2.2 Area Codes
2.2.3 Sub-Area Codes
Facility Area Area Description B11 A00 PLATFORM GENERAL
H01 HELIDECK & SUPPORT
J01 ALL JACKET (EXCEPT RISERS) K01 EAST CRANE & PEDESTAL K02 WEST CRANE & PEDESTAL L01 36” GAS PIPELINE, B-11 TO H-7
P01 CONTROL ROOM LEVEL-CONTROL BUILDING
P02 PIG RECEIVER/LAUNCHER AREA - CELLAR DECK NORTH P03 INLET GAS SCRUBBER AREA - CELLAR DECK MIDDLE P04 RECYCLE COOLER AREA - UTILITY DECK NORTH/EAST Q01 QUARTERS 1ST FLOOR U02 FRESH WATER COOLERS - CELLAR DECK SOUTH/EAST U03 FIREWATER PUMPS AREA - CELLAR DECK SOUTH U04 MECH.EQUIPMENT ROOM - CELLAR DECK SOUTH U05 CELLAR DECK SOUTH/WEST INCL. LANDING AREA U06 UTILITY DECK NORTH OF FIREWALL
U07 TRANSFORMER AREA - UTILITY DECK SOUTH U08 AIR COMPRESSOR ROOM - UTILITY DECK SOUTH U09 SWITCHGEAR ROOM - UTILITY DECK SOUTH U10 GENERATOR ROOM - UTILITY DECK SOUTH U11 KGB TURBINE AIR INTAKE - UTILITY DECK SOUTH U12 P/L COMPRESSOR ROOM - EQUIP. DECK NORTH U13 WORKSHOP/STORES AREA - EQUIP. DECK SOUTH U14 ROOF DECK LAYDOWN AREA
U15 HELIDECK UTILITY AREA
U16 DIESEL STORAGE TANK - CELLAR DECK SOUTH/WEST
U17 DIESEL STORAGE & SLOP OIL TANKS - CELLAR DECK NORTH-WEST
U18 DIESEL STORAGE TANKS - CELLAR DECK MIDDLE
Facility/Area Code 12 236
B11 U19 POTABLE & FRESHWATER STORAGE TANKS - CELLAR DECK NORTH
U20 POTABLE & FRESHWATER STORAGE TANKS - CELLAR DECK SOUTH
Facility Area Area Description
Document / Revision No. Owner Approved
2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006
Facility/Area Code 13 236
EKOA A00 PLATFORM GENERAL
A01 STORAGE AREA/LAYDOWN DECKS D01 DERRICK
D02 DRILL FLOOR D03 BOP DECK D04 SKID DECK
D05 SCHLUMBERGER UNIT D06 CEMENT & ACIDIZING AREA D07 PIPE RACK AREA
D08 BULK STORAGE AREA D09 MUD MIXING AREA
D10 MUD TANKS & MUD PUMP AREA D11 WELLHEAD AREA
D12 WELLHEAD AREA
D13 BURNER ROOM
H01 HELIDECK & SUPPORT
J01 ALL JACKET (EXCEPT FOR RISERS) K01 EAST CRANE & PEDESTAL
K02 WEST CRANE & PEDESTAL
L01 10" PIPELINE (Used for umbilical), FROM EKOF L02 NOT IN USE (20" OIL/GAS PIPELINE, EKOA TO EKOF) L03 NOT IN USE (6" GAS LIFT FROM EKOF TO EKOA) L04 17" OIL/GAS PIPELINE EKOA TO EKOF
Q01 QUARTERS 1ST FLOOR
R01 10" RISER(Used for umbilical), FROM EKOF
R02 NOT IN USE (20" OIL/GAS RISER, EKOA TO EKOF) R03 6” GAS LIFT RISER FROM EKOF
R04 17" OIL/GAS RISER EKOA TO EKOF U01 UTILITIES MODULE NORTH/EAST Facility Area Area Description
Facility/Area Code 14 236
EKOA U02 UTILITIES MODULE NORTH/WEST U03 DIESEL STORAGE DECK TANK
U04 POTABLE WATER STORAGE DECK TANK U05 POTABLE WATER STORAGE DECK TANK U06 FRESH WATER STORAGE DECK TANK U07 EMERGENCY GENERATOR ROOM U08 MAIN GENERATOR ROOM
Facility Area Area Description
Document / Revision No. Owner Approved
2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006
Facility/Area Code 15 236
EKOB A00 PLATFORM GENERAL
A01 STORAGE AREA / LAYDOWN DECKS
D05 SCHLUMBERGER UNIT D06 CEMENT & ACIDIZING AREA D07 PIPE RACK AREA
J01 ALL JACKET (EXCEPT RISERS) K01 EAST CRANE & PEDESTAL K02 WEST CRANE & PEDESTAL L01 10" OIL/GAS EKOB TO EKOF L02 18" OIL/GAS EKOB TO EKOF L03 22" OIL/GAS EKOB TO EKOF L05 20" OIL/GAS PIPELINE TO EKOM P01 CONTROL ROOM R05 20" OIL/GAS RISER TO EKOM U01 FRESH WATER TANK
U02 DIESEL STORAGE TANK Facility Area Area Description
Facility/Area Code 16 236
EKOB U03 RAW FRESH WATER TANK U04 POTABLE WATER TANK U05 WORKSHOP
U06 WAREHOUSE
U07 AIR RECEIVER AREA U08 STORAGE AREA
U09 GENERATOR PACKAGE U10 EMERGENCY GEN. ROOM U11 FIREWATER PUMPS Facility Area Area Description
Document / Revision No. Owner Approved
2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006
Facility/Area Code 17 236
EKOC A00 PLATFORM GENERAL
A01 MAINTENANCE WAREHOUSE & OFFICES A02 CELLAR DECK CENTER
A03 OFFICE AREA
B01 STORAGE BRIDGE1 EKOC TO BS III B02 STORAGE BRIDGE2 BS III TO EKOP B03 QUARTERS BRIDGE EKOC TO EKOQ D01 DRILLING DERRICK
D02 DRILL FLOOR D03 BOP DECK D04 SKID DECK
D05 SCHLUMBERGER UNIT D06 CEMENT MIX UNIT J01 ALL JACKET (EXCEPT RISERS) K01 EAST CRANE & PEDESTAL
P05 COMPRESSOR TRAIN 1 - LEVEL B (EAST) P06 COMPRESSOR TRAIN 2 - LEVEL B (WEST) R01 8" GAS RISER EKOC TO EKOB
T01 BRIDGE SUPPORT III EKOC TO EKOP U01 BELOW CELLAR DECK
U06 MOTOR CONTROL CENTER
U07 COMPRESSOR UTILITY TRAIN 1 – LEVEL C (EAST) Facility Area Area Description
Facility/Area Code 18 236
EKOC U08 COMPRESSOR UTILITY TRAIN 2 – LEVEL C (WEST) U09 TRAIN 1 TURBINE ROOM ROOF
U10 TRAIN 2 TURBINE ROOM ROOF U11 LOCAL EQUIPMENT ROOM Facility Area Area Description
Document / Revision No. Owner Approved
2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006
Facility/Area Code 19 236
EKOF A00 PLATFORM GENERAL
B01 FLARE BRIDGE 1 EKOF TO BS 1 B02 FLARE BRIDGE 2 BS 1 TO EKOW B03 FLARE BRIDGE 3 EKOW TO FL 1 B04 PRODUCTION BRIDGE EKOF TO EKOQ F01 FLARE I & STRUCTURE (SOUTH) H01 HELIDECK & SUPPORT
J01 ALL JACKET (EXCEPT RISERS) K01 EAST CRANE & PEDESTAL K02 WEST CRANE & PEDESTAL L01 6” GAS LIFT, EKOF TO EKOA L02 10” FUEL GAS EKOF TO EKOB
L03 10” PIPELINE (Used for umbilical), EKOF to EKOA P01 2/4A RECEIVERS/LAUNCHER (SOUTH WEST 20M) P02 2/4B RECEIVERS/LAUNCHER (EAST CENTER 20M)
P03 CRUDE OIL PUMPS/SKIMMER TANK (SOUTH-CENTER 20M) P04 SETTLING TANKS
P05 CELLAR DECK NORTH END P06 1ST STAGE SEPARATORS P07 EXCHANGER SKID (LOWER) P08 CONTAINER AREA (LOWER) P09 OLD TURBINE AREA
P10 WORLEY SEPARATOR PKG.
P11 OLD TURBINE AREA P12 V3011
P13 CONTAINER AREA (UPPER) P14 2ND + 3RD STAGE SEPARATORS P15 EXCHANGER SKID (TOP)
P16 COOLER PKG.
P17 TURBINE PKG. LAYDOWN DECK P18 CONTROL ROOM
P19 SOUTH EAST 20M DECK
R01 10" RISER (FOR UMBILICAL) TO EKOA R02 20” OIL/GAS RISER FROM EKOA
R03 NOT IN USE (10" OIL/GAS RISER FROM EKOB) Facility Area Area Description
Facility/Area Code 20 236
EKOF R04 18" OIL/GAS RISER FROM EKOB R05 22" OIL/GAS RISER FROM EKOB R06 6" GAS LIFT RISER EKOF TO EKOA T01 BRIDGE SUPPORT 1 EKOF TO EKOW T02 FLARE 1 SUPPORT (SOUTH)
U01 LOWER WORKSHOP U02 WELD SHOP
U03 TRANSFORMER DECK
Facility Area Area Description
Document / Revision No. Owner Approved
2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006
Facility/Area Code 21 236
EKOH A00 PLATFORM GENERAL
B01 HOTEL BRIDGE EKOH TO EKOC H01 HELIDECK & SUPPORT
H02 HELICOPTER HANGAR J01 ALL JACKET
K01 SOUTH CRANE & PEDESTAL Q00 MAIN FLOOR
Q01 QUARTERS 1ST FLOOR Q02 QUARTERS 2ND FLOOR Q03 QUARTERS 3RD FLOOR Q04 QUARTERS 4TH FLOOR Q05 QUARTERS 5TH FLOOR Q06 QUARTERS 6TH FLOOR
U00 UTILITIES MODULE - GENERAL U01 CELLAR DECK
U02 MEZZANINE DECK Facility Area Area Description
Facility/Area Code 22 236
EKOJ A00 PLATFORM GENERAL
B01 BRIDGE EKOJ - EKOX
B02 FOR EQUIPMENT LOCATED ON EKOM - B02 C00 MODULE SUPPORT FRAME - GENERAL
C01 MSF UTILITY AREA – LEV. 1 & LEV. 1 MEZZ. (C11 & C21) C02 MSF PROC. AREA – LEV. 1 & LEVEL 1 MEZZ. (C12 &C22) C03 MSF RISER AREA – LEV. 1 & LEV. 1 MEZZ. (C13 & C23) C10 MSF ALL AREAS - LEVEL 1
C11 MSF UTILITY AREA - LEVEL 1 C12 MSF PROCESS AREA - LEVEL 1 C13 MSF RISER AREA - LEVEL 1 C20 MSF ALL AREAS - LEVEL 1 MEZZ.
C21 MSF UTILITY AREA - LEVEL 1 MEZZ.
C22 MSF PROCESS AREA - LEVEL 1 MEZZ.
C23 MSF RISER AREA - LEVEL 1 MEZZ.
F01 FLARE BOOM
I00 INJECTION COOLER MODULE
J01 JACKET
K01 NORTH CRANE & PEDESTAL K02 SOUTH CRANE & PEDESTAL L00 PIPELINE GENERAL
L01 24" OIL PIPELINE FROM ELDB L02 30" GAS PIPELINE FROM ELDB L03 14" OIL/GAS PIPELINE FROM TOR L04 34" OIL PIPELINE TO TEESSIDE L05 36" GAS PIPELINE TO EMDEN L06 20" OIL PIPELINE FROM VALHALL L07 20" GAS FROM VALHALL (CANCELLED) L08 20" OIL PIPELINE FROM ULA
L09 12" GAS PIPELINE FROM GYDA
L10 6" GAS/FUEL PIPELINE EKOJ TO EKOK P00 PROCESS MODULE GENERAL
P10 PROC. MOD. - LEVEL 1
P11 PROC. MOD. - LEVEL 1 SOUTH P12 PROC. MOD. - LEVEL 1 NORTH Facility Area Area Description
Document / Revision No. Owner Approved
2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006
Facility/Area Code 23 236
EKOJ P15 PROC. MOD. - LEVEL 1 & LEV. 1 MEZZ. (P10&P20) P20 PROC. MOD. - LEVEL 1 MEZZ.
P21 PROC. MOD. - LEVEL 1 MEZZ. SOUTH P22 PROC. MOD. - LEVEL 1 MEZZ. NORTH P30 PROC. MOD. - LEVEL 2
P31 PROC. MOD. - LEVEL 2 SOUTH P32 PROC. MOD. - LEVEL 2 NORTH
P35 PROC. MOD. - LEVEL 2 & ABOVE (P10 & P20) P40 PROC. MODULE - LEVEL 2 MEZZ.
P41 PROC. MOD. - LEVEL 2 MEZZ. SOUTH P42 PROC. MOD. - LEVEL 2 MEZZ. NORTH P50 PROC. MOD. - WEATHER DECK
P51 PROC. MOD. - WEATHER DECK SOUTH P52 PROC. MOD. - WEATHER DECK NORTH P61 PROC. MOD. - WEATHER DECK MEZZ. SOUTH P62 PROC. MOD. - WEATHER DECK MEZZ. NORTH P70 PROC. MOD. - UPPER WEATHER DECK
P71 PROC. MOD. - UPPER WEATHER DECK SOUTH P72 PROC. MOD. - UPPER WEATHER DECK NORTH R00 RISER MODULE
R01 24” OIL RISER FROM ELDF R02 30” GAS RISER FROM ELDF R03 14” OIL/GAS RISER FROM TOR R04 34" OIL RISER, EKOJ TO TEESSIDE R05 36" GAS RISER, EKOJ TO EMDEN R06 20" OIL RISER FROM VALHALL
R07 20" GAS RISER FROM VALHALL (CANCELLED) R08 20" OIL RISER FROM ULA
R09 12" GAS RISER FROM GYDA
R10 6" GAS FUEL RISER, EKOJ TO EKOK
R11 J – TUBE FIBRE OPTIC CABLE & EMDEN SSIV UMBILICAL R12 J – TUBE FOR TEESSIDE SSIV UMBILICAL
P62 PROC. MOD. - WEATHER DECK MEZZ. SOUTH P70 PROC. MOD. - WEATHER DECK MEZZ. NORTH Facility Area Area Description
Facility/Area Code 24 236
EKOJ P71 PROC. MOD. - UPPER WEATHER DECK SOUTH P72 PROC. MOD. - UPPER WEATHER DECK NORTH R00 RISER MODULE
R01 24” OIL RISER FROM ELDF R02 30” GAS RISER FROM ELDF R03 14” OIL/GAS RISER FROM TOR R04 34" OIL RISER, EKOJ TO TEESIDE R05 36" GAS RISER,EKOJ TO EMDEN R06 20" OIL RISER FROM VALHALL
R07 20" GAS RISER FROM VALHALL (CANCELLED) R08 20" OIL RISER FROM ULA
R09 12" GAS RISER FROM GYDA
R10 6" GAS FUEL RISER, EKOJ TO EKOK
R11 J – TUBE FIBRE OPTIC CABLE & EMDEN SSIV UMBILICAL R12 J – TUBE FOR TEESIDE SSIV UMBILICAL
S00 SEPARATION MODULE - GENERAL S10 SEP. MOD. - LEVEL 1
S11 SEP. MOD. - LEVEL 1 SOUTH S12 SEP. MOD. - LEVEL 1 NORTH
S15 SEP. MOD. - LEVEL 1 & LEV. 1 MEZZ. (S10&S20) S20 SEP. MOD. - LEVEL 1 MEZZ.
S21 SEP. MOD. - LEVEL 1 MEZZ. SOUTH S22 SEP. MOD. - LEVEL 1 MEZZ.NORTH S30 SEP. MOD. - LEVEL 2
S31 SEP. MOD. - LEVEL 2 SOUTH S32 SEP. MOD. - LEVEL 2 NORTH
S35 SEP. MOD. - LEVEL 2 & MEZZ. (S30&S40) S40 SEP. MOD. - LEVEL 2 MEZZ.
S41 SEP. MOD. - LEVEL 2 MEZZ. SOUTH S42 SEP. MOD. - LEVEL 2 MEZZ. NORTH S50 SEP. MOD. - WEATHER DECK
S51 SEP. MOD. - WEATHER DECK SOUTH S52 SEP. MOD. - WEATHER DECK NORTH S60 SEP. MOD. - WEATHER DECK MEZZ.
S61 SEP. MOD. - WEATHER DECK MEZZ. SOUTH Facility Area Area Description
Document / Revision No. Owner Approved
2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006
Facility/Area Code 25 236
EKOJ S62 SEP. MOD. - WEATHER DECK MEZZ. NORTH S70 SEP. MOD. - UPPER WEATHER DECK
S71 SEP. MOD. - UPPER WEATHER DECK SOUTH S72 SEP. MOD. - UPPER WEATHER DECK NORTH U00 UTILITIES MODULE - GENERAL
U10 UTIL. MOD. - LEVEL 1
U11 UTIL. MOD. - LEVEL 1 SOUTH U12 UTIL. MOD. - LEVEL 1 NORTH U20 UTIL. MOD. - LEVEL 1 MEZZ.
U21 UTIL. MOD. - LEVEL 1 MEZZ. SOUTH U22 UTIL. MOD. - LEVEL 1 MEZZ. NORTH U30 UTIL. MOD. - LEVEL 2
U31 UTIL. MOD. - LEVEL 2 SOUTH U32 UTIL. MOD. - LEVEL 2 NORTH
U35 UTIL. MOD. - LEVEL 2 & LEV. 2 MEZZ. (U30&U40) U40 UTIL. MOD. - LEVEL 2 MEZZ.
U41 UTIL. MOD. - LEVEL 2 MEZZ. SOUTH U42 UTIL. MOD. - LEVEL 2 MEZZ. NORTH U50 UTIL. MOD. - LEVEL 3
U51 UTIL. MOD. - LEVEL 3 SOUTH U52 UTIL. MOD. - LEVEL 3 NORTH Z00 HOOK-UP, GENERAL EKO-J - EKOX ZBX HOOK-UP, B01 - EKOX
ZCB HOOK-UP, C00 - B01 ZCJ HOOK-UP, C00 - J00 ZJC HOOK-UP, EKOJ - EKOC ZJF HOOK-UP, EKOJ - EKOF ZJH HOOK-UP, EKOJ - EKOH ZJR HOOK-UP, EKOJ - EKOR ZJX HOOK-UP, EKOJ - EKOX ZPC HOOK-UP, P00 - C00 ZPF HOOK-UP, P00 - F00 ZPI HOOK-UP, P00 - I00 ZSC HOOK-UP, S00 - C00 ZSP HOOK-UP, S00 - P00 Facility Area Area Description
Facility/Area Code 26 236
EKOJ ZUC HOOK-UP, U00 - C00 ZUP HOOK-UP, U00 - P00 ZUS HOOK-UP, U00 - S00 Facility Area Area Description
Document / Revision No. Owner Approved
2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006
Facility/Area Code 27 236
EKOK A00 PLATFORM GENERAL
B01 BRIGDE EKOK TO EKOB J01 ALL JACKET (EXCEPT RISERS) K01 EAST CRANE & PEDESTAL K02 WEST CRANE & PEDESTAL L01 12" WATER EKOK TO EKOW
R01 12" WATER INJECTION RISER TO EKOW R02 24” WATER INJECTION RISER FROM ELDE R03 6” FUEL GAS RISER FROM EKOJ
13A CELLAR DECK - GENERAL 13C CELLAR DECK CENTRE
16K NOT IN USE (COMPLETION RIG, REMOVED) 16L NOT IN USE (PUMP & MUD MOD, COMP RIG) 16M NOT IN USE (ENGINE MOD, COMPL. RIG) 17A NOT IN USE (BRIDGE) Replaced by B01
18A FLARE BOOM
19A HELIDECK
Facility Area Area Description
Facility/Area Code 28 236
EKOL A00 PLATFORM GENERAL (FUTURE) B01 EKOL TO EKOM
Facility Area Area Description
Document / Revision No. Owner Approved
2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006
Facility/Area Code 29 236
EKOM A00 PLATFORM GENERAL
B00 BRIDGE GENERAL
B01 EKOM TO BRIDGE SUPPORT T01 B02 BRIDGE SUPPORT T01 TO EKOJ J01 JACKET (EXCEPT RISERS)
K01 DECK CRANE
K01-01 DECK CRANE PEDESTAL K01-02 DECK CRANE CABIN
K01-03 DECK CRANE MACHINE ROOM
L05 6" GAS LIFT EXPORT PIPELINE TO EKOA P00 PROCESS AREA-GENERAL
P01 PIPE SUPPORT RACK
P01-20 STORAGE AREA FOR OIL & CHEMICALS P01-21 STORAGE AREA FOR PRESSURISED BOTTLES P01-22 STORAGE AREA FOR OXYGEN BOTTLES P01-23 CRANE BOOM REST
P30 PROCESS AREA LEVEL 1 INTERM. DECK P30-01 HYDROCYCLONE SKID AREA (EAST) P30-02 SEPARATOR VALVE AREA
P30-03 CRUDE OIL COOLER AREA P30-04 HPU SKID AREA
P30-05 HYDROCYCLONE SKID AREA (WEST) P30-06 DIESEL TREATMENT AREA
P40 PROCESS AREA LEVEL 2 INTERM. DECK-MEZZ P40-01 HP PRODUCTION WATER COALESCER AREA P40-02 HP PRODUCTION SEPARATOR AREA
P40-03 CHEMICAL INJECTION SKID AREA P40-04 FLASH TANK AREA
Facility Area Area Description
Facility/Area Code 30 236
EKOM P40-05 REJECT OIL TREATMENT SKID AREA P40-06 TEST SEPARATOR AREA
P50 PROCESS AR5A LEVEL 3 WEATHER DECK P50-01 PSV AREA (EAST)
P50-22 FUTURE PIG HANDLING AREA (NORTH) P50-23 FUTURE PIG RECEIVER AREA (NORTH) P50-24 STAIR TO P60 DECK
P50-25 LIFT MACHINE ROOM
P50-30 TEMPORARY GENERATOR AREA P50-31 PIG RECEIVER AREA (SOUTH) P50-32 PIG HANDLING AREA (SOUTH)
P60 PROCESS AREA LEVEL 4 TOTE TANK DECK P60-01 ESCAPE ROUTE (WEST)
P60-31 VALVE AREA FOR PIG RECEIVERS R00 RISERS-GENERAL
R01 20" EXPORT RISER (FUTURE) Facility Area Area Description
Document / Revision No. Owner Approved
2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006
Facility/Area Code 31 236
EKOM R02 20" OIL IMPORT RISER FROM EKOB(FUTURE) R03 16" WEST EKOFISK PROD. IMPORT RISER(FUTURE) R04 17" OIL IMPORT RISER FROM EKOA
R05 6" GAS LIFT EXPORT RISER TO EKOA(FUTURE) R06 16" NEW SUBSEA DEVELOP. IMPORT RISER(FUTURE) R07 10" J-TUBE-UMBILICAL TO EKOA(J3)(FUTURE)
R08 10" J-TUBE ELECT./UMBILICAL(J2) (FUTURE) R09 10" J-TUBE ELECT./UMBILICAL(J1) (FUTURE) R10 16" J-TUBE HYDRAULICS(J4) (FUTURE) R11 16" J-TUBE HYDRAULICS(J5) (FUTURE) T01 BRIDGE SUPPORT
U00 UTILITY AREA-GENERAL
U09 UTILITY AREA UNDER CELLAR DECK U09-01 OPEN DRAIN AREA
U10 UTILITY AREA LEVEL 1 CELLAR DECK U10-01 TRANSFORMER ROOM
U10-13 WELL SERVICE PUMP ROOM U10-19 ESCAPE ROUTE (EAST)
Facility/Area Code 32 236
EKOM U10-27 BRIDGE LANDING AREA (NORTH) U10-28 LIFEBOAT STATION
U10-37 AIR RECEIVER & NITROGEN GENERATOR U20 UTILITY AREA LEVEL 2 CELLAR DECK-MEZZ.
U20-01 HIGH VOLTAGE ROOM
U20-16 WASTE FOOD CONTAINER AREA U20-17 WIND BREAK
U20-21 ARCHIVE & COPY ROOM U20-22 OFFICE 1
U20-23 OFFICE 2
U20-24 MEETING & RECREATION ROOM U20-25 COFFEE BAR
Document / Revision No. Owner Approved
2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006
Facility/Area Code 33 236
EKOM W00 WELLBAY AREA-GENERAL
W09 WELLBAY AREA UNDER CELLAR DECK W09-01 DRAIN TANK AREA
W09-02 DRAIN PUMP AREA
W10 WELLBAY AREA LEVEL 1 CELLAR DECK W10-01 WELLBAY AREA (NORTH)
W20 WELLBAY AREA LEVEL 2 CELLAR DECK-MEZZ.
W20-01 WELLBAY AREA (NORTH) W20-02 WELLBAY AREA (SOUTH)
W20-03 MANIFOLD VALVE ACCESS DECK (NORTH) W20-04 MANIFOLD VALVE ACCESS DECK (SOUTH) W20-05 ESD & TANK AREA (NORTH)
W20-06 ESD & TANK AREA (SOUTH) W20-10 ESCAPE ROUTE (NORTH) W20-11 ESCAPE ROUTE (WEST)
W20-12 ESCAPE ROUTE (SOUTHWEST) W20-13 ESCAPE ROUTE (NORTHEAST) W20-14 ESCAPE ROUTE (SOUTHEAST)
W30 WELLBAY AREA LEVEL 3 INTERV. DECK W30-01 WELLBAY AREA (NORTH)
W30-02 WELLBAY AREA (SOUTH)
W30-03 INTERVENTION SKID RAILS AREA (NORTH) Facility Area Area Description
Facility/Area Code 34 236
EKOM W30-04 INTERVENTION SKID RAILS AREA (SOUTH) W30-05 SLURRY TANK AREA
W30-06 HIGH PRESSURE PUMP AREA
W30-07 FUTURE RISER ESD VALVE AREA (NORTH) W30-08 FUTURE RISER ESD VALVE AREA (SOUTH) W30-09 LAYDOWN AREA (NORTH)
W40 WELLBAY AREA LEVEL 4 INTERV. DECK-MEZZ.
W40-01 SLURRY TANK AREA
W40-02 HYDRAULIC POWER PACK AREA W40-03 HIGH PRESSURE MANIFOILD AREA W40-05 AREA FOR SIMOPS CABIN
W40-10 ESCAPE ROUTE (NORTH) W40-11 ESCAPE ROUTE (EAST) W40-12 ESCAPE ROUTE (SOUTH)
W50 WELLBAY AREA LEVEL 5 WEATHER DECK W50-01 PSV AREA (NORTH)
W50-02 PSV AREA (SOUTH)
W50-03 WELLBAY WEATHER DECK AREA (NORTH) W50-04 WELLBAY WEATHER DECK AREA (SOUTH)
W50-05 BRIDGE LANDING AREA FOR JACK-UP RIG (NORTH) W50-06 BRIDGE LANDING AREA FOR JACK-UP RIG (SOUTH) W50-07 STORAGE AREA FOR RADIOACTIVE ISOTOPE W50-08 LAYDOWN AREA (SOUTH)
Z01 HOOK-UP AREA, P01 B01 Facility Area Area Description
Document / Revision No. Owner Approved
2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006
Facility/Area Code 35 236
EKOM Z02 HOOK-UP AREA, B01 T01 - B02 Z03 HOOK-UP AREA, B02 C11 (EKOJ) Z04 HOOK-UP AREA, B01 J01
Z09 HOOK-UP AREA, U09 - W09 - J01 Z10 HOOK-UP AREA, U10 - W10 Z20 HOOK-UP AREA, U20 - W20 Z30 HOOK-UP AREA, P30 W30 Z50 HOOK-UP AREA, P50 W50 Z60 HOOK-UP AREA, P60 Facility Area Area Description
Facility/Area Code 36 236
EKOQ A00 GENERAL
J01 ALL JACKET (EXCEPT RISERS) P01 PIPELINE
Q01 QUARTERS 1ST FLOOR Q02 QUARTERS 2ND FLOOR Q03 QUARTERS 3RD FLOOR Q04 QUARTERS 4TH FLOOR Q05 QUARTERS ROOF
U01 FIREWATER PUMP ROOM U02 BRIDGE AREA
EKOW A00 PLATFORM GENERAL
J01 ALL JACKET (EXCEPT RISERS) K01 EAST CRANE
P01 CELLAR DECK P02 MEZZANINE DECK
R01 12" WATER INJECTION RISER FROM EKOK U01 WEATHER DECK
Facility Area Area Description
Document / Revision No. Owner Approved
2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006
Facility/Area Code 37 236
EKOX A00 PLATFORM GENERAL
B01 BRIDGE EKOX - EKOC
C00 MODULE SUPPORT FRAME - GENERAL C01 MSF - CELLAR DECK
D00 DRILLING GENERAL
D42 WINDWALLS, V-DOOR AND WIRELINE DOOR D43 NORTH STAIRS
Facility/Area Code 38 236
EKOX D70 MUD MODULE LOWER LEVEL D75 SLURRY UNIT MODULE
D80 MUD MODULE MEZZANINE LEVEL D90 MUD MODULE PIPE DECK LEVEL J01 JACKET (EXCEPT RISERS) K13 DECK CRANE SOUTH K14 DECK CRANE NORTH T01 BRIDGE SUPPORT (TRIPOD) U10 UTILITY AREA CELLAR DECK U20 UTILITY AREA MEZZANINE DECK U30 UTILITY AREA WEATHER DECK W00 WELLHEAD AREA GENERAL W11 WELLHEAD AREA 1 CELLAR DECK W12 WELLHEAD AREA 2 CELLER DECK W21 WELLHEAD AREA 1 MEZZANINE DECK W22 WELLHEAD AREA 2 MEZZANINE DECK W31 WELLHEAD AREA 1 WEATHER DECK W32 WELLHEAD AREA 2 WEATHER DECK Facility Area Area Description
Document / Revision No. Owner Approved
2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006
Facility/Area Code 39 236
ELDA A00 PLATFORM GENERAL B01 BRIDGE ELDA TO ELDF D01 DERRICK
D02 EAST SHALE SHAKER ROOM (MODULE 128)
D03 NOT IN USE (WEST SHALE SHAKER ROOM (MOD. 121) D04 SKID DECK
D05 WELLHEAD MEZZ DECK WEST D06 WELLHEAD MEZZ DECK EAST
D07 SCALE INHIBITOR VALVE RACK AREA D08 WELLHEAD AREA (MODULE 113 & 104) D09 INHIBITOR STORAGE AREA (MOD 112)
D10 BULK STORAGE & HYDRAULIC SKID (MODULE 103) D11 EAST OF SWITCHGEAR ROOM
D12 WEST OF SWITCHGEAR ROOM D13 PIPE RACK AREA
D14 TPM OFFICE/WORKSHOP AREA (MODULE 122)
D15 DRILLING SUPPORT/SLURRY AREA (MODULE 115-118) D16 CONDUCTOR AREA CELLAR DECK (MODULE 198) D17 (PA17) DRILLERS CABIN
D20 (PA20) MUD TANK MODULE D21 (PA21) MUD PUMP MODULE D22 (PA22) MUD MIXING MODULE D23 (PA23) SACK CUTTER MODULE
D24 (PA24) MAIN GENERATOR NO 1 BOX UPPER DECK D25 (PA25) LER MODULE
D26 (PA26) LER MODULE
D27 (PA27) NORTH STAIRTOWER D28 (PA28) SOUTH STAIRTOWER D31 (PA31) SKIDBASE
D32 (PA32) MUD TANK NO. 2 BOX LOWER DECK D33 (PA33) MUD TANK NO. 3 BOX LOWER DECK D34 (PA34) MUD PUMP NO. 2 BOX MEZZ. DECK D35 (PA35) MUD PUMP NO. 3 BOX MEZZ. DECK D36 (PA36) MAIN GEN. NO. 2 BOX UPPER DECK D37 (PA37) MAIN GEN. NO. 3 BOX UPPER DECK Facility Area Area Description
Facility/Area Code 40 236
ELDA D38 (PA38) LOCAL INST. ROOM ROOF LEVEL D39 (PA39) LOCAL ELEC. ROOM ROOF LEVEL H01 HELIDECK & SUPPORT
J01 ALL JACKET (EXCEPT RISERS) K01 EAST CRANE & PEDESTAL Q05 QUARTERS 5TH FLOOR Q06 QUARTERS 6TH FLOOR Q07 QUARTERS ROOF
U01 SWITCHGEAR/MCC ROOM (MODULE 105) U02 BULK STORAGE (MOD. 116/117/118)
U03 WHS, STORES & OFFICE AREA (MODULES 123/124/125) U04 EQUIPMENT STORAGE MEZZ DECK (MODULE 112) U05 EAST UTILITY AREA (MODULE 111)
U06 WEST UTILITY AREA (MODULE 102) U07 GENERATOR ROOM (MODULE 105) U08 CELLAR DECK CENTER (MODULE 197) U09 CELLAR DECK NORTH (MODULE 197) U10 AIR HANDLING AREA (MODULE 198) U11 POTABLE WATER DECK TANK NORTH U12 POTABLE WATER DECK TANK WEST U13 DIESEL STORAGE DECK TANK WEST U14 DIESEL STORAGE DECK TANK CENTER U15 DIESEL STORAGE DECK TANK EAST U16 RAW WATER DECK TANK EAST U17 RAW WATER DECK TANK CENTER U18 RAW WATER DECK TANK WEST U19 COLLECTION SUMP AREA Facility Area Area Description
Document / Revision No. Owner Approved
2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006
Facility/Area Code 41 236
ELDB A00 PLATFORM GENERAL B01 BRIDGE ELDB TO FLARE
D06 CEMENT & ACIDIZING AREA (MODULE 351) D07 MUD TANKS & PUMPS (MODULE 342) D08 PIPE RACK AREA (MODDULE 352) D09 EAST BURNE BOOM
D10 WEST BURNER BOOM
D11 WELLHEAD AREA (MODULE 324)
D12 WELLHEAD AREA ON CELLAR DECK (MODULE 324) D13 CAT ENGINE ROOM (MODULE 341)
F01 FLARE & STRUCTURE H01 HELIDECK & SUPPORT
J01 ALL JACKET (EXCEPT RISERS) K01 EAST CRANE
K02 WEST CRANE
L01 24” OIL PIPELINE, ELDB TO EKOJ L02 30” GAS PIPELINE, ELDB TO EKOJ P01 CONTROL ROOM (MODULE 321)
P02 GAS PIG LAUNCHER AREA (MODULE 325) P03 PRODUCTION AREA ON CELLAR DECK
P04 PROD. COOLERS & SEPARATORS (MOD. 333/334) P05 TEST SEPARATOR & METERING AREA (MOD. 322/323) P06 NOT IN USE (GAS DEHYDRATION AREA (MOD. 335)) P07 GAS COMPRESSOR ROOM (MODULE 352)
P08 WATER TREATMENT AREA Q01 QUARTERS 1ST FLOOR Q02 QUARTERS 2ND FLOOR Q03 QUARTERS 3RD FLOOR Q04 QUARTERS 4TH FLOOR Q05 QUARTERS 5TH FLOOR Facility Area Area Description
Facility/Area Code 42 236
ELDB Q06 QUARTERS 6TH FLOOR Q07 QUARTERS ROOF
R01 24” OIL RISER FROM ELDF R02 30” GAS RISER FROM ELDF R03 24” OIL RISER, ELDB TO EKOJ R04 30” GAS RISER, ELDB TO EKOJ
R05 14” WATER INJECTION RISER FROM ELDE R06 6” GAS LIFT RISER FROM ELDE
T01 FLARE SUPPORT
U01 UTILITY AREA ON CELLAR DECK
U02 FIREWATER PUMP AREA EAST (MODULE 332) U03 POWER STATION (MODULE 336)
U04 OILY WATER TREATMENT
U05 SWITCHGEAR ROOM (MODULE 336) U06 HOT OIL HEATER AREA (MODULE 373) U07 NO. 1 POTABLE WATER TANK
U08 NO. 2 POTABLE WATER TANK U09 NO. 1 DIESEL FUEL TANK
U10 NO. 1 RAW FRESH WATER TANK U11 NO. 2 RAW FRESH WATER TANK U12 NO. 2 DIESEL FUEL TANK
U13 PIG RECEIVER AREA (NEW) Facility Area Area Description
Document / Revision No. Owner Approved
2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006
Facility/Area Code 43 236
ELDE A00 PLATFORM GENERAL
B01 BRIDGE ELDE TO ELDF
J01 JACKET
K01 PLATFORM CRANE
L01 24" WATER INJECTION PIPELINE TO EKOK L02 14" WATER INJECTION PIPELINE TO ELDB L03 6" GAS LIFT PIPELINE TO ELDB
P00 PROCESS AREA - GENERAL
P01 WATER INJECTION AREA - GENERAL P02 GAS TREATMENT AREA - GENERAL P11 WATER INJECTION AREA - CELLAR DECK P12 GAS TREATMENT AREA - CELLAR DECK P21 WATER INJECTION AREA - MEZZANINE DECK P22 GAS TREATMENT AREA - MEZZANINE DECK P41 WATER INJECTION AREA - WEATHER DECK P42 GAS TREATMENT AREA - WEATHER DECK P02 GAS TREATMENT AREA - GENERAL P12 GAS TREATMENT AREA - CELLAR DECK P22 GAS TREATMENT AREA - MEZZANINE DECK P42 GAS TREATMENT AREA - WEATHER DECK R01 24" WATER INJECTION RISER TO EKOK R02 14" WATER INJECTION RISER TO ELDB R03 6" GAS LIFT RISER TO ELDB
U00 UTILITY MODULE - GENERAL U10 UTILITY MODULE - CELLAR DECK U20 UTILITY MODULE - MEZZANINE DECK
U30 UTILITY MODULE - UPPER MEZZANINE DECK U40 UTILITY MODULE WEATHER DECK
Facility Area Area Description
Facility/Area Code 44 236
ELDF A00 PLATFORM GENERAL
B01 BRIDGE 1 ELDF TO BRIDGE SUPPORT B02 BRIDGE 2 BRIDGE SUPPORT TO FLARE F01 FLARE & STRUCTURE
J01 JACKET (EXCEPT RISERS) K01 EAST CRANE & PEDESTAL
P05 NOT IN USE (COMP. SUCTION SCRUBBER AREA (MOD. 204) P06 PIG LAUNCHER AREA (MOD. 202/203)
P07 PROVER LOOP AREA (MOD. 201)
P08 GLYCOL STILL SURGE TANK AREA (MOD. 214) P09 PROD. SEP. AREA (MOD. 203)
P10 PROD. COOLER AREA (MOD. 201 TO 204) P11 PIG RECEIVER AREA
P12 WATER TREATMENT AREA (NEW) R01 24" OIL RISER, ELDF TO ELDB R02 30" GAS RISER, ELDFTO ELDB R03 14” OIL/GAS RISER FROM EMBL R04 J – TUBE FOR UMBILICAL TO EMBLA T01 BRIDGE SUPPORT
T02 FLARE SUPPORT U01 BATTERY ROOM AREA U02 MAINTENANCE AREA U03 FLASH TANK AREA
Document / Revision No. Owner Approved
2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006
Facility/Area Code 45 236
ELDF U09 TURBINE EXHAUST AREA (MOD. 212/213) Facility Area Area Description
Facility/Area Code 46 236
EMBL A00 PLATFORM GENERAL D01 WELLHEAD AREA
D02 BURNER BOOM
D03 VENT STACK
H01 HELIDECK & SUPPORT
J01 ALL JACKET (EXCEPT RISERS) K01 EAST CRANE & PEDESTAL L01 14" OIL/GAS EMBL TO ELDF
P01 PROCESS AREA
R01 14" OIL/GAS RISER TO ELDF
R02 J – TUBE FOR UMBILICAL FROM ELDF U01 PERSONNEL ROOM AREA
U02 CONTROL ROOM AREA U03 SWITCHROOM AREA Facility Area Area Description
Document / Revision No. Owner Approved
2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006
2169 / 09 Director-Plant-and-Equipment-Information 11.09.2006