• No results found

About Company. ESABD code: 58067

N/A
N/A
Protected

Academic year: 2021

Share "About Company. ESABD code: 58067"

Copied!
18
0
0

Loading.... (view fulltext now)

Full text

(1)
(2)

About Company

ESABD code: 58067

Clean Room Facility for Space & Hi-Rel Products Manufacturing Area

G.L.Electronic was established in 2003, In 2008 was registered as G.L.Electronic Ltd

.

Manufacturing Hi-rel electronics in the field of Ground and Space technologies

Space activity are realized in clean room class 100.000

Staff have ESA certifications according to ECSS 70-08/26/28/38 CAT 2 & CAT 3

Since 2007 participating on international projects in French Guiana (CSG)

Co-operations with the Czech Academy of Science, Charles University,VUTB and CEITEC

Participation in 4 international projects with partners TAS-I,CGS-OHB, Lux Space, Temis

Manufacturing Area

©

(3)

Professional activities

G.L. Electronic

G.L. Electronic

Space

Space S

Segment

egment

Ground

Ground S

Segment

egment

EGSE

EGSE

Realization of flight electronic systems

Design use external co-operation

HW/SW

Flextronics Design Brno Ltd.

Mechanical and Thermal

SAB Aerospace Ltd.

Flight hardware manufacturing

Hi-Rel harness

Quality control process (PID&VPD) • Measurement and final testing

Final integration of the unit

Installation & Integration activities

Integration of Rack box

Instalation of A/V systems

•• Safety (gas leak) )

Telephone distribution system

Security system

(4)

G.L.Electronic

Prime contractor

Industrial Consortium of Czech companies for Space projects

Industrial Consortium of Czech companies for Space projects

G.L.Electronic s.r.o. Hi-Rel Manufactruring

Purchases of materials EEE Assembly PCB,Harness Conformal coating,Bonding

Final integration units

FLEXTRONICS s.r.o. Design / Testing Electrical Design Electrical Testing (Testing Facilities) SAB AEROSPACE s.r.o. Thermo-mechanical design Thermo-mechanical designses Testing Facilities FRENTECH Mechanical Manufacturing

(Frame ,Coating Alodine ) TVC inside cleanromm

(5)

Clean Room - Workplace Brno in Czech Republic

Clean Room: class 100 000 (ISO8) Number of employees :

Production area 95m

2

ESA certificates:

7 technicians

Assembly area 70 m

2

Technician spec.: 3 technicians

©

© GG..LL..ElectronicElectronic / / Illus.photoIllus.photo

©

© GG..LL..ElectronicElectronic / / Illus.photoIllus.photo

©

(6)

Clean Room Activities : Assembly and Hand Soldering

AssemblyAssembly and and hand soldering hand soldering of of tthrough-hole components components Re

Re--work and work and modification modification 

Assembly Assembly SMD SMD and and hand soldering of

hand soldering of fine fine pitch

pitch componentscomponents

©

© GG..LL..ElectronicElectronic / / Illus.photoIllus.photo

©

© GG..LL..ElectronicElectronic / / Illus.photoIllus.photo ©

(7)

Clean Room – Measurement and Testing Activities

Testing of power distribution

Boards, I/O Boards, RF Boards

Adjustment of Forward & Backward

RF power

Analog signals monitoring,

temperature sensors calibration

Calibration of oscillators (± 0.1 ppm)Testing of boards & final units

Full functional Thermal test & Full functional Thermal test &

Thermal-vacuum test

Test Result ReportingVibration test

©

© GG..LL..ElectronicElectronic / / Illus.photoIllus.photo ©

(8)

Clean Room Activities : Harness manufacturing

 

Identification of conectors and cables

© G.L.Electronic / Illus.photo © G.L.Electronic / Illus.photo

 

Cable with connector D'Sub for telecamera

 RF cables

©

© G.L.Electronic / Illus.photoG.L.Electronic / Illus.photo

© G.L.Electronic

© G.L.Electronic / Illus.photo/ Illus.photo

© G.L.Electroic

© G.L.Electroic / Illus.photo/ Illus.photo

Circular

Circular-- sizesize 20 20

© G.L.Electronic / Illus.photo © G.L.Electronic / Illus.photo

(9)

Clean Room Activities : Harness integrations on the MockUp

Mockup of microsatellite Mockup of satellite

©

© G.L.Electronic / Illus.photoG.L.Electronic / Illus.photo

Mockup minisatellite

(10)

Participations on the Space Projects in the Czech Republic

Collaboration with Academy of Sciences of the Czech Republic (AV-UFA) &

Charles University Prague (UK-MFF), Department of Surface and Plasma Science

Faculty of Mathematics and Physics

SOLAR ORBITER - TDS (Time domain sampler) BB/EM(AV-UFA)

SOLAR ORBITER - SWA/PAS CEM board EM/QM (UK-MMF) SOLAR ORBITER - Process verification of SMD hand-soldering for

RPW-TDS and SWA/PAS-CEM units FM (CNES)

©

© ESA / ESA / Illus.photoIllus.photo

RPW-TDS and SWA/PAS-CEM units FM (CNES) ACTIVITY IDENTIFICATIONS:

 Technical consultations

 Clean room manufacturing and Q.C. system

 Rework and modifications on PCBs

 Harness, internal cabling and mechanical integration

 Final implementation of gluing & conformal coating

---AIS RX Rebuild and Vessel Sat – Harness ( Power ,Date and RF ) FM (LuxSpace) Verific. process of SMD hand soldering of flight level PCB (ESA)

(11)

C

ertifications for Hi-Rel manufacturing

Staff : ESA Certification

CAT 2 & CAT 3 –– ECSS-Q-70-08 – ECSS-Q-ST-70-26 – ECSS-Q-ST-70-28 – ECSS-Q-ST-70-38

Clean room Class 100.000

The validation report 8/2014

EU and CNES

Certification for

Handling Crane

Integration and Moving of the satellite

(Centre Spatial Guyanais) – ECSS-Q-ST-70-38 (Centre Spatial Guyanais)

(12)

Final integration PROBA V 3/2013

 SSISSSIS:: P

Preparationsreparations ofof thethe VV02 & PROBA V VV02 & PROBA V 

Vega

Vega isis ready for the start of the second llaunchaunch

P

Preparationsreparations ofof thethe Separation

Separation systemsystem for for integration

integration withwith PROBA V

PROBA V satellitesatellite

  SSIS: SSIS: Final Integrations Final Integrations ofof harness harness ©

© ESA / ESA / Illus.photoIllus.photo

©

© ANTARES / ANTARES / Illus.photoIllus.photo

©

(13)

Final integration LARES satellite 1/2012

 LARES: LARES:

Transfer preparations Transfer preparations

VEGA & LARES VEGA & LARES 

Vega during the final Vega during the final preparation for

preparation for thethe first Launch

first Launch

Transfer preparations Transfer preparations for

for integration integration on the on the AVUM AVUM   LARES: LARES: Final Integrations Final Integrations Almasat

Almasat and Pand P--Pods Pods with 7

with 7 CubeSatsCubeSats

©

© ESA / ESA / Illus.photoIllus.photo

©

© ESA / ESA / Illus.photoIllus.photo

©

(14)

S

pace segment

Co-operation on ongoing projects 2013-2014

Clients :TAS-I,CGS-OHB,LUXSPACE,TEMIS,SITAEL, BLU ELECTRONIC,ANTARES,SAB Aerospace

AV-UFA CR, UK- MFF CR

 AIS-RX Rebuild – Harness FM

Implemented projects 2005-2013

 SSIS / VERTA – Harness integration FM

 LARES – Harness FM

 VESSEL SAT 1&2 Harness FM

We participate in the field: PCB assembling, bonding , quality control, measurement,

manufacturing of external harness and final integration of unit box

 AIS-RX Rebuild – Harness FM

 EDRS-C – HARNESS FM

 EDRMK2 / RPDA – FM

 ASIM FM

 HEXAPOD - FM

 SERENA - EQM,FM

 SOLAR ORBITER – EM ,EQM

 GALILEO Fuse box ,FM

 SGEO – EQM,FM

 SENTINEL1 – EQM, FM

 ENMAP - FM 1& 2

 VESSEL SAT 1&2 Harness FM

 SAR LUPE  GLOBALSTAR2  HERSCHEL  AMS-PDS02  O3B - FM  SWARM  GAIA  GALILELEO FOC

 AGILE- HW and Harness

(15)

Ground segment

Mainly under leadership of

Carlo Gavazzi Space

and

Telematic Solutions

in French Guyana

We are concentrating primarily on technical support for

the complete electro installation

Telephone, audio and video signal ,safety (gas leak),

and special applications and individual measurements

and partial integration of RACK boxes.

Maintenance for the ground segment throughout the

mission lifetime, including yearly service visits and

repair.Work is performed by our qualified technicians.

(16)

Ground segment

Project :

MANGOUSTA

– Security camera system

Activities:

Electrical assembly and final installation of

camera system with IR sensors

Integration of A/V systems

Project : Launching pads

VEGA

,

SOYUZ

Project : Launching pads

VEGA

,

SOYUZ

Activities:

Electrical Installations and assembly of

switchboards (monitoring boxes)

Integration of A/V and telephone systems

Safety signalization (Gas leak)

Installation of sensors

Installation of optical cables

SOYUZ

:

(17)

General Strategy

Reliable business partner for the realization of Ground and

Space project

Offering high quality products and services for ESA partners

Interest in co-operation in new international projects

(18)

References

Related documents

With the offshore and mining industry now expanding into the global ocean in remote areas, a case can be made that it is time for the London Convention and Protocol to be amended

By identifying the level of AMH, the number of mature oocytes obtained could be predicted and the appro- priate total amount of gonadotropin dose could be used in the controlled

Referring to the European Parliament’s document of 13 October 2013, this agreement (Thaçi-Tadic) marks an important step and strengthens the responsibility of the Kosovo authorities

STRIPS is computationally efficient in the sense that determining the consequences of an action is simply a case of adding and deleting from a list of assertions. However, the

[r]

To assess the effects of fragmentation on the reproductive success of grassland birds, we measured rates of nest predation and brood parasitism for four species of birds

« Privacy of financial information in cyberspace: banks addressing what consumers want », Journal of retail banking services, xx3. « Enticing online consumers: an extended

2019 ) to arrive at a new algorithm, Optimistic Regularized Online Balanced Descent (Optimistic ROBD), that achieves a constant competitive ratio for a class of online optimiza-