• No results found

Newsletter March 2014

N/A
N/A
Protected

Academic year: 2021

Share "Newsletter March 2014"

Copied!
7
0
0

Loading.... (view fulltext now)

Full text

(1)

Dear customers and business friends

This year starts off with some news about aerodyn, following a jubilee last year for aerodyn. Thirty years have passed since its foundation in 1983, years which have seen many changes in the company and the wind energy sector. Look forward to the book, available soon, that relates this story in word and pictures. Management has positioned itself anew to carry this story on into the future. Markus Rees and Rainer Osthorst, both with aerodyn for more than 20 years, have taken over management.

The Hyosung 5 MW turbine is the third large offshore wind turbine developed by aerodyn and is now put into service. Two further new turbines for other clients will follow within this year. Existing turbine types of various clients also receive our attention as we are presently in the process of increasing rotor sizes, presenting cost optimizations and re-issuing certifications. We have extended our services in the field of design and calculation and now offer our clients analysis of aeroelastic behavior,

simulation of typhoon loads and fracture mechanics analyses. Rainer Osthorst

General Manager

To be continued on page 2

aerodyn receives A-design assessment for aerodynBlade ae5.0-68

www.aerodyn.de ·

©

aerodyn Energiesysteme GmbH

(2)

The aeroMaster 5.0 offshore wind turbine developed by aerodyn was fully installed on 24 February 2014. Hyosung Corporation, the Korean power and industrial systems company and wind turbine manufacturer, installed the prototype on Jeju Island south of the Korean peninsula. The wind turbine with a rotor diameter of 139 m and a rated power of 5 MW has a high-speed drive train with a medium voltage generator. The turbine was developed incorporating the well-proven aeroMaster drive train concept. The aeroMaster 5.0 is already the third 5 MW offshore wind turbine from aerodyn. A second prototype of the 5 MW turbine will be installed during the course of this year by a Chinese manufacturer. Close cooperation between aerodyn and its customers in South Korea and China allowed for successful completion of the development project within three years from first studies to installation of the prototype. The well-prepared Hyosung team managed the straightforward installation, even though work had been delayed due to historical findings in a cave at the site and unfavourable weather conditions.

Hyosung Corporation installs aeroMaster 5.0 prototype on Jeju Island, Korea

The 68 m long ae5.0-68.0 rotor blade is the newest member of the successful aerodynBlade license blade family. It is designed for a 5 MW turbine in a TC2B environment.

At the end of 2013 the certification body issued the Design Assessment Type A – after completing a thorough assessment of the design documentation and analysis of the required blade tests.

The first blade set as well as the test blade were manufactured at a renowned blade manufacturer in China and transported by ship to Korea. In the last newsletter we already reported about the successful blade test. Installation of the blades and the rotor was the last step in the aeroMaster 5.0 installation.

(3)

One recent innovation presented by aerodyn is the helipad for its 5 MW aeroMaster offshore turbine. Due to severe maritime weather conditions offshore turbines are often hard to reach for maintenance personnel and material. Boat access may be limited by wave heights and strong currents while helicopter access is still possible. Nowadays many offshore turbines possess a “Helicopter Hoist Platform”. This means a small platform on top of the turbine nacelle, onto which personnel and material can be roped down from the hovering helicopter.

The helipad innovation is a platform mounted on the rear end of the nacelle that enables the helicopter to land short-time. This way quicker and, above all, safer access to the turbine is provided, also for personnel without special training. Furthermore loading and unloading of tools and maintenance material becomes safer and easier. The helipad approach has many advantages for the safety concept of the turbine.

Also the prototype of another aerodyn design, the SCD 6.0 MW, will be set up in 2014 – equipped with a helipad.

Helipad for offshore aeroMaster 5.0 turbine

aerodyn uses methods typically used in the field of rotor dynamics and aerospace engineering.

These include the full aeroelastic linking of the rotor blades as well as the effects of rotation on the vibrational modes of the whole turbine.

The aim is to determine the stability of these vibrational modes within the whole range of operational states and to exclude the risk of destructive instabilities. Such instabilities are motions which lead to a rapid transfer of energy from the air stream to the blade structure, known as flutter or divergence. In contrast to the commonly used time domain analyses, these frequency domain methods provide a more profound understanding of the physical phenomena.

The risk of flutter is known to arise with increasing blade length, weight and flexibility.

Stability simulation

Page 3 of 7

(4)

The aeroMaster 2.5 turbine which has 3 licensees worldwide is in a permanent process of further development and of qualification of new suppliers. Besides the aerodynBlades with diameters up to 118 m, now two different blades manufactured in China with 110 m diameter based on non-aerodyn designs have been qualified for use on the aeroMaster 2.5 MW turbine.

The new blades are:

Sinoma 53.8 TMT 53.8

Both blades are 53.8 m long and have a 2.3 m blade root diameter. The turbine version with 110 m diameter has been designed for TC3A wind conditions. The blades can be purchased in China at an attractive price level.

Further information about Sinoma and TMT blades:

http://www.trp.com.cn

http://www.sinomablade.com.cn/En/

aeroMaster 2.5 turbine now available in two 110 m rotor diameter versions

As of 1st January 2014, engineers Markus Rees and Rainer Osthorst are Managing Directors of aerodyn Energiesysteme GmbH. The former Managing Director Sönke Siegfriedsen will remain a partner in the company.

Markus Rees has been working at aerodyn in the field of turbine simulation and load calculation for 20 years, the management of which he assumed in the course of these years. As project manager, he was in charge of the development of new turbines and has been responsible for marketing for many years together with the former Managing Director Sönke Siegfriedsen. Markus Rees has been a partner and authorized signatory in aerodyn Energiesysteme for eight years.

Rainer Osthorst by now looks back on more than 20 years of active life at aerodyn. His professional expertise focuses on the finite element calculations of rotor blades and cast iron components. He is also qualified as a business economist and controller and has been responsible for finances and organization for more than 10 years. Rainer Osthorst has been a partner and authorized signatory in aerodyn Energiesysteme for eight years.

(5)

In an average year, around 80 tropical cyclones are observed in the tropical and subtropical latitudes. About 35% of them occur in the Northwest Pacific. Tropical cyclones endanger man and material goods, especially during the summer and late summer. Water masses striking land and rainfall of an intensity almost unknown in our temperate zones as well as extreme wind speeds that outdo European gales by far cause extensive damage. For these reasons, great interest is shown in understanding more about the physical phenomena in a tropical cyclone.

In China in particular, production of electrical energy with wind turbines has reached economic dynamics that for some years has been putting local European development way in the shade. However, continuation of this success demands wind turbines whose design can withstand a tropical cyclone. Already three years ago, aerodyn, in close cooperation with a leading German wind energy research institute, started working on a wind model for tropical cyclones.

The beginning of the project was dedicated to collecting, examining and processing high-resolution measured data on tropical cyclones of the last few years from Asia and the Pacific. Based on these data, risk maps on the frequency of a tropical cyclone in Asia were first created. These maps are the basis for estimation of the typhoon class at the planned turbine site.

In a second step, a model was developed based on a non-Gaussian wind distribution that is capable of depicting turbulence and an increased occurrence of peak winds. The model generates high-resolution turbulence time series that can be used directly for load calculation.

The entire development phase of the wind model was supervised by Germanischer Lloyd to ensure the best possible conformity with directives. Germanischer Lloyd has confirmed that the model can be used for calculation of a tropical cyclone.

Typhoon simulation software tool

aerodyn Energiesysteme is the leading engineering firm for the design of innovative wind turbines in line with market requirements. For 30 years, aerodyn has been designing rotor blades, control systems, drive trains and complete wind turbines. An experienced team of engineers is ready to assist our clients, from the concept to detailed design right up to commissioning and support during series production. More than 10% of all systems installed worldwide to date were developed by aerodyn Energiesysteme.

We look forward to implementing innovations with you in the future as well.

Page 5 of 7

(6)

In 2013 one of the pioneering enterprises in the wind sector celebrated its 30th jubilee. In such a long history there are certainly a lot of stories and anecdotes to tell.

Please look forward to first-hand accounts of thirty years of business in the wind sector, ranging from the pioneering days of garage-tinkered prototypes to today’s optimized multi-megawatt series turbines.

Mr. Sönke Siegfriedsen, one of the veterans of wind energy, is currently completing the last lines of this literary work.

Upcoming new book: aerodyn’s first thirty years

In January 2014 aerodyn participated in the World Future Energy Summit 2014 in Abu Dhabi.

This event has steadily grown during recent years and in 2014 the fair and the congress counted over 28,000 professional visitors. Our aerodyn booth inside the German pavilion was much frequented by people from all branches of the wind business. We had many inspiring and interesting discussions with potential customers.

The new 2 MW low-wind version of our aeroMaster turbine with a 120 m rotor received particular interest.

(7)

Imprint

Publisher:

aerodyn Energiesysteme GmbH

Provianthausstraße 9 · 24758 Rendsburg, Germany phone: +49 (0) 4331 1275 0 · fax: +49 (0) 4331 1275 55 email: [email protected] · www.aerodyn.de

Responsible for the content: Contact: Peter Krämer Published: every six months Layout: bartsch design GmbH

aerodyn at exhibitions and conferences

aerodyn will attend with a booth at the following exhibitions this year:

Brazil Windpower 2014 – Rio de Janeiro, Brazil

26–28 August 2014

WindEnergy Hamburg 2014 – Hamburg, Germany

23–26 September 2014

China Wind Power 2014 – Beijing, China

22–24 October 2014

aerodyn represented in Ukraine

Since early February 2014 aerodyn is represented in Ukraine by a consultant:

Mr. Vadym Novikov Address: 22/18 Narodna Street 03110 Kiev Ukraine фізичною особою підприємцем Вадимом Новіковим, який мешкає за адресою вул. Народна 22/18, Київ 03110, Україна Email: [email protected] Telephone: +38 (0) 442751623 Mobile: +38 (0) 674015797 +38 (0) 503313307

Mr. Novikov has already several years of experience in the wind turbine business. We are happy to have found an experienced person like Mr. Novikov to represent us.

References

Related documents

Using the functionality and data contained within the Kronos Workforce Analytics application, Workforce Analytics plug-ins provide analysis and guided decisions so your team

established by Elliott. It retraces .618 of the market decline from the 1928 and 1930 highs and, within it, the extended fifth wave travels 1.618 times the distance of the

The class will cover both important theoretical topics and discuss important policies issues relating to entrepreneurial choices.. The course is roughly divided into three parts,

Table 5.7: Mean and standard deviation of blood pressure measurements in three days test and re-test measurements in healthy subjects. P≤0.05 vs visit one using Tukey post hoc test,

Response Percent Response Count Yes 74.7% 74 No 25.3% 25 answered question 99 skipped question

Although the Community of Inquiry framework presents the online learning experience as a relationship between cognitive presence, social presence, and teaching presence, this

It has shown that reading and designing comics can teach visual literacy techniques and could be a potential tool for teaching visuals, multimodality, visual rhetoric,