• No results found

WHITEPAPER. Cp, Cpk, Pp, and Ppk a guide to process capability and capability indices

N/A
N/A
Protected

Academic year: 2021

Share "WHITEPAPER. Cp, Cpk, Pp, and Ppk a guide to process capability and capability indices"

Copied!
13
0
0

Loading.... (view fulltext now)

Full text

(1)

WHITEPAPER

Cp, Cpk, Pp, and Ppk – a guide to process capability and

capability indices

(2)

Cp, Cpk, Pp, and Ppk – your way to consistent quality

Cp, Cpk, Pp and Ppk are parameters (indices) that act as indicators for process performance and

capability. The single number in Cpk or Ppk tell you all about how capable your process is in actually delivering a quality product.

This article is a guide to process capability and capability indices.

We’ll clarify the indices, their use and interpretation, and highlight how smart QMS software makes your process more reliable.

Key takeaways

Cp, Cpk, Pp and Ppk are parameters (indices) that can measure process variation and can help manufacturers to

determine process performance and capability. Cp and Cpk are used with stable, mature

processes that are under

statistical control. In contrast, Pp and Ppk are useful when

analyzing performance in a pre- production run or a new

process that is not yet under statistical control.

AlisQI can help you to easily determine process performance and capability. The smart,

intuitive system calculates the indices, creates visual

snapshots, helping you establish process stability and to make informed decisions.

(3)

Index

Introduction………...4

What do the indices tell you about your process…………..5

The part where abbreviations are made clear………6

Your quick interpretation guide……….7

Capability indices and the AlisQI platform……….9

How to calculate Cp, Cpk, Pp, and, Ppk………10

Conclusion……….12

(4)

01

Introduction

The holy grail for any manufacturing manager is a fully capable process. Meaning that your factory does what it should do: produce products your customer wants to pay for. How to find out that you are capable and that the products fit your customers’ requirements?

You can simply check every product after production, and hope for the best. But that doesn't really sound like 2021. Luckily, we can stand on the shoulders of giants.

(5)

AlisQI Quality Management Software 05

What do the indices tell you about your process?

Cp, Cpk, Pp and Ppk are parameters (indices) that act as indicators for process performance and capability. The single number in Cpk or Ppk tell you all about how capable your process is in actually delivering a quality product.

Lean Six Sigma methodologies teach us that reducing variation in your processes will make the outcome of those processes (i.e. quality) more predictable. A process is considered stable if it maintains its average and standard deviation over time. Short-term stability is a good predictor for long-term behavior. Once you’ve ensured stability, you can use capability indices to deepen your understanding, identify if the process starts to drift, and take more informed decisions

regarding potential adjustments.

(6)

The part where abbreviations are made clear

Cp and Cpk measure process capability. Cp assesses the process potential and whether the process spread is within the pre-defined specification limits. On the other hand, Cpk measures the actual capability of the process. The k represents the centralizing factor.

Let’s illustrate the difference with a very simple example.

Imagine trying to fit a cake inside a box. The box represents the specs and our customers' demands, while the cake is the process and its natural variation. If the cake is wider than the box, it won’t fit. If the cake is narrower than the box but not centered – it will likely hit the sides of the box. Hitting the sides of the box is equivalent to

producing a defective part.

As you probably already guessed, this simple analogy is not meant to fuel your cravings. Instead, it tells us that we want manufacturing processes to be well-centered and within the specification limits.

Cp and Cpk are used with processes that are under statistical control.

They are indicators of mature, stable processes.

In contrast, Pp and Ppk measure process performance. Pp monitors the spread of the process relative to its specification limits, while Ppk measures the process centering. So, what is the difference between Cp, Cpk and Pp, Ppk? Pp and Ppk are used with new processes, that are not yet under statistical control. Here, you can think of a pre- production run with an initial setup. To analyze performance in a pre- production run, there is also a difference in how data is being

collected (whole population versus the sample deviation or deviation mean with Cp and Cpk).

(7)

AlisQI Quality Management Software 07

02

Your quick

interpretation guide

When interpreting your capability indices, you might also be inspired by these standard classifications.

(8)

To go back to our previous example, we only have a satisfied

customer if the cake fits in the box. Then we are capable of delivering a quality product. But how capable are we?

If the cake only just fits the box, we can deliver to the customer.

However, we cannot afford any more variation, because then the cake would no longer fit the box. If we have plenty of margin in the box, we can of course deliver, and we will know that we also have margin for error. So, we can sleep tight.

This degree of margin is called process capability and is measured by means of capability indices. That is where the cp(k)/pp(k) family joins the table.

If the box is too small, capability indices are <1 If the cake exactly fits the box, capability = 1.

And if there is margin, it is >1.

The more margin to your box the better, as more margin allows for process variation without risking products we cannot sell.

When interpreting your capability indices, you might also be inspired by these standard classifications:

(9)

AlisQI Quality Management Software 09

03

Capability indices and the AlisQI

platform

In this next section we’ll elaborate on how you can calculate Cp, Cpk, Pp, and Ppk within AlisQI and highlight how smart QMS software makes your process more reliable.

(10)

How to calculate Cp, Cpk, Pp, and Ppk

Still waiting for the part with math equations? Sure, we could list them. Some of you may (happily) start calculating. Doing the math one time is easy and won’t cost much time. However, the story changes completely when you need to do the math for 10

parameters within 200 products. Automation saves you this effort!

Filling your specifications in AlisQI, you’ll cut back on time and eliminate the risk of taking the wrong decision.

The data is analyzed in a matter of milliseconds and summarized into clear histograms, control charts and other useful SPC tools that help with your decision-making.

(11)

AlisQI Quality Management Software 11 Is your process centered? Has it shifted? Is it too wide? No matter the

case, everything will become crystal clear. Regardless of the amount of data in your analysis set, the calculation of Cp, Cpk, Pp and Ppk is available with the push of a button. And, if you’re still worried about mixing the four abbreviations or interpreting them, the smart system can help with suggestions.

All insights and overviews can be stored for quick reuse in

dashboards or exported as pdfs. AlisQI enables you to easily and accurately monitor process behavior and make adjustments to keep things consistent. Using smart automation, Cp, Cpk, Pp and Ppk will no longer be confusing, calculating and interpreting the indices will become business-as-usual - or better said a piece of cake.

(12)

Conclusion

Cp, Cpk, Pp and Ppk are parameters (indices) that can measure process variation and can help manufacturers to determine process performance and capability. Cp and Cpk are used with stable, mature processes that are under statistical control. In contrast, Pp and Ppk are useful when analyzing performance in a pre-production run or a new process that is not yet under statistical control.

AlisQI can help you to easily determine process performance and capability. The smart, intuitive system calculates the indices, creates visual snapshots, helping you establish process stability and to make informed decisions.

Should there still be any unanswered questions, do not hesitate to contact us. We’d love to show you how your factory can benefit from using our software and the multiple ways in which you can enjoy our SPC toolkit.

Need more resources to help your team achieve Quality Intelligence?

Visit the AlisQI website for whitepapers, case studies, videos, free courses, and blogs on industry-related topics.

(13)

AlisQI Quality Management Software 13

Discuss

your case?

Do you want to discuss your case with one of our experts?

Please contact us and we will schedule a call to discuss KPIs for your business

Call +31 (0)85-7600975 or [email protected]

References

Related documents

• Relatively easy to use e-mail and file encryption software is available, such as Pretty Good Privacy (PGP) which runs on almost all computers and integrates with most major

– Lack of standardized loan-level fields for balance sheet loans. – Heterogeneity in vender specific fields for securitized loans.. high interest rates/low asset prices; low interest

B14.When you are insertive, the reason(s) you do not use a condom with your primary partner include (select all that apply):.. personal preference, uncomfortable)?.  Neither of us

Following problem determination, if IBM determines On-site Service is required, scheduling of service will depend upon the time of your call, machine technology and redundancy,

So long as a subject has the right behavioural, phenomenal and cognitive dispositions, nothing science tells us about why he has those dispositions - in terms of what cognitive or

BUGMINER consists of three data mining and statistical processing engines: automatic completion check engine; automatic redundancy check engine; and bug report trend analysis

DUPLICATE DETECTION RESULTS In line with previous work, FactorLCS returns a list of 20 reports / groups most likely to be duplicates of the report the user is trying to

In this study, we use space-borne hyperspectral data to map woody plant community patterns collected in two study sites in the Cerrado (Brazilian savannah), namely, the Parque