• No results found

Green Mining, on-going projects

N/A
N/A
Protected

Academic year: 2021

Share "Green Mining, on-going projects"

Copied!
17
0
0

Loading.... (view fulltext now)

Full text

(1)

Copyright © Tekes

Green Mining,

on-going projects

Program annual seminar 24

th

October 2012

Helsinki, Finlandia hall

Harry Sandström

Spinverse Oy

(2)

Copyright © Tekes

Green Mining program is part of Natural Resources and

Sustainable Economy focus area of Tekes

(3)

Copyright © Tekes

Green

Mining, part of national R&D funding

23.10.2012

Harry Sandström

Duration:

2011-2016

Budget:

60 m€, out of which

Tekes

funding is 30 m€

.

Enterprises:

20 m€ Tekes funding

as grants (35/50%) or loans (70%),

proposals can be submitted all the

time

Public research organizations

: 10

m€ Tekes funding as grants

(60/70%). Calls once a year.

GTK

Universities

Green Mining

Direct geology related

R&D and education

(4)

Copyright © Tekes

Long term aims of the programme

The aim is to make Finland a global forerunner of responsible

mineral economy

To achieve global leader status in selected fields of mineral and

mining research

Continuous improvement of practices in organizational processes

in Finnish mineral cluster companies

Finnish mineral sector is well known and carries a positive image

within the country and abroad

To develop new business models that offer export opportunities to

Finnish mining sector service and technology providers and

increase the number of SMEs in the cluster.

(5)

Copyright © Tekes

The programme covers the whole mineral sector

Research and

education

Mining

industry

Mining activity

metallic minerals

industrial minerals

Exploration

Stone

materials

industry

Aggregate production

Gravel and sand

extraction

Technology

industry

Minerals sector

machinery and

equipment

manufacture

Process planning

Natural stone

industry

Soapstone product

manufacture

Dimension stone

production

Minerals sector services

Excavation contracting

Transport services

Sampling and measurement

Financial services

Information services

Consultant services

(6)

Copyright © Tekes

Summary of on going projects

Company projects

Number of projects 14

– Mining companies 3

– Technology providers 6

– Instrument providers 3

– Material providers 1

Total costs 13.4 m€

Tekes funding 6.05 m€

Public projects

Number of projects 14

Other partners 38

– Mining companies 15

– Service and techn.

providers 23

Total costs 10.6 m€

Tekes funding 7.3 m€

(7)

Copyright © Tekes

Public Green Mining research projects (2012)

Maintenance

Automation

Exploration

Energy

Processing

Reduction of emissions

Measurement

Materials

Social licence to operate

Mine Steel

Repro

DEVICO

Ren energy

Thiogold

BEPGEII

Sorex

Ads. mater.

MINIMAN

Arsenal

NICK

Dilacomi

NovTexEx

Total budget €10,6 M

Tekes funding € 7.3 M

KMK 4/26/12

RAIKU

(8)

Copyright © Tekes

Endomines

Company specific Green Mining research

projects

Maintenance

Automation

Exploration

Energy

Processing

Reduction of emissions

Measurement

Materials

Social licence to operate

Total budget

13.4 M€

(Tekes 6.1 M€)

Miilux

Talvivaara

Mustavaara

Machinery

Normet

Allu Finland

Metso Minerals

KMK 4/26/12

Avance Partner

Fenno-Aurum

Sandvik

Outotec

IMA Engineering

Firotec

(9)

Copyright © Tekes

9

16

32

R&D organizations

Exploration and

Service and technology

Mining organizations

providers

Aalto University Agnico-Eagle Finland ABB

Finnish Forest Research Institute Anglo American Arctic Drilling Company Geological Survey of Finland Boliden Minera BK-Automation Kajaani School of Applied Science Endomines Corrotech Kemi-Torno School of Applied Science Kevitsa Mining DEKRA Finland Lappeenranta University of Technology Mondo Minerals Ekokem-Palvelu

Tampere University oif Technology Mustavaaran kaivos GaV Group University of Oulu Nordic Mines Ima Engineering

Univesity of Lapland Nordkalk Insinööritoimisto Suomen Unit Nortec Minerals Kemin Digipolis

Northland Mines Kemira Chemicals Outokumpu Keycast Pyhäsalmi Mine Langh Ship

Sotkamo Silver Lohjan Energiahuolto Talvivaaran Kaivososakeyhtiö Metso Automation

Yara Suomi Metso Minerals Miktech Mine On-Line Service

MIP Electronics Norilsk Nickel Harjavalta

Outokummun Energia Outokumpu Chrome Outotec Paakkola Conveyors PHD Nordic Pixact Polar Metalli Rovaniemen Kehitys Ruukki Metals

Sandvik Mining and Construction SKF

Teollisuuden KPP

Participating organizations 10/2012

23.10.2012

Harry Sandström

So far natural stone and

aggregate industries are not

involved!

Mining companies are mainly

participating through public

research projects!

(10)

Copyright © Tekes

Focus and funding of GM projects

Total costs appr. 24 m€

(11)

Copyright © Tekes

Focus and funding of company specific

projects

(12)

Copyright © Tekes

Going towards to new mining age ?

Source: Austmine

2012

0

0,5

1

1,5

2

2,5

3

3,5

4

4,5

5

2004

2005

2006

2007

2008

2009

2010

2011

2012

High commodity prices

Easy access to capital

High labour costs/low availability

More volume = more equipment

Exploit known deposits, marginal

new ground.

Unprecedented volume challenge

Combat declining grades

Productivity focus/low cost

Autonomy & Smart Systems

Safety via technology

Less people = more technology

and automation

Our opportunities

Bigger domestic market

Finnish cleantech know-how

Technology and service

(13)

Copyright © Tekes

Commercialization

Challanges in mining cluster innovation system

3 big actors

3 medium size

and 10 small

companies

10 metal mines

30 industrial minerals quarries

40 exploration companies

Aalto University

GTK

Kajaani School of Applied Sciences

Kemi-Tornio School of Applied Science

Lappeenranta University of Technology

Oulu University

Tampere University of Technology

VTT

Where the innovations are

created?

Where they are developed

further globally?

How to promote the growth

and internationalization?

End users

R&D

organizations

Technology

and service

providers

23.10.2012

Harry Sandström

(14)

Copyright © Tekes

Segmentation of recognized service and technology providers

in Finnish mining cluster

23.10.2012

Harry Sandström

Segment

Number of

companies

Laboratory, measurement, intrumentation technology

23

Environmental consultancy

15

Engineering works

14

Planning and engineering

11

Machinery providing and planning

12

Material providers

8

Other business consultancy

7

Geological consulting

4

Sampling

5

Leagal consultancy

4

Financing

4

Automation

4

Water technology

3

ITC

3

Maintenance

5

Energy

3

Tecnology providers

2

Communication

1

Recycling

1

Total

129

(15)

Copyright © Tekes

Internationalization and size of selected mining cluster

Technology and service providers

23.10.2012

Harry Sandström

Part of international concern

”Business as usual”

(16)

Copyright © Tekes

Summary

Project portfolio covers well the sector and includes over 200 man power

years´ R&D effort by now.

The program has gathered new R&D organizations with different viewing

angle diversifying the research.

There is still need to enhance the Nordic and international cooperation in RDI

projects.

Joint arctic mining technology development is a big opportunity to the

northern mining countries.

Collaborative research among mining companies is still an unused

opportunity.

Pilot cases and support for commercializing are needed to get new service

and technology innovations into the market.

Horizontal alliances among the service and technology providers should be

(17)

Copyright © Tekes

Thank you very much for your attention!

Spinverse

Programme Coordinator

Mr Harry Sandström

Tel. + 358 400 709 899

[email protected]

Tekes

Programme Manager

Mr Kari Keskinen

Tel. + 358 10 60 55843

[email protected]

http://www.tekes.fi/ohjelmat/GreenMining

References

Related documents

This terminal project proposes to expand upon the existing literature on walkability measurement techniques, namely the research performed by Schlossberg and Brown (2004)

Specific url handler when does the right click and forward slashes will open in tablets compared to contact a url, copy and the fix Say aws service handler icon in html button

In the Production and DST distribution activity test at T0 (CERN) regional center are produced DST files from the recorded RAW data, which are then distributed to all the T1

Until a few years ago Dell was mainly a pure hardware vendor, but with the acquisition of Perot Systems Dell entered the market for IT services and additional acquisitions in

For more information on managing user permissions, see Cisco TelePresence Management Suite Analytics Extension Administrator Guide.. Web

Table and chairs Telephone Toaster Trash compactor Utensils Wall accessory (1) Item (2) (3) (4) (6) (7) (8) Cost or other basis Insurance or other reimbursement Fair market value

black nylon frame - standard temples - mid smoke PC anti-scratch black nylon frame - standard temples - grey 6 PC anti-scratch black nylon frame - standard temples - clear

When you issue the e-ticket before you issue the associated EMD (EMD-A) or when you make the combined TTP/TTM entry, the Issued-In-Connection-With field (ICW) in the TSM-P of