ESSIP Plan Edition 2012
ATC17-ASP02 Upgrade and put into service ATC system to support the Basic procedure (specifically PAC and COD)
01/2013 12/2018
ATC17-ASP03 Upgrade and put into service ATC system to support electronic dialogue procedure in Transfer of communication process
01/2013 12/2018
ATC17-ASP04 Upgrade and put into service ATC system to support electronic dialogue procedure in Coordination process
01/2013 12/2018
ATC17-ASP05 Train ATC staff for applying electronic dialogue procedure 01/2013 12/2018
▲ Applicable to the military.
Description of finalised SLoAs is available on the EIPR website at http://www.eurocontrol.int/articles/essip-plan/
Consultation & Approval
Working arrangement in charge: Unassigned
Outline description approved in: 03/2012
Latest objective review at expert level in: 04/2012
Commitment decision body: Provisional Council (PC)
Objective approved/endorsed in: 07/2012
Latest change to objective approved/endorsed in: -
Expected performance benefits
Safety : Capacity :
Cost-effectiveness : Environment :
Security : N/A
Detailed SloA descriptions
ATC17-REG01 Conduct safety oversight of the changes Start:01/2013 Finish:12/2018
Action by : National Supervisory Authorities (NSAs)
Description & purpose : Oversee safety of the changes induced by upgrades of the system to support Electronic Dialogue during Coordination and Transfer. The tasks to be done are as follows:
- Analyse the safety case; - Review safety arguments;
- Prepare the material for the acceptance of changes.
Supporting material(s) : EUROCONTROL - EAM 1 - ESARR 1 - Safety Oversight in ATM - Edition 2.0 / 02-12-2009
Url : http://www.eurocontrol.int/articles/esarr-1-safety-oversight-atm
Finalisation criteria : 1 - Formal acceptance by the NSA of the proposed changes communicated to ANSP.
ATC17-ASP01 Develop safety assessment for the changes Start:01/2013 Finish:12/2018
Action by : ANS Providers
Description & purpose : Develop safety assessment of the changes, notably upgrades of the system to support Electronic Dialogue during Coordination and Transfer. The tasks to be done are as follows:
- Conduct hazard identification, risk assessment in order to define safety objectives and safety requirements mitigating the risks;
- Develop safety assessment;
- Deliver safety assessment to the NSA, if new standards are applicable or if the severity class of identified risks is 1 or 2.
This safety assessment shall be based on fully validated/recognised method.
ATC17
Electronic Dialogue as Automated Assistance to Controller during Coordination and Transfer
ESSIP Plan Edition 2012
Supporting material(s) : EUROCONTROL - EAM 4 - ESARR 4 - Risk Assessment and Mitigation in ATM - Edition 1.0 / 05-04-2001
Url : http://www.eurocontrol.int/articles/esarr-4-risk-assessment-and-mitigation-atm
EUROCONTROL - SPEC 106 - EUROCONTROL Specification for On-Line Data Interchange (OLDI) - Edition 4.2 - OJ 2011/C 146/05 / 16-12-2010
Url : http://www.eurocontrol.int/ses/public/standard_page/oldi_spec.html
Finalisation criteria : 1 - The Safety argument for all changes, generated by the deployment of APW, has been delivered by the ANSP to the NSA.
ATC17-ASP02 Upgrade and put into service ATC system to support the Basic procedure
(specifically PAC and COD) Start:01/2013 Finish:12/2018
Action by : ANS Providers
Description & purpose : When bilaterally agreed between ANSPs, upgrade and put into service ATC system to support the Basic procedure, specifically Preliminary Activation Message (PAC) and, if applicable, SSR Code Assignment Message (COD).
Supporting material(s) : EUROCONTROL - System Supported Coordination (SYSCO) Implementation Guidelines - Edition 2.0 / 18-03-2011
Url : http://www.eurocontrol.int/articles/fasti-documents
EUROCONTROL - SPEC 106 - EUROCONTROL Specification for On-Line Data Interchange (OLDI) - Edition 4.2 - OJ 2011/C 146/05 / 16-12-2010
Url : http://www.eurocontrol.int/ses/public/standard_page/oldi_spec.html
Finalisation criteria : 1 - Ground systems upgraded with the functions to support Basic procedure, as identified by the individual administration from the following list :
- PAC; - COD.
2 - The technical file (TF) with evidences of compliance and the EC declaration of verification of systems (DoV) has been delivered to the competent National Supervisory Authority (NSA).
3 - The functions to support Basic procedure, as identified by the individual administration from the following list : - PAC;
- COD;
are documented and in operational use.
ATC17-ASP03 Upgrade and put into service ATC system to support electronic dialogue
procedure in Transfer of communication process Start:01/2013 Finish:12/2018
Action by : ANS Providers
Description & purpose : When bilaterally agreed between ANSPs, upgrade and put into service ATC system to support electronic dialogue procedure in Transfer of communication process using OLDI.
Supporting material(s) : EUROCONTROL - System Supported Coordination (SYSCO) Implementation Guidelines - Edition 2.0 / 18-03-2011
Url : http://www.eurocontrol.int/articles/fasti-documents
EUROCONTROL - SPEC 106 - EUROCONTROL Specification for On-Line Data Interchange (OLDI) - Edition 4.2 - OJ 2011/C 146/05 / 16-12-2010
Url : http://www.eurocontrol.int/ses/public/standard_page/oldi_spec.html
Finalisation criteria : 1 - Ground systems upgraded with the functions to support electronic dialogue procedure in Transfer of communication process using OLDI messages, as identified by the individual administration from the following list :
- ROF; - COF; - TIM; - HOP; - MAS; and - SDM.
2 - The technical file (TF) with evidences of compliance and the EC declaration of verification of systems (DoV) has been delivered to the competent National Supervisory Authority (NSA).
3 - The functions to support the transfer and communication process as identified by the individual administration from the following list :
- ROF; - COF; - TIM; - HOP; - MAS; and - SDM.
are documented and in operational use.
ATC17
Electronic Dialogue as Automated Assistance to Controller during Coordination and Transfer
ESSIP Plan Edition 2012
ATC17-ASP04 Upgrade and put into service ATC system to support electronic dialogue
procedure in Coordination process Start:01/2013 Finish:12/2018
Action by : ANS Providers
Description & purpose : When bilaterally agreed between ANSPs, upgrade and put into service ATC system to support electronic dialogue procedure in Transfer of communication process using OLDI.
Supporting material(s) : EUROCONTROL - System Supported Coordination (SYSCO) Implementation Guidelines - Edition 2.0 / 18-03-2011
Url : http://www.eurocontrol.int/articles/fasti-documents
EUROCONTROL - SPEC 106 - EUROCONTROL Specification for On-Line Data Interchange (OLDI) - Edition 4.2 - OJ 2011/C 146/05 / 16-12-2010
Url : http://www.eurocontrol.int/ses/public/standard_page/oldi_spec.html
Finalisation criteria : 1 - Ground systems upgraded with the functions to support electronic dialogue procedure in Coordination process using OLDI messages, as identified by the individual administration from the following list :
- RAP; - RRV; - CDN; - ACP; - RJC; and - SBY.
2 - The technical file (TF) with evidences of compliance and the EC declaration of verification of systems (DoV) has been delivered to the competent National Supervisory Authority (NSA).
3 - The functions to support the coordination process as identified by the individual administration from the following list - RAP; - RRV; - CDN; - ACP; - RJC; and - SBY;
are documented and in operational use.
ATC17-ASP05 Train ATC staff for applying electronic dialogue procedure Start:01/2013 Finish:12/2018
Action by : ANS Providers
Description & purpose : Train operational staff in the use of electronic dialogue procedure. The tasks to be done are as follows: - Develop a training package (material);
- Update the training plans;
- Determine staff population to be trained; - Apply the training plans.
Supporting material(s) : EUROCONTROL - System Supported Coordination (SYSCO) Implementation Guidelines - Edition 2.0 / 18-03-2011
Url : http://www.eurocontrol.int/articles/fasti-documents
EUROCONTROL - SPEC 106 - EUROCONTROL Specification for On-Line Data Interchange (OLDI) - Edition 4.2 - OJ 2011/C 146/05 / 16-12-2010
Url : http://www.eurocontrol.int/ses/public/standard_page/oldi_spec.html
Finalisation criteria : 1 - The training plans have been updated and a training package has been developed by the ANSP for the use of electronic dialogue procedure
SESAR Active ECAC
COM09
Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP)REG ASP MIL APO USE INT IND
ESSIP Plan Edition 2012
Description & purpose
In the light of diminishing industry support for the X.25 protocol, it is expected that X.25 will be phased out by 2009-2012. This affects all international and regional ATM applications that make use of these networks. A replacement of X.25 for networks with a common standard is therefore strongly needed at European level.
Commission Regulation (European Communities) No 633/2007 of 7 June 2007 lays down requirements for the application of a FMTP for information exchanges between flight data processing systems for the purpose of notification, coordination and transfer of flights between air traffic control units and for the purposes of civil-military coordination. This regulation implies de facto that the IPv6 be the new standard for international or regional data networks or services.
The purpose of this ESSIP objective is to ensure that all ECAC States migrate their international or regional data networks or services to IPv6 by the mandatory completion date of the application of FMTP. However, as some States have already started the migration of their national networks to IPv4 this standard can be accepted as a transition to IPv6.
The PENS project is aiming at the provision and deployment of a common networking infrastructure, based on IPv4 and IPv6, to cover the data connectivity requirements between ANSPs, for Network Operations Management applications and EAD. It is considered as an acceptable means of compliance for this objective.
This objective stipulates the actions put on ATM stakeholders in both cases: 1) States intending to participate in PENS;
2) All other ECAC States. Note:1. PENS will also support IP v4.
Note: 2. for this objective, Full operational capability (FOC) means the effective IPv6 capability to comply with Commission Regulation (EC) No 633/2007 but NOT the phase-out of X.25 or IPv4 capability.
Applicable area(s) Operational capability dates FOR THIS OBJECTIVE
Initial operational capability: 01/2006 All ECAC States
Full operational capability: 12/2014
References
European ATM Master Plan relationship
Enabler - [CTE-C11a]-PENS
Applicable legislation
Council Decision of 30 March 2009 endorsing the European Air traffic Management Master Plan of the Single European Sky ATM Research (SESAR) project (2009/320/EC)
- Commission Regulation (European Communities) No 633/2007 of 7 June 2007 laying down requirements for the application of a Flight Message Transfer Protocol (FMTP)
- Commission Regulation (EU) No 283/2011 of 22 March 2011 amending Regulation (EC) No 633/2007 as regards the transitional arrangements referred to in Article 7
Applicable ICAO Annexes and other references
None
Stakeholder Lines of Action (SloA )
SloA ref. Title Start Finish
COM09-REG01 Notify relevant National ANSPs of the mandate to migrate to IPv6 09/2009 07/2010
COM09-REG02 Inform the European Commission and the EUROCONTROL Agency of the planned means & dates of compliance of the National ANSPs
09/2009 12/2010
COM09-ASP01 Migrate international or regional X.25 data networking facilities and/or services to IP
09/2009 07/2010 ▲
COM09-ASP02 Subscribe to PENS services (OPTIONAL) DELETED COM09-ASP03 Migrate international or regional X.25 data networking facilities and/or
services to IPv6
01/2006 12/2014 ▲
COM09-AGY01 Report on PENS performance 09/2009 12/2011
▲ Applicable to the military.
Description of finalised SLoAs is available on the EIPR website at http://www.eurocontrol.int/articles/essip-plan/