Cerro Verde Expansion

(2)
(3)

Sociedad Minera Cerro Verde

Mine Location

35 km from Arequipa

90 km from Matarani Port

Population

Peru - 30 million

Arequipa – 1.2 million

Elevation of the Mine

2,700 m.a.s.l. (8,900 ft) Shareholders Freeport-McMoRan Inc.: 53.56% Sumitomo: 21.00% Buenaventura: 19.58%

Shareholders in Lima Stock

(4)

Cerro Verde Operations

Pre Expansion

360,000 MT/day Mined 40,000 MT/day Crushed Leach

9,000 MT/day ROM Leach

120,000 MT/day Concentrator (CV1)

(5)

Mineral Reserves

3.9 billion metric tons at 0.37% Cu and 0.014% Mo and 1.48 g/t Ag, Stripping Ratio = 0.97

Mine Life

30 years (2045)

Life of Mine Production

28.2 billion pounds of copper, 0.7 billion pounds of molybdenum,

85.2 million ounces of silver

(6)

6

Cerro Verde Expansion

Beginnings

In 2010, Cerro Verde S.A.A. initiated a feasibility study to evaluate the possibility of expanding its Production Unit according to its large reserve of sulphides and oxides, by means of the construction of a second concentrator (C2) with:

a designed capacity of 240,000 MT/day

a leaching platform (PAD1, Phase III) with a capacity of 100,000 MT/day mine development

a series of similar auxiliary and/or complementary facilities

(7)

Cerro Verde Mine Operations

2016 Mined Material

630,000 MT/day (New Mined)

730,000 MT/day (Total Material Moved)

2016 Ore

360,000 MT/day Sulfide Ore

40,000 MT/day Crushed Leach Ore 40,000 MT/day ROM Ore

Average Grade of Mined Ore

0.387% CuT (3.874 Kg. Cu/MT)

This includes primary sulphides (high, low

(8)

Haul Trucks (88) Cat 793’s (9) Komatsu 930 (23-27) Additional trucks by EOY 2018 Shovels (4) P&H 4100 AC (2) P&H 4100 DC (3) P&H 2800 (2) O&K RH200 (1) Additional P&H 4100 DC in 2017 Production drills (10) PV271 (2) Additional PV271’s in 2017

Mine Fleet

(9)

CV1

Total cost: US$890 million

24-month schedule

Construction started in

4Q 2004

The first line started

operations in 4Q 2006

The second line started

operations in 1Q 2007

Full capacity production

achieved in June 2007

CV2

Total cost: US$4.5 billion

EISA was approved on 2012 Construction started in March

2013

Produced first copper

concentrate in September 2015

Full capacity production

achieved in December 2015

Inauguration in May 2016

(10)
(11)

(2) 60 X 113 Gyratory Primary Crushers (FLS)

(12)

CV2 – Secondary & Tertiary Crushing

(8) Cone Crushers – Metso MP 1250

(8) Polysius High Pressure Grinding Rolls HPGR 2.4M Dia X 1.6M Rolls (5 MW)

(13)

13

CV2 – Ball Mills

(6) Polysius Ball Mills 8.2M dia X 14.6M 22 MW each

(14)

CV2 – Flotation

Flotation Cells 50 X 130 M3

(15)
(16)
(17)

Water – Our Priority

- Collect water in Arequipa´s highlands with regulated dam system

- Build a potable water treatment plant, which is one of the most modern in South America (PWTP II)

- It benefits 300,000 people currently and could benefit 750,000 in the future

- Investment of US$120 million

- Upgrade the potable and sewage water network in order to assure the water resource can reach homes

- Investment of US$40 million

- Decontaminate the Chili River with a

wastewater treatment plant 17

Arequipa is located in a desert (Atacama desert)

The Peruvian government, authorities of Arequipa, and Cerro Verde

worked together to plan and ensure the hydric resource for future generations

(18)

The Chili River is the most important water source in Arerquipa; it is the key factor for economic activities such as agriculture, commerce, tourism and mining

It was used to receive all waste water produced in the city

SEDAPAR and Cerro Verde worked together to improve the quality of the Chili River through the construction of a wastewater treatment plant (WWTP) The WWTP was financed totally by

Cerro Verde

Operation and maintenance to be the responsibility of Cerro Verde for a minimum of the first two years

Investment to construct the WWTP was approximately US$500 million.

Waste Water Treatment Plant

The Chili River is key for life in Arequipa

(19)

19

In exchange for financing the WWTP, Cerro

Verde uses up to 1 m3/sec of treated water for

the expansion of its operations

The rest of the treated water is returned to the Chili River

The WWTP benefits all of Arequipa:

- Health – clean water that meets national and international standards

- Agriculture – fresh water for irrigation

- Tourism – quality recreational areas are being rejuvenated

- Environment – positive impact on flora and fauna

- Great sustainable development project that completes the virtuous circle of water

Great example of cooperation and joint team

work between authorities and private companies

Enlozada WWTP

(20)

Transport of sealed 15

metric ton containers

Transport in trucks from

CV to La Joya transfer station, approx. 52 km

Transport in train from

La Joya to Matarani, approx. 55 km

Transporting Concentrate

to Matarani Port

(21)
(22)
(23)

Copper in Concentrates

1.04 billion lbs Cu in

2.0 million metric tons of copper concentrate

Copper Cathodes

110 million lbs Cu

Molybdenum in Concentrates

21 million lbs Mo in

17,500 metric tons of concentrate

(24)

24 At Cerro Verde, we contribute to the sustainable

development of Arequipa, through the integration of economic growth, environmental protection, social progress and the effective governance of our region.

(25)

Community Relations

Education

Training

Health & Nutrition

(26)

Community Relations

Small Businesses Infrastructure

(27)

Santísimo Sacramento Chapel La Compañía Church

Community Relations

(28)

Workforce

Approximately 4,100 employees and 1,800 contractors at Cerro Verde

Orgullo nos Une “Pride Unites Us”

(29)
(30)

References

Related documents

In the cases of Italy, Germany and France there seems to be no clear monetary reaction, although in Germany there are some signs that monetary policy tends to o ff set fi scal

The identification of QI triggered an explosion of results in distributed optimal controller synthesis [ 34 , 35 , 36 , 37 , 38 , 39 , 40 , 41 , 42 ] – these results showed that

This steel is produced by a special melting and refining technique in order to give mechanical properties with maximum isotropy and is certified to meet a minimum average

Dr Lolekha informed that a multi-country working group, led by Indonesia Medical Council, to work on the core competencies of medical graduates in the South-East Asia Region was

The analysis performed points out that a local voltage control based on Law B is the most incisive on the voltage profile, but at the same time it involves an higher amount

If the parent has not submitted completed forms after that date when the child was scheduled to start attendance, the parent will be responsible for payment of fees in order

Fig 1. Biophysics of transcription regulation. A) TFs bind to regulatory DNA regions (promoters and enhancers) in a sequence-specific manner to regulate transcriptional gene

Thus, if government investment increases and defense spending falls dollar for dollar, consumption, labor, and output are not affected in the short run, but in the long run,