preface
Carollo Engineers is an environmental consulting firm with more than 700 employees in 38 offices throughout the United States. All of our work is performed in the areas of water and wastewater, resulting in a level of understanding of key project issues that few can match. Carollo Systems, LLC is a subsidiary of Carollo Engineers that provides SCADA programming and control systems integration services to water and wastewater utilities. We formed this specialized company to provide dedicated, focused expertise and best-in-class products and services. We provide the full range of SCADA system design, implementation, and support services, including full design-build project delivery.
This is a specialty Statement of Qualifications presenting Carollo's experience and expertise in control system programming and SCADA system integration.
CONTENTS
Issues and Differentiators
Capabilities
Key Achievements
Resources
i s s u e s a n d d i f f e r e n t i a t o r s 1 V:\CompanySOQs\P rogrammingSvcs\Indd\01IssuesPRG .indd
Issues and
differentiators
DelIVeRInG QualIty SOlutIOnS fOR
OPeRatIOnal ReSultS
More and more utilities are deciding to obtain control system programming services as a professional service rather than a low-bid commodity. They have learned that programming quality cannot be controlled with a low-bid, construction contract approach.
Since 1993, Carollo has been a leader in providing quality
programmable logic controller (PLC) and human-machine interface (HMI) programming services to water and wastewater utilities. Our clients have benefited from having their engineer design and program their process control systems, especially when their engineer has the programming resources of Carollo.
In 2006, Carollo formed a dedicated subsidiary, Carollo Systems, LLC, to better serve our clients' needs by focusing on delivering the water industry's finest supervisory control and data acquisition (SCADA) programming services.
the limitations of low-Bid Software
On most construction projects, the SCADA control system is part of a low-bid contract. The SCADA system is generally the last portion of a construction project to be completed and often the most troublesome. Every modification can become a significant change order. Low-bid programmers often leave unfinished work, software bugs, and very little documentation. On these
projects, treatment plant staff have minimal input on the “look and feel” of the operator interface and the details of control strategy operation. That’s because the contractor-programmer performs its work far from the owner’s facilities. By the time the SCADA software is completed and placed in operation and operations staff can really see how it works, the general contractor and programmer are out of time and money and are primarily motivated to wrap things up and leave.
Carollo programmers will work with your operations staff to develop easy-to-use SCADA graphic screens.
i s s u e s a n d d i f f e r e n t i a t o r s 2
V:\CompanySOQs\P
rogrammingSvcs\Indd\01IssuesPRG
.indd
the Right approach
Carollo Systems can eliminate these difficulties by performing the programming as a direct extension of our engineering services. When Carollo Systems performs system programming, we establish a relationship with you before the work starts, develop it throughout the project, and continue that relationship long after your new control system is commissioned. We work with your staff to select screen colors and symbols, command sequences, and other “look and feel” aspects of the SCADA operator interface. We also reserve part of our budget for post-installation refinements. This way, operations staff can “test drive” the new SCADA system before the final configuration adjustments are performed.
Because Carollo's staff includes programmers, engineers, and operators, we can provide the most effective, innovative control system solutions customized to meet your needs. We take advanced control strategies from conception to successful implementation, working with your operations staff each step of the way.
Benefits
Many of our clients have experienced the benefits of Carollo’s programming services. Carollo delivers SCADA systems that
work. A successful SCADA system project should provide the means to effectively translate the Engineer's process control concepts into a practical SCADA system that can be readily understood and fully utilized by operators. By eliminating the low-bid contractor from the delivery process, the Carollo engineer/programmer can work directly with your operations staff to refine control strategies into practical, effective operational logic and easy-to-use graphic screens.
We streamline the automation process. By eliminating the contractor-programmer, an unnecessary middle-man in the process, many of the typical construction delays and disputes related to development and configuration of the SCADA software are eliminated. Because we have extensive experience programming our own control strategies, we can efficiently deliver quality SCADA solutions that improve treatment plant performance, reliability, and efficiency.
We achieve operations staff participation and buy-in, resulting in greater utilization of the new technology and automation. Carollo delivers practical process control solutions directly to the user, tailored to meet each of our clients' individual needs. We understand that early involvement of operations staff in the development of SCADA screens, staff training, and easy-to-use documentation are keys to realizing full operator use of new SCADA controls and technology.
Carollo combines our programming, process engineering, and operations expertise with your operations staff’s knowledge to deliver control systems that improve your plant’s performance.
i s s u e s a n d d i f f e r e n t i a t o r s 3
V:\CompanySOQs\P
rogrammingSvcs\Indd\01IssuesPRG
.indd
We deliver quality and value. Our engineering heritage has instilled in our staff the importance of providing quality services and work products. We have developed a systematic approach to software development and project delivery tailored to the special demands of the water industry. We start with standard software modules that we have developed over many years and many projects. This leverages our extensive water industry experience for greater programming efficiency. We work with each of our clients to customize how the modules are utilized and combined in order to meet project specific requirements and operational needs. We have rigorous standards for program documentation, which are enforced through in-house peer review and quality checks. The result is a well-documented, easy-to-use, and reliable system that is easier to maintain and more effectively used by operators.
c a p a b i l i t i e s 4
V:\CompanySOQs\P
rogrammingSvcs\Indd\02CapabilitiesPRG
.indd
Carollo provides the full range of SCADA system engineering and implementation services, including:
System planning and design.
•
SCADA system programming and integration.
•
Equipment procurement and installation.
•
System testing and commissioning.
•
Detailed installation design.
•
Design-build contracting.
•
Optimization.
•
Radio telemetry systems.
•
Maintenance services.
•
SyStem PlannInG anD DeSIGn
Carollo is a water and wastewater industry leader in all aspects of instrumentation, control, and communication systems planning, design, and implementation. We have successfully designed hundreds of treatment facilities, each with an instrumentation and control system designed to optimize the operation of the facility. Our dedication to the water and wastewater industries gives us unparalleled expertise in applying instrumentation and control systems to solve water and wastewater operations challenges.Our projects cover every aspect of water and wastewater control systems: telemetry, SCADA, distributed control systems (DCSs), PLC systems, PC-based computer systems, operator interface
software, local area networks, information management systems, and the full range of physical and analytical instruments. Our clients have ranged from small municipalities to some of the largest utilities in the country. We have designed treatment plants ranging in size from less than 1 mgd to more than 600 mgd.
capabilities
Carollo recently completed a utility-wide SCADA Master Plan for the City of Reedley, CA.
c a p a b i l i t i e s 5
V:\CompanySOQs\P
rogrammingSvcs\Indd\02CapabilitiesPRG
.indd
SCaDa SyStem PROGRammInG anD InteGRatIOn
Carollo’s outstanding team of programmers and control system engineers is experienced in implementing the full range of control, SCADA, and information system technologies. We can deliver comprehensive solutions, from planning through design and complete implementation, including:Excellent project management capabilities for all SCADA project
•
phases.
Configuration expertise in all SCADA HMI programming
•
packages and local operator interface displays.
Extensive programming experience with all of the major PLC
•
products.
Programming in high-level languages, such as MS Visual Basic.
•
Many years of experience setting up Ethernet local-area networks
•
(LANs), fiber optic systems, and wide-area networks (WANs). Experience with implementation of radio systems, including
•
licensed VHF, UHF, 900MHz MAS, and microwave, as well as unlicensed ISM and UNII spread-spectrum technologies. Ability to troubleshoot systems and fix hardware or software
•
problems.
Extensive experience cutting over from old to new systems with
•
minimal operational disruption.
eQuIPment PROCuRement
On most of Carollo’s programming projects, we provide some or all of the computer and PLC hardware. We can also supply complete control panels for a project.
Carollo has discount purchasing arrangements with many of the major PLC vendors.
SyStem COmmISSIOnInG
After the PLC programming and HMI configuration has been completed, the critical steps of testing, training, startup, commissioning, and documentation must be effectively completed for a successful SCADA project. Often, these tasks are the most challenging, particularly with a low-bid contractor.
Carollo provides thorough testing of our systems in the shop and in the field on every project. We develop comprehensive test procedures and perform thorough testing in the office to make sure we are ready for a trouble-free startup when we go to the field.
Carollo’s systematically organized and thoroughly documented PLC code results in fewer bugs during startup and easier maintenance for the life of the system.
c a p a b i l i t i e s 6
V:\CompanySOQs\P
rogrammingSvcs\Indd\02CapabilitiesPRG
.indd
Carollo has commissioned all of the systems we have programmed, usually in cooperation with a construction contractor that is building the facility for which we are providing the SCADA system. All of our programmers also serve as startup engineers, actively working with the other startup personnel to plan the startup, perform the tests, solve problems, and startup the equipment, processes, and controls. Our experience and "can do" attitude significantly streamlines startup activities related to the control system and minimizes hassles during this critical project activity.
We know that operator training and SCADA system operations and maintenance (O&M) documentation are critical to a successful project. At Carollo, we pride ourselves in effective, thorough training and complete, useful, and clear O&M documentation.
DetaIleD InStallatIOn DeSIGn
Carollo provides panel designs, loop drawings, control schematics, and other wiring design services for our clients. These are used by panel shops and electrical contractors to construct the hardware infrastructure for the control systems we design. With a staff of more than 50 electrical and instrumentation engineers and designers, we can handle even the largest projects.
We understand that providing our clients with clear and complete wiring documentation is essential for SCADA/control system maintenance and longevity.
DeSIGn-BuIlD COntRaCtInG
Carollo can provide complete turnkey solutions, including design, equipment procurement, system integration and programming, installation, startup, testing, training, and documentation.
Carollo is a licensed electrical contractor in California and can obtain project performance bonds and meet other contracting requirements. We have established relationships with several electrical contractors and can perform the procurement and installation work required for our clients' SCADA projects.
Carollo has performed design-build SCADA projects for several of our clients, including:
Contra Costa Water District, CA.
•
City of Santa Cruz, CA.
•
Collier County Utilities, FL.
•
Carollo successfully performed a complete design-build replacement of the distributed computer control system at the 40-mgd Randall-Bold Water Treatment Plant.
c a p a b i l i t i e s 7
V:\CompanySOQs\P
rogrammingSvcs\Indd\02CapabilitiesPRG
.indd
City of Hillsborough, CA.
•
City of Plantation, FL.
•
OPtImIzatIOn
Advanced automation and process optimization have become increasingly important parts of our firm’s services. Recent projects have increasingly focused on greater levels of automation for
enhanced operational efficiency, process control standardization, and unattended operation.
Utilities are also increasingly integrating control systems data with utility information management systems, including computerized maintenance management systems (CMMS), laboratory information management systems (LIMS), geographic information systems (GIS), hydraulic modeling programs, etc.
Carollo is a leader in the application of distributed control and SCADA systems to improve operational efficiency. We achieve this by optimizing the operator’s interaction with the process and reducing chemical and energy use. Carollo’s licensed, experienced operators work with programmers and control engineers to develop practical approaches to advanced process automation.
RaDIO telemetRy SyStemS
Our experience with computerized SCADA/telemetry for water, sewer, and storm drain systems spans more than 25 years. We have completed over 40 water and wastewater SCADA telemetry planning, design, and implementation projects in the past 10 years, including projects tailored to water and wastewater transmission systems ranging from less than 10 mgd to more than 300 mgd in capacity. Our experience with SCADA and telemetry systems
includes radio, telephone, hardwire, and microwave systems handling from 5 to 235 remote facilities. Our radio experience includes
conventional licensed radio systems and unlicensed spread-spectrum systems, including Ethernet radio systems. Central station computers range from personal computers to minicomputers and workstations, and associated information management networks. We have designed large-scale systems with over 10,000 (physical and software) data and control point capacity.
maIntenanCe SeRVICeS
Carollo provides ongoing service to our clients once a project is complete. Our technicians are available to service your control systems whenever we are needed.
Carollo designs and implements SCADA systems for remote telemetry applications, including all types of radio technologies.
c a p a b i l i t i e s 8
V:\CompanySOQs\P
rogrammingSvcs\Indd\02CapabilitiesPRG
.indd
Our approach to maintenance services is to develop long-term relationships and serve as an extension of your staff. Your assigned programmer will get to know your staff and your facilities and will work with you to solve problems and improve performance. SCADA maintenance services include:
Troubleshooting equipment.
•
Preventative maintenance.•
System backups.•
Supplementary instruction.•
Software upgrades.•
Control logic modifications.
•
System enhancements.
•
autOmatIOn HaRDwaRe anD SOftwaRe
PRODuCtS SuPPORteD
As a professional services company, Carollo has specified and used a diverse range of different manufacturers' products. Our emphasis is always on providing the best fit for each application. The following tables provide an overview of the manufacturers and related products we support, organized by major automation hardware and software category.
Carollo Systems is a member of the systems integrator programs for all of the major hardware and software manufacturers.
Carollo provides ongoing support to all of our SCADA clients for system training, maintenance, and upgrades.
c a p a b i l i t i e s 9
V:\CompanySOQs\P
rogrammingSvcs\Indd\02CapabilitiesPRG
.indd
automation Hardware and Software Products Supported
PL C / R TU H ar dw ar e
M anufac turer Produc ts
Rockwell Automation / Allen-Bradley SLC 500, PLC-5, MicroLogix, CompactLogix, and ControlLogix Modicon / Schneider Electric 984 Series, Compact-984, Micro, Momentum, Premium, Quantum,
Atrium, and M340 PAC
General Electric / GE Fanuc Series 90-30 and 90-70 PLCs, RX3i and RX7i PAC Systems, and VersaMax
Siemens Simatic S5 and S7 PLCs
Control MicroSystems SCADAPack Controllers Automation Direct DirectLogic / Koyo PLCs
Opto-22 SNAP PAC Controllers, Brains, and SNAP I/O Industrial Control Links SCADA Flex/Plus, ICL-4300, EtherLogic
Motorola MOSCAD
Others Bristol-Babcock, Idec, Mitsubishi, Omron, ABB
PL C / R TU P ro gr am m in g a n d C on fig ur at io n S of tw ar e
M anufac turer Produc ts
Rockwell Automation /
Allen-Bradley 6200 Series, RSLogix5, RSLogix500, RSLogix5000 Modicon / Schneider Electric Modsoft, ProWORX Nxt, Concept, Unity PRO General Electric / GE Fanuc LogicMaster 90 and Proficy
Siemens MicroWin, S5/S7 for Windows
Control MicroSystems TelePACE RLL, ISaGRAF IEC-61131, C/C++ Automation Direct DirectSoft
Opto-22 PAC Project Suite
ICS Triplex ISaGRAF IEC-61131-3/IEC-61449 Suite
SC A D A /H M I S of tw ar
e Wonderware / InvensysM anufac turer InTouch and System PlatformProduc ts Rockwell Automation RSView32, SE, and now FactoryTalk View HMI Modicon / Schneider Electric Citect
General Electric / GE Fanuc Intellution FIX32, iFIX, and now Proficy HMI
Siemens WinCC
National Instruments LookOut
Transdyn Dynac
Iconics Genesis32, Genesis64
Control MicroSystems ClearSCADA
D at ab as e H is to ri
an Wonderware / InvensysM anufac turer ActiveFactory and In-SQL HistorianProduc ts Rockwell Automation FactoryTalk Historian
OSISoft PI Historian
General Electric / GE Fanuc Intellution's iHistorian and Proficy Historian
Microsoft Access and SQL-Server RDBMS
Oracle RDBMS
Others Sybase, Ingress
O pe ra to r I nt er fa
ce Maple SystemsM anufac turer MicroOIT, Blue, Silver, Ivory, and Gold SeriesProduc ts Rockwell Automation PanelView, PanelView Plus, Industrial Series General Electric / GE Fanuc QuickPanel
Total Control Products QuickPanel
Others QSI QTerm, Pro-Face HMI, IDEC, C-More, DirectView, MicroOIT, Teco, Christensen, P&F, Xycom, Eaton / C-H
k e y a c h i e v e m e n t s 10
V:\CompanySOQs\SCAD
AP
rogrammingSvcs\Indd\03KeyAcheivePRG
.indd
WATER AND WASTEWATER EXPERTS
Carollo Engineers specializes in the planning, design, and
construction of water and wastewater facilities. Carollo’s reputation is based upon client service and a continual commitment to quality. During our 80-year history, Carollo has successfully completed more than 20,000 projects for public sector clients.
As the quality of SCADA systems implementation has become more critical to our clients' operations, we have added SCADA system programming and integration to our client services offerings. We now have a staff of some of the most capable and experienced water and wastewater SCADA programmers in the industry.
SummARy Of RECENT EXPERIENCE
On the next page is a table summarizing some of Carollo's recent SCADA programming and systems integration projects. Our experience is very broad and includes a wide range of project sizes, treatment processes, PLC models, and SCADA operator interface software.
The project profiles on the subsequent pages present highlights and descriptions of a number of Carollo’s more significant control system programming projects. They demonstrate that our team of experienced systems integration professionals can handle any type or size of project. These clients can attest to the quality and responsiveness of Carollo’s services.
Our work is performed exclusively in the areas of water and wastewater, resulting in a level of understanding of key project issues that few can match.
achievements
Key
Key
a c
=--=-::..c
'--=--' :....::....:::....::....:
k e y a c h i e v e m e n t s 11
V:\CompanySOQs\SCAD
AP
rogrammingSvcs\Indd\03KeyAcheivePRG
.indd
Recent SCADA Programming Experience
Client Name/Project Name Controller Hardware Software PointsI/O
City of Bellingham, Washington
Wastewater Treatment Plant Energy and Aeration Upgrades Siemens S7 •• Dynac Step 7 250
City of Benicia, California
Wastewater Treatment Plant Improvements Modicon •• Citect Concepts 1,100
Collier County, Florida
North County Regional WTP Control & Information System Upgrade Allen-Bradley ControlLogix •• Intellution iFIX AB RSLogix™ 5000 1,000
City of Corcoran, California
Arsenic Removal WTP SCADA System Design and Programming Allen-Bradley SLC5/05 •• Intellution iFIX AB RSLogix™ 500 500
Contra Costa Water District, Concord, California
Bollman Water Treatment Plant DCS Replacement QuantumModicon •• Wonderware Unity Pro 2,000
Contra Costa Water District, Concord, California
Randall-Bold DCS Replacement Design-Build Project Modicon •• Concept Wonderware 1,300
Contra Costa Water District, Concord, California
MPP & Willow Pass Pump Stations PLC/HMI Programming Modicon •• Concept Wonderware 350
City of Fresno, California
Fresno-Clovis Regional Wastewater Reclamation Facility 68-mgd Expansion
Modicon • ProWORX NxT
• FactoryLink 8,000
Town of Hillsborough, California
SCADA System Design and Programming Control Micro SCADAPac •• TelePace Lookout 500
City of Merced, California
Wastewater Treatment Plant Phase III Interim Improvements/Upgrade Allen-Bradley • AB RSView
®
• AB RSLogix™ 5000 950
Cities of Mesa and Phoenix, Arizona
Val Vista Water Treatment Plant Upgrade DCS Modicon •• ProWORX NxT FactoryLink 2,000
Orange County Sanitation District, California
Wastewater Treatment Plant Expansion Modicon •• ProWORX NxT StreamLine 1,300
Placer County Water Agency, California
Maintenance Services Allen-Bradley • AB RSLogix
™ 500 200
City of Plantation, Florida
East Water Treatment Plant SCADA System Upgrade Design-Build Allen-Bradley ControlLogix • AB RSView
® SE
• AB RSLogix™ 5000 500
City of Reedley, California
SCADA Master Plan and WWTP Expansion Programming QuantumModicon •• Wonderware Unity Pro 950
City of Roseville, California
Barton Road Water Treatment Plant SCADA Communications Upgrade Allen-Bradley •• Allen-BradleyDynac 800
City of Roseville, California
Dry Creek WWTP Conversion to UV Disinfection QuantumModicon •• Concept Dynac 500
City of Roseville, California
Pleasant Grove Wastewater Treatment Plant, Miscellaneous Upgrades QuantumModicon •• Concept Dynac 100
Sacramento Regional County Sanitation District, California
Wastewater Treatment Plant Boiler System Control Allen-Bradley • AB RSLogix
™ 5
• AB RSView® 200
Salt Lake City Public Utilities, Utah
Redwood Road Water Reclamation Facility Process Control Upgrade Modicon •• Concept Wonderware 1,000
City of Santa Cruz, California
Water Pollution Control Plant DCS Allen-Bradley • AB RSLogix
™ 5
• Wonderware 300
City of Santa Maria, California
Water Telemetry/SCADA System DCS Modicon •• Modsoft Wonderware 600
City of Santa Rosa, California
Laguna Subregional Water Reclamation Facility PLC Programming Siemens S5 •• Siemens S5 Wonderware 450
South Tahoe Public Utility District, California
Effluent Pumping SCADA Upgrade Allen-Bradley •• Wonderware AB RSLogix™ 5000 100
City of Watsonville, California
Recycled Water Facility SCADA System Design and Programming Allen-Bradley •• Wonderware AB RSLogix™ 5000 1,000
City of Watsonville, California
Secondary Treatment Plant Upgrade Siemens S7 •• Concept Wonderware 400
City of Yuma, Arizona
East Mesa Water Treatment Plant Allen-Bradley • AB RSLogix
™ 5000 500
k e y a c h i e v e m e n t s 12
V:\CompanySOQs\SCAD
AP
rogrammingSvcs\Indd\03KeyAcheivePRG
.indd
Contra Costa Water DistriCt, California
Bollman Water Treatment Plant DCS Replacement
Carollo was the prime contractor for a $1.7 million turnkey (hardware and software) replacement of the distributed control system at the 75-mgd Bollman Water Treatment Plant for the Contra Costa Water District in Concord, California. The project included replacement of the plant’s obsolete, proprietary Bailey Infi-90 DCS with a modern, open standards based distributed PC/PLC system. The new system utilizes four Modicon Quantum Unity hot-failover CPU pairs connected to I/O modules in eight area control cabinets. The PLC control network is configured in a redundant Ethernet/fiber ring. The remote I/O communications are also redundant.
The operator interface is provided by 12 thin-client terminals connected to redundant SCADA terminal servers running Wonderware InTouch for Terminal Services version 9.5.
Carollo provided hardware, software, programming, and complete systems integration services. Carollo was the prime contractor and
directed the work of subcontractors for electrical installation, fiber optic cable testing, panel fabrication, and design assistance.
The Bollman Plant is the main source of water for several communities, and allowable shut down times were very short, considering the magnitude of the project. Our team worked closely with District staff to develop a comprehensive cutover plan, including fallback options to ensure continuous water deliveries. Carollo completed the project on time, within budget, and with minimal disruptions to staff and operations.
H I G H L I G H T S
Turnkey design-build SCADA system for a 75-mgd water
treatment plant modicon Quantum unity PLCs Wonderware HmI using terminal
services and “thin-client” operator workstations Detailed cutover planning and
tightly phased switchover to maintain water production
Carollo replaced the entire distributed control system for the CCWD 75-mgd Bollman Water Treatment Plant.
k e y a c h i e v e m e n t s 13
V:\CompanySOQs\SCAD
AP
rogrammingSvcs\Indd\03KeyAcheivePRG
.indd
PLC controls, including the nanofiltration and reverse osmosis membrane treatment units.
•
Replace the existing process data reporting system with a new Proficy Historian and Xcel Reporter report generation package. Carollo served effectively as the general contractor by preparing the scope of work for and supervising the work of the electrical installation contractor. Carollo purchased and installed the computer equipment and software. The project was completed successfully on time and on budget, despite technical and cutover challenges. Carollo has been retained to provide continuing services to Collier County.Collier County, floriDa
North County Regional Water Treatment Plant Control
and Information SCADA System upgrade
H I G H L I G H T S
Design-build replacement of control system for 20-mgd membrane water treatment plant Successful cutover of operational
treatment plant with minimal downtime
Complete reprogramming of membrane treatment units Innovative design reduced cost by interfacing with existing I/O
module subsystem
Carollo upgraded the SCADA system at the Collier County, Florida, North Regional Water Treatment Plant, including complete replacement of all PLC and HMI programs.
Operations at the Collier County North County Regional Water Treatment Plant are assisted by its control and information system. The old control system used Siemens/Texas Instruments 555 and 315 PLCs for monitoring and automatic control using remote I/O over a Profibus network. A graphics interface to the plant operations staff was provided by a PC-based SCADA/HMI system using Iconics Genesis software on two operator workstations and a SCADA server. Engineering and operator workstations had reached an age of declining reliability, and the PLC/remote I/O network demonstrated serious performance problems.
Carollo was retained by the County to:
•
Provide evaluations, upgrade recommendations, and design-build services for the control and information system including concept and architecture,networks, PLC/HMI hardware, redundancy, reporting, and data sharing.
•
Replace all existing Genesis SCADA/HMI software with the County standard, Intellution iFIX.•
Install a fiber optic based Ethernet network to support communications between all PCs and PLC CPUs.•
Replace existing PLC CPUs with new Allen-Bradley ControlLogix CPUs and completely reprogram allk e y a c h i e v e m e n t s 14 V:\CompanySOQs\SCAD AP rogrammingSvcs\Indd\03KeyAcheivePRG .indd H I G H L I G H T S
SCADA design, programming, startup, and training Wonderware 9.5 SCADA HmI with thin client operator stations
Terminal Services architecture to reduce costs and simplify
maintenance
Allen-Bradley ControlLogix PLCs modular programming to simplify
maintenance and streamline changes
Carollo Engineers and another firm designed a new 7.7-mgd water recycling facility for the City of Watsonville, California. The $50 million treatment plant includes coagulation, flocculation, and sedimentation as pretreatment, followed by filtration and UV disinfection. The Carollo design included a new SCADA process control system for the plant.
The new SCADA system consists of redundant SCADA servers running Wonderware InTouch 9.5 for Terminal Services, plus a dedicated History Server. The system also includes control room operator stations and four remote operator terminals, all running thin client sessions of Wonderware InTouch. The system includes a dedicated SCADA computer Ethernet network.
The plant PLCs are all Allen-Bradley, mostly ControlLogix models. The PLC system is connected over an Ethernet network, which uses fiber optic media for all runs between buildings.
Carollo Systems was selected to provide complete SCADA HMI and PLC programming services. The scope of work included meetings with the client prior to programming, coordination with the construction contractor and several vendors and subcontractors, programming, testing, startup, and training.
Carollo Systems worked as an integral part of the construction team. During startup, Carollo programmers worked in the field with contractor and construction management personnel to integrate all of the various plant PLCs, including those provided as part of mechanical equipment packages.
City of Watsonville, California
Recycled Water facility SCADA System Design and
Programming
Carollo Systems provided complete SCADA HMI and PLC programming services for Watsonville's new Recycled Water Facility.
k e y a c h i e v e m e n t s 15
V:\CompanySOQs\SCAD
AP
rogrammingSvcs\Indd\03KeyAcheivePRG
.indd
The City of Reedley, California, Public Works Department is responsible for facilities that provide services for water distribution, stormwater collection, wastewater collection and treatment, and solids disposal systems throughout the City’s sphere of influence. The various systems have been operated independently with different types of SCADA hardware and software.
The primary purpose of the master plan was to determine the most economical way of consolidating, integrating, and standardizing all of the various water, stormwater, and wastewater related SCADA facilities to enable City staff to manage the system more efficiently with less burden on operations staff.
Carollo was retained to perform an evaluation of these facilities. We prepared a SCADA Master Plan that provided the necessary information to design a functional and consolidated control system for the City’s various utilities departments. The goal was to develop
a control system master plan that would reduce the utilities’ current operating costs by replacing existing obsolete equipment, improving operational efficiency through utilization of innovative
technologies, improving current operations staff efficiency, reducing total chemical usage, and reducing total electrical power consumption. The wastewater treatment plant is currently undergoing an expansion that will include a new SCADA system, which will serve as the central consolidation point as well as a foundation for the new citywide SCADA system project. Carollo is programming the new wastewater treatment plant SCADA system, which uses a Wonderware InTouch HMI and Modicon Quantum PLCs.
City of reeDley, California
SCADA master Plan and Wastewater Treatment
Plant Expansion Programming
H I G H L I G H T S
utility-wide SCADA master Plan for water, wastewater, and
stormwater services Programming and engineering for new Wonderware/modicon plant
SCADA control system modicon Quantum PLCs programmed with unity software
Wonderware InTouch Version 10.0 using terminal services
Carollo's SCADA Master Plan for the City of Reedley leveraged the City's ongoing Wastewater Treatment Plant Expansion to form the foundation for the citywide SCADA system.
k e y a c h i e v e m e n t s 16
V:\CompanySOQs\SCAD
AP
rogrammingSvcs\Indd\03KeyAcheivePRG
.indd
The City of Roseville’s 18-mgd Dry Creek Wastewater Treatment Plant used gaseous chlorine for effluent disinfection and sulfur dioxide for dechlorination. Based on safety, cost, and toxicity concerns, Roseville retained Carollo to evaluate alternatives to its current disinfection system. A project to convert the existing system to UV disinfection resulted. Project scope included design, PLC and HMI programming, construction management, startup, and commissioning.
As part of the project, extensive control system modifications are being implemented. The control system uses Modicon Quantum PLCs and a Dynac SCADA HMI. PLC cabinets are being added to support the UV generation system, as well as on-site hypochlorite generation, electrical system additions, chemical system changes, and plant flow control modifications. Carollo programmed the PLCs and SCADA HMI screens for the project. The UV PLCs were programmed by the vendor.
Due to Carollo's programming approach, industry experience, and close working relationship with the design team, our experienced programming team was able to accommodate a number of design and schedule changes without additional cost to the owner.
Roseville has new detailed programming standards to facilitate easier
troubleshooting and more efficient maintenance overall. Carollo's programmers delivered system
modifications in full compliance with these standards, giving the City a quality product that interfaces perfectly with its other systems and facilities.
Dry Creek Wastewater Treatment Plant Conversion to
uV Disinfection
H I G H L I G H T S
Complete system design responsibilities Construction support SCADA/HmI system programming PLC programming (modicon Quantum) Expansion/additions to existing, fully operational wastewater
treatment plant Startup and commissioning
City of roseville, California
Carollo performed PLC and HMI programming, as well as construction phase support, for the Dry Creek Wastewater Treatment Plant UV Disinfection project.
k e y a c h i e v e m e n t s 17
V:\CompanySOQs\SCAD
AP
rogrammingSvcs\Indd\03KeyAcheivePRG
.indd
toWn of HillsborougH, California
SCADA System Design and Programming
H I G H L I G H T S
full-service SCADA system design, equipment selection, programming, commissioning,
and field testing 154-mHz radio telemetry system
for 25 sites Radio system design and implementation in a highly
congested environment Sophisticated digital radios for
high-speed transmission on limited bandwidth Redundant PCs at the master
station and communications processing
PLC at the master station to enhance reliability
Hillsborough’s SCADA system features a 154-MHz radio telemetry system for high-speed transmission to 25 sites on limited available bandwidth, in hilly terrain.
Carollo designed water, water quality, and wastewater facility telemetry for the Town of Hillsborough. This project included a fully integrated and programmed control and monitoring system. Hillsborough also selected Carollo to integrate and program the system, provide construction management, and assist with system installation. Teledesign Systems radios with digital modems were installed.
The Carollo team determined the radio frequency band during design. Signal propagation was an important consideration, since most of the facilities are located in hilly areas with buildings and trees. However, the bandwidth available in the highly congested San Francisco Bay Area was only about one-third the amount normally used for high-speed telemetry systems. The use of specialized radios allows use of the assigned frequency (154.47875 MHz) with a reasonable speed of data transmission (4,800 bps). The team tested radio communication at this speed during design. At some low-lying sites, a dial-up telephone line was provided for increased reliability. Field instrumentation included water quality monitoring for turbidity and chlorine residual; monitoring of flow, pressure, and energy usage for each pump at the pump stations; utility power monitoring; and process alarms.
Carollo configured the PLCs/RTUs and the master station. The PLCs/RTUs are SCADAPack with radios manufactured by Teledesign Systems of San Jose, California. This system is open-architecture with ladder logic programming of the SCADAPack RTUs. National Instruments Lookout is used for operator-interface functions at the master station PC.
k e y a c h i e v e m e n t s 18
V:\CompanySOQs\SCAD
AP
rogrammingSvcs\Indd\03KeyAcheivePRG
.indd
City of MerCeD, California
Wastewater Treatment Plant Phase III Interim
Improvements/upgrade
H I G H L I G H T S
New Allen-Bradley based PC/ PLC SCADA system for a 10-mgd
wastewater treatment plant Process and SCADA upgrades
Complete programming by Carollo
Relational database history and reporting system
Because the Merced Wastewater Treatment Plant is normally staffed only 40 hours per week, Carollo provided a redundant dialer system to alert operators of any problems at the plant.
As part of the Phase III upgrade to its wastewater treatment plant, the City of Merced needed a new SCADA control system. Carollo designed both the process improvements and the control system upgrades. Prior to the upgrade, the Merced plant operated using stand-alone controllers and hardwired control devices. The new design provides for a central PC-based computer system used for monitoring and controlling the plant processes.
The project included the installation of new PLCs in both the new and existing process areas, the installation of a new fiber optic network, and the installation of a host computer system. The design
of the system included hardware specifications, details on the related electrical system modifications, and comprehensive process descriptions presenting the revised methods of operation.
Carollo performed all of the programming and system integration for the project, including establishing programming standards, PLC programming, HMI configuration, testing, commissioning, training, and documentation.
k e y a c h i e v e m e n t s 19
V:\CompanySOQs\SCAD
AP
rogrammingSvcs\Indd\03KeyAcheivePRG
.indd
City of CorCoran, California
Arsenic Removal Water Treatment Plant SCADA
System Design and Programming
H I G H L I G H T S
Programming and startup of 20-mgd pressurized filtration plant for removal of arsenic from
groundwater supply Replacement of outdated interface software for existing
wellfield control system and integration with new plant
control system upgrade using GE/Intellution
ifIX® software
Carollo Engineers, in cooperation with another firm, designed the new Arsenic Water Treatment Plant for the City of Corcoran, California. Carollo Systems was selected to program the new plant control system. Prior to the project, the City of Corcoran's existing water supply system consisted of eight groundwater wells delivering water to the city storage system with minimal filtration through a sand filter and chemical disinfection. The existing control system consisted of RTUs at each well and pump station communicating through a radio network to a National Instrument's Lookout SCADA program at the public works facility.
In addition to the process upgrades, declining factory support for the existing SCADA software prompted the replacement of the existing SCADA control system with an implementation of GE Proficy iFIX® 4.0 SCADA/HMI software. Plant control is now handled through a pair of Allen-Bradley SLC5/05 processors.
Carollo's efforts on this project included:
•
Duplication of existing well and pump station controls in new SCADA/HMI system.•
Programming of control and operator interface for all plant processes (with exception of OEM filtration system).Carollo programmed the City of Corcoran's very first water treatment plant.
•
Integration of communications with OEM filtration system into plant SCADA system.•
System startup and commissioning.•
Provision of thoroughly documented control system for the City.•
Operations personnel training.•
Process report development.•
Automated alarm paging system.•
Remote site access.k e y a c h i e v e m e n t s 20
V:\CompanySOQs\SCAD
AP
rogrammingSvcs\Indd\03KeyAcheivePRG
.indd
City of fresno, California
fresno-Clovis Regional Wastewater Reclamation
facility 68-mgd Expansion
H I G H L I G H T S
Design and programming of a complete PLC-based distributed
control system with over 8,000 I/O points Programming, graphics display configuration, and mIS database
development fiber-optic data highway
Carollo programmed a complete control system with more than 8,000 I/O points for the $87 million, 68-mgd expansion to the Fresno-Clovis Regional Wastewater Treatment Plant.
Carollo designed and programmed the new control system for the $87-million expansion to the existing Fresno-Clovis Regional Wastewater Treatment Plant. The control system includes multiple, hot backup PLCs and a network of 15 PC operator interface
computers (OIS). All data highways are fiber optics. This distributed control system has more than 8,000 input/output points, which can be accessed from any of the 15 OIS computers.
In addition, there is a separate MIS network, which consists of an additional 30 computers. Any of these 30 MIS computers can access process data and graphic displays with proper passwords. Carollo performed process control software programming, graphic display configuration, and MIS database application software, which includes automatic report generation.
k e y a c h i e v e m e n t s 21
V:\CompanySOQs\SCAD
AP
rogrammingSvcs\Indd\03KeyAcheivePRG
.indd
soutH taHoe PubliC utility DistriCt, California
Effluent Pumping SCADA upgrade
H I G H L I G H T S
Worked directly with operations and maintenance staff
Programming of Allen-Bradley PLCs Configuration of Wonderware HmI Development of energy management pump scheduling
program
Carollo worked with operations and maintenance staff at the STPUD’s Wastewater Treatment Plant to design and program a new control system for the plant’s export pumps.
The South Tahoe Public Utility District (STPUD) Wastewater Plant discharges effluent through a pipeline that extends from the plant, over a Sierra Nevada pass, to the Harvey Place Reservoir. Two pumping stations convey the water through the pipelines. Significant power cost savings have been realized by curtailing the use of the pumps during the afternoon hours by avoiding pumping during peak electric rate hours.
Carollo worked directly with the plant O&M staff to develop a practical control strategy to store effluent during peak rate hours and pump at high rates during the lowest rate periods. Carollo designed and programmed the new control system for operating the export pumps and scheduling their operation based on a computer model of the pumping system.
The control system was built around Allen-Bradley PLCs and the existing Wonderware SCADA system. Active X components were also developed for this project to provide a spreadsheet-style interface for the data tables required to adjust the pump scheduling program. The Wonderware displays served as a container for the custom components to seamlessly integrate the custom operations into the existing SCADA system.
Carollo provided wiring drawings and worked with maintenance staff who installed the hardware and wiring for the project. Carollo worked with operations staff to test and refine the logic to make sure it is effective, reliable, and easy to use.
r e s o u r c e s 22 V:\CompanySOQs\SCAD AP rogrammingSvcs\Indd\04R esourcesPRG .indd
resources
Name/Education/ Certifications/Yearsof Experience Representative Experience Expertise
Jeff Martin
CEO, General Manager, Carollo Systems
BA Education Graduate Coursework in Accounting, MIS/ DSS, Basic and COBOL, University of Wisconsin 25 Years of Experience
• Over 24 years of experience in planning, design, project management, strategic planning, and business management in the areas of computer systems, instrumentation, and process automation for water, wastewater, industrial, aquaculture, mining and military systems.
• Project experience includes management of studies, designs,
construction services, and systems implementation. Project scopes have included process control, SCADA, instrumentation, computer control, telemetry, information technology and turnkey EI& C systems. Major project assignments have included:
– City of Mankato, MN – 18 years of overall I&C project planning and management. ($5.65 Million)
– City of Buffalo, MN – 10 years of overall I&C project planning and management. ($1.64 Million)
– Western Lakes Superior Sanitary District (WLSSD) – 12 years of overall I&C project planning and management. ($3.2 Million)) – Gencor – (8) Synthetic Fuel Recovery Facilities throughout the
United States – ($4 Million)
– Venezuela – World Bank and EX/IM Bank Environmental Projects – ($3.68 Million) • Project management • Domestic/ international contract negotiations • Scada system planning and design
• Software standards planning and documentation
• Hardware selection and design
• Scada master plan development • Design-build, CMAR turnkey delivery methodologies • Systems implementation • Communication networks Michael Prosser Engineering Manager, Carollo Systems BS Electrical Engineering Certified Netware Engineer; Technical Certifications from Allen Bradley and Modicon; Manufacturer Certifications in Networking and Communications 27 Years of Experience
• Designed and implemented a networked district-wide SCADA based control system, including multiple data historians, redundant SCADA servers, and thin-client access via Microsoft terminal services for the Olivenhain Municipal Water District, California. Provided all automation equipment and services for a complete SCADA system for a microfiltration membrane water treatment plant.
• Provided system integration services for the City of Tracy, California, for both the water and wastewater utility departments including treatment plants and remote facilities. Services included development of the City's engineering standards for SCADA, PLCs, networks, RF and fiber-optic communications, instrumentation, 891 electrical switchboards, UL-845 motor control, and UL-508 industrial control panels.
• Provided planning, design, and implementation services for all distribution system infrastructure for the Sacramento Suburban Water District, California. Provided multiple centralized SCADA systems, controls, instrumentation, PLC-based RTUs, and wide area communications network.
• Designed and implemented County standards for RTUs, electrical switchboards, motor control, instrumentation, and several SCADA-based control systems for Okaloosa County, Florida. Provided a wireless communications infrastructure to support 250+ remotely located RTUs.
• Technology project management • SCADA system engineering • SCADA system master planning • SCADA technology trends and innovation • Communication system design and implementation
• System testing and startup • Construction management • Radio telemetry systems • Ethernet networks
---~.
r e s o u r c e s 23 V:\CompanySOQs\SCAD AP rogrammingSvcs\Indd\04R esourcesPRG .indd Name/Education/ Certifications/Years
of Experience Representative Experience Expertise
Jeff Janowiak
Wonderware Certified Application Developer 17 Years of Experience
• Senior programmer for the City of Corcoran, California, Arsenic Removal Water Treatment Plant. Responsibilities included designing the interface system using Intellution Proficy iFIX SCADA/HMI software, integrating existing HMI software into new iFIX SCADA system, programming Allen Bradley SLC5/05, programming SCADAPack RTUs using TelePace software, developing process data reports, integrating automated alarm paging software with plant SCADA software, and performing startup, troubleshooting, and system cutover duties.
• Lead programmer for the Collier County, Florida, North Regional Water Treatment Plant SCADA System Replacement. Developed detailed equipment lists for the procurement of the Control System Components and developed project programming templates and standards for this major control system upgrade.
• Lead PLC programmer and SCADA system developer for control system upgrades of four Placer County Water Agency (PCWA), California, water treatment plants. Initial work for PCWA included development of hardware and software design guides. All PCWA plant control systems use Allen-Bradley PLC 5/40E processors and Intellution SCADA software. SCADA workstations were developed so that each plant can be monitored remotely from PCWA headquarters.
• Staff engineer for upgrading the South Bayside System Authority’s SCADA plant system in Redwood City, California. This project involved upgrading the existing Intellution SCADA software from Fix32 to iFIX.
• Staff engineer for RTU programming and SCADA development of the Santa Lucia Preserve Control Network in Carmel, California. This project involved coordination of over 20 RTU-controlled well sites connected by a spread-spectrum radio network, with future expansion to exceed 100 sites.
• Lead PLC programmer and SCADA system developer for a three-phase control system upgrade for the Medford Water Commission Robert A. Duff Water Treatment Plant in Medford, Oregon. Phase 1 included the addition of Allen-Bradley SLC500 controllers to handle control of the plant’s eight existing filters, the chemical feed system, and the raw water and distribution pumping systems. Phase 2 involved the addition of four new filters, along with associated PLC and SCADA graphics. Phase 3 added an ozone system to the plant headworks.
• PLC programming • SCADA software programming • Data highway networks • System cutover, testing, and commissioning • Troubleshooting and maintenance • Project engineering • Operator and maintenance staff training
---~.
r e s o u r c e s 24 V:\CompanySOQs\SCAD AP rogrammingSvcs\Indd\04R esourcesPRG .indd Name/Education/ Certifications/Years
of Experience Representative Experience Expertise
Mark Weston
BS Computer Engineering Wonderware Certified Application Developer 28 Years of Experience
• Implemented replacement SCADA system for the City of Casa Grande, Arizona. System requirements include support for 24 Allen Bradley ControlLogix PLCs, fiber and copper infrastructure, servers, workstations, Wonderware Intouch/Active Factory/Historian, security camera support and managed switches. Design includes compatibility with current and future City infrastructure.
• Implemented the latest generation of Wonderware/Intouch/Active Factory SCADA system for the City of Reedley, California. Design included advanced terminal services techniques that allows for simple addition of workstations and wireless remote access as well as future master plan capacities. The design includes dual redundant rack mount servers and Historian running the latest server class operating systems as well as secure remote access using Cisco technologies for highly efficient ongoing support and enhancement capabilities.
• Provided professional design services for a major upgrade to a potable water production facility and superfund site for the San Gabriel Valley Water Company, El Monte, California. Services included design and coordination of PLCs/communication capabilities and traditional discrete/ analog communications. Provided a comprehensive SCADA/PLC system communications master plan to integrate the new equipment into an existing 35-node wide area network (WAN).
• Provided systems integration services for a large wastewater treatment plant expansion for the City of Tracy, California. Worked with the electrical engineer on design modifications to include industrial computers running appropriate SCADA software. Provided design and procurement services for all I&C equipment, electrical switchboards, motor control centers, and industrial control panels. Also performed testing, installation, startup, commissioning, and generation of final documentation. • SCADA software programming • Software architecture design • Communication Networks • System cutover, testing, and commissioning • Troubleshooting and maintenance • LAN/WAN network automation Amir Najafi BS Electrical Engineering Controls and Instrumentation 22 Years of Experience
• PLC/HMI programmer for the Contra Costa Water District 80-mgd Bollman Water Treatment Plant DCS Replacement, Concord, California. The new control systems consist of Quantum Unity hot standby PLCs and Wonderware InTouch HMI program. Duties included programming, debugging, FAT testing, and commissioning on customer site.
• PLC programmer for the City of Reedley, California, Wastewater Treatment Plant DCS Upgrade. Duties included PLC programming, debugging, FAT testing, and commissioning on customer site.
• Senior automation engineer for Schneider Electric. Responsibilities included organizing technical seminars to introduce Schneider automation products (PLCs, HMIs), monitoring and programming software, holding courses for PLC and HMI programming, technical support for OEMs, and technical support of system integrators for preparing proposals, configuration, design, and implementation.
• Project software leader for providing six hot test dynamometer stands for testing six cylinder diesel engineers for Perkins Engines Company Limited, United Kingdom. Duties included programming, debugging, and commissioning on customer site.
• Project manager for an unloading grab crane (1000 T/hr) control system for Razi Petrochemical Company. Duties included project management, design management, and supervision of commissioning and after sales service. This is a PLC-based system with Schneider Electric Telemacanique PLC and speed drives.
• PLC programming • SCADA software systems • Software architecture design • Control systems design • Project engineering • Communication networks • Operator and maintenance staff training
---~.
r e s o u r c e s 25 V:\CompanySOQs\SCAD AP rogrammingSvcs\Indd\04R esourcesPRG .indd Name/Education/ Certifications/Years
of Experience Representative Experience Expertise
Tony Burgarino, PhD, P.E.
PhD Environmental Engineering, MS
Environmental Engineering, BS Science and Engineering 40 Years of Experience
• Project manager for the City of Yuma, Arizona, Utility SCADA System Upgrade Phase 1. This system is a major upgrade of telemetry between remote pumping and treatment facilities and the Main Street Water Treatment Plant.
• Project manager for the Town of Hillsborough, California, Utilities Telemetry System. This system replaced an existing telephone-based telemetry system with a radio-based system. The system includes 9 storage tank locations, 15 pumping plant locations, and 4 sewer lift locations. Dr. Burgarino led the radio design and programming effort for the new system.
• Project manager for the City of Santa Cruz, California, Remote Facilities Upgrade. This project replaced remote terminal units and analog radio with new Modicon momentum programmable logic controllers and Teledesign Systems digital packet radio.
• Project manager/project engineer for the City of Fresno, California, Water System Telemetry and the Water System Telemetry Expansion projects. Dr. Burgarino used simulation and modeling to develop energy management control procedures and a telemetry monitoring and control system for Fresno's Water Division made up of 235 wells, a central control facility, and an integrated information management network of computers.
• Project manager and systems engineer for planning, evaluation, design, and construction assistance for the Municipal SCADA System Upgrades for the City of Sunnyvale, California. This was an extensive radio telemetry project to integrate control of pumping stations, water wells, a recycle plant, storm and sewer remote facilities, using radio, Ethernet radio surveillance, and server/client based computer systems.
• System programming • Project management • Radio telemetry systems • SCADA system design • Chemical feed system design
Charlie Chung, P.E.
BS Electrical Engineering 45 Years of Experience
• Project manager for the Contra Costa Water District Randall-Bold Water Treatment Plant DCS Upgrade, Concord, California. Provided programming services for the DCS and SCADA system.
• Project manager for the Contra Costa Water District, California, Randall-Bold MPP Pump Station. Project responsibilities included PLC and HMI configuration.
• Project engineer for software programming and startup for 68-mgd and 80-mgd expansions to the Fresno-Clovis Regional Wastewater Reclamation Facility for the City of Fresno, California.
• Systems engineer for design, programming, integration, and startup of a standby power facility PLC and OIS programming project for the Central Contra Costa Sanitary District in Martinez, California. The project included a redundant Modicon 984 PLC in a hot standby mode, WonderWare OIS software, and Modbus Plus fiber optic networks to communicate to all the plant control Modicon 984 PLCs.
• Control systems engineer for PLC software programming for the sludge distribution system for the City of Visalia, California. The system uses Allen-Bradley PLCs and a Ready Panel operator interface terminal.
• Project engineer for PLC programming for a wastewater treatment plant upgrade for the City of Santa Rosa, California. The work included PLC and local operator interface station programming for nine Siemens S5 PLCs. The project involved using an SST PLC simulation program to simulate all of the processes before plant startup.
• PLC programming • HMI programming • Control system design • Water and wastewater control strategy design • System cutover, testing, and commissioning
---~.
r e s o u r c e s 26 V:\CompanySOQs\SCAD AP rogrammingSvcs\Indd\04R esourcesPRG .indd Name/Education/ Certifications/Years
of Experience Representative Experience Expertise
Bill Roberts
BS Electrical Engineering 45 Years of Experience
• Provided lead support for a system integration team for the City of Fort Collins, Colorado. The team of electrical engineers, controls engineers, and electricians developed utility-wide standards for electrical and control systems primarily for two wastewater treatment facilities and one water treatment facility. Integration services included design, build, programming, and commissioning, as well as continued operations staff support.
• Implemented a automations program for the City of Fort Collins, Colorado, Water Production Division. Provided standards, design, and programming to convert a hard-wired 57-mgd water treatment plant to a PLC based control system. The system consisted of Modicon PLC and Modvue HMIs. Oracle was used as a historical database.
• Provided design-build consulting and PLC programming for a 50-mgd water treatment expansion for the City of Fort Collins, Colorado. Specified instrumentation and controls equipment and procured all equipment for in-house controls cabinet construction. Provided lead support for PLC programming, HMI programming, and database management. Performed commissioning services for the I&C equipment and the eight PLCs. Held control system training classes for the plant operations and maintenance staff.
• Implemented a new SCADA system for the East Larimer County Water District, Colorado. Designed, programmed, and commissioned a GE Proficy iFIX HMI that communicated to remote pump stations and storage reservoirs over Ethernet/TCPIP radios to Modicon Quantum controllers. Local control was through Red Lion HMIs. Proficy Historian was used for the historical data storage.
• Upgraded the PLC/HMI systems for a regional water treatment facility in northern Colorado. Replaced Modicon 685 PLC controllers with Quantums and reprogrammed ten PLCs for improved communication and control. Provided logic annotation and system documentation. The stand-alone Intellution FIX 2.7 was replaced with GE Proficy iFIX 5.0 and Historian with reporting through Hach WIMS.
• PLC programming • HMI programming • Control cabinet design • Final EI&C commissioning • Operations and maintenance training Elise Moore Wonderware Certified Application Developer 6 Years of Experience
• Responsible for SCADA screen development for Ak-Chin Indian Community, Arizona, Water and Wastewater SCADA/PLC System Integration.
• Project coordinator for the 18-mgd Dry Creek Wastewater Treatment Plant Chlorine Conversion to UV Disinfection for the City of Roseville, California. Responsibilities include managing all hard copy and electronic files, generating weekly progress meeting agendas, recording and distributing meeting minutes, and managing all programming and project coordination meetings.
• Project coordinator for the City of Roseville’s new $100-million, 12-mgd Pleasant Grove Wastewater Treatment Plant Aeration Upgrade. Responsibilities included generating agendas for weekly progress meetings, recording and distributing meeting minutes, and writing proposed contract modifications (PCMs) and change orders (COs).
• SCADA software programming • Database development • Project administration • Construction management • Project coordination
---~.
c o m p a n y p r o f i l e 27 V:\CompanySOQs\P rogrammingSvcs\Indd\05ComP rofPRG .indd
Company
profile
Carollo is an environmental engineering firm specializing in the planning, design, and construction of water and wastewater facilities. Our reputation is based upon client service and a continual commitment to quality. We currently maintain 38 offices in 16 states. During our 82-year history, Carollo has successfully completed more than 20,000 projects for public sector clients. Carollo is currently ranked within Engineering News Record’s (ENR's) top 500 design firms. More importantly, ENR’s annual Source Book ranks Carollo among the top 20 firms for water and wastewater treatment plant design. Unlike our competitors, Carollo only provides water and wastewater engineering services. We recruit nationwide and hire technical staff
who have extensive background and training specific to this field. For that reason, the quality and professional standing of our core group of wastewater and water professionals equals or exceeds that provided
by some of the largest engineering firms in
the country.
CAROLLO SYSTEMS, LLC
Carollo Systems is a subsidiary of Carollo Engineers, created to provide quality SCADA system programming and integration services to our water and wastewater clients.
Carollo has been providing SCADA programming services for many of our clients since 1993. In recent years, more and more of our clients have asked us to program their SCADA systems. They have been frustrated by the frequent poor quality of SCADA systems provided by
Our work is performed exclusively in the areas of water and wastewater, resulting in a level of understanding of key project issues that few can match.
Dallas Oklahoma City Fort Worth Austin Houston Phoenix Albuquerque Yuma SarasotaTampa Broward County Palm Beach Orlando Miami Broomfield Littleton Salt Lake City
Las Vegas Reno Carson City Boise Seattle Portland
Carollo Office Locations San Francisco Sacramento Fresno Sunnyvale San Diego Los Angeles Orange County Pasadena Oceanside Inland Empire Kansas City Omaha Chicago Boston Walnut Creek V:\Graphics\Stock\USCarolloOffices.ai Rev. 05-02-14
c o m p a n y p r o f i l e 28
V:\CompanySOQs\P
rogrammingSvcs\Indd\05ComP
rofPRG
.indd
contractors in the low-bid environment and want another alternative. Our clients appreciate the quality and superior long-term service that Carollo's professional and industry-focused programmers and systems engineers provide. Both our clients and Carollo have found that when SCADA programming services are provided as a professional service, the quality of the SCADA projects is significantly higher and our clients' operations personnel are more satisfied with the results. To better serve this need, Carollo formed a subsidiary company with our programming staff. We created Carollo Systems to provide:
• A professional, "no hassle" approach to SCADA programming projects.
• Best-in-class quality, service, and expertise, focused on the needs of water and wastewater utility clients.
• An organization built to deliver the most challenging projects on time and on budget.
• More client staff input on SCADA projects, resulting in less rework and greater staff satisfaction with the final product.
• Competitive pricing.
WATER AND WASTEWATER SCADA PROGRAMMING
EXPERTS
Since 1993, Carollo has performed over 50 separate programming projects for over 30 different clients, all water and wastewater treatment and transmission facilities. Projects have ranged from small 100-point systems to systems with over 5,000 PLC I/O points. Our clients span the country from California to Florida. Our staff are experienced with all of the major brands of PLCs (including Allen-Bradley, Modicon, GE, and Siemens) and SCADA HMI software (including Wonderware, iFIX, and RSView). We are members of the Systems Integrator programs with the major vendors and maintain complete in-house hardware and software development systems for most of these products. Carollo Systems provides the full range of systems integration and SCADA programming services, focusing exclusively on water and wastewater applications. Depending on project needs, Carollo Systems can provide:
• PLC programming.
• SCADA operator interface configuration.
• Network equipment setup and commissioning.
• Radio telemetry setup and commissioning.
We have provided engineering services to some clients for more than 70 years.
City of Phoenix, Arizona, Cave Creek Water Reclamation Plant.