• No results found

Risk management - Malaysia

Effects of Corporate Governance Structures on Enterprise Risk Management Practices in Malaysia

Effects of Corporate Governance Structures on Enterprise Risk Management Practices in Malaysia

... Bursa Malaysia (2001) while measurement of risk management effort upon COSO-ERM ...and risk and related ERM practices is evaluated through their publicly available annual report and the ...

8

Enterprise Risk Management Adoption in Malaysia: A Disclosure Approach

Enterprise Risk Management Adoption in Malaysia: A Disclosure Approach

... Bursa Malaysia cited poor corporate governance and poor risk management as major contributors to their failures during the crisis (Jin, ...the risk management strategies adopted by ...

22

Risk Management Practices In Islamic Banking Institutions:  A Comparative Study Between Malaysia And Jordan

Risk Management Practices In Islamic Banking Institutions: A Comparative Study Between Malaysia And Jordan

... their risk management programmes, and, as a result, most empirical analyses have to rely on ...in Malaysia and three practitioners from Jordan Central Bank and Islamic Banks in Jordan) were involved ...

10

The Regulatory Framework on Liquidity Risk Management of Islamic Banking in Malaysia

The Regulatory Framework on Liquidity Risk Management of Islamic Banking in Malaysia

... Negara Malaysia (BNM) for liquidity risk management (LRM) Islamic banking in Malaysia, thus suggesting best ...liquidity risk, although IFSB is not a mandatory regulatory framework for ...

21

Risk Management On Safety And Health Performance In Infineon Technologies (Malaysia) Sdn. Bhd.

Risk Management On Safety And Health Performance In Infineon Technologies (Malaysia) Sdn. Bhd.

... The semiconductor industry‟s safety record has always been poor. It remains one of the dangerous industries in which to work. The main purpose of this research is to study the implementation of risk ...

24

The Effectiveness of Risk Management Committee and Hedge Accounting Practices in Malaysia

The Effectiveness of Risk Management Committee and Hedge Accounting Practices in Malaysia

... 3 their use of derivatives for hedging activities. Many of the companies are not forthcoming to fulfil the requirements needed to apply hedge accounting. The argument that the strict requirements of the accounting ...

6

Need of risk management practice amongst bumiputera contractors in Malaysia construction industries

Need of risk management practice amongst bumiputera contractors in Malaysia construction industries

... In Malaysia context, contractors are separated into two groups which are bumiputera and non- ...in Malaysia, regardless of whether they are bumiputera or non-bumiputera, local or foreign contractor to ...

8

Landslide Risk Management (LRM): Towards a Better Disaster Risk Reduction (DRR) Programme in Malaysia

Landslide Risk Management (LRM): Towards a Better Disaster Risk Reduction (DRR) Programme in Malaysia

... Landslide Risk Management (LRM) is relatively new and received little attention from geoscientists and stakeholders in addressing landslide geodisaster especially in ...Landslide Risk Elements ...

12

Evaluation and risk management of noise exposure among workers at palm oil mill in Malaysia

Evaluation and risk management of noise exposure among workers at palm oil mill in Malaysia

... occupational risk management on noise exposure in palm oil mill in Johor and Melaka, ...for risk management on noise exposure in palm oil ...the risk management on noise exposure ...

46

Risk Management on Design Works in Malaysia

Risk Management on Design Works in Malaysia

... Abstract: Construction project is shrouded with various aspects of risks related to design professionals and design works. The parties involved must be able to manage the risks to complete a construction project ...

9

Contractors’ Approaches to Risk Management at the Construction Phase in Malaysia

Contractors’ Approaches to Risk Management at the Construction Phase in Malaysia

... systematic risk management is needed in order to reduce its complexity in a construction project and to help in ensuring the construction projects are successfully completed on time and within budget (KLIUC ...

7

Risk Evaluation Triangle (RET) For Landslide Risk Management (LRM): A Case Study from Kota Kinabalu, Sabah, Malaysia

Risk Evaluation Triangle (RET) For Landslide Risk Management (LRM): A Case Study from Kota Kinabalu, Sabah, Malaysia

... for risk: the potentially affected population, a government agency, the design engineer or geoscientist (Lacasse & Nadim, ...Societal risk to life criteria reflect the reality that society is less ...

9

Risk Management Practices towards Developments of Sport and Recreational Activities in Malaysia

Risk Management Practices towards Developments of Sport and Recreational Activities in Malaysia

... The staff is the human resource working in an organization in various levels of management. In this study, the staff refers to staff working at the state’s JBS complex facility and Rakan Muda Complex in ...

11

Evaluating the Risk Management on Disabled Athlete Activities in Malaysia

Evaluating the Risk Management on Disabled Athlete Activities in Malaysia

... Next, equipment should be used according to usage guidelines or according to their specific use and not misused. Equipment should also be compatible with the size of the athlete using it. For example, the junior athlete ...

6

Risk management strategies and performance of construction firms in selected counties in Kenya

Risk management strategies and performance of construction firms in selected counties in Kenya

... Effective risk strategies measures suggested to control construction costs included proper project costing and financing and analyzing and forecasting cost and schedule ...cost risk management ...

148

Multi Agency Collaboration in Flood Disaster Management in Sarawak, Malaysia

Multi Agency Collaboration in Flood Disaster Management in Sarawak, Malaysia

... Disaster Risk Management Plan (NDMRP) (2018 – 2030) report, the most commonly found gap between planning and implementation exist mainly due to lack of institutional coordination among agencies involved in ...

9

Comparative Analysis of Risk Management Techniques for Large-Scale Systems

Comparative Analysis of Risk Management Techniques for Large-Scale Systems

... the risk assessment was using Logistic Regression ...test management proposes a logistic regression based methodology to assess test ...test management, and number the description, kind and variety ...

5

MANAGEMENT OF BUILDING MOSQUE IN MALAYSIA

MANAGEMENT OF BUILDING MOSQUE IN MALAYSIA

... facility management system, only a few guidelines and options exist that can be applied to achieve the objectives; such as identifying maintenance work by either preventing or planning ...the management of ...

9

The Association Between Risk Factors and Hypertension in Perak, Malaysia

The Association Between Risk Factors and Hypertension in Perak, Malaysia

... A population-based cross-sectional household survey was initiated in Perak, Malaysia. This was a pilot study conducted at five sampling locations (Gerik, Kampar, Kuala Kangsar, Parit Buntar and Taiping). Four ...

6

Vol 43, No 2 (2013)

Vol 43, No 2 (2013)

... on risk definition must look risk management and its planning from the two perspectives mentioned: on the one hand the probabilities of a particular manifestation of the event, and on the other hand ...

6

Show all 10000 documents...

Related subjects