Click to edit Master title style

Hercules Intermodal  Transit  Center 

Hercules Intermodal  Transit  Center 

Hercules Intermodal  Transit  Center 

Hercules Intermodal  Transit  Center 

City Council 

City Council –– Project Update

Project Update

City Council 

City Council –– Project Update

Project Update

2/25/2010

INTERMODAL TRANSIT CENTERINTERMODAL TRANSIT CENTERINTERMODAL TRANSIT CENTER

F e b r u a r y   2 3

F e b r u a r y   2 3

1

r d

r d

,

, 2 0 1 0

2 0 1 0

F e b r u a r y   2 3

(2)

Click to edit Master title style

Tonight’s Presentation:

Tonight’s Presentation:

Tonight s Presentation:

1.  Accomplishments

K

A

M

ti

Tonight s Presentation:

1.  Accomplishments

K

A

M

ti

Key Agency Meetings

Public Workshops

Design Review & Planning Commission

Key Agency Meetings

Public Workshops

Design Review & Planning Commission

2.  Project Phasing Plan

3 Design Packages and Review Process

2.  Project Phasing Plan

3 Design Packages and Review Process

3.  Design Packages and Review Process

4.  Schedule

Design

3.  Design Packages and Review Process

4.  Schedule

Design

Design

Environmental Document

Construction

Design

Environmental Document

Construction

(3)

Click to edit Master title style

Key Agency Meetings

Key Agency Meetings

Key Agency Meetings

Key Agency Meetings

BCDC Design Review ‐ January 11

th

2010

BCDC Design Review ‐ January 11

th

2010

UPRR Presentation 

UPRR Presentation ‐‐ January 26

January 26

th

th

2010

2010

UPRR Presentation 

UPRR Presentation ‐‐ January 26

January 26

th

th

2010

2010

AMTRAK Presentation 

AMTRAK Presentation ‐‐ February 12

February 12

th

th

2010

2010

AMTRAK Presentation 

AMTRAK Presentation ‐‐ February 12

February 12

th

th

2010

2010

(4)

Click to edit Master title style

BCDC

BCDC 

Jurisdiction 

(5)

Click to edit Master title style

Rail Improvements‐Bay Interface

(6)

Click to edit Master title style

(7)

Click to edit Master title style

Rail Improvements‐Bay Interface

(8)

Click to edit Master title style

(9)

Click to edit Master title style

2/25/2010

INTERMODAL TRANSIT CENTER

9

(10)

Click to edit Master title style

(11)

Click to edit Master title style

(images to be inserted)

Project Design Elevations:

Top of Rail Elevation 11.6-ft. above MSL

(images to be inserted)

Platform Elevation 12.4-ft. above MSL

Civic Plaza Elevation 18.0-ft. above MSL

Possible Flood Elevations:

Mean High Tide (MHT) & Mean High Water (MHW) = 3-ft above Mean Sea Level (MSL)

MSL

MHT & MHW = 3’ 100-yr Flood= 7’

Flood + 16” rise= 8’ Flood + 55” rise= 11’

Mean High Tide (MHT) & Mean High Water (MHW) 3 ft. above Mean Sea Level (MSL)

•100-yr Flood Elevation = 7-ft. above MSL

•Flood Elevation + 16 in. Sea Level Rise = 8-ft. above MSL

•Flood Elevation + 55 in. Sea Level Rise = 11-ft. above MSL

(12)

Click to edit Master title style

Public Workshops

Public Workshops

Public Workshops

C

k id P k

C

k id P k D

D

b

b

1

1

st

st

Public Workshops

C

k id P k

C

k id P k D

D

b

b

1

1

st

st

Creekside Park 

Creekside Park ‐‐ December 1

December 1

st 

st 

Civic Plaza 

Civic Plaza ‐‐ December 17

December 17

th

th

Creekside Park 

Creekside Park ‐‐ December 1

December 1

st 

st 

Civic Plaza 

Civic Plaza ‐‐ December 17

December 17

th

th

Café & Bus Transfer 

Café & Bus Transfer ‐‐ January 25

January 25

th

th

Interpretive Program & RR Plaza

Interpretive Program & RR Plaza ‐‐ February 22

February 22

th

th

Café & Bus Transfer 

Café & Bus Transfer ‐‐ January 25

January 25

th

th

Interpretive Program & RR Plaza

Interpretive Program & RR Plaza ‐‐ February 22

February 22

th

th

Interpretive Program & RR Plaza 

Interpretive Program & RR Plaza  February 22

February 22

Interpretive Program & RR Plaza 

(13)

Click to edit Master title style

Open Spaces

Open Spaces

H

l

P i t

H

l

P i t

Bayfront Park

Bayfront Park

Hercules Point

Hercules Point

Bay Trail

Bay Trail

Multi‐use Trail

Multi‐use Trail

Creekside 

Creekside Park

Park

Bayfront Park

Bayfront Park

Neighborhood Park

Neighborhood Park

North Channel

North Channel

Restoration

Restoration

Civic Plaza

Civic Plaza

Public Plaza

Public Plaza

Creekside Trail

Creekside Trail

Multi‐use Trail

Multi‐use Trail

Public Plaza

Public Plaza

Railroad Plaza

Railroad Plaza

Public Plaza

Public Plaza

f

k

f

k

Multi use Trail

Multi use Trail

Refugio Creek

Refugio Creek

Natural Greenway

Natural Greenway

Bayfront Park

Bayfront Park

Neighborhood Park

Neighborhood Park

Sycamore Plaza

Sycamore Plaza

Public Plaza

Public Plaza

(14)
(15)

Click to edit Master title style

Creekside Park

(16)

Click to edit Master title style

Civic Plaza

Bay Trail

Station

(17)

Click to edit Master title style

Civic Plaza

(18)
(19)

Click to edit Master title style

Café / Bus Transfer

(20)
(21)

Click to edit Master title style

(22)

Click to edit Master title style

Project Phasing Plan

Project Phasing Plan

Project  Phasing  Plan

Project  Phasing  Plan

(23)

Click to edit Master title style

(24)

Click to edit Master title style

Design Packages

Design Packages

Design Packages

Design Packages

(25)

Click to edit Master title style

Review Process

Review Process

Review Process

Review Process

EIR Public  Workshops Monthly Ad‐Hoc  Meetings Informal  Design  Reviews Study  Sessions Council  Project  Updates EIR  Certification Anticipated June 2010 Formal  Design  Review Planning  Commission  Resolution

(26)

Click to edit Master title style

Project Schedule

Project Schedule

EIR Document

EIR Document

June 2010

June 2010

June 2010

June 2010

Design 

Design 

Construction

Construction

Funding 

Allocation

Funding 

Allocation

2012/2013

2012/2013

2012/2013

2012/2013

July 2010

July 2010

July 2010

July 2010

Allocation

Allocation

(27)

Click to edit Master title style

Hercules Intermodal  Transit  Center 

Hercules Intermodal  Transit  Center 

Hercules Intermodal  Transit  Center 

Hercules Intermodal  Transit  Center 

City Council 

City Council –– Project Update

Project Update

City Council 

City Council –– Project Update

Project Update

2/25/2010

INTERMODAL TRANSIT CENTERINTERMODAL TRANSIT CENTERINTERMODAL TRANSIT CENTER

F e b r u a r y   2 3

F e b r u a r y   2 3

27

r d

r d

,

, 2 0 1 0

2 0 1 0

F e b r u a r y   2 3

References

Related documents

– Eliminate paper transfers- Still necessary to account for transfers but change policy to reduce abuse – Introduce a Day Pass using Clipper, sell magnetic. strip pass on-board

INTRODUCING A COLLABORATIVE BUSINESS MODEL FOR EUROPEAN ERP VALUE CHAINS

deficiencies for Counterfeit Parts Detection and Avoidance Systems (Level II or III CAR, Disapproved Purchasing. System, System Withhold, etc.)

Click to edit Master title style EVOLUTION OF CYBERSECURITY IDENTIFYING BEST PRACTICES.. PHILIP DIEKHOFF, IT

► It is therefore important to define the relevant market in order to determine whether a firm has such a dominant position.. ► In the case of Malta, several cases required that the

Click to edit Master title style Traditional Access control. iPhone

The Indigenous Research Reform Agenda, 2002 [CRC Aboriginal & Tropical Health].. Another gratuitous

Members from the Grand Ronde Tribal Historic Preservation Office toured the Tri- City Water Resource Recovery Facility to learn about the new outfall project.... Tri-City