• No results found

Clarifying the interface between PHARE and SAPARD

Financial Data About “SAPARD – PHARE – IPA”, Three Key Financial Projects, Offered by the EU for Bulgaria

Financial Data About “SAPARD – PHARE – IPA”, Three Key Financial Projects, Offered by the EU for Bulgaria

... Abstract Bulgaria is a country that is positioned in the south-east Europe and north-west of the Balkan Peninsula. Bulgaria in the east it borders on the Black Sea, to the south are Turkey and Greece, on the west by ...

5

Clarifying the Relationship between Software Architecture and Usability

Clarifying the Relationship between Software Architecture and Usability

... distinction between the visible part of the user interface (buttons, pull-down menus, check-boxes, background color, ...exchange between the user and the ...user interface, but mainly with the ...

6

General report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2000. Report from the Commission. COM (2002) 781 final, 9 January 2003

General report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2000. Report from the Commission. COM (2002) 781 final, 9 January 2003

... As regards ISPA, a Co-operation Agreement was signed on 19 January 2000 between the Commission and the EIB on Community structural assistance, including ISPA, for the period 2000-2006. The main objective of the ...

19

General report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2001. Report from the Commission. COM (2003) 329 final, 4 June 2003

General report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2001. Report from the Commission. COM (2003) 329 final, 4 June 2003

... The first two rounds of Monitoring Committees were organised in 2001 in all candidate countries. Summaries from these meetings are communicated to the ISPA Management Committee. Requirement for ex-post are stipulated in ...

22

General report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2002. Report from the Commission. COM (2003) 844 final, 5 January 2004

General report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2002. Report from the Commission. COM (2003) 844 final, 5 January 2004

... The year 2002 was the third year when all three pre-accession instruments came on stream. In line with accession negotiations that culminated in a positive outcome at the end of the year, an increased emphasis was put on ...

24

General report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2006. Commission report to the European Parliament and the Council. COM (2007) 692 final, 9 November 2007

General report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2006. Commission report to the European Parliament and the Council. COM (2007) 692 final, 9 November 2007

... Requirements for ex-post evaluation are stipulated in Section XIII of the annex to the Financing Memorandum, which is concluded for each project between the Commission and the ISPA beneficiary state. This section ...

10

General report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2004. Commission report to the European Parliament and the Council. COM (2006) 137 final, 24 March 2006

General report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2004. Commission report to the European Parliament and the Council. COM (2006) 137 final, 24 March 2006

... annual PHARE, ISPA and SAPARD ...responsibilities between the ...co-ordination between the Commission services ...the Phare Management Committee, the body assisting the Commission in ...

7

General report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2005. Commission report to the European Parliament and the Council. COM (2006) 746 final, 30 November 2006

General report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2005. Commission report to the European Parliament and the Council. COM (2006) 746 final, 30 November 2006

... responsibilities between the ...co-ordination between the Commission services ...the Phare Management Committee, the body assisting the Commission in co-ordinating the ...

9

General report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2003. Commission report to the European Parliament and the Council. COM (2005) 178 final, 2 May 2005

General report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2003. Commission report to the European Parliament and the Council. COM (2005) 178 final, 2 May 2005

... – Several periodic co-ordination meetings were held in order to set up the working framework and make operational improvements to the Co-operation Agreement between the Commission and the EIB on Community ...

8

Annex to the general report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2002. Country sections. Commission staff working document. SEC (2003) 1477 final, 5 January 2004

Annex to the general report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2002. Country sections. Commission staff working document. SEC (2003) 1477 final, 5 January 2004

... of SAPARD in Slovenia: – The National Fund, located within the Ministry of finance administers SAPARD funds allocated under the responsibility of the National Authorising Officer (NAO); it is responsible ...

64

Annex to the general report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2000. Country sections. Commission staff working document. SEC (2002) 1418 final, 9 January 2003

Annex to the general report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2000. Country sections. Commission staff working document. SEC (2002) 1418 final, 9 January 2003

... balance between road, rail and waterways: – Corridor IV : from Hungary to Constanta (East Branch) and from Hungary to Bulgaria (South Branch), with a view of setting most of this rail/road corridor to EU ...

52

Annex to the general report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2001. Country sections. Commission staff working document. SEC (2003) 656 final, 4 June 2003

Annex to the general report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2001. Country sections. Commission staff working document. SEC (2003) 656 final, 4 June 2003

... co-ordination between Phare, ISPA and SAPARD as between all other bilateral/multilateral assistance is carried out by an Inter-ministerial Foreign Assistance Co-ordination Committee, reuniting ...

53

Annex to the general report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2003. Country sections and additional information. Commission staff working document. SEC (2005) 558 final, 2 May 2005

Annex to the general report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2003. Country sections and additional information. Commission staff working document. SEC (2005) 558 final, 2 May 2005

... CO-ORDINATION BETWEEN PRE-ACCESSION INSTRUMENTS • At the national level: – Financial management: through the National Fund – Policy co-ordination between PHARE, ISPA and SAPARD as ...

67

Annex to the general report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2006. Country sections and additional information. Commission staff working document. SEC (2007) 1468 final, 9 November 2007

Annex to the general report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2006. Country sections and additional information. Commission staff working document. SEC (2007) 1468 final, 9 November 2007

... 1.2.3. SAPARD With regard to rural development, Croatia has made substantial progress related to the implementation of the Special pre-Accession Programme for Agriculture and Rural Development ...for SAPARD ...

29

Annex to the general report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2004. Country sections and additional information. Commission staff working document. SEC (2006) 378 final, 24 March 2006

Annex to the general report on pre-accession assistance (PHARE - ISPA - SAPARD) in 2004. Country sections and additional information. Commission staff working document. SEC (2006) 378 final, 24 March 2006

... Complementarity between Phare and Sapard at regional level will be ensured through a close co-ordination between the Regional Development Agencies in the priority regions for Phare and ...

22

The enlargement process and the three pre-accession instruments: Phare, ISPA, Sapard

The enlargement process and the three pre-accession instruments: Phare, ISPA, Sapard

... Phare has now also started to support investment in economic and social cohesion, based on a preliminary National Development Plan, which the Commission has asked the can[r] ...

26

Clarifying differences between review designs and methods

Clarifying differences between review designs and methods

... Reviews that are predominantly aggregative may have similar epistemological and methodological assump- tions to much quantitative research and there may be similar assumptions between predominantly configura- tive ...

9

Clarifying the relationship between brand personality and persuasive advertising

Clarifying the relationship between brand personality and persuasive advertising

... Ainsi en se basant sur ce qui a été évoqué dans notre recherche nous pouvons déduire que lorsque la marque est familière, la publicité persuasive a une influence moins imp[r] ...

24

Clarifying the Association Between the Subtypes of Narcissism and Suicide Risk

Clarifying the Association Between the Subtypes of Narcissism and Suicide Risk

... association between previously established vulnerabilities and suicidal ...relationships between variables, as opposed to relying on less sophisticated statistical ...associations between constructs ...

67

Clarifying the Relationship between Emotion Regulation, Gender, and Depression

Clarifying the Relationship between Emotion Regulation, Gender, and Depression

... relationships between emotion regulation strategies and psychopathology tend to focused on one particular measure of emotion regulation and one particular ...association between psychopathology and emotion ...

153

Show all 10000 documents...

Related subjects