Industrialised building
Implementation strategy for industrialised building system
24
A review of supply chain management issues in Malaysian industrialised building system (IBS) construction industry
7
Persepsi pemaju terhadap penggunaan IBS (Industrialised Building System)
44
Precast reinforced concrete sandwich panel as an industrialised building system
6
Level of Acceptance Towards Industrialised Building System (IBS) In Malaysia
8
Comparing conventional to industrialised building system construction costing : a case study of school building projects
27
Innovative procurement adoption for Industrialised Building System (IBS) projects
6
Effectiveness of industrialised building system (IBS) implementation for Malaysian construction industry
38
ICT readiness in Industrialised Building System (IBS) management processes: case studies
5
Implementing industrialised building system (IBS) in Malaysia: acceptance and awareness level, problems and strategies
16
The role of knowledge management in improving the adoption and implementation practices of industrialised building system (IBS) in Malaysia
13
A review on the current issues and barriers of Industrialised Building System (IBS) adoption in Malaysia’s construction industry
9
Supply chain management (SCM) : disintegration team factors in Malaysian industrialised building system (IBS) construction projects
5
Significant usage of slab and wall form technique in industrialised building systems (IBS) for low cost highrise apartments construction
38
Factors that enhance sustainable deliverables in Industrialised Building System (IBS) construction
17
Barriers in the implementation of industrialised building system in Malaysian construction industry
22
Simulation of industrialised building system formation for housing construction
111
Simulation of Industrialised Building System components production
7
Industrialised building system formation scheduling for public buildings
29
Improving utilisation of industrialised building system (IBS) in low cost housing projects
7