Ethernet OAM. Victor Olifer (JANET/GEANT JRA1 Task 1) JRA1/TERENA workshop, Copenhagen, 20 November connect communicate collaborate

N/A
N/A
Protected

Academic year: 2021

Share "Ethernet OAM. Victor Olifer (JANET/GEANT JRA1 Task 1) JRA1/TERENA workshop, Copenhagen, 20 November connect communicate collaborate"

Copied!
28
0
0

Loading.... (view fulltext now)

Full text

(1)

connect • communicate • collaborate

Ethernet OAM

Victor Olifer (JANET/GEANT JRA1 Task 1)

(2)

connect • communicate • collaborate

Agenda

Ethernet Service Assurance & Monitoring overview

 Monitoring standards

 Service assurance standards Service assurance lab trials

CFM/Y.1731 trial

 Multi-domain testbed

 OAM agent boxes

 CyPortal

JRA1 & JRA2 trial (Year 4 extension)

 Multi-segment connections

 Diverse equipment

 perfSONAR extensions

(3)

connect • communicate • collaborate

Wide-area point-to-point Ethernet

connections

Where we can find such connections?

- GEANT Plus, JANET Lightpath: demand is from big projects, large scientific centres - Inter-router connections

- An offer from commercial providers: they had 20% revenue growth in 2010 over 2009. Mobile backhaul and multi-site corporates are major users; the reasons – price and flexibility

- New demand for academic providers might arise from such areas as cloud services, data centres, HD videoconferences, multi-site university connections

Multi-segment multi-domain connection with: - Ethernet UNI (a must);

- segments of pure Ethernet (optional);

- segments where Ethernet is tunneled over some other technology, e.g TDM (SDH, OTN) or MPLS (optional)

(4)

connect • communicate • collaborate

Problems with managing Ethernet

connections

Until recently Ethernet had no OAM tools (hence cheapest equipment) -> no way to check, monitor and troubleshoot connectivity and performance end-to-end ( a customer view) or within a domain (a provider view).

E.g. comparing to IP experience: No ping, traceroute and ICMP diagnostic messages available.

Partial solution: we can use MPLS or SDH/OTN OAM to manage tunnels

Good news: Ethernet OAM functions started being developed and implemented in equipment since 2007-8

Bad news: We (JANET) don’t have much experience in Ethernet OAM use. The same situation in other NRENs

(as far as I know from GEANT3 participants).

(5)

connect • communicate • collaborate

Three areas of emerging Ethernet

OAM standards

Service assurance

• Checks whether a connection performs to its specs,

e.g. up to CIR and EIR, after service configuration and

activation.

Service monitoring

• Periodic checks of connection connectivity (continuity)

and performance (delay, loss, throughput, availability)

Service Service trouble shooting

• When monitoring shows a fault one needs to locate a

faulty point along a path and possible reason(s) of a

failure

(6)

connect • communicate • collaborate

Service Assurance (1)

1. Service definitions

(topology: e.g. point-to-point, bandwidth

profile: CIR, EIR for several CoS):

MEF 10.2

ITU-T G.8011

Very important as it is often a cause of confusions:

e.g. CIR might be measured for UDP payload or

Ethernet frames – very different figures for the same

data flow

2. Service performance

parameters (delay, loss,

throughput, availability):

MEF 10.2.1

Y.1563

(7)

connect • communicate • collaborate

Service Assurance (2)

3.Service Verification

Relatively new (Summer 2011) ITU-T spec Y.1564

“Ethernet service activation test methodology”

Defines a simple disruptive on-demand procedure

that tests connectivity and throughput up to CIR & EIR & policing limit

by injecting traffic into a connection

More suitable for Ethernet than complex and IP-centric RFC2544;

implemented in many traffic generators

(8)

connect • communicate • collaborate

Service Assurance trials

JANET lab trial of SunRise RxT tester

Positive impression, works according the standard,

looks worth to try in wide-area tests

CIR

Box PIR=CIR+EIR Tester PIR

Just one problem: Y.1564 doesn't’t give an opportunity to detect the situation when real PIR value set up lower

(9)

connect • communicate • collaborate

Service Monitoring

Customer maintenance session level 7

Service provider maintenance session level 5

Operator maintenance sessions level 3

IEEE 802.1ag Connectivity Fault Management (CFM) (ratified in 2007):

- Hierarchical sessions of heartbeat messages

(Continuity Check Messages, CCM) -> up/down status check

- VLAN-aware

- MEP (End) and MIP (Intermediate) maintenance points

ITU-T Y.1731 (ratified in 2008):

(10)

connect • communicate • collaborate

Service Troubleshooting

CFM

:

-

Linktrace

(analogy of IP

traceroute

)

- Loopback

(analogy of IP

ping

)

- RDI (Remote Defect Indication)

Y.1731

:

- same as CFM + a richer set of diagnostic messages

+ performance monitoring (loss, delay, throughput)

:

- Alarm Indication Signal (AIS)

- Lock Signal

- …

(11)

connect • communicate • collaborate

Service monitoring trials

JRA1 Task 1 Ethernet OAM trial (2011):

- 5 NRENs, 5 connections under 6 months monitoring - Small Y.1731 agent boxes from Overture

- CyPortal from Cyan Optics for storing and visualising of monitoring data

Positive results but only for single-segment connections

Combined JRA1 Task 1& JRA2 Task 3 Service Assurance & Monitoring trial GN3 Year 4 (2012-2013) - ongoing

(12)

connect • communicate • collaborate

JRA 1 Ethernet OAM trial (2011)

objectives

NORDUnet

Essex Uni

JANET LH

Cloud service

Cyan OAM portal

SURFnet

CESNET PIONIER (PSNC)

OAM Data from Collector

Equipment under test

OAM agent (Overture ISG24)

Collector

 Test CFM/Y.1731 functions in multi-domain and multi-vendor environment (5 connections)

 Evaluate Y.1731 agent boxes

 Evaluate OAM data visualisation system (CyPortal)

Monitored VLAN connections

(13)

connect • communicate • collaborate

OAM agent options

Dedicated extra network switch with advanced OAM capabilities

OAM capabilities of existing network boxes: routers, switches, muxes

Software OAM agent on a dedicated server (e.g. ‘dot1ag-utils’ developed by SARA and presented by Ronald van der Pol at NORDUnet 2011)

 Pros: uniform, rich OAM functionality, and consistent source of monitoring data

 Cons: extra boxes overheads (adds complexity, cost – especially for high speed links, maintenance etc)

 Pros: no extra equipment, ability to test internal segments

 Cons: some vendor-specific features, e.g. in CFM MIBs – diverse environment with possible incompatibilities

 Pros: end users can ping and trace network elements; no switches needed  Cons: currently limited to MEP down functionality, performance depends on

(14)

connect • communicate • collaborate

ISG24 OAM agent box trial

Compact 4 port GE demarcation box, low cost (~ $1000)

2 copper GE and 2 SFP ports (there is 10GE version)

Web GUI

OAM functions:

CFM

Y.1731 D(elay)MM and L(oss)M

RFC 2544

PAA – proprietary analogy of Y.1731

Ethernet First Mile 802.2ag

(15)

connect • communicate • collaborate

ISG24 CCM (continuity) tests

 Positive results – properly detected the Up/Down state of all 5 connections by permanent monitoring over 6 months

 Compact web form

(16)

connect • communicate • collaborate

ISG 24 DMM (performance) tests

 Mostly positive results – CFM and PAA Delay Measurement sessions showed stable and close to expected (from other sources) One Way and Two Ways delays and jitter results

 We experienced some problems with CFM One Way delay measurements on two connections – will talk later after CyPortal slides

Janet – NORDUnet PAA results:

PSNC– CESNET CFM DMM results:

(17)

connect • communicate • collaborate

CyPortal: monitoring data storage

and visualisation

 Detailed monitoring data are collected from ISG24 agent boxes and stored in a cloud-based database

 Web GUI provides a map of all services; in red those which current parameters violate SLD

(18)

connect • communicate • collaborate

CyPortal: Per- service data

 Historical graphical presentation of all parameters under monitoring

 Zooming of a selected time period

 Setting of SLA limits

 Flexible reports

(19)

connect • communicate • collaborate

Problems encountered

1. Saw-tooth shape of delay between JANET LH and Essex Uni

Level 3 DDM session Level 5 DDM session

 There was no reason for saw-tooth shape of Two Way Delay with peaks of about 1 sec showed by MEP Level 5 (ISG24 box)

 Capturing and analyzing traffic before and after MEP Level 3 (Ciena 311v box) showed the ‘guilty’ box:

 MEP Level 3 time-stamped packets of MEP Level 5 instead of their transparent forwarding – definitely a bug in a box software

(20)

connect • communicate • collaborate

Problems encountered (cont.)

2. Inability of ISG boxes to measure CFM One Way Delay on some

connections (LH-Copenhagen, LH-Essex)

PAA: OAD = 10. 903 TWD = 23,004

CFM DMM: OAD = ---- TWD = 23,004

ISG vendor version: too poor synchronization to calculate CFM OWD Seems not to be true: why it is enough for proprietary PAA

(21)

connect • communicate • collaborate

JRA1 Ethernet OAM trial

conclusions

Ethernet OAM functions embedded in the carrier grade Ethernet

equipment are mature enough to be used for effective monitoring of health and performance of wide-area Ethernet services from a customer and provider perspectives

 The use of dedicated Ethernet demarcation boxes with a rich set of OAM functions (Overture ISG and Accedian MetroNID) proved to be an effective way for monitoring Ethernet services on the end-to-end basis

Visualization and data store software like CyPortal is a very useful

element for providing managed Ethernet services

 We managed to monitor only single-segment connections on the end-to-end basis – still more to try

(22)

connect • communicate • collaborate

Year 4 JRA1/JRA2 Service

Assurance & Monitoring trial

 To carry on the previous trial with extending of an investigation for:

 multi-segment connections with hierarchical monitoring

 troubleshooting

 use of embedded CFM/Y.1731 function in carrier class equipment (such as Cisco, Juniper, Extreme, Brocade, Alcatel etc)

 To support new Ethernet OAM functionality in perfSONAR software: • perfSONAR protocol and topology extensions to support Eth OAM data

(data storing, searching and fetching)

• use of the existing GN3 perfSONAR implementation (perfSONAR MDM) with needed changes

• standardization under the OGF NMC/NM umbrella

Trial objectives:

Trail term – 1 year, the end in March 2013

(23)

connect • communicate • collaborate GEYSERS NORDUnet testbed Bristol Uni JANET LH SURFnet CESNET PSNC Collector TNO (NL) NORDUnet core SARA

- Y.1731 agent box (ISG24 from Overture )

- Y.1731 enabled equipment of the trial participants

- non-Y.1731 enabled equipment of the trial participants

1000

GN3 Year 4 testbed

(24)

connect • communicate • collaborate

Multi-segment Janet – NORDUnet

service

Janet ISG24 193.63.63.133 NORDUnet ISG24 109.105.113.183 Janet testbed Ciena 5305 NORDUnet testbed ALU 1850 TSS

Customer, level 5, MA/MEG=“jan-nor-400”

Provider, level 4,MA/MEG=“jan-nor-400-4” – doesn’t exist yet

134 314

144 344

Operator, level 2,MA/MEG=“nor-400-2” – doesn’t exist yet Operator, level 2, MA/MEG=“janet-400-2

1152 1153

1101 1102

Inter-node, level 0, MA/MEG=“isg-ciena-400-0” Inter-operator, level 0, MA/MEG=“jan-nor-400-0”

doesn’t exist yet

1 3

Inter-node, level 0, MA/MEG=“tss-isg” 1 2

(25)

connect • communicate • collaborate

Multi-segment tests

Evaluation of different hierarchical schemes:

Shared levels (same VLAN ID for domains)

Independent levels (C-VID, S-VID)

Testing different ways of visualizing of the hierarchical monitoring

information for different types of users – NOC engineers, end users.

Location of a failure by:

using a hierarchy of CCM sessions;

using Linktrace protocol and MIPs

Different types of faults should be emulated:

Link fauilre

Port failure

Route Loops

(26)

connect • communicate • collaborate

Year 4 trial team

 JRA2 Task 3:

• Roman Lapacz , PSNC • Jakub Gutkowski, PSNC • Freek Dijkstra, SARA

• Ronald van der Pol, SARA • Richa Malhotra, SURFnet • Borgert van der Kluit, TNO • Rob Smets, TNO

• Piotr Zuraniewski, TNO • Otto Baijer, TNO

 JRA1 Task 1:

 Alberto Colmenero, NORDUnet

 Victor Olifer, Janet

 Marcin Garstka, PSNC,

 Jan Radil, CESNET

 Michal Hazlinsky, CESNET

 Mayur Channegowda , Essex Uni

(27)

connect • communicate • collaborate

(28)

connect • communicate • collaborate

Year 3 Partner testbed example

-PSNC testbed

References

Related documents

propovjednici bili su manje oprezni. Prepričavanje anegdota za njih je bilo ključno, pa je bilo sigurno da će do izmjena doći. Višestrukost Marija sama po sebi bila je dovoljna

Look at the plot from aileron (input 1) to bank angle (output 2). The aircraft is oscillating around a nonzero bank angle. Thus, the aircraft is turning in response to an

The paper will argue that the criminalisation of khat is a contravention of the obligations under the International Covenant on Economic, Social and Cultural Rights (ICESCR),

The present study suggest the in fluence of activities or building features as major sources of indoor CO 2 , PM 10 and VOCs levels associated to the reduced airing of the

Let me suppose that the government and the agent play simultaneously in period 1 as described in figure 3. one agent, static game with perfect information) there are two

Professional Resources =>Long-Term Care/Community=>Case Management Best Practice for Community Care =>Ontario Stroke System => Professional Resources =>

Operating 5 Blast Furnace Mhangura Copper Mines (ZMDC) Operating

Reps: 10 reps each exersice Sets: 2 Rest: 90-120 seconds B: Wrist preperation Video: http://www.youtube.com/watch?v=7gfLCVNWFrM Reps: Sets: 2 Rest: 90-120 seconds C: Scapula