• No results found

SESAR 2020 PJ22 familiarisation webex

N/A
N/A
Protected

Academic year: 2022

Share "SESAR 2020 PJ22 familiarisation webex"

Copied!
15
0
0

Loading.... (view fulltext now)

Full text

(1)

Ramona Santarelli, Valentina Piccinelli

SESAR 2020 PJ22

familiarisation webex

21 December 2016

(2)

Familiarization Webex

It is organized by group of projects basing on the partecipation to the brefing sessions

To share as much as possible knowledge about PJ22 scope and core activities

To understand how to coordinate with Solution, Enabling and VLD projects in view of PMP preparation

To let Solution and Enabling Projects to start working with

SE-DMF tool

(3)

SESAR 2020 PJ22 familiarisation webex#02 3

Project Project Name Lead PJ SJU BREFING SESSION PJ 22 FAMILIARIZATION WEBEX

#1 #2 #3 #4 #1 #2 #3 #4

PJ01 Enhanced Arrivals and Departures NATS PJ02 Increased Runway and Airport

Throughput ECTL

PJ03a Integrated Surface Management ENAV

PJ03b Airport Safety Nets DSNA

PJ04 Total Airport Management SEAC

PJ05 Remote Tower for Multiple Airports AT-ONE PJ06 Trajectory Based Free Routing DSNA PJ07 Optimised Airspace Users Operations ECTL PJ08 Advanced Airspace Management ECTL

PJ09 Advanced DCB ECTL

PJ10 Separation Management in en route and

TMA DFS

PJ11 Enhanced Air and Ground Safety Nets ECTL ?

PJ13 Air Vehicle Systems Alenia

PJ14 CNS Selex

PJ15 Common Services INDRA

PJ16 CWP-HMI Thales Gnd

PJ17 SWIM Infrastructures Thales Gnd

PJ18 4D Trajectory Management INDRA

VLD 1-2 (PJ24) Network Collaborative Management ECTL ?

VLD 1-4 (PJ25) Arrival Management extended to en-

route Airspace DSNA

VLD 1-5 (PJ26) Enhanced Terminal Airspace using RNP-

Based Operations ENAIRE

VLD 1-6 (PJ27) Flight Information Exchange DFS VLD 1-7 (PJ28) Integrated Airport Operations (incl. TBS) AT-ONE

VLD 1-10

(PJ31) Initial Trajectory Information Sharing Airbus AIR ?

Ad hoc coordination planned between PJ22 and PJ19 via Joint Sju-Pj19-PJ22 session

(4)

PJ22 – “Validation and Demonstration Engineering” is participated by European ANSP, Industries and Research Entities, it has as primary objective to provide a transversal support to the System Engineering of the Validation and Demonstration activities performed under the scope of the SESAR 2020 Programme.

PJ22 Validation and Demonstration Engineering

•SE data management will be based on a data centric approach. The goal is to allow capturing SE data in a structured way ensuring consistency, coherence and coverage at programme level while facilitating and controlling change management across the SESAR Solution life cycle.

Requirement Management

•PJ22 will maintain the V&VPs, V&VIs and Demonstration Platform Development methodologies , to be made available for SESAR solution, enabling and demo projects.

•It will promote coherent engineering approach and harmonized outputs for the development of the V&V platform.

•It will identify a minimum set of technical evidences/ related to the V&V platform development that can be captured in the relevant platform availability note(s).

•The use of the methodology is NOT mandatory and remain under scope of solution projects.

Platform Methodology

•PJ22 will be in charge of maintaining the catalogue of the existing V&V and Demonstration Platforms and associated

documentation from SESAR 1, describing their current capabilities and their planned evolution, and populate it whenever a new platform is proposed by a SESAR Solution or VLSD project.

Platform Catalogue

•PJ22 will support the communalization of validation tools and interoperability solutions when appropriate, by enabling the identification and selection of a set of strategic validation tools and interoperability solutions and producing technical specifications, interoperability requirements and conformance criteria that are applicable for the different simulators, tools and V&VI.

Communalization of validation tools and interoperability solutions

Supporting Engineering Activities

of SESAR Solution Lifecycle

(5)

5

PMP Preparation

SESAR 2020 PJ22 familiarisation webex#02

•Familiarization webex with Solution, Enabling and Demo Projects having participated to Briefing Sessions :

•to share the objectives and core activities of PJ22

•to identify the best way to support Projects, starting with first SESAR Solutions

•to share proposal on the way for interacting and coordinating

•Ad hoc/ periodic coordination (annual) via webex or F2F Project Coordination

•F2F workshop with candidate Solution, Enabling and/or Demo Projects to be identified in coordination with SJU

•to present SE-DMF and collect feedback for possible customization and refinement

•Solution Project Coordinator acting as POC for initial provision of solution list, leader, working team

•Training

•Support on the SE-DMF WP2: SE-DMF Coordination

•Coordination for V&V Platform Methodology refinement and update :

•PJ22 team

•A POC for each Project that could be in the loop of the V&V Platfom Methodology for collection of input/ feedback WP3: V&V Platform Methodology Coordination

•Ad hoc coordination, if neede, basing on the results of the PJ22 analysis

Communalization of validation tools and interoperability solutions

(6)

The System Engineering

Data Management Framework

Requirement Management

Tools, processes, methods, design,

implementation, maintenance, change

management, inter- level integration

traceability Data

Centric approach

Guidance

Information structure definition, adapted to

SESAR Solution lifecycle, for compliance and

consistency

SE-DMF platform

Report

Enhancing the maturity assessment

process to support Gates

Wide accessib

ility

Standard Homogeneity Transparency

SINGLE SOURCE

information of Configuration and

change

management

(7)

Vx/TRLx

Documents supported by SE-DMF

Exploratory

Research Industrial Research Very Large

Demonstration Industrialisation and Deployment

Platform Tests

SESAR 2020 PJ22 familiarisation webex

(8)

Integration with other SESAR 2020 collaboration tools

EATMA

(the Reference Architecture)

SE-DMF

(the Engineering Data Management Framework)

extranet

(call for SDSS)

Programme

level

(Programme Information and Process Management)

MEGA Hopex

EATMA repository

IBM DNG DOORS 9

SE-DMF repository SDSS

repository

PIRM

Change management

EATMA

release Architectural changes

• DMF aims at securing the coherence with Enterprise Level, integrating with EATMA and in line with PIRM [ref.

Data Model]

Requirement Management

• DMF reporting feature allows to automatically generate

Deliverables (in line with SESAR

templates), to be dropped into the SESAR document repository

Report

(9)

Data capture and deliverables production

SE data capture

Export of deliverables

Dashboard to support Maturity Gate

9

SESAR 2 02 0 ATM /T ec hn ol ogi ca lSol ut io n P roject pa rtne rs

Text

Data

Requir ement

s

SESAR 2020 PJ22 familiarisation webex

(10)

Projects

Users

Dashboards Changes

SE SAR 20 20 ATM/ Te ch no lo gi ca lSol ut io n Pr oje ct pa rtne rs Text

Data

Requir ements

Collaborative Revision &

Approval process

Data capture: web environment

(11)

Page 11

SE SAR 20 20 ATM/ Te ch no lo gi ca lSol ut io n Pr oje ct pa rtne rs Text

Data

Requir ements

Data capture: web environment

Configurable views

(attributes and

links) according to

the Data Structure

implemented

(12)

Revision process

Drafting of document,

in a collaborative

environment

Authors

Revision of document

Reviewer

Approval of document

approver

(13)

Coordination and set up process

SESAR 2020 ProjectsSJUPJ22

SE data identification and

maintenance explanation at Briefing Sessions

and dedicated webex Programme

Handbook

This presentation Set up of the

process

Identification of Solutions, in sequence for the

training

Set up of SE-DMF work area and provision of training Progressive

coordination with Solutions

Consolidation of baseline data

packages

Populate SE-DMF specific areas with info and data

Document deliveries Baseline data

package

Set of familiarization webex will be performed for those Projects having participated to the Briefing Sessions.

SESAR 1 Data Packages

(OSED/SPR/INTEROP, VALP, TS, VALR) to be consolidated by each Solution for the subsequent upload on the dedicated Solution Working Area

Working teams

SESAR 2020 PJ22 familiarisation webex

(14)

Next steps for SE-DMF set up

Projects Leaders are requested to provide to [email protected] :

• The list of Solutions

• The list of Solution leaders

• For each Solution:

• Provide names of working teams

• Specifying roles (author, reviewer, approver)

• Consolidate the baseline Data Package (from SESAR 1) A training programme will be set up for the Working teams:

• Webex

• F2F

• Webinairs

Where to go for SE-DMF access and support

For any doubt or support requests, you can go to the website http://www.se-dmf.eu/

and write at:

[email protected]

[email protected]

(15)

This project has received funding from the SESAR Joint Undertaking under the European Union’s Horizon 2020 research and innovation programme under grant agreement No [number]

The opinions expressed herein reflect the author’s view only.

Under no circumstances shall the SESAR Joint Undertaking be responsible for any use that may be made of the information contained herein.

Thank you very much for your attention!

PJ22 WP2 Kick Off Meeting

References

Related documents

14 When black, Latina, and white women like Sandy and June organized wedding ceremonies, they “imagine[d] a world ordered by love, by a radical embrace of difference.”

• First, unfold your disposable washcloth and put it on your lap. Then, use your finger tips to wet your face. Then, put the cleanser on your fingers. You will want to suds it up

Though there is a vast amount of literature on the spillover of information across  the  markets,  only  a  few  of  them  have  focused  on  the  Indian 

Similarly, inequality solutions are required to determine the monotonicity and concavity of functions by the use of derivative (Sandor 1997).. E-mail address:

Between 2001 and 2006, the number of single family dwellings on the Sunshine Coast has increased by 7%; while for the rest of BC there was a gradual decline of 5% over this

z Comparison of control and unaffected skin biopsies particularly Comparison of control and unaffected skin biopsies

Employers don’t expect perfection, so a typo in your cover letter isn’t sufficient reason for them to reject your

And yet, there is evidence that establishing an accountability regime that uses externally-set tests, where the results of these tests have significant consequences for