Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

ConocoPhillips Engineering Numbering System (COPENS)

1 236

ConocoPhillips Engineering Numbering System

(COPENS)

Document no.: 2169

Process correspondence:

Anskaffelse, Boring/WS, HMS - risikostyring, Prosjekt, Vedlikehold

NORSOK Standard Reference:

(2)

2 236

SECTION - 1 INTRODUCTION ________________________________________ 5

1.1 Purpose . . . 5

1.2 Scope . . . 5

1.3 User groups . . . 5

1.4 Handling of non-conformances . . . 5

1.5 Definitions . . . 6

1.6 Normative References . . . 7

1.6.1 NORSOK Standards: . . . 7 1.6.2 COPENS References: . . . 7 1.6.3 Other References: . . . 7

SECTION - 2 FACILITY/AREA CODE ___________________________________ 8

2.1 Facility Code . . . 8

2.2 Area Codes . . . 9

2.2.1 Area Type Codes . . . 10

2.2.2 Room numbering . . . 10

2.2.3 Sub-Area Codes . . . 11

SECTION - 3 DISCIPLINE CODES ____________________________________ 50

SECTION - 4 SYSTEM NUMBER _____________________________________ 52

4.1 System Number . . . 52

4.2 System Number Group . . . 52

4.3 System Description . . . 57

4.4 System Boundaries . . . 75

SECTION - 5 TECHNICAL OBJECT NUMBERING/TAG NUMBERING _______ 77

5.1 Extent of Tagging . . . 77

5.2 SAP Asset Register / Functional Location Hierarchy / Structure . . . 78

5.2.1 SAP Asset Register / Functional Location Structure . . . 79

5.3 When to keep a Unit & Tag Number . . . 80

5.4 Superior Functional Location . . . 84

5.4.1 General Unit Numbers / “stand alone” Tagged Items . . . 85

5.4.2 General Unit Numbers for Telecommunication & Computer Systems (860, 870 & 880) . . . 87

(3)

Document / Revision No. Owner Approved /

3 236

5.5.1 Tag Sequence Number. . . 90

5.5.2 Tag Descriptions . . . 91

5.5.3 Other General Information . . . 92

5.5.4 Future tag . . . 92

5.6 Category Codes . . . 93

5.6.1 Valid Category Codes . . . 94

5.7 Secondary Alpha Prefix . . . 95

5.8 Equipment Numbers . . . 96

5.8.1 Equipment Numbers . . . 98 5.8.2 Serial Numbers . . . 100

5.9 Technical Information . . . 100

5.9.1 Functional Location . . . 100 5.9.2 Equipment . . . 100 5.9.3 Material Master . . . 101

5.9.4 Linking Plant & Equipment Documentation to the Functional Location Hierarchy. . . 102

5.10 Category Descriptions and Tag Number Requirements . . . 103

5.11 Secondary Alpha Prefix - Valid Codes . . . 144

5.11.1 Alpha Prefix Legend - Category 01 HVAC & Refrigeration Equipment . . . 144

5.11.2 Alpha Prefix Legend - Category 05 Fans (blowers) . . . 145

5.11.3 Alpha Prefix Legend - Category 13 Computer Equipment . . . 145

5.11.4 Alpha Prefix Legend - Category 26 Cables (incl. Umbilicals) . . . 145

5.11.5 Alpha Prefix Legend - Category 28 & 43 Panels (Electrical & Instrument) . . . 145

5.11.6 Alpha Prefix Legend - Junction Boxes - Category 13, 28, 43 & 80 - Electrical/Instrument/Telecomm/F & G . . . 146

5.11.7 Alpha Prefix Legend - Category 43 Fire & Gas Equipment . . . 146

5.11.8 Alpha Prefix Legend - Category 43 Instrument Valves . . . 147

5.11.9 Alpha Prefix Legend - Category 43 Instruments . . . 148

5.11.10 Alpha Prefix/Suffix Legend - Category 43 PCDA control, alarm and information signals . . . 160

5.11.11 Alpha Prefix Legend - Category 60, Pipeline Systems (pig launchers/receivers, pipelines, risers & J-Tube) . . . 162

5.11.12 Alpha Prefix Legend - Category 60 Pipe Support / Penetration . . . 162

5.11.13 Alpha Prefix Legend - Category 13 & 80 Communication (telecom) Equipment . . . 162

5.11.14 Alpha Prefix Legend - Category 91 Automatic/Actuator Operated Valves . . 165

5.11.15 Alpha Prefix Legend - Category 93 Safety Relief Valves . . . 166

5.11.16 ISA Format Table (Alpha Prefixes). . . 167

5.12 Example of Tag Syntax for Typical Equipment Categories . . . 168

(4)

4 236

5.13.1 Line Numbering Structure . . . 171

5.13.2 Line Sequence Number . . . 171

5.13.3 Pipe Class Sheet (Specification). . . 173

5.13.4 Pipe Size . . . 174

5.13.5 Product Service Codes EKOll & new installations (valid for EKOX, EKOJ, ELDE & New installations) . . . 175

5.13.6 Insulation Class . . . 178

5.13.7 Optional Sub-Code . . . 178

5.13.8 Pipe Line Numbering - for New Lines on EKOI Installations, Excluding EKOX, EKOJ, ELDE & New Installations . . . 179

5.13.9 Product Service Codes for EKOI Installations (not valid for EKOX, EKOJ, ELDE and new installations) . . . 180

5.14 Specification for Tag Nameplates & Labels . . . 183

5.14.1 General . . . 183

5.14.2 Design, Fabrication and Installation of Tag Nameplates . . . 184

5.14.3 Tag Descriptions on Tag Nameplates . . . 186

5.14.4 Examples of Standard/Overall Tag Nameplates . . . 187

5.14.5 Labeling of Cable and Core Identification . . . 196

5.14.6 Labeling of HVAC Ductwork . . . 199

5.14.7 Labeling of Piping with Color Coding . . . 200

SECTION - 6 DOCUMENT/DRAWING NUMBER ________________________ 201

6.1 General . . . 201

6.2 Document/Drawing Number Structure . . . 201

6.2.1 Standard Document/Drawing Number . . . 202

6.2.2 Document/Drawing Number for Existing Facilities . . . 205

6.3 Drawing Number Exceptions . . . 205

6.3.1 Instrument . . . . 205

6.3.2 Piping. . . 206

6.3.3 Supplier Documents and Drawings . . . 206

6.4 Document/Drawing Titles and Descriptions . . . 207

6.5 Document/Drawing Sub-Type Codes . . . 207

6.5.1 Document Sub-Types. . . 207

6.5.2 Drawing Sub-Types . . . 212

SECTION - 7 ABBREVIATIONS - DOCUMENT/DRAWING & EQUIPMENT

MODULE ____________________________________________ 219

7.1 General . . . 219

(5)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Introduction 5 236

1

Introduction

1.1

Purpose

These additional technical requirements are developed by ConocoPhillips Norway (COPNO) and are intended to replace NORSOK Coding System, Z- DP-002.

These technical requirements cover requirements additional to the NORSOK Standards listed under Normative References.

1.2

Scope

ConocoPhillips Engineering Numbering System (COPENS) shall be used for the coding of equipment and documents for new development projects, modification projects as well as maintenance related work.

1.3

User groups

User groups for this procedure are all personnel engaged in the allocation of equipment and document numbers associated with any ConocoPhillips new building project, modification project or maintenance work.

1.4

Handling of non-conformances

This standard includes requirements that cannot be deviated from, unless an authorized dispensation is obtained. Should there be any questions or uncertainties arising from these requirements the Manager Maintenance shall be contacted. The Manager Maintenance shall approve any eventual dispensation from this standard, accordance with document

(6)

Introduction 6 236

1.5

Definitions

Alpha Prefix codes Describes the technical objects function or type within the category code

BD Company identifier in SAP (BD= COPNO)

Bill of Material (BOM) Components list for an object (Equipment BOM)

Construction Type Link to Material Master number in SAP

COPNO ConocoPhillips Norway

Design Documents Document category = D in SAP

DFO Documentation for Operations

Equipment Category Identification of an object type (numeric two digits)

Equipment Number A number that uniquely identifies the item and remains with the object regardless of it's location (non-intelligent number).

ESD Emergency Shut Down (system)

Facility Name of plant/platform

Functional Location Functional address of an object (physical location = location)

F&G Fire & Gas (system)

Material Master Number

Unique identification of a component type

PCDA Process Control & Data Acquistion (system)

PM program Preventive Maintenance program

PSD Process Shut Down (system)

Sequence Number A five (5) digit non-intelligent number (except for instruments)

Superior Functional Location

General level above a functional location

Supplier Documents Vendor Documents = Manufacturer Documents. Document category = V in SAP

System number Identifies a process/support or utility system

TAG Nameplate The physical label/plate, adjacent to the item, which identifies the object's tag number and it’s description of it's function/service

TAG number A technical object's functional location address within a system/facility

Technical Object A general term used to describe all equipment, packages and components, which will be registered in the COPNO Asset Register

(7)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Introduction 7 236

1.6

Normative References

1.6.1 NORSOK Standards:

Z-001, Documentation for Operations (DFO)

Z-DP-002, Coding System

Z-003, Technical Information Flow Requirements

Z-004, CAD Symbol Libraries

Z-005, 2D CAD Drawing Standard

Z-008, Criticality Analysis for maintenance purposes

Z-015, Temporary Equipment

1.6.2 COPENS References:

2805 Utstyr som settes permanent ut av drift

4314 Documentation for Operations (DFO)

4583 Piping Design Requirements for New Installations and Modifications to Existing Facilities

4920 Avviksbehandling

4946 Endringer i utstyrsregisteret

4963 Vedlikeholdsstyring

4971 Registration and Modification of Plant and Equipment Documents

5047 Criticality analysis for maintenance purposes

5060 Piping & Valve Specification - Greater Ekofisk Field

5077 Specification for Piping Colour Coding and Marking

6232 Equipment for Temporary use offshore

1.6.3 Other References:

(8)

Facility/Area Code 8 236

2

Facility/Area Code

2.1

Facility Code

Facility represents the common term for all installations (e.g. platforms, rigs, vessels, etc.) di-rectly operated by ConocoPhillips. Facility Code is composed of max. four (4) alphanumeric characters (Note that facility Tor & H-7, is described in SAP Asset register with 3 characters + one blank character).

A Facility includes associated structures like bridges, tripods, flares, pipelines, risers. For example; EKOJ is bridged to EKOX, the bridge is there for the purpose of connecting EKOJ, and therefore the bridge is associated as an area to EKOJ.

The Facility Code and the Area Code shall be registered in the company's equipment register and document control system as attributes for identifying to which Facility and Area a

documents/equipment is applicable. However these attributes will not form part of the actual Document/Drawing Number. Below are listed the ConocoPhillips Facility Codes:

NOTE: Any bridges, tripods, flares, pipelines, risers, etc. connected to a platform will be covered under one Facility Code, and further identi-fied through the Area Code, (section 2.2 Area Codes on page 9).

CODE FACILITY

GENERAL

BD01 Multiple Facilities and Equipment Information

LAND SITE

ONSH Onshore Facilities

PRODUCTION & TRANSPORTATION FACILITIES

B-11 GAS BOOSTER – EMDEN PIPELINE

EKOA EKOFISK 2/4 ALPHA

EKOB EKOFISK 2/4 BRAVO

EKOC EKOFISK 2/4 CHARLIE

EKOD EKOFISK WEST 2/4 DELTA

EKOF EKOFISK 2/4 FTP

EKOH EKOFISK 2/4 HOTEL

EKOJ EKOFISK 2/4 JULIETT

EKOK EKOFISK 2/4 KILO

EKOL EKOFISK 2/4 LIMA (Future Living Quarters)

EKOM EKOFISK 2/4 MIKE

EKOQ EKOFISK 2/4 QUARTERS

EKOW EKOFISK 2/4 WHISKEY

EKOX EKOFISK 2/4 XRAY

(9)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 9 236

2.2

Area Codes

"Area" as used in COPENS identifies a specific area, module or structure on or connected to a platform. An Area has defined boundaries and it normally performs a function.

Area Code is composed of three (3) alphanumeric characters. The leading alpha character is standard and shall not be deviated from, however, the two numeric characters shall be developed by the design contractor and approved by the project.

The Facility Code and the Area Code shall be registered in the company's document system and equipment register as attributes for associating a Facility and Area with specific equipment/ documents. These codes will not form part of the actual Document/ Drawing Number. (see Section 6 Document/Drawing Number on page 201).

Typical examples of Area Code (also showing the applicable Facility Code):

ELDB ELDFISK 2/7 BRAVO

ELDE ELDFISK 2/7 ECHO

ELDF ELDFISK 2/7 FTP

EMBL ELDFISK 2/7 DELTA (EMBLA)

H-7 GAS BOOSTER – EMDEN PIPELINE

TOR TOR 2/4 ECHO

a) EKOK A00 = Platform General on EKOK b) EKOX B01 = Bridge EKOX to EKOC

c) EKOA L02 = Pipeline EKOA - EKOM, 17" Oil/Gas d) EKOM R04 = 17” Oil Import Riser, from EKOA

NOTE: An Area Code will only be unique when appearing together with the applicable Facility Code.

Example: Sub-Area Code B01 (Bridge no. 1) is used for several platforms. Only in the combination EKOJ B01 will it mean a specific bridge; Bridge from EKOJ to EKOX.

(10)

Facility/Area Code 10 236

2.2.1 Area Type Codes

Below are listed the standard COPENS Area Type Codes: Note: That area type codes can vary on old platforms).

2.2.2 Room numbering

Room numbering will function as a sub/sub-area and shall have the following structure. The room number will consist of an additional 2 digits following the sub-area code; for ex. EKOM U10-32 Generator Room. Area code plus room number will be used in SAP equipment module when registering functional location. However, only the area code will be used when cross referencing documents/drawings.

CODE AREA TYPE DESCRIPTION

A Platform General (overall, non-area related) B Bridge (between platforms or to tripod)

C Cellar Deck

D Drilling (module/rig)

F Flare (flare on platform or outlying flare, excl. tripod)

G GBS (gravity based structures)

H Helideck (incl. support structure and access routes from living quarters)

J Platform Jacket (incl. conductor support frame)

K Deck Crane (main platform cranes)

L Pipeline (incl. expansion loop up to flange/weld to riser bend)

M Module Not in use

P Process (module)

Q Living Quarters (accommodation)

R Riser (def.: part of pipeline system which extend from first flange/ weld or ESD valve above platform deck to first flange/weld after bottom riser bend). Also in-cludes J-tubes for umbilicals and cables.

S Hull

T Tripod (support-jackets under bridges and flares)

U Utility (module)

W Wellhead (area below drilling area - incl. subsea wellhead)

Z Space between

modules

(11)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 11 236

2.2.3 Sub-Area Codes

Facility Area Area Description B11 A00 PLATFORM GENERAL

H01 HELIDECK & SUPPORT

J01 ALL JACKET (EXCEPT RISERS) K01 EAST CRANE & PEDESTAL K02 WEST CRANE & PEDESTAL L01 36” GAS PIPELINE, B-11 TO H-7

P01 CONTROL ROOM LEVEL-CONTROL BUILDING

P02 PIG RECEIVER/LAUNCHER AREA - CELLAR DECK NORTH P03 INLET GAS SCRUBBER AREA - CELLAR DECK MIDDLE P04 RECYCLE COOLER AREA - UTILITY DECK NORTH/EAST Q01 QUARTERS 1ST FLOOR

Q02 QUARTERS 2ND FLOOR Q03 QUARTERS 3RD FLOOR

R01 36" GAS EXPORT RISER TO H-7 R02 36" GAS IMPORT RISER FROM EKOJ

U01 SEA WATER PUMPS AREA - CELLAR DECK NORTH U02 FRESH WATER COOLERS - CELLAR DECK SOUTH/EAST U03 FIREWATER PUMPS AREA - CELLAR DECK SOUTH U04 MECH.EQUIPMENT ROOM - CELLAR DECK SOUTH U05 CELLAR DECK SOUTH/WEST INCL. LANDING AREA U06 UTILITY DECK NORTH OF FIREWALL

U07 TRANSFORMER AREA - UTILITY DECK SOUTH U08 AIR COMPRESSOR ROOM - UTILITY DECK SOUTH U09 SWITCHGEAR ROOM - UTILITY DECK SOUTH U10 GENERATOR ROOM - UTILITY DECK SOUTH U11 KGB TURBINE AIR INTAKE - UTILITY DECK SOUTH U12 P/L COMPRESSOR ROOM - EQUIP. DECK NORTH U13 WORKSHOP/STORES AREA - EQUIP. DECK SOUTH U14 ROOF DECK LAYDOWN AREA

U15 HELIDECK UTILITY AREA

U16 DIESEL STORAGE TANK - CELLAR DECK SOUTH/WEST

U17 DIESEL STORAGE & SLOP OIL TANKS - CELLAR DECK NORTH-WEST

(12)

Facility/Area Code 12 236

B11 U19 POTABLE & FRESHWATER STORAGE TANKS - CELLAR DECK NORTH

U20 POTABLE & FRESHWATER STORAGE TANKS - CELLAR DECK SOUTH

(13)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 13 236

EKOA A00 PLATFORM GENERAL

A01 STORAGE AREA/LAYDOWN DECKS D01 DERRICK

D02 DRILL FLOOR D03 BOP DECK D04 SKID DECK

D05 SCHLUMBERGER UNIT D06 CEMENT & ACIDIZING AREA D07 PIPE RACK AREA

D08 BULK STORAGE AREA D09 MUD MIXING AREA

D10 MUD TANKS & MUD PUMP AREA D11 WELLHEAD AREA

D12 WELLHEAD AREA

D13 BURNER ROOM

H01 HELIDECK & SUPPORT

J01 ALL JACKET (EXCEPT FOR RISERS) K01 EAST CRANE & PEDESTAL

K02 WEST CRANE & PEDESTAL

L01 10" PIPELINE (Used for umbilical), FROM EKOF L02 NOT IN USE (20" OIL/GAS PIPELINE, EKOA TO EKOF)

L03 NOT IN USE (6" GAS LIFT FROM EKOF TO EKOA)

L04 17" OIL/GAS PIPELINE EKOA TO EKOF Q01 QUARTERS 1ST FLOOR Q02 QUARTERS 2ND FLOOR Q03 QUARTERS 3RD FLOOR Q04 QUARTERS 4TH FLOOR Q05 QUARTERS 5TH FLOOR Q06 QUARTERS 6TH FLOOR Q07 QUARTERS ROOF

R01 10" RISER(Used for umbilical), FROM EKOF

R02 NOT IN USE (20" OIL/GAS RISER, EKOA TO EKOF)

R03 6” GAS LIFT RISER FROM EKOF R04 17" OIL/GAS RISER EKOA TO EKOF U01 UTILITIES MODULE NORTH/EAST

(14)

Facility/Area Code 14 236

EKOA U02 UTILITIES MODULE NORTH/WEST U03 DIESEL STORAGE DECK TANK

U04 POTABLE WATER STORAGE DECK TANK U05 POTABLE WATER STORAGE DECK TANK U06 FRESH WATER STORAGE DECK TANK U07 EMERGENCY GENERATOR ROOM U08 MAIN GENERATOR ROOM

(15)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 15 236

EKOB A00 PLATFORM GENERAL

A01 STORAGE AREA / LAYDOWN DECKS A02 OFFICE / COFFEE ROOM

D01 DERRICK D02 DRILL FLOOR D03 BOP DECK D04 SKID DECK

D05 SCHLUMBERGER UNIT D06 CEMENT & ACIDIZING AREA D07 PIPE RACK AREA

D08 BULK STORAGE AREA

D09 MUD TANKS & MUD PUMP AREA D10 WELLHEAD AREA

D11 WELLHEAD HYDR. ROOM D12 BURNER BOOM

J01 ALL JACKET (EXCEPT RISERS) K01 EAST CRANE & PEDESTAL K02 WEST CRANE & PEDESTAL L01 10" OIL/GAS EKOB TO EKOF L02 18" OIL/GAS EKOB TO EKOF L03 22" OIL/GAS EKOB TO EKOF L05 20" OIL/GAS PIPELINE TO EKOM P01 CONTROL ROOM

P02 LAUNCHER AREA

P03 WATER SEPARATOR PACKAGE

P04 PUMPS

P05 TEST SEPARATOR P06 DEGASSING POT

R01 10" FUEL GAS RISER EKOB TO EKOF R02 18" OIL/GAS RISER EKOB TO EKOF R03 22" OIL/GAS RISER EKOB TO EKOF R04 8" GAS LIFT RISER FROM EKOC R05 20" OIL/GAS RISER TO EKOM U01 FRESH WATER TANK

U02 DIESEL STORAGE TANK

(16)

Facility/Area Code 16 236

EKOB U03 RAW FRESH WATER TANK U04 POTABLE WATER TANK U05 WORKSHOP

U06 WAREHOUSE

U07 AIR RECEIVER AREA U08 STORAGE AREA

U09 GENERATOR PACKAGE U10 EMERGENCY GEN. ROOM U11 FIREWATER PUMPS

(17)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 17 236

EKOC A00 PLATFORM GENERAL

A01 MAINTENANCE WAREHOUSE & OFFICES A02 CELLAR DECK CENTER

A03 OFFICE AREA

B01 STORAGE BRIDGE1 EKOC TO BS III B02 STORAGE BRIDGE2 BS III TO EKOP B03 QUARTERS BRIDGE EKOC TO EKOQ D01 DRILLING DERRICK

D02 DRILL FLOOR D03 BOP DECK D04 SKID DECK

D05 SCHLUMBERGER UNIT D06 CEMENT MIX UNIT D07 PIPE RACK AREA D08 BULK STORAGE AREA

D09 MUD TANKS & MUD PUMP AREA D10 ABOVE MUD TANKS AREA D11 WELLHEAD AREA

D12 BURNER ROOM

D13 DRILLING GENERATOR ROOM J01 ALL JACKET (EXCEPT RISERS) K01 EAST CRANE & PEDESTAL K02 WEST CRANE & PEDESTAL

L01 8" GAS (COFLEXIP) EKOC TO EKOB P01 CONTROL ROOM

P02 GAS SCRUBBER AREA P03 GAS COOLER AREA

P04 FRESH WATER COOLER AREA

P05 COMPRESSOR TRAIN 1 - LEVEL B (EAST) P06 COMPRESSOR TRAIN 2 - LEVEL B (WEST) R01 8" GAS RISER EKOC TO EKOB

T01 BRIDGE SUPPORT III EKOC TO EKOP U01 BELOW CELLAR DECK

U06 MOTOR CONTROL CENTER

U07 COMPRESSOR UTILITY TRAIN 1 – LEVEL C (EAST)

(18)

Facility/Area Code 18 236

EKOC U08 COMPRESSOR UTILITY TRAIN 2 – LEVEL C (WEST) U09 TRAIN 1 TURBINE ROOM ROOF

U10 TRAIN 2 TURBINE ROOM ROOF U11 LOCAL EQUIPMENT ROOM

(19)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 19 236

EKOF A00 PLATFORM GENERAL

B01 FLARE BRIDGE 1 EKOF TO BS 1 B02 FLARE BRIDGE 2 BS 1 TO EKOW B03 FLARE BRIDGE 3 EKOW TO FL 1 B04 PRODUCTION BRIDGE EKOF TO EKOQ F01 FLARE I & STRUCTURE (SOUTH) H01 HELIDECK & SUPPORT

J01 ALL JACKET (EXCEPT RISERS) K01 EAST CRANE & PEDESTAL K02 WEST CRANE & PEDESTAL L01 6” GAS LIFT, EKOF TO EKOA L02 10” FUEL GAS EKOF TO EKOB

L03 10” PIPELINE (Used for umbilical), EKOF to EKOA P01 2/4A RECEIVERS/LAUNCHER (SOUTH WEST 20M) P02 2/4B RECEIVERS/LAUNCHER (EAST CENTER 20M)

P03 CRUDE OIL PUMPS/SKIMMER TANK (SOUTH-CENTER 20M) P04 SETTLING TANKS

P05 CELLAR DECK NORTH END P06 1ST STAGE SEPARATORS P07 EXCHANGER SKID (LOWER) P08 CONTAINER AREA (LOWER) P09 OLD TURBINE AREA

P10 WORLEY SEPARATOR PKG. P11 OLD TURBINE AREA

P12 V3011

P13 CONTAINER AREA (UPPER) P14 2ND + 3RD STAGE SEPARATORS P15 EXCHANGER SKID (TOP)

P16 COOLER PKG.

P17 TURBINE PKG. LAYDOWN DECK P18 CONTROL ROOM

P19 SOUTH EAST 20M DECK

R01 10" RISER (FOR UMBILICAL) TO EKOA R02 20” OIL/GAS RISER FROM EKOA

R03 NOT IN USE (10" OIL/GAS RISER FROM EKOB)

(20)

Facility/Area Code 20 236

EKOF R04 18" OIL/GAS RISER FROM EKOB R05 22" OIL/GAS RISER FROM EKOB R06 6" GAS LIFT RISER EKOF TO EKOA T01 BRIDGE SUPPORT 1 EKOF TO EKOW T02 FLARE 1 SUPPORT (SOUTH)

U01 LOWER WORKSHOP U02 WELD SHOP

U03 TRANSFORMER DECK

(21)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 21 236

EKOH A00 PLATFORM GENERAL

B01 HOTEL BRIDGE EKOH TO EKOC H01 HELIDECK & SUPPORT

H02 HELICOPTER HANGAR J01 ALL JACKET

K01 SOUTH CRANE & PEDESTAL Q00 MAIN FLOOR Q01 QUARTERS 1ST FLOOR Q02 QUARTERS 2ND FLOOR Q03 QUARTERS 3RD FLOOR Q04 QUARTERS 4TH FLOOR Q05 QUARTERS 5TH FLOOR Q06 QUARTERS 6TH FLOOR

U00 UTILITIES MODULE - GENERAL U01 CELLAR DECK

U02 MEZZANINE DECK

(22)

Facility/Area Code 22 236

EKOJ A00 PLATFORM GENERAL

B01 BRIDGE EKOJ - EKOX

B02 FOR EQUIPMENT LOCATED ON EKOM - B02 C00 MODULE SUPPORT FRAME - GENERAL

C01 MSF UTILITY AREA – LEV. 1 & LEV. 1 MEZZ. (C11 & C21) C02 MSF PROC. AREA – LEV. 1 & LEVEL 1 MEZZ. (C12 &C22) C03 MSF RISER AREA – LEV. 1 & LEV. 1 MEZZ. (C13 & C23) C10 MSF ALL AREAS - LEVEL 1

C11 MSF UTILITY AREA - LEVEL 1 C12 MSF PROCESS AREA - LEVEL 1 C13 MSF RISER AREA - LEVEL 1 C20 MSF ALL AREAS - LEVEL 1 MEZZ. C21 MSF UTILITY AREA - LEVEL 1 MEZZ. C22 MSF PROCESS AREA - LEVEL 1 MEZZ. C23 MSF RISER AREA - LEVEL 1 MEZZ.

F01 FLARE BOOM

I00 INJECTION COOLER MODULE

J01 JACKET

K01 NORTH CRANE & PEDESTAL K02 SOUTH CRANE & PEDESTAL L00 PIPELINE GENERAL

L01 24" OIL PIPELINE FROM ELDB L02 30" GAS PIPELINE FROM ELDB L03 14" OIL/GAS PIPELINE FROM TOR L04 34" OIL PIPELINE TO TEESSIDE L05 36" GAS PIPELINE TO EMDEN L06 20" OIL PIPELINE FROM VALHALL L07 20" GAS FROM VALHALL (CANCELLED) L08 20" OIL PIPELINE FROM ULA

L09 12" GAS PIPELINE FROM GYDA

L10 6" GAS/FUEL PIPELINE EKOJ TO EKOK P00 PROCESS MODULE GENERAL

P10 PROC. MOD. - LEVEL 1

P11 PROC. MOD. - LEVEL 1 SOUTH P12 PROC. MOD. - LEVEL 1 NORTH

(23)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 23 236

EKOJ P15 PROC. MOD. - LEVEL 1 & LEV. 1 MEZZ. (P10&P20) P20 PROC. MOD. - LEVEL 1 MEZZ.

P21 PROC. MOD. - LEVEL 1 MEZZ. SOUTH P22 PROC. MOD. - LEVEL 1 MEZZ. NORTH P30 PROC. MOD. - LEVEL 2

P31 PROC. MOD. - LEVEL 2 SOUTH P32 PROC. MOD. - LEVEL 2 NORTH

P35 PROC. MOD. - LEVEL 2 & ABOVE (P10 & P20) P40 PROC. MODULE - LEVEL 2 MEZZ.

P41 PROC. MOD. - LEVEL 2 MEZZ. SOUTH P42 PROC. MOD. - LEVEL 2 MEZZ. NORTH P50 PROC. MOD. - WEATHER DECK

P51 PROC. MOD. - WEATHER DECK SOUTH P52 PROC. MOD. - WEATHER DECK NORTH P61 PROC. MOD. - WEATHER DECK MEZZ. SOUTH P62 PROC. MOD. - WEATHER DECK MEZZ. NORTH P70 PROC. MOD. - UPPER WEATHER DECK

P71 PROC. MOD. - UPPER WEATHER DECK SOUTH P72 PROC. MOD. - UPPER WEATHER DECK NORTH R00 RISER MODULE

R01 24” OIL RISER FROM ELDF R02 30” GAS RISER FROM ELDF R03 14” OIL/GAS RISER FROM TOR R04 34" OIL RISER, EKOJ TO TEESSIDE R05 36" GAS RISER, EKOJ TO EMDEN R06 20" OIL RISER FROM VALHALL

R07 20" GAS RISER FROM VALHALL (CANCELLED) R08 20" OIL RISER FROM ULA

R09 12" GAS RISER FROM GYDA

R10 6" GAS FUEL RISER, EKOJ TO EKOK

R11 J – TUBE FIBRE OPTIC CABLE & EMDEN SSIV UMBILICAL R12 J – TUBE FOR TEESSIDE SSIV UMBILICAL

P62 PROC. MOD. - WEATHER DECK MEZZ. SOUTH P70 PROC. MOD. - WEATHER DECK MEZZ. NORTH

(24)

Facility/Area Code 24 236

EKOJ P71 PROC. MOD. - UPPER WEATHER DECK SOUTH P72 PROC. MOD. - UPPER WEATHER DECK NORTH R00 RISER MODULE

R01 24” OIL RISER FROM ELDF R02 30” GAS RISER FROM ELDF R03 14” OIL/GAS RISER FROM TOR R04 34" OIL RISER, EKOJ TO TEESIDE R05 36" GAS RISER,EKOJ TO EMDEN R06 20" OIL RISER FROM VALHALL

R07 20" GAS RISER FROM VALHALL (CANCELLED) R08 20" OIL RISER FROM ULA

R09 12" GAS RISER FROM GYDA

R10 6" GAS FUEL RISER, EKOJ TO EKOK

R11 J – TUBE FIBRE OPTIC CABLE & EMDEN SSIV UMBILICAL R12 J – TUBE FOR TEESIDE SSIV UMBILICAL

S00 SEPARATION MODULE - GENERAL S10 SEP. MOD. - LEVEL 1

S11 SEP. MOD. - LEVEL 1 SOUTH S12 SEP. MOD. - LEVEL 1 NORTH

S15 SEP. MOD. - LEVEL 1 & LEV. 1 MEZZ. (S10&S20) S20 SEP. MOD. - LEVEL 1 MEZZ.

S21 SEP. MOD. - LEVEL 1 MEZZ. SOUTH S22 SEP. MOD. - LEVEL 1 MEZZ.NORTH S30 SEP. MOD. - LEVEL 2

S31 SEP. MOD. - LEVEL 2 SOUTH S32 SEP. MOD. - LEVEL 2 NORTH

S35 SEP. MOD. - LEVEL 2 & MEZZ. (S30&S40) S40 SEP. MOD. - LEVEL 2 MEZZ.

S41 SEP. MOD. - LEVEL 2 MEZZ. SOUTH S42 SEP. MOD. - LEVEL 2 MEZZ. NORTH S50 SEP. MOD. - WEATHER DECK

S51 SEP. MOD. - WEATHER DECK SOUTH S52 SEP. MOD. - WEATHER DECK NORTH S60 SEP. MOD. - WEATHER DECK MEZZ.

S61 SEP. MOD. - WEATHER DECK MEZZ. SOUTH

(25)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 25 236

EKOJ S62 SEP. MOD. - WEATHER DECK MEZZ. NORTH S70 SEP. MOD. - UPPER WEATHER DECK

S71 SEP. MOD. - UPPER WEATHER DECK SOUTH S72 SEP. MOD. - UPPER WEATHER DECK NORTH U00 UTILITIES MODULE - GENERAL

U10 UTIL. MOD. - LEVEL 1

U11 UTIL. MOD. - LEVEL 1 SOUTH U12 UTIL. MOD. - LEVEL 1 NORTH U20 UTIL. MOD. - LEVEL 1 MEZZ.

U21 UTIL. MOD. - LEVEL 1 MEZZ. SOUTH U22 UTIL. MOD. - LEVEL 1 MEZZ. NORTH U30 UTIL. MOD. - LEVEL 2

U31 UTIL. MOD. - LEVEL 2 SOUTH U32 UTIL. MOD. - LEVEL 2 NORTH

U35 UTIL. MOD. - LEVEL 2 & LEV. 2 MEZZ. (U30&U40) U40 UTIL. MOD. - LEVEL 2 MEZZ.

U41 UTIL. MOD. - LEVEL 2 MEZZ. SOUTH U42 UTIL. MOD. - LEVEL 2 MEZZ. NORTH U50 UTIL. MOD. - LEVEL 3

U51 UTIL. MOD. - LEVEL 3 SOUTH U52 UTIL. MOD. - LEVEL 3 NORTH Z00 HOOK-UP, GENERAL EKO-J - EKOX ZBX HOOK-UP, B01 - EKOX

ZCB HOOK-UP, C00 - B01 ZCJ HOOK-UP, C00 - J00 ZJC HOOK-UP, EKOJ - EKOC ZJF HOOK-UP, EKOJ - EKOF ZJH HOOK-UP, EKOJ - EKOH ZJR HOOK-UP, EKOJ - EKOR ZJX HOOK-UP, EKOJ - EKOX ZPC HOOK-UP, P00 - C00 ZPF HOOK-UP, P00 - F00 ZPI HOOK-UP, P00 - I00 ZSC HOOK-UP, S00 - C00 ZSP HOOK-UP, S00 - P00

(26)

Facility/Area Code 26 236

EKOJ ZUC HOOK-UP, U00 - C00 ZUP HOOK-UP, U00 - P00 ZUS HOOK-UP, U00 - S00

(27)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 27 236

EKOK A00 PLATFORM GENERAL

B01 BRIGDE EKOK TO EKOB J01 ALL JACKET (EXCEPT RISERS) K01 EAST CRANE & PEDESTAL K02 WEST CRANE & PEDESTAL L01 12" WATER EKOK TO EKOW

R01 12" WATER INJECTION RISER TO EKOW R02 24” WATER INJECTION RISER FROM ELDE R03 6” FUEL GAS RISER FROM EKOJ

13A CELLAR DECK - GENERAL 13C CELLAR DECK CENTRE 13N CELLAR DECK NORTH 13S CELLAR DECK SOUTH 15A UTILITY MODULE

15B POWER MODULE

15C WATER INJECTION MODULE 15D WATER TREATMENT MODULE 15E WELLHEAD MODULE

15F DEAREATOR

16A ACCOMMODATION

16B BULK MODULE

16C PUMP MODULE

16D RESERVE MODULE 16E ENGINE MODULE 16F SKID BASE

16G SUBSTRUCTURE

16H DERRICK

16K NOT IN USE (COMPLETION RIG, REMOVED)

16L NOT IN USE (PUMP & MUD MOD, COMP RIG)

16M NOT IN USE (ENGINE MOD, COMPL. RIG)

17A NOT IN USE (BRIDGE) Replaced by B01

18A FLARE BOOM

19A HELIDECK

(28)

Facility/Area Code 28 236

EKOL A00 PLATFORM GENERAL (FUTURE) B01 EKOL TO EKOM

(29)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 29 236

EKOM A00 PLATFORM GENERAL

B00 BRIDGE GENERAL

B01 EKOM TO BRIDGE SUPPORT T01 B02 BRIDGE SUPPORT T01 TO EKOJ J01 JACKET (EXCEPT RISERS)

K01 DECK CRANE

K01-01 DECK CRANE PEDESTAL K01-02 DECK CRANE CABIN

K01-03 DECK CRANE MACHINE ROOM

L05 6" GAS LIFT EXPORT PIPELINE TO EKOA P00 PROCESS AREA-GENERAL

P01 PIPE SUPPORT RACK

P01-20 STORAGE AREA FOR OIL & CHEMICALS P01-21 STORAGE AREA FOR PRESSURISED BOTTLES P01-22 STORAGE AREA FOR OXYGEN BOTTLES P01-23 CRANE BOOM REST

P30 PROCESS AREA LEVEL 1 INTERM. DECK P30-01 HYDROCYCLONE SKID AREA (EAST) P30-02 SEPARATOR VALVE AREA

P30-03 CRUDE OIL COOLER AREA P30-04 HPU SKID AREA

P30-05 HYDROCYCLONE SKID AREA (WEST) P30-06 DIESEL TREATMENT AREA

P30-10 ESCAPE ROUTE (NORTH) P30-11 ESCAPE ROUTE (EAST) P30-12 ESCAPE ROUTE (SOUTH) P30-13 ESCAPE ROUTE (WEST) P30-14 STAIRS (SOUTH)

P30-20 HANDLING AREA (NORTH) P30-21 HANDLING AREA (SOUTH)

P40 PROCESS AREA LEVEL 2 INTERM. DECK-MEZZ P40-01 HP PRODUCTION WATER COALESCER AREA P40-02 HP PRODUCTION SEPARATOR AREA

P40-03 CHEMICAL INJECTION SKID AREA P40-04 FLASH TANK AREA

(30)

Facility/Area Code 30 236

EKOM P40-05 REJECT OIL TREATMENT SKID AREA P40-06 TEST SEPARATOR AREA

P40-10 ESCAPE ROUTE (NORTH) P40-11 ESCAPE ROUTE (WEST) P40-12 ESCAPE ROUTE (SOUTH) P40-13 ESCAPE ROUTE

P40-14 HANDLING AREA

P50 PROCESS AR5A LEVEL 3 WEATHER DECK P50-01 PSV AREA (EAST)

P50-02 PSV AREA (WEST)

P50-03 TEMPORARY STORAGE AREA P50-04 SCALE INHIBITOR AREA P50-10 ESCAPE ROUTE (NORTH) P50-11 ESCAPE ROUTE (WEST) P50-12 ESCAPE ROUTE (EAST) P50-13 ESCAPE ROUTE (SOUTH) P50-14 ESCAPE AREA (SOUTH)

P50-20 HAZARDOUS WASTE STORAGE

P50-22 FUTURE PIG HANDLING AREA (NORTH) P50-23 FUTURE PIG RECEIVER AREA (NORTH) P50-24 STAIR TO P60 DECK

P50-25 LIFT MACHINE ROOM

P50-30 TEMPORARY GENERATOR AREA P50-31 PIG RECEIVER AREA (SOUTH) P50-32 PIG HANDLING AREA (SOUTH)

P60 PROCESS AREA LEVEL 4 TOTE TANK DECK P60-01 ESCAPE ROUTE (WEST)

P60-02 TOTE TANK AREA

P60-03 ESCAPE ROUTE (SOUTH) P60-04 ESCAPE ROUTE (SOUTH) P60-05 ESCAPE ROUTE (SOUTHWEST) P60-06 ESCAPE ROUTE (EAST)

P60-31 VALVE AREA FOR PIG RECEIVERS R00 RISERS-GENERAL

R01 20" EXPORT RISER (FUTURE)

(31)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 31 236

EKOM R02 20" OIL IMPORT RISER FROM EKOB(FUTURE) R03 16" WEST EKOFISK PROD. IMPORT RISER(FUTURE) R04 17" OIL IMPORT RISER FROM EKOA

R05 6" GAS LIFT EXPORT RISER TO EKOA(FUTURE) R06 16" NEW SUBSEA DEVELOP. IMPORT RISER(FUTURE) R07 10" J-TUBE-UMBILICAL TO EKOA(J3)(FUTURE)

R08 10" J-TUBE ELECT./UMBILICAL(J2) (FUTURE) R09 10" J-TUBE ELECT./UMBILICAL(J1) (FUTURE) R10 16" J-TUBE HYDRAULICS(J4) (FUTURE) R11 16" J-TUBE HYDRAULICS(J5) (FUTURE) T01 BRIDGE SUPPORT

U00 UTILITY AREA-GENERAL

U09 UTILITY AREA UNDER CELLAR DECK U09-01 OPEN DRAIN AREA

U10 UTILITY AREA LEVEL 1 CELLAR DECK U10-01 TRANSFORMER ROOM

U10-02 DELUGE SKID AREA U10-03 CAISSON AREA U10-04 BATTERY ROOM

U10-05 MECHANICAL WORKSHOP

U10-06 ELECT/INSTR./TELECOMS WORKSHOP U10-07 HVAC ROOM SUPPLY

U10-08 J-TUBE AREA

U10-09 HVAC ROOM EXTRACT U10-10 FIRE TEAM ROOM U10-11 HPU AREA

U10-12 HVAC INLET

U10-13 WELL SERVICE PUMP ROOM U10-19 ESCAPE ROUTE (EAST) U10-20 ESCAPE ROUTE (NORTH) U10-21 ESCAPE ROUTE (WEST)

U10-22 ESCAPE ROUTE (SOUTHWEST) U10-23 STAIR TOWER (WEST)

U10-24 LIFT

U10-25 TRUCK PARK

(32)

Facility/Area Code 32 236

EKOM U10-27 BRIDGE LANDING AREA (NORTH) U10-28 LIFEBOAT STATION

U10-29 MUSTER AREA

U10-30 WASTE SORTING AREA U10-31 CARGO CONTAINERS AREA U10-32 GENERATOR ROOM

U10-33 STAIRS (SOUTHWEST) U10-34 ESCAPE ROUTE (SOUTH) U10-35 FRACKING STATION U10-36 FIN FAN AREA

U10-37 AIR RECEIVER & NITROGEN GENERATOR U20 UTILITY AREA LEVEL 2 CELLAR DECK-MEZZ. U20-01 HIGH VOLTAGE ROOM

U20-02 LOW VOLTAGE ROOM

U20-05 EMERGENCY SWITCHGEAR ROOM U20-06 LOCAL EQUIPMENT ROOM

U20-10 ESCAPE ROUTE (NORTH) U20-11 ESCAPE ROUTE (WEST) U20-12 ESCAPE ROUTE (SOUTH) U20-14 AIR COMPRESSOR ROOM U20-15 HANDLING AREA

U20-16 WASTE FOOD CONTAINER AREA U20-17 WIND BREAK

U20-21 ARCHIVE & COPY ROOM U20-22 OFFICE 1

U20-23 OFFICE 2

U20-24 MEETING & RECREATION ROOM U20-25 COFFEE BAR

U20-26 PC-OFFICE

U20-27 RECREATION ROOM, SMOKING U20-30 CORRIDOR

U20-31 BROOM CLOSET U20-32 WC 1

U20-33 WC 2 U20-34 URINAL

(33)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 33 236

EKOM W00 WELLBAY AREA-GENERAL

W09 WELLBAY AREA UNDER CELLAR DECK W09-01 DRAIN TANK AREA

W09-02 DRAIN PUMP AREA

W10 WELLBAY AREA LEVEL 1 CELLAR DECK W10-01 WELLBAY AREA (NORTH)

W10-02 WELLBAY AREA (SOUTH) W10-03 MANIFOLD AREA (NORTH) W10-04 MANIFOLD AREA (SOUTH) W10-05 RISER AREA (NORTH) W10-06 RISER AREA (SOUTH) W10-07 FUTURE PUMP AREA W10-08 HOSE LOADING STATION W10-09 ESCAPE ROUTE (EAST) W10-10 STAIRS (NORTH) W10-11 STAIRS (SOUTH)

W10-12 ESCAPE ROUTE (NORTH) W10-14 ESCAPE ROUTE (SOUTH) W10-15 ESCAPE ROUTE WEST

W20 WELLBAY AREA LEVEL 2 CELLAR DECK-MEZZ. W20-01 WELLBAY AREA (NORTH)

W20-02 WELLBAY AREA (SOUTH)

W20-03 MANIFOLD VALVE ACCESS DECK (NORTH) W20-04 MANIFOLD VALVE ACCESS DECK (SOUTH) W20-05 ESD & TANK AREA (NORTH)

W20-06 ESD & TANK AREA (SOUTH) W20-10 ESCAPE ROUTE (NORTH) W20-11 ESCAPE ROUTE (WEST)

W20-12 ESCAPE ROUTE (SOUTHWEST) W20-13 ESCAPE ROUTE (NORTHEAST) W20-14 ESCAPE ROUTE (SOUTHEAST)

W30 WELLBAY AREA LEVEL 3 INTERV. DECK W30-01 WELLBAY AREA (NORTH)

W30-02 WELLBAY AREA (SOUTH)

W30-03 INTERVENTION SKID RAILS AREA (NORTH)

(34)

Facility/Area Code 34 236

EKOM W30-04 INTERVENTION SKID RAILS AREA (SOUTH) W30-05 SLURRY TANK AREA

W30-06 HIGH PRESSURE PUMP AREA

W30-07 FUTURE RISER ESD VALVE AREA (NORTH) W30-08 FUTURE RISER ESD VALVE AREA (SOUTH) W30-09 LAYDOWN AREA (NORTH)

W30-10 LAYDOWN AREA (SOUTH) W30-11 ESCAPE ROUTE (EAST) W30-12 ESCAPE ROUTE (SOUTH) W30-13 ESCAPE ROUTE (WEST) W30-14 ESCAPE ROUTE (NORTH) W30-15 FRACKING STATION

W40 WELLBAY AREA LEVEL 4 INTERV. DECK-MEZZ. W40-01 SLURRY TANK AREA

W40-02 HYDRAULIC POWER PACK AREA W40-03 HIGH PRESSURE MANIFOILD AREA W40-05 AREA FOR SIMOPS CABIN

W40-10 ESCAPE ROUTE (NORTH) W40-11 ESCAPE ROUTE (EAST) W40-12 ESCAPE ROUTE (SOUTH)

W50 WELLBAY AREA LEVEL 5 WEATHER DECK W50-01 PSV AREA (NORTH)

W50-02 PSV AREA (SOUTH)

W50-03 WELLBAY WEATHER DECK AREA (NORTH) W50-04 WELLBAY WEATHER DECK AREA (SOUTH)

W50-05 BRIDGE LANDING AREA FOR JACK-UP RIG (NORTH) W50-06 BRIDGE LANDING AREA FOR JACK-UP RIG (SOUTH) W50-07 STORAGE AREA FOR RADIOACTIVE ISOTOPE W50-08 LAYDOWN AREA (SOUTH)

W50-20 ESCAPE ROUTE (NORTH) W50-21 ESCAPE ROUTE (EAST) W50-22 ESCAPE ROUTE (SOUTH) W50-23 ESCAPE ROUTE (SOUTHWEST) W50-24 ESCAPE ROUTE (WEST)

Z01 HOOK-UP AREA, P01 B01

(35)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 35 236

EKOM Z02 HOOK-UP AREA, B01 T01 - B02 Z03 HOOK-UP AREA, B02 C11 (EKOJ) Z04 HOOK-UP AREA, B01 J01

Z09 HOOK-UP AREA, U09 - W09 - J01 Z10 HOOK-UP AREA, U10 - W10 Z20 HOOK-UP AREA, U20 - W20 Z30 HOOK-UP AREA, P30 W30 Z50 HOOK-UP AREA, P50 W50 Z60 HOOK-UP AREA, P60

(36)

Facility/Area Code 36 236

EKOQ A00 GENERAL

J01 ALL JACKET (EXCEPT RISERS) P01 PIPELINE Q01 QUARTERS 1ST FLOOR Q02 QUARTERS 2ND FLOOR Q03 QUARTERS 3RD FLOOR Q04 QUARTERS 4TH FLOOR Q05 QUARTERS ROOF

U01 FIREWATER PUMP ROOM U02 BRIDGE AREA

EKOW A00 PLATFORM GENERAL

J01 ALL JACKET (EXCEPT RISERS) K01 EAST CRANE

P01 CELLAR DECK P02 MEZZANINE DECK

R01 12" WATER INJECTION RISER FROM EKOK U01 WEATHER DECK

(37)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 37 236

EKOX A00 PLATFORM GENERAL

B01 BRIDGE EKOX - EKOC

C00 MODULE SUPPORT FRAME - GENERAL C01 MSF - CELLAR DECK

D00 DRILLING GENERAL D10 CAPPING BEAM LEVEL D11 SKID BEAM D12 SKID BEAM D13 SKID BRACE D14 SKID BRACE D15 N/S SKID JACK D16 N/S SKID JACK D17 N/S SKID JACK D18 N/S SKID JACK D20 BOP LEVEL

D21 PRIMARY MUD BOX D22 BOP CONTROL BOX

D23 BOP DECK

D24 BOP PLATFORM D25 E/W SKID JACK D26 E/W SKID JACK D30 SHAKER DECK LEVEL D31 SHAKER BOX

D32 UTILITY BOX

D40 DRILL FLOOR LEVEL D41 DRILL FLOOR

D42 WINDWALLS, V-DOOR AND WIRELINE DOOR D43 NORTH STAIRS

D44 SOUTH STAIRS D45 DRILLERS' CABIN D46 MANIFOLD BOX

D47 MCC BOX

D48 WORK AREA BOX D50 RIG FLOOR ROOF D60 DERRICK GENERAL

(38)

Facility/Area Code 38 236

EKOX D70 MUD MODULE LOWER LEVEL D75 SLURRY UNIT MODULE

D80 MUD MODULE MEZZANINE LEVEL D90 MUD MODULE PIPE DECK LEVEL J01 JACKET (EXCEPT RISERS) K13 DECK CRANE SOUTH K14 DECK CRANE NORTH T01 BRIDGE SUPPORT (TRIPOD) U10 UTILITY AREA CELLAR DECK U20 UTILITY AREA MEZZANINE DECK U30 UTILITY AREA WEATHER DECK W00 WELLHEAD AREA GENERAL W11 WELLHEAD AREA 1 CELLAR DECK W12 WELLHEAD AREA 2 CELLER DECK W21 WELLHEAD AREA 1 MEZZANINE DECK W22 WELLHEAD AREA 2 MEZZANINE DECK W31 WELLHEAD AREA 1 WEATHER DECK W32 WELLHEAD AREA 2 WEATHER DECK

(39)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 39 236

ELDA A00 PLATFORM GENERAL B01 BRIDGE ELDA TO ELDF D01 DERRICK

D02 EAST SHALE SHAKER ROOM (MODULE 128)

D03 NOT IN USE (WEST SHALE SHAKER ROOM (MOD. 121) D04 SKID DECK

D05 WELLHEAD MEZZ DECK WEST D06 WELLHEAD MEZZ DECK EAST

D07 SCALE INHIBITOR VALVE RACK AREA D08 WELLHEAD AREA (MODULE 113 & 104) D09 INHIBITOR STORAGE AREA (MOD 112)

D10 BULK STORAGE & HYDRAULIC SKID (MODULE 103) D11 EAST OF SWITCHGEAR ROOM

D12 WEST OF SWITCHGEAR ROOM D13 PIPE RACK AREA

D14 TPM OFFICE/WORKSHOP AREA (MODULE 122)

D15 DRILLING SUPPORT/SLURRY AREA (MODULE 115-118) D16 CONDUCTOR AREA CELLAR DECK (MODULE 198) D17 (PA17) DRILLERS CABIN

D20 (PA20) MUD TANK MODULE D21 (PA21) MUD PUMP MODULE D22 (PA22) MUD MIXING MODULE D23 (PA23) SACK CUTTER MODULE

D24 (PA24) MAIN GENERATOR NO 1 BOX UPPER DECK D25 (PA25) LER MODULE

D26 (PA26) LER MODULE

D27 (PA27) NORTH STAIRTOWER D28 (PA28) SOUTH STAIRTOWER D31 (PA31) SKIDBASE

D32 (PA32) MUD TANK NO. 2 BOX LOWER DECK D33 (PA33) MUD TANK NO. 3 BOX LOWER DECK D34 (PA34) MUD PUMP NO. 2 BOX MEZZ. DECK D35 (PA35) MUD PUMP NO. 3 BOX MEZZ. DECK D36 (PA36) MAIN GEN. NO. 2 BOX UPPER DECK D37 (PA37) MAIN GEN. NO. 3 BOX UPPER DECK

(40)

Facility/Area Code 40 236

ELDA D38 (PA38) LOCAL INST. ROOM ROOF LEVEL D39 (PA39) LOCAL ELEC. ROOM ROOF LEVEL H01 HELIDECK & SUPPORT

J01 ALL JACKET (EXCEPT RISERS) K01 EAST CRANE & PEDESTAL K02 WEST CRANE & PEDESTAL

P01 CONTROL ROOM Q01 QUARTERS 1ST FLOOR Q02 QUARTERS 2ND FLOOR Q03 QUARTERS 3RD FLOOR Q04 QUARTERS 4TH FLOOR Q05 QUARTERS 5TH FLOOR Q06 QUARTERS 6TH FLOOR Q07 QUARTERS ROOF

U01 SWITCHGEAR/MCC ROOM (MODULE 105) U02 BULK STORAGE (MOD. 116/117/118)

U03 WHS, STORES & OFFICE AREA (MODULES 123/124/125) U04 EQUIPMENT STORAGE MEZZ DECK (MODULE 112) U05 EAST UTILITY AREA (MODULE 111)

U06 WEST UTILITY AREA (MODULE 102) U07 GENERATOR ROOM (MODULE 105) U08 CELLAR DECK CENTER (MODULE 197) U09 CELLAR DECK NORTH (MODULE 197) U10 AIR HANDLING AREA (MODULE 198) U11 POTABLE WATER DECK TANK NORTH U12 POTABLE WATER DECK TANK WEST U13 DIESEL STORAGE DECK TANK WEST U14 DIESEL STORAGE DECK TANK CENTER U15 DIESEL STORAGE DECK TANK EAST U16 RAW WATER DECK TANK EAST U17 RAW WATER DECK TANK CENTER U18 RAW WATER DECK TANK WEST U19 COLLECTION SUMP AREA

(41)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 41 236

ELDB A00 PLATFORM GENERAL B01 BRIDGE ELDB TO FLARE D01 DERRICK (MODULE 342) D02 DRILL FLOOR (MODULE 341) D03 BOP DECK (MODULE 341) D04 SKID DECK

D05 MUD HOPPER AREA (MODULE 325)

D06 CEMENT & ACIDIZING AREA (MODULE 351) D07 MUD TANKS & PUMPS (MODULE 342) D08 PIPE RACK AREA (MODDULE 352) D09 EAST BURNE BOOM

D10 WEST BURNER BOOM

D11 WELLHEAD AREA (MODULE 324)

D12 WELLHEAD AREA ON CELLAR DECK (MODULE 324) D13 CAT ENGINE ROOM (MODULE 341)

F01 FLARE & STRUCTURE H01 HELIDECK & SUPPORT

J01 ALL JACKET (EXCEPT RISERS) K01 EAST CRANE

K02 WEST CRANE

L01 24” OIL PIPELINE, ELDB TO EKOJ L02 30” GAS PIPELINE, ELDB TO EKOJ P01 CONTROL ROOM (MODULE 321)

P02 GAS PIG LAUNCHER AREA (MODULE 325) P03 PRODUCTION AREA ON CELLAR DECK

P04 PROD. COOLERS & SEPARATORS (MOD. 333/334) P05 TEST SEPARATOR & METERING AREA (MOD. 322/323) P06 NOT IN USE (GAS DEHYDRATION AREA (MOD. 335))

P07 GAS COMPRESSOR ROOM (MODULE 352) P08 WATER TREATMENT AREA

Q01 QUARTERS 1ST FLOOR Q02 QUARTERS 2ND FLOOR Q03 QUARTERS 3RD FLOOR Q04 QUARTERS 4TH FLOOR Q05 QUARTERS 5TH FLOOR

(42)

Facility/Area Code 42 236

ELDB Q06 QUARTERS 6TH FLOOR Q07 QUARTERS ROOF

R01 24” OIL RISER FROM ELDF R02 30” GAS RISER FROM ELDF R03 24” OIL RISER, ELDB TO EKOJ R04 30” GAS RISER, ELDB TO EKOJ

R05 14” WATER INJECTION RISER FROM ELDE R06 6” GAS LIFT RISER FROM ELDE

T01 FLARE SUPPORT

U01 UTILITY AREA ON CELLAR DECK

U02 FIREWATER PUMP AREA EAST (MODULE 332) U03 POWER STATION (MODULE 336)

U04 OILY WATER TREATMENT

U05 SWITCHGEAR ROOM (MODULE 336) U06 HOT OIL HEATER AREA (MODULE 373) U07 NO. 1 POTABLE WATER TANK

U08 NO. 2 POTABLE WATER TANK U09 NO. 1 DIESEL FUEL TANK

U10 NO. 1 RAW FRESH WATER TANK U11 NO. 2 RAW FRESH WATER TANK U12 NO. 2 DIESEL FUEL TANK

U13 PIG RECEIVER AREA (NEW)

(43)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 43 236

ELDE A00 PLATFORM GENERAL

B01 BRIDGE ELDE TO ELDF

J01 JACKET

K01 PLATFORM CRANE

L01 24" WATER INJECTION PIPELINE TO EKOK L02 14" WATER INJECTION PIPELINE TO ELDB L03 6" GAS LIFT PIPELINE TO ELDB

P00 PROCESS AREA - GENERAL

P01 WATER INJECTION AREA - GENERAL P02 GAS TREATMENT AREA - GENERAL P11 WATER INJECTION AREA - CELLAR DECK P12 GAS TREATMENT AREA - CELLAR DECK P21 WATER INJECTION AREA - MEZZANINE DECK P22 GAS TREATMENT AREA - MEZZANINE DECK P41 WATER INJECTION AREA - WEATHER DECK P42 GAS TREATMENT AREA - WEATHER DECK P02 GAS TREATMENT AREA - GENERAL P12 GAS TREATMENT AREA - CELLAR DECK P22 GAS TREATMENT AREA - MEZZANINE DECK P42 GAS TREATMENT AREA - WEATHER DECK R01 24" WATER INJECTION RISER TO EKOK R02 14" WATER INJECTION RISER TO ELDB R03 6" GAS LIFT RISER TO ELDB

U00 UTILITY MODULE - GENERAL U10 UTILITY MODULE - CELLAR DECK U20 UTILITY MODULE - MEZZANINE DECK

U30 UTILITY MODULE - UPPER MEZZANINE DECK U40 UTILITY MODULE WEATHER DECK

(44)

Facility/Area Code 44 236

ELDF A00 PLATFORM GENERAL

B01 BRIDGE 1 ELDF TO BRIDGE SUPPORT B02 BRIDGE 2 BRIDGE SUPPORT TO FLARE F01 FLARE & STRUCTURE

J01 JACKET (EXCEPT RISERS) K01 EAST CRANE & PEDESTAL K02 WEST CRANE & PEDESTAL L01 24" OIL PIPELINE, ELDF TO ELDB L02 30" GAS PIPELINE, ELDF TO ELDB P01 CONTROL ROOM

P02 DEGASSING POT AREA (MOD. 207) P03 GLYCOL STORAGE AREA (MOD. 206) P04 GAS/GAS EXCH. AREA (MOD. 205)

P05 NOT IN USE (COMP. SUCTION SCRUBBER AREA (MOD. 204)

P06 PIG LAUNCHER AREA (MOD. 202/203) P07 PROVER LOOP AREA (MOD. 201)

P08 GLYCOL STILL SURGE TANK AREA (MOD. 214) P09 PROD. SEP. AREA (MOD. 203)

P10 PROD. COOLER AREA (MOD. 201 TO 204) P11 PIG RECEIVER AREA

P12 WATER TREATMENT AREA (NEW) R01 24" OIL RISER, ELDF TO ELDB R02 30" GAS RISER, ELDFTO ELDB R03 14” OIL/GAS RISER FROM EMBL R04 J – TUBE FOR UMBILICAL TO EMBLA T01 BRIDGE SUPPORT

T02 FLARE SUPPORT U01 BATTERY ROOM AREA U02 MAINTENANCE AREA U03 FLASH TANK AREA U04 OIL SUMP TANK AREA U05 AIR RECEIVERS AREA U06 FIREWATER PUMP AREA U07 TURBINE ROOM

U08 HOT OIL HEATER AREA (MOD. 214)

(45)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 45 236

ELDF U09 TURBINE EXHAUST AREA (MOD. 212/213)

(46)

Facility/Area Code 46 236

EMBL A00 PLATFORM GENERAL D01 WELLHEAD AREA

D02 BURNER BOOM

D03 VENT STACK

H01 HELIDECK & SUPPORT

J01 ALL JACKET (EXCEPT RISERS) K01 EAST CRANE & PEDESTAL L01 14" OIL/GAS EMBL TO ELDF

P01 PROCESS AREA

R01 14" OIL/GAS RISER TO ELDF

R02 J – TUBE FOR UMBILICAL FROM ELDF U01 PERSONNEL ROOM AREA

U02 CONTROL ROOM AREA U03 SWITCHROOM AREA

(47)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 47 236

H7 A00 PLATFORM GENERAL H01 HELIDECK & SUPPORT

J01 ALL JACKET (EXCEPT RISERS) K01 EAST CRANE & PEDESTAL K02 WEST CRANE & PEDESTAL P01 CONTROL ROOM

P02 RECEIVER/LAUNCHER AREA P03 INLET GAS SCRUBBER AREA P04 RECYCLE COOLER AREA Q01 QUARTERS 1ST FLOOR Q02 QUARTERS 2ND FLOOR Q03 QUARTERS 3RD FLOOR R01 36" GAS RISER TO EMDEN R02 36" GAS RISER FROM B11 U01 UTILITY PUMPS AREA U02 HEATERS/EXCH. AREA U03 FIREWATER PUMPS AREA U04 HOT OIL HEATER ROOM U05 BRIDGE LANDING AREA U06 UTILITY DECK NORTH U07 TRANSFORMER AREA U08 AIR COMP. ROOM U09 SWITCHGEAR ROOM U10 GENERATOR ROOM

U11 TURBINE AIR INTAKE AREA U12 TURBINE ROOM

U13 WORKSHOP/STORES AREA U14 ROOF LAYDOWN AREA U15 ROOF UTILITIES AREA U16 DIESEL STORAGE TANKS

U17 DIESEL STORAGE AND SLOP OIL TANKS U18 DIESEL STORAGE TANKS

U19 POTABLE AND FRESH WATER STORAGE TANKS U20 POTABLE AND FRESH WATER STORAGE TANKS

(48)

Facility/Area Code 48 236

TOR A00 PLATFORM GENERAL B01 BRIDGE TO FLARE D01 DERRICK D02 DRILL FLOOR D03 BOP DECK D04 SKID DECK D05 SCHLUMBERGER UNIT D06 CEMENT PUMP UNIT AREA D07 PIPE RACK AREA

D08 BULK STORAGE AREA D09 AMINE TANK

D10 MUD TANKS & PUMPS D11 WELLHEAD AREA D12 SACK STORAGE AREA D13 BURNER BOOM F01 FLARE & STRUCTURE H01 HELIDECK & SUPPORT

J01 ALL JACKET (EXCEPT RISERS) K01 EAST CRANE & PEDESTAL K02 WEST CRANE & PEDESTAL

L01 NOT IN USE (12" OIL TOR TO EKOR) (Closed and filled with water) L03 14" OIL/GAS TOR TO EKOJ

P01 CONTROL ROOM P02 LAUNCHER AREA

P03 EXCHANGER AND GLYCOL SYSTEM P04 METERING & PROVING

P05 SEPARATOR AREA P06 GAS LIFT MODULE

P07 CELLAR DECK SOUTH EAST Q01 QUARTERS 1ST FLOOR Q02 QUARTERS 2ND FLOOR Q03 QUARTERS 3RD FLOOR Q04 QUARTERS 4TH FLOOR Q05 QUARTERS 5TH FLOOR Q06 QUARTERS 6TH FLOOR

(49)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Facility/Area Code 49 236

TOR Q07 QUARTERS ROOF

R01 NOT IN USE (12" OIL RISER TO EKOR) (Closed and filled with water) R03 14" OIL/GAS RISER TO EKOJ

T01 FLARE SUPPORT U01 POTABLE WATER TANK U02 FRESH WATER TANK NO.1 U03 FRESH WATER TANK NO.2 U04 FRESH WATER TANK NO.3 U05 DIESEL TANK NO.1

U06 DIESEL TANK NO.2 U07 DIESEL TANK NO.3

U08 FIRE WATER EXP. TANK WEST U09 GLYCOL STORAGE

U10 FIREWATER EXT. TANK EAST U11 PUMP AREA

U12 GENERATOR ROOM U13 EAST FIREWATER PUMPS U14 WORKSHOP & STORES U15 WEST FIREWATER PUMPS U16 UTILITIES AREA

U17 SWITCHGEAR ROOM U18 DIESEL DAY TANK AREA U19 WAREHOUSE AREA U20 EMERGENCY GEN. ROOM U21 CAT. ENGINE ROOM

(50)

Discipline Codes 50 236

3

Discipline Codes

This code is applicable for numbering of documents and drawings, specifically those designated as DFO.

Engineering Discipline Code consists of one (1) alpha character, and identifies the engineering discipline to which a document/drawing relates.

NOTE: Engineering Discipline Codes are related to disciplines functions, i.e. engineering subjects, they represent no direct connection to the organizational structure or departments in ConocoPhillips.

Code Engineering Discipline

A Architectural/Civil B Not in Use

C Not in Use

D Drilling E Electrical

F Health, Safety & Environmental Engineering HSE (incl. Risk Analysis) G Multidiscipline/General Engineering

H HVAC/Sanitation

I Instrumentation/Metering

J Insulation (Thermal/Fire/Acoustic) & Winterization

K Material Technology (incl. Corrosion Protection & Protective Coating) L Subsea & Pipeline (incl. Marine Operations,Templates, Risers & J-tubes) M Mechanical (incl. Rotating Equip. Valves, Lifting Equip., Press. Vessels &

Heat Exchangers)

N Not in use in Norway, use code F

O Operations

P Piping

Q Quality

R Computer & Electronic Control

S Structural (incl. Jacket, Tripods & Bridges) T Telecommunication U Process V Not in Use W Weight Control X Inspection Y Geoscience Z Not in Use

(51)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

Discipline Codes 51 236

NOTE: Be advised that the discipline table in SAP contain additional codes not used for Norway projects. Only the above codes shall be used for Norway projects.

(52)

System Number 52 236

4

System Number

4.1

System Number

System Numbers identifies a process/support/utility system. System Numbers are composed of three (3) characters.

The first digit of the system represents the system main group - see 4.2 System Number Group on page 52.

4.2

System Number Group

MULTI-SYSTEMS NUMBER

SYSTEM GROUP 0 - WELLHEADS AND FLOWLINES

NOTE: Comments are included to minimize uncertainty when setting system limits. See especially section 4.4 System Boundaries on page 75 where general guidelines for system boundary choices are given.

System No. System Description

CAB System for all cables

G00 Non-specific and across many systems

SIG Signals

TMP Temporary equipment

System No. System Description

000 Wellhead systems general 010 Wellheads and flowlines 020 2-phase production lines

(53)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

System Number 53 236

SYSTEM GROUP 1 - OIL/NGL PROCESS

SYSTEM GROUP 2 - GAS PROCESS

System No. System Description

100 Oil/NGL process systems general 110 High pressure production separation 120 Low pressure production separation

130 Not in Use (Doris oil storage and skimmer.)

140 High pressure test separation 150 Oil/NGL metering, fiscal 160 NGL separation and reinsertion

180 Produced Water

190 Oil export pumping

System No. System Description

200 Gas process systems general

210 Gas process compression incl. Export compression

220 Gas dehydration

230 Not in Use (Flash and vent gas compression)

240 Gas desulphurisation 250 Gas metering, fiscal

260 Gas lift

270 Gas injection to reservoir 280 Gas dew point conditioning 290 Start, fuel and blanket gas

(54)

System Number 54 236

SYSTEM GROUP 3 - WATER INJECTION RESERVOIR STIMULATION

SYSTEM GROUP 4 - OIL AND GAS EXPORT

SYSTEM GROUP 5 - PROCESS UTILITY

System No. System Description

300 Water injection systems general

310 Sea water supply

320 Water ultra violet sterilisation 330 Water vacuum deaeration

340 Water storage and chemical treatment 350 Water booster pumping

360 Water HP pumping

370 Water export/import risers and pipelines

System No. System Description

400 Oil and Gas Import/Export Systems General 410 Export risers, pig launchers and pipelines 420 Import risers and pig receivers

430 Oil export pumping

440 Gas export compression

System No. System Description

500 Open Drain

510 Flare, vent and blow-down

520 Drain system and oily water treatment 530 Chemical injection

540 Glycol circulation and regeneration

550 Not in Use (Propane compression and reclaim)

560 Hot oil

570 Sea water

580 Process inert gas

(55)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

System Number 55 236

SYSTEM GROUP 6 - PROCESS UTILITY AND FACILITY SUPPORT

SYSTEM GROUP 7 - SAFETY AND LOSS PREVENTION

System No. System Description

600 Closed cooling water 610 Instrument and utility air

620 Process/equipment control and measurement computers

630 Hydraulic power

640 Steam generation and waste heat recovery

650 Diesel fuel

660 High voltage power generation and distribution 670 Low voltage power generation and distribution

690 Jet fuel

System No. System Description

700 Safety and loss prevention systems general 710 Water fire fighting

720 Fire fighting and passive fire protection 730 Fire and gas detection

740 Emergency power generation and distribution 750 Safety shutdown system

760 Equipment remote alarm and indication 770 Escape and personnel safety

780 Navigation and identification

(56)

System Number 56 236

SYSTEM GROUP 8 - FACILITY SYSTEMS

SYSTEM GROUP 9 - DRILLING

System No. System Description

800 Fresh water (Drill water)

810 Potable water

820 Building and accommodation

830 Heat, ventilation and air condition (HVAC) 840 Mechanical handling, tools and supplies

850 Structures

860 Communication radio links 870 Communication systems general 880 Commercial computer systems

890 Electronic control and protection system

System No. System Description

900 Drilling systems general

910 Derrick and derrick substructures

920 Mud handling

930 Cement handling

940 Well control system 950 Rig hydraulic power 960 Rig electric power

970 Rig HVAC system

980 Rig bulk handling

990 Rig air system

9A0 Movable drilling equipment 9B0 Movable drilling tools 9C0 Wire line equipment

(57)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

System Number 57 236

4.3

System Description

MULTI – SYSTEM GROUP

System CAB – Cable

This system covers all cables on a Platform.

System G00 – Multi system, non-specific and across many systems

Used for documents containing more than one system.

Documentation of criticality assessments, ref. Norsok Z-008 / TCD2 5047.

System SIG – Signals

This system covers all signals not coming from/going to a (physical) equipment with a function location tag number eg. transmitters, valves, ie. signals having another function location tag number (sequence number) than the equipment its coming from.

System TMP – Temporary equipment

This system includes all temporary equipment on a Platform, ref. Norsok Z-015 – Temporary Equipment / Temporary equipment forms and doc. 6232 – Equipment for temporary use offshore.

SYSTEM GROUP 0 - WELLHEADS AND FLOWLINES

System group 0 contains systems that together control and transport oil/gas/NGL from the reservoir up to and including the production/test header.

System 000 - Wellhead and Flowline Systems General

The system covers equipment not classified as belonging to a certain system. This may be equipment operating several systems within group "0".

Note: Not used for specific equipment or piping.

System 010 - Wellheads and Flowlines

This system covers equipment in connection with production wells, X-mas trees and flowlines for the transport of oil/gas/NGL up to and including the header - valves.

Note:

• Water / Gas injection header is part of system 260, 270, 370 • Water / Gas injection flowlines belong to system 260, 270, 370 • Production headers are part of system 020

(58)

System Number 58 236

System 020 - 2-Phase Production Lines

This system covers equipment in connection with multi-phase production lines including production header to export riser provided that no separation or other process has been carried out. Separation for well metering only (test separation), where hydrocarbons and water are recombined after metering, is a separate process belonging to system 140 - High pressure test separation. Where a line leaves a wellhead platform and crosses a bridge to a processing platform (for example from 2/4X to 2/4J), the production line limit is the first bridge landing. The line will then continue in the appropriate system for the recipient platform (110, 120 or 140).

Note 1:

• Includes Production Header, ref system 010 • Test headers are included in system 140

• Production lines without water are also part of system 020.

Note 2:

• 2-phase refers to systems in which hydrocarbons (oil, gas, NGL) and water flow to-gether. Hydrocarbon mixtures where water is not included are considered single phase.

• For classification and registration of documentation, only systems and

sub-systems will be used. I.e: 111 Oil/NGL Recycle system will be registered as 110 High Pressure Production Separation.

System 030 – Electrical Submersible Pumps, ESP

This system covers equipment in connection with 2-phase production by means of electrical driven pumps installed in reservoir.

SYSTEM GROUP 1 - OIL/NGL PROCESS

System group 1 contains systems that together perform the required processing of produced oil/ NGL/water from production/test header up to the point where the oil/NGL/water is transported to another platform by pumping or landing.

System 100 - Oil/NGL Process Systems General

The system covers equipment not classified as belonging to a certain sub-system. This may be equipment operating several systems within group "1".

System 110 - High Pressure Production Separation

This system covers equipment from headers and import risers including HP separation/produc-tion pumps. If no other separaseparation/produc-tion/process exists, the system covers equipment up to the export launcher. Including OIL/NGL Recycle.

Note:

• Where there is only one separator, this will be system 110 irrespective of the actual pressure.

• For gas down stream of a separator: The piping to the first equipment item in the downstream system shall be part of the separation system. See also

Section 4.4 System Boundaries on page 75.

(59)

Document / Revision No. Owner Approved 2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006

System Number 59 236

System 120 - Low Pressure Production Separation

This system covers equipment cooler / valve d/s 1st stage (HP) separation up to and including pipe/header after LP separation for further processing, transport, or up to export launcher. LP production pumps are included in the system.

System 130 - Not in Use (Doris Oil Storage and Skimmer)

Not in use for existing platforms, information only.

The system covers equipment in connection with the storage of oil, the cleaning of produced water, and the cleaning of waste water from drains, etc.

System 140 - Test Separation

This system covers equipment from header and import risers up to and including the burner boom. Test production pumps are included in the system.

Note:

• Gas and oil piping from the Test Separator belongs to system 140 up to the tie-in point to production piping.

• The Test Header and piping up to the test separator are part of system 140.

System 150 - Oil/NGL Metering, Fiscal

This system covers equipment in connection with the metering of produced/transported oil/NGL. Import metering measures oil brought to the platform.

Export metering measures oil leaving the platform.

Note:

• This system is limited to the metering skid and its immediate connections.

• A new system begins immediately down stream of the metering package, either ex-port for exex-port oil or the system the oil flows into for imex-port oil.

System 160 - NGL Separation and Stabilising

The system covers equipment in connection with the removal and reclaim of gas from the NGL separated through the gas dew point conditioning system.

Note:

• This system is not used. Included in system 280.

System 180 - Produced Water

This system covers all equipment in connection with the processing and treatment of produced water. The upstream limit is the connection to the production separator. For produced water that is discharged to sea, system 180 also includes the outfall piping. The reject oil return to the proc-ess is also system 180 up to the connection to the separator piping.

System 190 - Oil export pumping

This system covers equipment in connection with the pumping of oil from one platform to anoth-er, or ashore from a platform. The system covers equipment from the header on the inlet side to the header on the outlet side.

References

Related documents