Queries/clarifications of consultants in pre bid meeting on RFP for consultancy services for base line socio economic survey and RFP for consultancy services for preparation of Rehabilitation and Resettlement policy frame work for Upper Krishna Project Stage-III held on 17.10.2012 at office of the Managing Director, KBJNL, Bangalore.

Sl.

No. Queries/clarifications Remarks

A BASE LINE SOCIO ECONOMIC SURVEY:

1

Request for modification regarding “consultancy services for base line socio economic survey”

Same is modified as “conducting base line socio economic survey for implementation of Upper Krishna Project Stage-III”.

2

Minimum eligibility criteria:

at least two assignments involving baseline surveys for assessment/evaluation of major projects anywhere in India with PDF’s equal to or more than twenty thousand

at least two assignments involving baseline surveys for assessment/evaluation of major projects anywhere in India with PDF’s equal to or more than twenty thousand for each assignment.

3

In the event of change in service tax rates, please clarify whether the revised rates would be admitted for settlement of bills.

The service tax rates will be as per the rates prevailing at that time.

4

Time frame of three months’ period for the baseline survey, analysis, policy formulation etc., appears to be too short for the nature of baseline survey and intensity of capturing validated data. Please examine and extend the date for completion of the entire work to eight months. An Action Plan defining milestones and progress from time to time will be helpful, not only for reporting to KBJNL but also for consultants to plan the activities and deployment of resources.

Time frame is as per the RFP and there is no change.

5

¸ÀzÀj ¸À«ÄÃPÉë PÉÊUÉÆ¼Àî®Ä ¤AiÉÆÃf¸À¨ÉÃPÁzÀ MlÄÖ “¦üÃ¯ïØ” ¹§âA¢ ¸ÀASÉå JµÀÄÖ? F ¹§âA¢UÉ AiÀiÁªÀÅzÁzÀgÀÆ PÀ¤µÀ× «zÁåºÀðvÉ/ C£ÀĨsÀªÀzÀ ªÀiÁ£ÀzÀAqÀ «¢ü¸À¯ÁVzÉAiÉÄÃ?

As per clause 9.10-3 the requirement needs to be assessed by the agency.

6

¸ÀzÀj ¸À«ÄÃPÉëAiÀÄ£ÀÄß PÉÊUÉÆ¼Àî®Ä PÉ.©.eÉ.J£ï ¤AzÀ ¸À«ÄÃPÁë ¹§âA¢AiÀÄ£ÀÄß MzÀV¹ CªÀgÉÆA¢UÉ KeɤìAiÀĪÀgÀ ¹§âA¢ MmÁÖV PÁAiÀÄð¤ªÀð»¸À¨ÉÃPÉ? CxÀªÁ KeɤìAiÀĪÀgÀÄ ¸ÀévÀAvÀæªÁV ¸À«ÄÃPÉë PÉÊUÉÆ¼ÀÀÄzÉ?

It is the sole responsibility of the agency for engaging the requisite staff to complete the assignment with in stipulated period.

7

¥Àæw ªÀÄļÀÄUÀqÉ UÁæªÀÄ/ ¥ÀæzÉñÀPÉÌ CxÀªÁ PÀ¤µÀ× JµÀÄÖ ªÀÄļÀÄUÀqÉ ¸ÀAvÀæ¸ÀÛ PÀÄlÄA§UÀ½UÉ NªÀð ¸À«ÄÃPÁë ¹§âA¢AiÀÄ£ÀÄß ¤AiÉÆÃf¸À¨ÉÃPÀÄ? AiÀiÁªÀÅzÁzÀgÀÆ C£ÀÄ¥ÁvÀ/¸ÀASÉå ¤UÀ¢ ¥Àr¸À¯ÁVzÉAiÉÄÃ?

It is the sole responsibility of the agency for engaging the requisite staff to complete the assignment with in stipulated period.

8 ¸ÀzÀj ¸À«ÄÃPÉë PÉÊUÉÆ¼Àî®Ä ¤UÀªÀĪÀÅ ¤¢ðµÀ× The format shall be prepared by the agency and got approved within the stipulated period as indicated in

(2)

[Type text]

PÁAiÀÄð¸ÀÆa, PÁAiÀÄð ¥ÀzÀÞw, ªÀiÁzÀj ¥Àæ±ÁߪÀ½UÀ¼ÀÄ, ¸ÀAUÀ滸À¨ÉÃPÁzÀ ªÀiÁ»w. «ªÀgÀ ªÀiÁ»w ¸ÀAUÀ滸À¨ÉÃPÁzÀ ªÀiÁzÀj £ÀªÀÄÆ£ÉUÀ¼ÀÄ EvÁå¢ ¥ÀÆgÉʸÀĪÀÅzÉÃ? CxÀªÁ KeɤìUÀ¼À ¸ÀévÀAvÀæªÁV F J¯Áè ªÀåªÀ¸ÉÜUÀ¼À£ÀÄß PÉÊUÉÆ¼Àî¨ÉÃPÉ? MAzÀÄ ªÉÃ¼É KeɤìUÀ¼Éà ¸ÀévÀAvÀæªÁV F ªÀåªÀ¸ÉÜUÀ¼À£ÀÄß PÉÊUÉÆ¼ÀÄîªÀÅzÁzÀgÉ EªÀÅUÀ¼À£ÀÄß C£ÀÄªÉÆÃ¢¸ÀĪÀ C¢üPÁjUÀ¼ÁgÀÄ?

section-7 of clause 7.7 of the RFP document / with in inception report period.

9

¸ÀzÀj 22 ªÀÄļÀÄUÀqÉ UÁæªÀÄ ºÁUÀÄ ¨ÁUÀ®PÉÆÃmÉ ¥ÀlÖtzÀ ¸ÀAvÀæ¸ÀÛ PÀÄlÄA§UÀ¼À ªÀiÁ»wAiÀÄ£ÀÄß F »AzÉ ¸ÀAUÀ滸À¯ÁVzÉAiÉÄÃ? ¸ÀAUÀ滸À¯ÁVzÀÝgÉ AiÀiÁªÀ ªÀiÁzÀjAiÀİè/ ºÉÃUÉ ¸ÀAUÀ滸À¯ÁVzÉ?

- No -

10

¥Àæ¸ÀÄÛvÀ ¸À«ÄÃPÉëAiÀÄ£ÀÄß F ºÀ¼ÉAiÀÄ “qÁmÁ ¨ÉÃ¸ï” DzÁj¹ vÀÄ®£ÁvÀäPÀªÁV PÉÊUÉÆ¼Àî¨ÉÃPÉ? CxÀªÁ ¸ÀévÀAvÀæªÁV PÉÊUÉÆ¼Àî¨ÉÃPÉÃ? F ºÀ¼ÉAiÀÄ qÁmÁ ¨ÉÃ¸ï “ºÁqïð PÁ¦” gÀÆ¥ÀzÀ°èzÉAiÉÄÃ? CxÀªÁ “¸Á¥ïÖ PÁ¦” gÀÆ¥À«zÉAiÉÄÃ?

Not applicable

11

¥Àæ¸ÀÄÛvÀ mÉAqÀgï PÁªÀÄUÁj ¸À«ÄÃPÉëAiÀÄ°è ¸ÀAUÀ滸À¯ÁzÀ ªÀiÁ»wAiÀÄ£ÀÄß UÀtwÃPÀgÀtUÉÆ½¹ “ºÁqïð” ºÁUÀÄ “¸Á¥ïÖ PÁ¦” ¤ÃqÀ¨ÉÃPÉÃ? AiÀiÁªÀ ¸Á¥ïÖªÉÃgï£À°è UÀtwÃPÀgÀtUÉÆ½¸À¨ÉÃPÀÄ? EzÀPÁÌV ¥ÀævÉåÃPÀªÁzÀ vÀAvÁæA±À ºÁUÀÄ ªÀiÁzÀj ¹zÀÝ¥Àr¸À¯ÁVzÀAiÉÄÃ? CxÀªÁ KeɤìUÀ¼Éà EzÀ£ÀÄß ¸ÀévÀAvÀæªÁV gÀƦ¹PÉÆ¼Àî¨ÉÃPÉÃ?

No specific software is developed. However, the report is to be submitted in both hard and soft copy in Kannada and English. Please refer to clause 9.10(e) of section-3.

12

¸ÀzÀj ¸À«ÄÃPÉëÃAiÀİè PÁAiÀÄð¤ªÀð»¸ÀĪÀ KeɤìAiÀĪÀgÀ ¹§âA¢ ªÀUÀðPÉÌ ¤ÃqÀ¨ÉÃPÁzÀ PÀ¤µÀ× ¸ÀA¨sÁªÀ£ÉUÉ ¸ÀA§A¢ü¹zÀAvÉ AiÀiÁªÀÅzÁzÀgÀÆ ªÀiÁUÀð¸ÀÆa gÀƦ¸À¯ÁVzÉAiÉÄÃ?

It is the decision of the agency, keeping in mind the provision of minimum wages.

13

¸ÀzÀj ¸À«ÄÃPÉë PÀÄjvÀÄ PÁ®PÁ®PÉÌ ¸À°è¸À¨ÉÃPÁzÀ ªÀgÀ¢UÀ¼À ªÀiÁzÀjUÀ¼À£ÀÄß ¤UÀªÀĪÉà ¹zÀÞ¥Àr¹ ¤ÃqÀĪÀÅzÉÃ? CxÀªÁ F J¯Áè ªÀgÀ¢UÀ¼À ªÀiÁzÀjUÀ¼À£ÀÄß KeɤìAiÀĪÀgÉà ¹zÀÞ¥Àr¹PÉÆ¼Àî¨ÉÃPÀÄ? ºÁUÁzÀgÉ F ªÀiÁzÀjUÀ¼À£ÀÄß C£ÀÄªÉÆÃ¢¸ÀĪÀ C¢üPÁjUÀ¼ÁgÀÄ?

It is the responsibility of the agency to design the required format. The same will be verified / examined by the monitoring consultant committee as in section-7, clause-7.9 of the bid document.

Report format and get the same approved within 5 working days from the date receipt of the report format.

14

¸ÀzÀj ¸À«ÄÃPÉëAiÀÄ°è ¸ÀAUÀ滸À¯ÁzÀ ªÀiÁ»wAiÀÄ ¤RgÀvÉ/ UÀÄtªÀÄlÖªÀ£ÀÄß ªÀÄgÀÄ¥Àj²Ã°¸À®Ä AiÀiÁªÀÅzÁzÀgÀÆ “¸ÀÆ¥ÀgïªÉÊdj ¸À«ÄÃPÁë” PÁAiÀÄðªÀ£ÀÄß ¤ªÀð»¸À¨ÉÃPÉÃ? EzÀPÁÌV AiÀiÁªÀÅzÁzÀgÀÆ ªÀiÁUÀð¸ÀÆaUÀ¼ÀªÉAiÉÄÃ?

Please refer to clause 7.9 & 7.10 of section-7 in the RFP document.

15

¸ÀzÀj ¸À«ÄÃPÁë PÁAiÀÄðPÁÌV KeɤìAiÀĪÀgÀ ¹§âA¢UÉ ªÁºÀ£À ªÀåªÀ¸ÉÜ ªÀÄwÛvÀgÀ ¸Ë®¨sÀåUÀ¼À£ÀÄß ¤UÀªÀĪÀÅ MzÀV¹«zÉÃ? CxÀªÁ J¯Áè ¸Ë®¨sÀåUÀ¼À£ÀÄß KeɤìAiÀĪÀgÉà PÀ°à¹PÉÆ¼Àî¨ÉÃPÉÃ?

Please refer to clause 7.14 of section-7 in the RFP document.

(3)

[Type text] 16

¸ÀzÀj ¸À«ÄÃPÉë PÉÊUÉÆ¼Àî®Ä “¦üÃ¯ïØ” ªÀÄlÖzÀ°è AiÀiÁªÀ AiÀiÁªÀ E¯ÁSÉUÀ¼À ¹§âA¢AiÉÆA¢UÉ ¸ÀªÀÄ£ÀéAiÀÄvÉ ¬ÄAzÀ PÁAiÀÄð¤ªÀð»¸À¨ÉÃPÀÄ? AiÀiÁªÀ AiÀiÁªÀ E¯ÁSÉUÀ¼À C¢üPÁjUÀ¼À ¸ÀÆZÀ£ÉUÀ¼À£ÀÄß ¥Á°¸À ¨ÉÃPÀÄ?

The agency to interact with General Manager, LAQ and R&R, Navanagar, Bagalkot.

17

¸ÀzÀj ¸À«ÄÃPÉë PÀÄjvÀÄ ¤UÀªÀÄzÀ »jAiÀÄ C¢üPÁjUÀ¼ÉÆA¢UÉ ¤gÀAvÀgÀ ¸ÀªÀiÁ¯ÉÆÃZÀ£É, ªÀiÁUÀðzÀ±Àð£ÀPÁÌV ¨ÉAUÀ¼ÀÆgÀÄ ºÁUÀÄ ¨ÁUÀ®PÉÆÃmÉ UÀ¼À°è KeɤìAiÀĪÀgÀÄ ¤¢ðµÀ× ¹§âA¢AiÀÄ£ÀÄß ¤AiÉÆÃf¸À¨ÉÃPÉÃ? ºÁUÁzÀgÉ EªÀgÀ ¸ÀASÉå ºÁUÀÄ AiÀiÁªÀ «zÁåºÀðvÉ/ ºÀÄzÉÝAiÀÄ ¹§âA¢AiÀÄ£ÀÄß ¤AiÉÆÃf¸À¨ÉÃPÀÄ?

A Nodal Officer may be nominated by the agency for interacting with the Department.

18

¸ÀzÀj ¸À«ÄÃPÉëÃAiÀÄ ¸ÀA¥ÀÆtð ªÀiÁ»w ¸ÀAUÀæºÀ, ««zsÀ ¸ÀAUÀæºÀuÁ £ÀªÀÄÆ£ÉUÀ¼ÀÄ, ««zsÀ ªÀgÀ¢UÀ¼ÀÄ, ¸ÀAªÀºÀ£É EvÁå¢UÀ¼À£É߯Áè PÀqÁØAiÀĪÁV PÀ£ÀßqÀ zÀ°èAiÉÄà PÉÊUÉÆ¼Àî¨ÉÃPÉÃ? CxÀªÁ PÀqÁØAiÀĪÁV EAVèõÀ£À°è ¤ªÀð»¸À¨ÉÃPÉÃ?

Both in Kannada & English.

19

KeÉ¤ì ¹§âA¢ ¸ÀévÀAvÀæªÁV PÀÄlÄA§UÀ¼À ªÀiÁ»w ¸ÀAUÀ滸À®Ä CªÀgÉÆA¢UÉ ¥Àæ±ÁߪÀ½UÀ¼À ¸ÀAªÀºÀ£À £ÀqɸÀĪÀ C¢üPÁgÀªÀ£ÀÄß ¤ÃqÀ¯ÁUÀÄvÀÛzÉAiÉÄÃ? CxÀªÁ F PÁAiÀÄðªÀ£ÀÄß ¸ÀPÁðgÀ¢AzÀ ¤AiÉÆÃf¸À¯ÁzÀ C¢üPÁjUÀ¼ÀÄ PÉÊUÉÆAqÀÄ, KeÉ¤ì ¹§âA¢ PÉêÀ® CªÀgÀ ¸ÀºÁAiÀÄgÀªÁV PÁAiÀið¤ªÀð»¸À¨ÉÃPÉÃ?

Details for each individual house hold has to be collected by the agency.

20

KeÉ¤ì ¹§âA¢UÉ “UÀÄgÀÄw£À PÁqïð”UÀ¼À£ÀÄß ¤UÀªÀÄ¢AzÀ ¤ÃqÀ¯ÁUÀĪÀÅzÉÃ? CxÀªÁ KeɤìUÀ¼Éà ¤ÃqÀ¨ÉÃPÉÃ?

Agency has to issue the identity cards.

21

¸À«ÄÃPÉë PÁAiÀÄð PÀÄjvÀÄ KeɤìAiÀĪÀgÀÄ ¸À°è¸ÀĪÀ ©¯ïUÀ¼ÀÄ£ÀÄß zÀÈrüÃPÀj¹ ©¯ï ¥ÁªÀw¸ÀĪÀ PÁAiÀÄð ¤UÀªÀÄzÀ ¨ÉAUÀ¼ÀÆgÀÄ PÀbÉÃj¬ÄAzÁUÀĪÀÅzÉÃ? CxÀªÁ ¨ÁUÀ®PÉÆÃmÉ PÀZÉÃj¬ÄAzÀ F dªÁ¨ÁÝj ¤ªÀð»¸À¯ÁUÀĪÀÅzÉÃ?

Will be done in the KBJNL Registered office, Bangalore.

22

¸ÀzÀj ¸À«ÄÃPÁë PÁAiÀÄðPÁÌV KeɤìAiÀĪÀgÀÄ JµÀÄÖ d£À “¸ÁªÀiÁfPÀ «eÁÕ£À” «¨sÁUÀzÀ qÁPÀÖgÉÃmïUÀ¼À£ÀÄß ¤AiÉÆÃf¹PÉÆ¼Àî¨ÉÃPÉÃ? JµÀÄÖ d£À ¸ÁßvÀPÉÆÃvÀÛgÀ ¥ÀzÀ«ÃzÀgÀgÀ£ÀÄß ¤AiÉÆÃf¹ PÉÆ¼Àî¨ÉÃPÀÄ? JµÀÄÖ d£À ¥ÀzÀ«ÃzÀgÀgÀ£ÀÄß ¤AiÉÆÃf¹PÉÆ¼Àî¨ÉÃPÀÄ? CzÉà jÃw “¸ÀASÁå ±Á¸ÀÛç” (STATISTICS) «¨sÁUÀzÀ JµÉÖµÀÄÖ PÀ¤µÀ× ¹§âA¢UÀ¼À£ÀÄß ¤AiÉÆÃf¹PÉÆ¼Àî¨ÉÃPÀÄ?

Key personnel as mentioned in para 3.1.2 of section-2 in the bid document

23

Inclusion of an extra item in the Scope of work at clause 7.3.1 in the bid document regarding co-ordination with the agency for base line socio

The following item is included in the scope of work at clause 7.3.1 page No.47 of bid document:

“To co-ordinate with the agency fixed for formulation of R&R policy framework for better

(4)

[Type text]

economic survey work interpretation of the results”, and also to

provide any data collected for the formulation of the R&R policy.

24 In Summary of costs, in Clause 6.2 of Section 6 in the bid document, regarding transportation

Only local transportation (one vehicle) at Bagalkot Town will be provided.

B R & R POLICY FRAME WORK:

1

Request for modification regarding “consultancy services for R&R policy frame work”

Same is now modified as “Formulation of R&R policy frame work for implementation of Upper Krishna Project Stage-III”.

2

For considering M.Phil degree in Social Science for position of Senior Social Scientist.

As per clause 3.1.2 of section-2 of the bid document, only Doctorate in Social Science from a reputed University is considered.

3

Inclusion of an extra item in the Scope of work at clause 7.3.1 in the bid document regarding co-ordination with the agency for base line socio economic survey work

The following item is included in the scope of work at clause 7.3.1 page No.47 of bid document:

“To co-ordinate with the agency fixed for Baseline Socio economic survey to understand the requirement for preparation of R&R policy framework”.

4

Time frame of four months’ period for policy formulation appears to be too short and atleast time gap of one month between survey work and R&R policy frame work.

Time frame is increased to 5 months.

5

Page 23, 9.10 (1) – it has been mentioned that key professionals required for the services shall consist of (1) Sr. Social Scientist, (2) Social Scientist, (3) Sr. Statistician, (4) Sr. Economist, (5) Sr. computer Analyst whereas in page 10, 3.1.2 (II) & Page 23, 9.10 (2) – it has been mentioned that consultant should deploy (i) Sr. Social Scientist, Sr. Economist and Computer Analyst. Please clarify.

Page 23, 9.10 (1) is modified as

iii) key professionals required for the services shall

consist of

(1) Sr. Social Scientist, (2) Sr. Economist, (3) Sr. computer Analyst

6

What would be the size of data collection for which supervision will be done and similarly, approximate number of households for which ground truthing would be carried out.

Where ever necessary, random sample check will be carried out by the department.

(5)

[Type text] 7

We request you to extend the time of submission of bid by 7 days in view of Dussehra festivals in the coming week.

No modifications in the calendar of events mentioned in the bid document

8

In Summary of costs, in Clause 6.2 of Section 6 in the bid document, regarding transportation

Only local transportation (one vehicle) at Bagalkot Town will be provided.

In addition to the above queries / clarification the following additional condition are incorporated in the bid document.

1. In section-1, letter of invitation 9.1 is included as below:

“If the rate(s) quoted by contractor for the work is below ninety percent of the estimated rates of the department then the contractor shall furnish an additional performance security in the form of Bank Guarantee for an amount equivalent to the difference between the cost as per quoted rate and 90% of the estimated rates. In case of contractor quoting rates above 125% of the estimated rates, then the amount over & above 125% will be withheld during the progress of work”.

References

Related documents

GCF shall simultaneously notify in writing those Proposers that have achieved the minimum overall technical score and inform them of the date, time and location for the opening of

Again, since this disturbance can be found only along the recirculation region, it seems that if this interaction causes transition the effect would be transition near the

The surviving or the consolidated corporation shall possess all the rights, privileges, immunities and powers and shall be subject to all the duties and liabilities of

sources not created solely for the classroom We began the Nepali Computer Project in 1988 with support between 1988 and 1992 from the Northeast Consortium for Language Teaching

Based on this research gap the aim of this paper is (1) to investigate the antecedents of store (format) patronage behaviour of older cohorts, (2) to identify

In general, the little changes in the West African summer monsoon climate induced by the swamp with respect to bare desert soil over the southern Sudan indicate more occurren- ces

The number of individual links that need to be probed to resolve attack syndrome ambiguity (a), the number of attack monitoring trails established over those links (b), and the

• Technical security mechanisms are used to ensure that the security policy is not violated by an adversary within the..