique approach to this complex business has proven both a success for

our customers and our company. Our team is highly educated, with much of our staff holding bachelors

and advanced level degrees, as well as decades of experience in construction, insurance, property

maintenance, finance and law.

As a General Contractor we are equipped to handle any restoration, especially those exterior

components caused by storm damage, such as: Roofing, air conditioning, windows, wall systems,

signage, metal work, framing, out-buildings, and gutter systems.

The primary construction concern in most of the jobs is roof systems, and we’ve got the experience,

know how and manufacturer credentials to deliver you the best in the business.

Some highlights include:

A+ Better Business Bureau rating

Ability to deliver extended warranties and NDL (no dollar limit warranties)

Certified Master Shingle Applicator from Certainteed

Certified installer for Versico single ply (flat roofing) systems

Extensive references from satisfied customers

Types of roof systems we install:

Our Insurance Dispute Resolution Service

Our team of adjusters, appraisers, contractors and attorneys have a combined experience of well over

100 years working with insurance companies to settle a vast array property claim disputes. We're so

confident we can get it settled in your favor, we incur the cost! (through Appraisal)

Modified Roofing

Built-Up Roofing

Sheet Metal Roofing

Stone Coated Steel

Shingle Roofing

Wood Shake Roofing

Tile Roofing

Concrete Clay

Single Ply Roofing

PVC EPDM TPO

The following page is an actual example of

the results of

our work with an insurance company.

“Ranger did exactly what they promised they would. They meticulously surveyed the property

damage, convinced the Insurance company to settle our claim for substantially more than their

original estimate, did a superior roof installation to what we had before and they handled all

the other trades to a beautiful completion of the entire project.”

(3)

Summary for LOC 01 BLDG 01

Line Item Total $306,766.28

Material Sales Tax @ 8.250% 88,513.24 7,302.34 314,068.62

Overhead @ 10.0% 314,068.62 31,406.86

Profit @ 10.0% 314,068.62 31,406.86

Replacement Cost Value 376,882.34

Less Depreciation (115,863.03)

Actual Cash Value 261,019.31

Less Deductible (1,000.00)

Net Claim 260,019.31

Total Recoverable Depreciation 115,863.03

Net Claim if Depreciation is Recovered $375,882.34

Summary for LOC 01 BLDG 01

Line Item Total $119,633.85

Total Adjustments for Base Service Charges 382.05

Subtotal 120,015.90

Comm. Rpr/Remdl Tax @ 8.250% 120,015.90 9,901.31

Replacement Cost Value $129,917.21

Less Depreciation (25,937.14)

Actual Cash Value $103,980.07

Less Deductible (1,000.00)

Net Claim $102,980.07

Total Recoverable Depreciation 25,937.14

Net Claim if Depreciation is Recovered $128,917.21

This is an actual example; we do not guarantee all results for all claims will be this significant. However, it is our experience that nearly every claim is initially under estimated, or contains multiple errors.

Mark Chapman, Storm Support

FINAL SETTLEMENT AFTER RANGER CLAIM ASSISTANCE

(4)
(5)
(6)
(7)
(8)
(9)

Project Name & Address

Owner/Contact Contract Amount Date

Freestar Investments Office Bldg.

13048 Research Blvd, Austin, TX 78750

Pat McGuiness 806-771-5408

$47,000 Feb 2009

First Baptist Church-Lucedale

345 Summer, Lucedale, MS 39452

601-947-3441 $240,000 Jan 2006

Second Baptist Church

1315 Dell Dr., Channelview, TX 77530

Dr. Kenneth E. Trent 281-452-7443

$15,890 Oct 2005

Christians Development

The Shops at Oak Forest Retail Center

1220 W. 43rd Street

Danny Palmero 713-952-2228

$98,600 Feb 2009

Trek II Construction Jack in the Box

12207 SW 133rd Ct., Miami FL 33186

Jeff Talley 865-466-8554

$87,600 Aug 2009

Valero-BaytownConvenience Store

1600 Business 146, Baytown, TX 77521

Valero Corporation $14,000 Mar 2009

Wire Cloth Manufacturer Manufacturing Facility

8527 Monroe, Houston, TX

Jim Beyer 713-941-1199

$88,500 Apr 2012

First Baptist Church

615 Runnenburg, Crosby, TX 77532

Robin Butler 281-328-2565

$43,856 Jun 2009

Blazer Building, Inc. Westpark Apartments

9219 Katy Freeway, Ste. 120, Houston, TX 77024

Jim Wania 713-461-5837

$312,000 May 2011

LSC Contractors Kensington Kensington Crossing Apartments

14651 Philippine Street, TX 77040 Laura Brundt 972-267-2757 $316,000 Feb 2009 Popeye’s Chicken Multiple Locations Mario Flores Cardinal SW 713-855-6151 $36,060 Jul 2010

Logan’s Fam Honey Glazed Ham

10560 Westheimer, Houston, TX 77042

Jim Logan 713-781-4335

$16,500 Nov 2008

The Inn at Circle T Hotel

4021 W. Hwy. 36, Hamilton, TX 76351

Mike Middleton 254-386-3209

$507,000 Jul 2012

The Hamilton Commission Auction

2525 Hwy. 281, Hamilton, TX 76351

Kristen McFarlin 254-386-3815

$327,000 Jul 2012

Recent Major Projects

We are very proud of our relationships with our customers and would encourage you to contact them to verify their

satisfaction with our work.

(10)

References

Project Name & Address

Owner/Contact Contract Amount Date

The Vista Park Apartments

12707 E. Mississippi Ave., Aurora, CO 80012

Leonard Murphy 303-885-4499

$319,000 Jan 2013

Goodyear Tire Store

4000 US Hwy. 281, Marble Falls, TX 78654

Wade West Closed Store

$45,500 Jun 2013

Best Western Plus Hotel

1403 US Hwy. 281, Marble Falls, TX 78654

Riyaz Bhaiwala 512-259-8200

$279,000 Jul 2013

Hotel Inn Express

1605 E. Whitestone Blvd., Cedar Park, TX 78613

Riyaz Bhaiwala 512-259-8200

$51,500 Oct 2013

Urgent Care—Marble Falls

1701 US Hwy. 281, Marble Falls, TX 78654

Dr. Mike Dickey 830-798-1122

$110,000 Sep 2013

Lexington Cattle Commission

605 First Street, Lexington, TX 78947

Russell Heller 979-773.2244

$260,000 Oct 2013

Apache Village Retail Center

1808 US Hwy. 281, Marble Falls, TX 78654

Cathy Wiz $97,000 Sep 2013

Parmer Medical Center

1307 Cleveland Street, Friona, TX 79035

Javier Rangel $325,000 In Progress

Soncy Auto Body

11540 / 40, Amarillo, TX 79124

Mark Warrick $435,000 In Progress

Hope Vet Clinic

10850 / 40, Amarillo, TX 79124

Dr. Sarah Faulker $117,000 In Progress

(11)

Project Photos

Kensington Crossing

Apartments

Concrete Tile & Shingles

The Inn at

Circle T Hotel

35,000 SQ FT Standing Seam Metal Stucco, AC, Windows, Gutters, Signage, Interiors

Insurance's initial offer: $338,499.43 Final Settlement amount: $507,209.30

(12)

Project Photos

First Baptist

Church

Architectural Shingles

Houston, TX

The Palms at Cinco Ranch Apartments

Architectural Shingles

New Construction

(13)

Holiday Inn Express

Architectural Shingles

Insurance's initial offer: $19,019.18 Final settlement amount: $50,410.87

Cedar Park, TX

Goodyear Tire

Service Center

R-Panel Metal Roof Paint, Gutters, AC, Signage

Insurance's initial offer: $0.00 Final settlement amount: $45,041.25

Marble Falls, TX

(14)

Project Photos

The Shops at Oak Forest

30,000 SQ FT Modified Bitumen

Project Photos

Franklin Leasing

(15)

The Hamilton

Commission

Livestock Auction

Facility

60,000 SQ FT R-Panel Metal Skylights, AC, Gutters, Lighting,

Out-Buildings

Insurance's initial offer: $128,917.21 Final settlement amount: $375,882.34

Hamilton, TX

(16)

Project Photos

Project Photos

Lexington Livestock Commission

44,000 SQ FT R-Panel Roof, Lighting, AC, Gutters, Out-Buildings

Insurance's initial offer: $0.00 Final settlement amount: $255,000 Lexington, TX

(17)

Best Western Hotel

Standing Seam Metal

34,000 SQ FT Standing Seam, Signage, Paint, AC

Insurance's initial offer: $152,189.04 Final settlement amount: $266,021.17

Marble Falls, TX

(18)

Project Photos

Garth Road

Office Building

TPO (12,000 SF)

Insurance's initial offer: $0.00

Final settlement amount: $113,501.60 Baytown, TX

Vista Park

Apartments

TPO (80,000 SF) Aurora, CO

Project Photos

(19)

Urgent Care

9,000 SQ FT Standing Seam, Signage, Painting, Gutters, AC Complete Exterior Restoration

Insurance's initial offer: $45,426.58 Final settlement amount: $87,390.23

Marble Falls, TX

References

Related documents

B2 PBA series Piezo switches Ø 19 (.748) Overview PBA SERIES Terminals F Flying leads C Cable Colours / Materials 0 Natural anodized 1 Blue anodized 2 Black anodized 3 Green anodized

This thesis presents geochemical and petrographic investigations of 90 volcanic rocks, mainly basaltic, from both the northern Ethiopian flood basalts and northern Afar

Note:The two trip unit outer retaining screws and fourth pole sensor retaining screw may be placed in the trip unit conductor holes at this time.. If preferred, the 5/16

Subjunctive  adalah bentuk kalimat yang berfungsi untuk menyatakan tentang pengharapan pada masa yang akan datang atau pengharapan yang tidak terwujud pada masa

• Raising the stream by regenerative storm water conveyance: $200 to $400 lineal foot The Northern Stream was reconnected to its floodplain using a floodplain benching approach.

In this paper, we demonstrated how domain information could be used to predict architectural dependencies, and assist software maintainers in searching for connected components at

-stage of development of the parasite which when ingested to the definitive host will result to infection -in the direct life cycle: Infective Stage comes from original infected

Compared to the last generation Cayenne models, the current Cayenne, Cayenne S and Cayenne Turbo provide up to a 20 percent increase in fuel economy, thanks in part to their