\\vboxsrv\conversion_tmp\scratch_1\[153888056.xls.ms_office.xls]BQ5
Bill No. 1 - General Items
Item
Description
Quantity
Unit
Rate
Amount
RM
RM
1.0
Preliminaries
Allow for the provision of
-a) Performance Bond amounting to 5% of
Lump Sum
3,000.00
3,000.00
Contract Sum
b) All Insurance in accordance to Preamble to
Lump Sum
5,000.00
5,000.00
Bill of Quantity
1.1
Contractor's Superintendence
Provide all necessary superintendence during
Lump Sum
15,000.00
15,000.00
the execution of the works including
appointment of a site agent
1.2
Setting out and survey works
Allow for the services of Licensed Surveyor,
Lump Sum
5,000.00
5,000.00
approved by the S.O. for setting out of the
works and other survey works in accordance
with the Specification
1.3
Office Accomodation for Superintending
Office and his staff
Provide and maintain a site office for the S.O.'s
Lump Sum
-supervision staff inclusive of furniture and
fitting and all in accordance with drawings and
specification.
1.4
Contractor's Office and Accommodation
Provide and maintain Contractor's office, store,
Lump Sum
5,000.00
5,000.00
workshop, workmen's accommodation necessary
fencing and their removal or reinstatement on
completion of the Works
1.5
Services
a) Allow for the provision or water, lighting power
Lump Sum
1,500.00
1,500.00
for the works and for S.O.'s and Contractor's
offices and accommodation of the contractor's
staff
b) Allow for the provision of water, lighting and
Lump Sum
-power for office accommodation for
Superintending Officer and his staff
c) Allow for the provision of First Aid Box, Helmet,
Lump Sum
500.00
500.00
Boots and all necessary services, guards,
watching and pay all charges as required.
1.6
Telephone for S.O.'s Staff
Allow for the installation of a handphone system
Lump Sum
1,000.00
1,000.00
for the exclusive use of S.O.'s representative
and payment for all monthly charges including
the bills for the telephone calls
1.7
Sign Boards
Supply, erect and maintain sign boards in
Lump Sum
1,500.00
1,500.00
accordance with the Specification and
drawing
Bill No. 1 - General Items (Cont'd)
Item
Description
Quantity
Unit
Rate
Amount
RM
RM
Brought Forward :
37,500.00
1.8
Progress Photographs
Provide colour progress photographs to be
Lump Sum
1,000.00
1,000.00
taken when directed by the S.O. Each set shall
consist of eight colour prints of postcard size.
6 sets of the photograph shall be submitted at
forthnightly interval.
1.9
Temporary Works
Allow for the provision and maintenance of all
Lump Sum
5,000.00
5,000.00
temporary works including temporary drains,
access road for both contractors and other
contractors, temporary diversion and all others
as specified by S.O.'s or as shown in the drawing.
1.10
Plants
Allow for mobilisation and demobilisation
Lump Sum
15,000.00
15,000.00
of all plants
1.11
Working Hours for S.O.'s Supervisory's Staff
Allow for the compliance of working hours for
Lump Sum
1,000.00
1,000.00
Superintending Officer's site representatives
1.12
Clearing up site
Allow for clearing up site during progress and on
Lump Sum
5,000.00
5,000.00
completion of works
1.13
As-Built Drawings
Allow for the preparation of as built drawings
with Engineer and Licensed Surveyor
Lump Sum
1,500.00
1,500.00
endorsement and all attendance of the
Superintending Officer to verify the accuracy of
the drawings.
The as-built drawings shall be prepared using
Autocad or compatible computer software.
3 sets of paper prints and one set of diskette
containing the file shall be submitted to the
Engineer.
1.14
Traffic Control
Allow for the provision and maintenance of temporary
Lump Sum
3,000.00
3,000.00
road diversion, all traffic or warning sign, signals,
barricades, road barriers and blinking lamps as
compliance with requirement of JKR and other
relevant authorities in connection with the works
1.15
Co-ordination
Allow for co-ordination with other contractors
Lump Sum
2,000.00
3,000.00
working on the site
1.16
Compliance to Specification and Conditions of
Contract
Allow for the compliance of Specification and
Lump Sum
500.00
500.00
conditions of Contract which are not specifically
mentioned in the Bill
Item Description Quantity Unit Rate Amount
RM RM
Precast Drain
2.1 Excavate and construct precast drain (brickwall to be paid separately) including lean concrete, mesh fabric, Grade 20 concrete bedding with X-distance as shown on drawing , jointing and stepping where required .
(a) 300mm half round drain 2,491 lin. m. 80.00 199,280.00
(b) 450mm half round drain R.O lin. m. 120.00
Brickwork
2.2 Construct cement sand brickwall to sides of half round drain inclusive of R.C. Struts, crusher run, weep holes complete with geotextile wrapping to the thickness as shown on the drawings, cement mortar rendering and backfilling complete as shown on the drawing.
(a) 225mm thick 3,186 sq.m. 47.00 149,742.00
(b) 345mm thick 390 sq.m. 65.00 25,350.00
(c) 450mm thick 55 sq.m. 85.00 4,675.00
Pipe Culvert
2.3 Supply and construct precast pipe culvert Class "Y" to road crossing including spigot, socket, rubber ring and all necessary joint. Rate to include excavation, lean concrete, Grade 20 concrete bedding and surround, mesh fabric reinforcement, jointing and backfilling complete as shown on drawings : (Bakau piling to be paid separately)
(a) 750 mm dia. (with concrete surround) 34 lin.m 260.00 8,840.00 (b) 900 mm dia. (with concrete surround) R.O lin.m 320.00
(c) 1050 mm dia. (with concrete surround) R.O lin.m 395.00 Culvert Sump For Pipe Culvert
2.4 Excavate, supply and construct cement sand brick sump at inlet and outlet of culvert to the thickness as shown in drawings. Rate to include lean concrete, Grade 20 concrete bedding, mesh fabric reinforcement, cement rendering, R.C strut, stainless steel steps and M.S grating complete as shown on drawing and excavation stabilisation measure during construction include sheet piling. (Bakau piling to be paid seperately). (a) Internal size 1050mm x 900mm, depth
not exceeding 1.5m 5 no. 850.00 4,250.00
(b) Internal size 1050mm x 900mm, depth exceeding
1.5m, not exceeding 2.0m 1 no. 1,100.00 1,100.00
(c) Internal size 1200mm x 900mm, depth exceeding
1.5m, not exceeding 2.0m R.O no. 1,350.00
(d) Internal size 1200mm x 900mm, depth exceeding
2m, not exceeding 2.5m R.O no. 1,600.00
(e) Internal size 1350mm x 900mm, depth exceeding
2m, not exceeding 2.5m R.O no. 1,850.00
House Entrance Slab
2.5 Excavate, supply and construct house entrance slab over the drain and headwall complete as detailed as shown in the drawing.
(a) 3600 mm x 1050mm x 100mm thick R.O no. 350.00
(b) 8720 mm x 1050mm x 100mm thick R.O no. 670.00
Total Carried Forward 393,237.00
Bill No. 2 - Major Drainage Works & Internal Drainage System
Item Description Quantity Unit Rate Amount
RM RM
Brought Forward 393,237.00
2.5 Excavate and construct 230 mm high x 230 mm thick brickwork head wall to sides of entrance slab inclusive of cement mortar plastering complete
as shown on the drawing. R.O no. 35.00
M.S Grating
2.6 Supply and lay 600mm x 600mm m.s grating to house entrance slab complete as detailed
as shown in the drawing. R.O no. 95.00
Slab Culvert
2.70 Supply and construct 100mm thk. grade 20 concrete slab
culvert over drain completed as shown on drawing R.O no. 350.00 PC slab over drain
2.80 Supply and install 750 x 900 mm (w x L) grade 20 precast
concrete slab over drain at backlane for each individual house R.O no. 38.00 completed as shown on drawing
Bakau Piling
2.12 (a) Mobilisation, transport and set up all necessary bakau piling plant and equipment at sites, dismantle and
remove them on completion of all bakau piling work 1 Lump Sum 1,000.00 1,000.00 (b) Supply, handle, pitch and drive 100mm diameter
bakau piles (initial/ extension) including cutting off pile
head 4,900 lin.m 2.50 12,250.00
(c) Supply and fix 100mm dia. M.S Sleeve for jointing bakau piles.490 no. 8.00 3,920.00 M.S Sleve shall be of size 450mm long x 3mm thk.
Total Carried to Summary 410,407.00
Bill No. 2 - Major Drainage Works & Internal Drainage System (Con't)
Item
Description
Quantity
Unit
Rate
Amount
RM
RM
Preparation of Pavement Formation
3.1
Excavate and shape the road subgrade to the correct
alignment, levels and gradients as shown on the
drawings, including boxing out and consolidating by a
10 ton smooth-wheeled roller ; part return of
excavated material to shoulder and medium including
fill-in, ram and compact to the required formation level
and gradient; removal of excess excavated material
to filling ground designated by S.O. including filling in,
ram and compaction.
15,301
sq.m.
2.50
38,252.50Sub-Base
3.2
Supply, spread and compact sand to the 50mm
compacted thickness as shown in the drawings
ram and compaction.
15,301
sq.m.
2.50
38,252.50Road-Base
3.3
Supply, spread and compact approved crushed
rock road base to the compacted thickness as
shown in the drawings
(a) 225 mm thick
15,301
sq.m.
11.20
171,371.20Asphaltic Concrete Surfacing
3.4
Supply and apply emulsified bituminous prime coat to
surface of crushed rock road base
15,301
sq.m.
0.70
10,710.703.5
Supply and apply bituminous tack coat to binder
course surface prior to laying of wearing course
14,919
sq.m.
0.70
10,443.303.6
Supply , lay and compact asphaltic concrete
surfacing to the compacted thickness as shown in
the drawing
(a) wearing course - 50 mm thick
14,919
sq.m.
12.50
186,487.50(b) binder course - 60 mm thick
14,919
sq.m.
13.50
201,406.50Turfing
3.7
Supply and lay spot turfing to road median, road
shoulder and at location as specified in the drawing,
including 50mm of selected topsoil, pegging, watering
3,963
sq.m.
2.50
9,907.50and tendering to ensure growth of turf planted.
Pavement Marking and Road Sign
3.8
Supply and install "BERHENTI" sign and 300mm
wide stop lines pavement marking with Thermoplastic
paint at all junction to JKR standard.
11
no.
450.00
4,950.00Total Carried Forward
671,781.70
Bill No. 3 - Road Work
Item
Description
Quantity
Unit
Rate
Amount
RM
RM
Brought Forward :
671,781.70
3.9
To supply and install all road signage complete at all the
road junction governed under area as
shown on the drawings to JKR satisfaction.
2
no.
450.00
900.003.10
To mark the pavement of the junction, accerelation and
deceleration lane at all the road junction governed under
Phase 1 as shown in the drawings or as directed by S.O.
and to JKR satisfaction.
(a) 100mm wide broken centre lines
1,759
lin.m
2.50
4,397.50(b) 150mm wide pavement edge lines
3,449
lin.m
3.50
12,071.50(d) Straight through direction arrow
5
no.
80.00
400.00(e) Left and right turn direction arrow
R.O
no.
100.00
(g) Straight through, left and right turn direction arrow
1
no.
120.00
120.00(f) Left or right turn direction arrow
R.O
no.
90.00
Kerb
3.11
Excavate, supply and construct precast kerb Type
M1 including 1:3:6 concrete base and haunching,
reinforcement and formwork, where required and
painting complete as shown on drawing
225
lin.m
27.00
6,061.50Scupper Drain
3.13
Excavate, supply and lay 225mm dia earthened
ware pipe including 100mm thick 1:3:6 concrete
foundation, backfilling to required level complete
as shown in the drawing
178
lin.m.
38.00
6,764.00Guardrail
3.14
Supply and construct new G.I gaurd rail next to main drain
200
lin.m.
105.00
21,000.00at location as shown in the drawing
Replacement of Unsuitable Material
3.15
Excavate and remove from site unsuitable material below
R.O
m
330.00
road formation level up to 600 mm deep and replace with
compacted suitable material from contractor own source
Total Carried To Summary
723,496.20
Bill No. 3 - Road Work (Con't)
Bill No. 4 - Sewerage Reticulation
Item Description Quantity Unit Rate Amount
RM RM
Trench Excavation
4.1 (i) Trench excavation of sewer pipe for depth exceeding 1.5 m but not exceeding 2.0 m including part backfill on completion, compaction, removal of surplus, shoring and/or sheet pile where
necessary:-(a) 225mm dia V.C. pipe 601 lin.m 20.00 12,026.00
(b) 300mm dia V.C. pipe R.O lin.m 20.00
(ii) -ditto- exceeding 2.0m but not exceeding 3.0m
(a) 225mm dia V.C. pipe 596 lin.m 26.00 15,485.60
(b) 300mm dia V.C. pipe 105 lin.m 20.00 2,104.00
(iii) -ditto- exceeding 3.0m but not exceeding 4.0m
(a) 225mm dia V.C. pipe 224 lin.m 55.00 12,325.50
(b) 300mm dia V.C. pipe 113 lin.m 20.00 2,256.00
(iv) -ditto- exceeding 3.0m but not exceeding 4.0m
(a) 225mm dia D.I.(Ductile Iron). Pipe R.O lin.m 80.00
(b) 300mm dia V.C. pipe 211 lin.m 20.00 4,220.00
4.2 Extra over item 4.1 for trench excavation in mettalled road. R.O lin.m 75.00 Rate to include cutting of mettalled pavement with diamond
cutter, reinstatement of mettalled road with 50mm thick sand blanket, 300mm thick crusher run, 50mm thick binder course and 60mm thick wearing coarse.
4.3 Ditto ~ for trench excavation under existing road side drains. R.O Lump Sum 2,000.00 Rate to include reinstatement of road side drain.
4.4 Ditto ~ for trench excavation under existing main drains. R.O Lump Sum 1,000.00 Rate to include reinstatement of pudu cut main drain.
Pipe Laying Notes :
-All sewer with diameter less than 450mm shall be vitrified clay pipe (VCP) with flexible joint and comply with M.S 881 Part 1 1991, M.S. 1061;1986. Foundation base of sewer must be compacted with crushed run.
All sewer with diameter 450mm and above shall be centrifugal spun reinforced concrete pipe (RCP) of class Z. All RCP shall be internally line with 12mm thick high alumina cement mortar. All pipe joints with flexible rubble rings joints.
4.5 Supply and lay sewer pipes complete including jointing, concrete/granular bedding, haunching all as specified
(a) 225mm dia V.C. pipe (Class A bedding) 1,421 lin.m 105.00 149,205.00 (b) 300mm dia V.C. pipe (Class A bedding) 429 lin.m 100.00 42,900.00
4.6 Connection to Existing Mainhole
Allow for connection of VCP pipe to existing manhole. Lump Sum 1,000.00 1,000.00 Rate to include reinstatement and make good of
existing manhole.
Carried Forward 241,522.10
Bill No. 4 - Sewerage Reticulation
Item Description Quantity Unit Rate Amount
RM RM
Brought Forward : 241,522.10
Precast Concrete Manhole
4.7 Excavate, supply and construct precast concrete manholes complete including lean concrete, Grade 20 cast in-situ concrete ring base, building in pipes, benching, precast r.c. chamber, Grade 20 mass concrete surround, formwork, stainless steel steps, precast r.c. cover slab complete as detailed and shoring and/or sheet pile where necessary during construction.
(manhole cover and frames to be paid separately) (i) Manhole type 1 with chamber diameter 1200mm
(for sewer pipe 225mm & 300mm)
(a) below ground level to invert level not exceeding 2.0m 14 no 2,000.00 28,000.00 (b) ditto exceeding 2.0m but not exceeding 3.0m 11 no 2,800.00 30,800.00 (c) ditto exceeding 3.0m but not exceeding 4.0m 5 no 3,300.00 16,500.00 (d) ditto exceeding 4.0m but not exceeding 5.0m 4 no 3,301.00 13,204.00 4.8 Supply and fix the following for manhole
backdrop including excavation:
(a) D.I. Tee 225mm x 225mm dia including N/A no 150.00 M.S. cover plate
(c) 90 degree medium D.I. Bend 225mm dia. N/A no 20.00
(e) D.I. Straights 225mm dia N/A lin.m 60.00
(g) concrete grade 15 mix including formwork N/A cu.m 70.00
4.9 Supply and fix Heavy Duty ductile iron manhole 34 no 440.00 14,960.00 covers and frames as specified
Carried Forward 344,986.10
Bill No. 4 - Sewerage Reticulation
Item Description Quantity Unit Rate Amount
RM RM
Brought Forward : 344,986.10
Testing of Sewer Line
4.6 (a) Carry out test for straightness and obstruction on all 1 Lump Sum 2,000.00 2,000.00 sewer lines as specified in Clause 4.3(a) of Section 5 of
Specification
(b) Carry out water testing on all sewer lines as specified in 1 Lump Sum 2,000.00 2,000.00 Clause 4.3(b) of Section 5 of Specification
(c) Carry out air testing on all sewer lines as specified in N/A Clause 4.3(c) of Section 5 of Specification
(d) Carry out C.C.T.V. Test and submission of test report for sewer lines as directed by S.O. representative or IWK/JPP
(i) 225mm dia. V.C. pipe 278 lin.m 25.00 6,937.50
4.7 Excavate beyond foundation level as directed by the
S.O. and backfill with selected material (Provisional) Rate only cu.m Service Connection
4.8 (a) Excavate, supply and lay 150mm dia. V.C. service pipe in class A bedding, 225mm dia. x 150mm dia. v.c. 'Y' junction including concrete thrust block, 150mm dia. x 45 degree v.c. short
bend, end cap at location as directed by S.O. (Provisional)
complete as shown on the drawings 91 no 450.00 40,950.00
(b) Supply and install Marker complete as shown on the Rate Only no 50.00 drawings
(c) To excavate, supply and construct last manhole within Rate Only no housing lot at the depth of 1.35m as shown on the
drawings
d) To supply and install end cap and install marker to D.I pipe 1 L.s 165.00 for future connection to last manhole of P.S.No.4
IWK Inspection
4.9 Allow for liasing with IWK/JPP for interim inspection 1 Lump Sum 4,000.00 4,000.00 during construction and final inspection for
handing over
Total Carried To Summary 400,873.60
Bill No. 5 - Water Reticulation
Item Description Quantity Unit Rate Amount
RM RM
TRENCH EXCAVATION
Excavate in all material below completed platform level Trench excavation shall be measured once only to the full depth of the trench.
5.1 Excavation trench not exceeding 1.5 m deep for water mains. Rate to include backfilling,compaction, dewatering, timbering and removal of surplus excavated material for :
(a) 150mm dia. pipe 2,005 lin.m 8.00 16,040.00
(b) 200mm dia. pipe R.O lin.m 10.00
(c) 300mm dia. pipe R.O lin.m 15.00
(d) 450mm dia. pipe 356 lin.m 20.00 7,120.00
5.2 -ditto- exceeding 1.5m
(a) 150mm dia pipe R.O lin.m 15.00
(b) 200mm dia. pipe R.O lin.m 20.00
(c) 300mm dia. pipe R.O lin.m 30.00
(d) 450mm dia. pipe R.O lin.m 40.00
5.3 Remove unsuitable materials beyond nominal 10 cu.m 15.00 150.00
limits of trench excavations as orded by the S.O. and backfill with selected materials; rate to include disposal material to spoil pit as directed (provisional)
5.4 Supply, fill, spread and compact approved sand 109 cu.m 35.00 3,815.00 in pipe trenches and at road crossing. Rate to
include transportation of sand.
5.5 Import selected earth from borrow site, rate to 10 cu.m 15.00 150.00 include excavation, backfilling, ramming and
compaction (provisional)
PIPE LAYING Notes:
(a) All spigot and socket ended pipes and specials shall be suitable for internally & externally welded slip joints
(b) All steel pipe shall be concrete lined internally and bitumen coated externally. All exposed steel pipes and specials shall be externally painted. (c) The rate for joining pipe, special or fitting shall be deemed to include the supply and installation of all joint coupling or mechanical coupling and jointing material complete
(d) All flanges shall be suitable for a rating of 16 bars unless specified otherwise
Total Carried To Forward 27,275.00
Bill No. 5 - Water Reticulation
Item Description Quantity Unit Rate Amount
RM RM
Brought Forward 27,275.00
(e) The thickness of steel shells and concrete lining shall be as stated in the specifications (f) Plain ended pipes shall be suitable for
mechanical coupling or internally and externally welded collar joints
(g) all pipe diameters mentioned refer to nominal diameter.
P/E means plain ended B/F means both end flanged
F/PE means one flanged end and one plain ended 5.6 Supply, lay and join spigot and socket ended
standard or sized steel water pipe; Rate to include loading, transport, handle, repair lining and coating where required, cutting, internally & externally welding and protection to welded joints and painting as specified.
(a) 150mm dia. pipe 2,005 lin.m 88.00 176,440.00
(b) 200mm dia. pipe R.O lin.m 126.00
(b) 300mm dia. pipe R.O lin.m 200.00
(d) 450mm dia. pipe 356 lin.m 300.00 106,800.00
Culvert Crossing
5.7 Supply, lay and join steel pipe and special for crossing over culvert or sump rate to include 1 No. flanged off-take tee for air valve connection, welding, jointing 4 nos. steel gusseted bends and 75mm x 6mm thk. M.S. steel strap as shown on drawing
-(a) 150mm dia. pipe 7 no 2,800.00 19,600.00
STEEL SPECIALS
Supply and fix steel specials P/E. Rate to include VA Dresser joint or mechanical coupling and jointing material complete
5.8 150mm dia. P/E bend
(a) up to 30 degree 11 no 210.00 2,310.00
(b) more than 60 degree 7 no 220.00 1,540.00
5.9 Tee barrel plain ended and with flanged branch
(a) 150mm x 150mm dia 12 no 240.00 2,880.00
5.10 Hydrant tee, barrel plain ended with flanged concentric branch
(a) 150mm x 100mm dia 11 no 210.00 2,310.00
TAPERS
5.11 Supply and fix cross P/E
(a) 200mm x 150mm 2 no 450.00 900.00
(b) 300mm x 200 mm R.O no 900.00
Total Carried Forward 340,055.00
Bill No. 5 - Water Reticulation
Item Description Quantity Unit Rate Amount
RM RM
Brought Forward : 340,055.00
END CAPS
5.12 Supply and fix end caps
(a) 150mm dia 1 no 220.00 220.00
(b) 200mm dia R.O no 253.00
(c) 300mm dia R.O no 710.00
(d) 450mm dia 1 no 850.00 850.00
Short piece
5.13 short piece x 600mm long P/E for sluice valve connection
(a) 150mm dia. 8 no. 52.80 422.40
(b) 200mm dia. Rate Only no. 77.00
(c) 300mm dia. Rate Only no. 132.00
(d) 450mm dia 2 no 250.00 500.00
5.14 600mm long flanged and plain ended short piece for sluice valve connection
(a) 150mm dia. 8 no. 660.00 5,280.00
(b) 200mm dia. Rate Only no. 1,210.00
(c) 300mm dia. Rate Only no. 1,870.00
(d) 450mm dia 2 no 2,000.00 4,000.00
Flanged Adaptor
5.15 Supply and fix flanged adaptor for sluice valve connection
(a) 150mm dia. 8 no. 300.00 2,400.00
(b) 200mm dia. Rate Only no. 500.00
(c) 300mm dia. Rate Only no. 800.00
(d) 450mm dia 2 no 900.00 1,800.00
Valves
Supply and fix cast iron fittings and specials for air valve, sluive valve and Hydrant. Rate to include mechanical coupling and jointing material 5.16 Air Valves
a) 50mm dia. double orifice air valve complete
with isolating stopcock 7 no 650.00 4,550.00
Sluice Valves
5.17 a) 150mm dia. double flanged sluice valves
suitable for a working pressure of 16 bars 8 no 700.00 5,600.00
b) 200mm dia. ditto - Rate Only no 960.00
c) 300mm dia. ditto - Rate Only no 2,000.00
(d) 450mm dia 2 no 3,500.00 7,000.00
Double oulet pillar hydrant
5.18 (a) 100mm dia. x 300mm B/F ductile iron
lengthening piece 11 no 110.00 1,210.00
(b) 100mm dia. x 500mm B/F ductile iron
lengthening piece 11 no 132.00 1,452.00
(c) 100mm dia. x 1000mm B/F ductile iron
lengthening piece 11 no 187.00 2,057.00
(d) 100mm dia. sluice valve, P.N. 16 rating, B/F 11 no 412.50 4,537.50
(e) 100mm dia. Ductile iron duckfoot bend 11 no 9.00 99.00
(f) Ductile iron double outlet pillar and painted as directed by the S.O., rate to include concrete
base 11 no 305.00 3,355.00
Total Carried Forward 385,387.90
Bill No. 5 - Water Reticulation
Item Description Quantity Unit Rate Amount
RM RM
Brought Forward : 385,387.90
Scour valve
5.19 Scour valve including 100 mm dia. sluice valve, ductile iron lengthening piece, flanged spigot, gibault coupling and short length of 100mm dia. uPVC Pipe class D to drain complete as shown on drawing. Rate to include reinstatement of drains to its
original state ( excluding tee) 3 no 1,200.00 3,600.00
5.20 Washout
Washout at dead end including 100mm 3 no. 1,200.00 3,600.00
dia. sluice valve, brick chamber and short length of uPVC pipe class D to drain complete as shown on Drawing. Rate to include reinstatement of drains to its original state
P.C Markers and Chambers 5.21 Supply and fix precast concrete marker,
including painting as directed for
(a) sluice valve 10 no 75.00 750.00
(b) air valve 7 no 75.00 525.00
(c) scour valve/ washout 3 no 75.00 225.00
(e) pipe 5 no 75.00 375.00
5.22 Supply and construct precast concrete chamber as detailed on drawing; rate to include excavation, sand bedding, complete with covers requirement
(a) hydrant valve 11 no 300.00 3,300.00
(b) sluice valve 10 no 300.00 3,000.00
(c) air valve 7 no 300.00 2,100.00
5.23 Supply and construct brickwork chamber as detailed on drawing; rate to include excavation, sand bedding , complete with covers to JBA requirement
(a) scour valve 3 no 650.00 1,950.00
Thrust and Anchor Blocks 5.24 Supply and construct thrust, diaphram
and anchor blocks. Rate to include excavation backfilling, compaction, concrete mix as specified, formwork, steel reinforcement
and all as shown on the drawings. 10 cu.m 260.00 2,600.00
Total Carried Forward 407,412.90
Bill No. 5 - Water Reticulation
Item Description Quantity Unit Rate Amount
RM RM
Brought Forward : 407,412.90
Miscellaneous
5.25 Allow for pressure and leakage test
including supply of water and instruments. Lump Sum 3,500.00 0.00 5.26 Allow for disinfection and flushing of pipe
including supply for chemicals, sampling
and chemical analysis Lump Sum 2,000.00 0.00
Service Connection
5.27 Excavate and provide 25mm dia service connection at the following M.S pipe rate to include malleable D.I. Clamp saddle, ferrul, tapping complete
(a) 150mm dia 91 no 120.00 10,920.00
5.28 Excavate, supply and lay 25mm dia S.S. pipe from tapping point up to the meter
position rate to include bends, laying through drain and all reinstatement back to its original conditions, Supplying and laying sand or quarry dush to S.Steel service connection pipe at road crossing and all as shown
on the drawings. 382 lin.m 55.00 21,021.00
5.29 Supply and fix (all fitting shall be of Stainless Steel)
(a) 15mm dia ball cock 91 no 9.00 819.00
(b) 25mm x 15mm Elbow 91 no 17.00 1,547.00
(c) 20mm Nipple 91 no 7.50 682.50
(d) 20mm Integrated Lockable Valve (ILV) 91 no 40.00 3,640.00
(e) 25mm x 20mm Bush 91 no 5.30 482.30
(f) 25mm x 20mm Reducer 91 no 18.00 1,638.00
(g) 15mm Nipple 91 no 6.00 546.00
Zone Meter (District Metering)
5.3 Supply and install a zone meter complete with Rate Only no 15,000.00 by pass and all necessary fitting, bends, felxible
coupling,flange adapter, valves and bulk meter (provisional)
Sampling Box
5.31 Supply and install a PUAS approved sampling box. Rate Only no 5,000.00 Location to be reconfirmed by PUAS.
Total Carried to Summary 448,708.70