• No results found

EDIFICAR S.A. ISO / OSHAS

N/A
N/A
Protected

Academic year: 2021

Share "EDIFICAR S.A. ISO / OSHAS"

Copied!
82
0
0

Loading.... (view fulltext now)

Full text

(1)

Contact:

Eng. David Pardo

TEL: (507) 282-0208 / 6550-7690

e-mail:

[email protected]

Web Page:

www.edificaronline.com

EDIFICAR S.A.

ISO 9001-2008 / OSHAS 18000-2007

30 YEARS OF EXPERIENCE

(2)

General Description

ISO 9001:2008 Certified quality management system

(Since 2005)

OHSAS 18001-1999 (Since 2006) OHSAS 18001-2007

(Since 2008) employment security certified systems

and procedures.

Implementation of a system for continuous

improvement based on the Lean Method.

Member of the Construction Management Association

of America (CMAA).

(3)

Our Philosophy

OUR WAY TO SERVE …

We work under high ethical norms.

We give our clients a fair, honest, and open treatment.

We work as a team with consultants, project managers and owners. The safety and wellbeing of our employees is always our priority. Environmental Responsibility.

(4)

OWNERS COUNCIL Business Development Pre Construction Budgeting Planning Recursos Humanos Finance Accounting Treasury Technical Services MEP Support Lean Construction Quality Assurance Construction NICARAGUA COSTA RICA PANAMÁ Administration Legal advisory IT Suppliers office EXECUTIVE COMMITTEE BOARD OF DIRECTORS

Our Organization

(5)

Our Staff

A successful work team with constant training: 160

people at your service.

55 Construction Professionals (11 with MBA)

45 Civil Engineers

1 Electromechanical Engineer

1 Mechanical Engineer

8 Architects

105 collaborators as additional supporting personnel

Between 800 and 3,000 workers on projects.

Panamá Office

(6)

www.edificaronline.com/intranet

Information System

The information system was designed specifically to the needs of

EDIFICAR, in which clients and engineers can have immediate access to

our Intranet:

Blue Prints and pictures

Memos and meeting agendas

Tracking of traders and suppliers

List of pending activities

Budget control

Procedures and norms

And much more …

Microsoft Project, On-Screen

Takeoff, Estimating Software.

Video conference rooms

(7)

Experience

EDIFICAR

has satisfactorily completed projects for companies such as:

(8)

Hotel Experience

Hotel Marriott Los Sueños

Hotel Four Seasons Papagayo

Hotel Hampton Inn & Suites

Pre – Construction advisor in projects such as:

Hotelera Cali (Marriott, Four Seasons, Andaz Hyatt, Hyatt Place)

Thunderbird

Grupo Marta (Hilton, Best Western, Holiday Inn Express)

Rica Costa (Wyndham Hotel)

Terranum Hotels (Aloft Starwood Hotels)

Casinos Crown (Sonesta Hotel)

Exclusive resorts (Miraval, One & Only)

Génesis (ST Regis Starwood)

Kirshert & Pakonem (Regent Hotel)

Panamá Pacífico (Hilton Garden Inn)

(9)

Hotel Experience

Hotel Marriott Los Sueños

Hotel Four Seasons Papagayo

Hotel Hampton Inn & Suites

Construction, expansion, and remodeling:

Some concluded projects are:

Four Seasons (60,000 m2)

ANdAZ Papagayo (24,000 m2)

Marriott Los Sueños (26,000 m2)

Sheraton (25,000 m2)

Costa Rica Marriott (Expansion)

Hotel Aloft (8,500 m2)

Hampton Inn and Suites

Garden Court Hotel and Casino

Best Western (Jacó, Irazú and San José)

SPAS Marriott Los Sueños y Costa Rica Marriott

(10)

Hotel Experience

(11)

Hotel Experience

Papagallo

(12)

Hotel Experience

(13)

Hotel Experience

(14)

Hotel Experience

(15)

Hotel Experience

Marriott San José

(16)

Located on Herradura Beach, Central Pacific.

Hotel Experience

(17)

Cliente repetitivo

Hotel Experience

(18)

Hotel Experience

Hampton Inn

(19)

Hotel Experience

(20)

Located on Jacó Beach, Central Pacific.

Hotel Experience

(21)

Cliente repetitivo

Hotel Experience

(22)

Medical Industry

Experience

Clean Room Zona Franca Coyol

MOOG MEDICAL Zona Franca Coyol

MOOG MEDICAL – Zona Franca Coyol

Some completed projects or under construction are:

ST JUDE MEDICAL (7,000 sq. m of Clean Rooms)

HOSPIRA CR4 Expansion

MOOG MEDICAL (1,200 sq. m of Clean Rooms)

BIOTECH

VOLCANO (4,500 sq. m of Clean Rooms)

(23)

Medical Industry Experience

ST JUDE MEDICAL

Over 21,000 s.q.f

of Clean Room

Medical Facility:

300,000 s.q.f

(24)

Medical Industry Experience

(25)

Medical Industry Experience

MOOG Medical

Medical facility: 70,000 s.q.f

Over 9,000 s.q.f

of Clean Room

(26)

Medical Industry Experience

VOLCANO

Over 4,500 sq. m of Clean Room

Medical Facility: 12,500 sq. m

(27)

Medical Industry Experience

HELIX MEDICAL

Over 800 sq. m of Clean Room

Medical Facility: 1,700 sq. m

(28)

Medical Industry Experience

(29)

Heavy Industry & Infrastructure

Experience

SILOS CALCAREO Cementos David

ARCELOR MITTAL Guápiles, Costa Rica

CONTINENTAL AG – Zona Franca Coyol

Some completed projects or under construction are:

CONTINENTAL AG

BRIDGESTONE – FIRESTONE (22,000 m2)

PROQUINAL

ARCELOR MITTAL C.R. (30,000 m2)

PASO A DESNIVEL, ROTONDA ALAJUELITA

(30)

Infraestructure Experience

(31)

Infraestructure Experience

(32)

Industry Experience

(33)

Heavy Industry Experience

(34)

Heavy Industry Experience

(35)

Heavy Industry Experience

(36)

Heavy Industry Experience

Arcelor Mittal C.R.

30,000 m3 of concrete cast

in 10 months

(37)

Heavy Industry Experience

(38)

Heavy Industry Experience

(39)

Institutional Experience

Some completed projects or under construction are:

Edificio Ciencias Sociales UCR (26,000 m2)

Biblioteca e Invernadero Ciencias Sociales UCR (6,000 m2)

Edificio oficinas E, Panamá Pacífico (12,000 m2)

Edificio de parqueos, Casco Antiguo, Panamá

Zona Franca América (C12, F30, C07, C14)

Oficinas BAC San Jose (Oficentro El Roble)

Edificio TRIBU

(40)

Institutional Experience

Ciencias Sociales - UCR

UCR

Area: 26,000 m2

Cost: $ 35 M

(41)

Institutional Experience

UCAGRO - UCR

UCR

Library and green house

Facultad de Agronomía

Universidad de Costa RIca

(42)

Institutional Experience

IBP, Panamá Pacífico

(43)

U Latina

Institutional Experience

Hospital Universitario

Área: 7,500 m2

Monto Aproximado: $ 10 M

Plazo: 9 meses

(44)

Institutional Experience

Edificio de Parqueos

CasCo

Antiguo

(45)

Institutional Experience

Zona Franca América

Recurring Client

(46)

Institutional Experience

Zona Franca América

Recurring Client

(47)

Institutional Experience

Zona Franca América

Recurring Client

(48)

Institutional Experience

(49)

Institutional Experience

(50)

Institutional Experience

(51)

Recurring Client

Institutional Experience

Various Buildings

EDIFICAR

has intervened in 8

(52)

Remodeling of CITI Office in Forum: 2,400 m2

Institutional Experience

(53)

Remodeling Call Center IBM: 3,125 m2

Institutional Experience

(54)

Remodeling ICT: 3,125 m2

Institutional Experience

(55)

Commercial Experience

FLEX BUILDING Zona Franca del Este

Auto Mercado El Coco Playas del Coco, Guanacaste

Algunos proyectos concluidos o en ejecución

PF Changs, Costa Rica

PF Changs, CoPanamá

Hipermás Guadalupe (30,000 m2)

PriceSmart (Zapote, Heredia, Escazú & Tibás)

Auto Mercado (Tibás, Escazú, Heredia & El Coco)

Ciudad Toyota (15,000 m2)

Centro comercial Atlantis Plaza

(56)

Commercial Experience

(57)

Commercial Experience

(58)

Recurring Client

Commercial Experience

Hipermás Guadalupe

(59)

Commercial Experience

PriceSmart and Automercado

EDIFICAR

has built the

PriceSmart of:

-

Zapote

-

Heredia

-

Escazú

-

Tibás

(60)

Recurring Client

Commercial Experience

(61)

Commercial Experience

(62)

Escazú, San José

15,000 m2.

Commercial Experience

Atlantis Plaza

Atlantis Plaza

Plaza

Jacó

(63)

Plaza Mayor Mall Expansion

(Rohrmoser, San José)

20,000 m2

Recurring Client

Commercial Experience

(64)

Commercial Experience

(65)

Residential Experience

VISTA LAS PALMAS Jacó Beach, Puntarenas

Some completed projects or under construction are:

Latitude Dent (9,400 m2)

Paradisus (15,000 m2)

Edificio Soleo (18,000 m2)

Residencial Nativa

Condominio Urbano Nunciatura

Condominio Le Parc (3,500 m2)

Segovia Heights (11,800 m2)

Alto Prieta (5,200 m2)

Vista Las Palmas (18,000 m2)

Condominio Terrazas del Pacífico (5,300 m2)

LUXURIOUS HOUSE LUXURIOUS HOUSE

Vista Mar (10,000 m2)

Condominio Altos de Palermo (15,000 m2)

Condominio Nativa

(66)

Residential Experience

Latitude Dent

Area: 9,400 m2

Cost: $ 6.5 M

(67)

Residential Experience

(68)

Residential Experience

(69)

Residential Experience

(70)

Residential Experience

(71)

Residential Experience

(72)

Residential Experience

(73)

Residential Experience

(74)

Jacó Beach, Central Pacific

18,000 m2

Residential Experience

Vista Las Palmas

(75)

Residential Experience

(76)

Use of tunnel framework.

120 apartaments.

Recurring Client

Residential Experience

(77)

Jacó Beach, Central Pacific

Recurring Client

Residential Experience

(78)

Recurring Client

Residential Experience

Central Pacific

Las Vistas

(79)

Residential Experience

(80)

Residential Experience

(81)

Execution

Excellent reputation:

-

With consultants, developers, bankers.

-

In terms of recurring clients.

-

As an honest and reliable company.

-

As a flexible and innovative professional company.

(82)

Central Office

South Side of the “Liga de la Caña” Warehouses.

La Uruca, San José Costa Rica, C.A. Tel.: +506 2519-6900 Fax: +506 2520-1703

www.edificaronline.com

Office in Panamá

No. 104 Tower A

International Business Park Panama Pacífico Panamá Tel.: +507 282-0208 Fax: +507 282-0209

WE KNOW

OUR

BUSINESS!

References

Related documents

A new pest, the western bean cutworm (WBC), is moving into the area from its historic range in the west and has the potential to be an economically important pest of sweet corn,

Interestingly, we shall show in Section 3.1 that Sklar’s theorem can be only partly extended to the imprecise case; although the combination of two marginal p-boxes by means of a set

BIG‑IP GTM enables F5’s high‑performance DNS Services, scales DNS responses geographically to survive DDoS attacks, and ensures global application high availability....

In this case, for CBOs to win public confidence in agriculture development and achieve effective and efficient performance of their roles, there is the need for intensive

perform creditably, such may not often represent the best possible use of the country's limited manpwer expertise. Apparently, the key issue is that the only way to progress in

Figure 3 shows the pseudo first-order rate equation plot for aniline blue dye adsorption onto activated plantain peels carbon.. Where, k 2 is the rate constant of pseudo

It also included five questions (Table 1) related to the degree of football interest (questions 1, 2, and 3), the degree of belief in the link be- tween a good knowledge of

The SRM would ensure the orderly restructuring of a bank likely to fail, guaranteeing that the bank failure would not harm the economy or cause financial instability