• No results found

ZEPPELIN VALUE ENGINEERing System for success

N/A
N/A
Protected

Academic year: 2021

Share "ZEPPELIN VALUE ENGINEERing System for success"

Copied!
9
0
0

Loading.... (view fulltext now)

Full text

(1)

www.zeppelin.com

ZEPPELIN VALUE ENGINEERING

System for success

(2)

ENGINEERING YOUR SUCCESS

Zeppelin Systems, the world leading plant manufacturer for high quality bulk material and liquids handling, has remarkably grown over the past 60 years. We cover the demands of a wide range of industries and supply all plant manufacturing services from one single source, whether basic engineering, in-house production of components, final assembly or comprehensive customer service. Thanks to our financial strength and our global network we have long been a reliable partner for our customers.

Every Zeppelin plant is developed according to the clients’ specific requirements and realized thanks to our customized innovative processes and technologies.

The knowledge we have acquired over more than 60 years of plant manufacturing and the world’s largest network for bulk material handling are the key to providing ideal solutions whatever the challenge. After all, your success is our goal.

Polymer Plants

Plants for plastics producers and forwarders

Plastics Processing & Rubber Plants

Plants for the plastics processing and rubber industry

Reimelt Food Technology

Plants for the food, confectionery and bakery industry

Henschel Mixing Technology

Mixers, mixing systems

Silos & Filters

Silo technology and filters

Components

Diverter valves, rotary feeders, separators, sifters …

Customer Service

Assembly, maintenance, spare parts

Quality Service

Services in quality management

Zeppelin plant engineering –

business fields

(3)

More value for more success –

this is what we strive for. Our

engineering departments all

over the world apply all their

experience and knowledge in

the optimization of planning

processes. The result: an

inno-vative concept that not only

saves time, but also reduces

costs. We call it value

engineer-ing. For you, this means market

edge, whether for new plants

or plant expansion.

FASTER – SMARTER – BETTER

Zeppelin Value Engineering

Parallel planning process

Sequential planning process

Phase model of a project

Time saving

Basic engineering Detail engineering Feed engineering Construction Commissioning Procurement

Feed engineering Basic engineering Detail engineering Procurement Construction Commissioning

St ar t o f p la nn in g p ro ce ss En d o f s eq ue nt ia l p la nn in g p ro ce ss En d o f p ar al le l p la nn in g p ro ce ss

Project phases that run in parallel require preengi-neering. On the one hand, the duration of the proj-ect can be considerably shortened. On the other hand, the increased risk, compared to a sequential planning process, be-comes more manageable thanks to professional pre-engineering.

5 4

(4)

}

Zeppelin Value Engineering’s goal is to save time

and money by planning processes optimally. We start the process at a point in time when project costs can still be influenced: at the initiation phase.

FEL can be gradually implemented in the design process and ends with the BASIC engineering or the request for bids of the project. Zeppelin pro-vides the necessary know-how for all FEL phases as well as the appropriate engineering services that will optimize your project at any given time.

FRONT-ENd LOAdING (FEL)

Project costs can be significantly influenced in the initial phase, but only very little once the project is in execution.

The planning phases:

n FEL 1 – Project Design Package (PDP)

n FEL 2 – Front-End Engineering Design (FEED)

n FEL 3 – Basic Engineering (BASIC)

duration of the project

Cost of project with PDP/FEED Cost of project without PDP/FEED

Planning and design phase

High

Influenceability of the costs

Influence on costs

Cost advantage

(5)

FEL 1 –

Project design Package (PdP)

Simulations and calculations are the basis for a realistic estimation of the anticipated costs. Step 1 of an FEL consists in determining the main com-ponents and providing a first assessment of the thermal and material balances.

The result is a PFD with the main components process data as well as a cost estimate of all the components.

We carry out the preliminary simulation of pneu-matic conveying systems, of a degassing process for monomer containing polymers, of the storage and blending process up to the logistics facility of polymers. n PFD n Simulation n Concept development n Cost estimate 9 8

(6)

FEL 2 –

Front-End Engineering design (FEEd)

In step 2 of the FEL phase, focus is set on the technical realization of the plant. The main com-ponents (silos, blenders, blower stations, bagging units, warehouses and pipelines) are integrated into an overall layout plan. We create the neces-sary PFDs, determine the energy required and support you in the dimensioning and specification of the main components.

n PFD n Dimensioning of the main components n Specification of the main components n Energy required

n Overall layout plan

n Budget proposal

(7)

FEL 3 –

Basic Engineering (BASIC)

The more accurately costs, volumes, deadlines, time and efforts can be determined, the more ef-ficiently a project can advance. Zeppelin will also support you in every matter related to step 3 of FEL. In this phase, which represents the completion of the Front-End Loading, inaccuracies are reduced. Quantity structure, deadlines, number of hours required and costs are determined in a much better way.

P&IDs for the project as well as other relevant documents for the realization of the plant result from FEL 3.

n E/I&C design

n Civil engineering

n Specification of instruments

n P&ID

n Final compilation and arrangement

of the plants and main components

n Bill of material

n Timetable

n Budget

(8)

As the world leading manufacturer for high quality bulk material handling, we can naturally also support you in all other steps of the project. Product testing, uprating studies, design of degassing tanks and process vessels, expansion and extension of existing logistics or dedusting plants, risk management analysis for bulk material plants, handling of new polymer grades, etc.: we have a wide scope of services and our professional project management is renown all over the world.

FROM A TO ZEPPELIN

(9)

© Z ep pe lin S ys te m s G m bH | S ub je ct t o c ha ng e | E di tio n 04 /1 5 | 0 31 10 15 03 | w w w .la ke -o f-c ons ens .c om Presented by: Zeppelin Systems GmbH Graf-Zeppelin-Platz 1 88045 Friedrichshafen Germany Tel.: +49 7541 202 - 02 Fax: +49 7541 202 - 1491 [email protected] www.zeppelin.com

For the complete Zeppelin Systems range please visit our website at www.zeppelin-systems.com

Global presence

n Australia n Belgium n Brazil n China n France n Germany n India n Italy n Korea n Russia n Saudi Arabia n Singapore n United Kingdom n USA

References

Related documents

Dersom pensjonsreformen skal kunne realisere utgiftsreduksjonen, forutsetter det at dagens AFP-ordning, de offentlige tjenestepensjonene og uføre- pensjonen blir tilpasset det

In this review article, I focus on gender stereotypes (i.e., the belief that “women canʼt do math”) from a social psychological perspective. It has been reported that women and

Effect of time-dependent cooling curve, photoionization and NEI on O vi column densities with 1 and 0.1 solar metallicities and different magnetic field strengths: solid lines

Overall, taking multiple docking solutions into account for binding affinity prediction does have a positive effect in terms of improvement of the correlation with experimental

• Abnormal mammogram with normal physical exam • Vague thickening or nodularity.. • Nipple Discharge •

As a proof-of- concept, we used meSDN framework to implement a WLAN virtualization service that effectively guarantees airtime shares to network slices using a Time Division

All participants demonstrated an increase in positive social engagement and a decrease in negative social engagement, indicating that this modified CICO intervention may be

Compared to detailed window models standard triple and quadruple glazing models resulted in lower heating and higher cooling needs, whereas in case of quintuple windows the