• No results found

Changing Bills of Material

In document SAP - TSCM40 (Page 195-200)

145 Exercise 5: Changing Bills of Material

Solution 5: Changing Bills of Material

Task 1:

Using the BOM with Usage Engineering/design which was created by the Engineering Department create a group bill of material with Usage Production that can be assigned to plants or used as a template to create plant BOMs.

What is the internal BOM number?____________

1. Before you create a production BOM, display the Engineering BOM that was created by your Engineering Department for material T-F##.

Field User Entry

a) Choose Logistics → Production → Master data → Bills of material → Bill of material → Material BOM → Display or transaction code CS03.

b) Choose Enter .

c) Go to the BOM header and make a note of the internal BOM number:

_______________

2. Using the Engineering BOM for T-F## created by the Engineering Department create a group BOM with usage Production

Note the following when you create a group BOM:

Field User Entry

Material T-F##

Plant group BOM has no entry for plant

Field User Entry

Usage 1 (Production)

Alternative No entry

Valid from Today’s date

a) Choose Logistics → Production → Master data → Bills of material → Bill of material → Material BOM → Create or transaction code CS01.

b) Enter the data from the table above.

c) Choose the Copy from... icon from the tool bar and enter through the warning.

3. Which system message do you get, and why?

a) W: Group BOM

The warning message regarding group BOMs can be deactivated from SAP R/3 4.7 onwards.

b) Choose Enter to work through the warning and continue. Ensure no error messages appear.

4. Enter the copy from material number T-F##, leave plant blank, enter Usage 2 Engineering/design, and click , Continue.

Save the BOM and display the header using the transaction Change material BOM.

Go to the BOM header and make a note of the internal BOM number:

_______________

a) Enter the copy from material number T-F##, leave plant blank, enter Usage 2 Engineering/design, and click , Continue.

b) Select all the components in the Engineering/design BOM for T-F##

and click copy again:

c) Save your BOM by choosing .

d) From the Create material BOM: Initial screen, choose Material BOM

→ Change.

Select Enter twice to access your BOM in change mode.

e) Select the Header icon . The BOM number is displayed in the BOM field under the material number.

BOM Number: ___________________

Continued on next page

TSCM40_I Lesson: Managing Bills of Material

Task 2:

Create and change plant validity.

1. Assign the group BOM to plants 1000 and 1100.

a) Choose Logistics → Production → Master Data → Bills of Material → Bill of Material → Material BOM → Plant assignment → Create or use transaction code CS07.

b) Enter the material number and BOM usage = 1. Do not enter the plant in the top portion of the screen.

Enter the plant 1000 in the Assign to section and press Enter . c) Select the checkbox next to the plant and choose Save.

2. Why can you not assign it to plant 1100?

Answer: If you try to assign to plant 1100, you will receive a message:

Material T-F## is not maintained in plant 1100.

3. Go to the BOM header for plant 1000.

What is the internal BOM number? _______________

Why? _______________

a) Choose Logistics → Production → Master data → Bills of material

→ Bill of material → Material BOM → Display. or use transaction code CS03.

Choose Header .

b) The internal BOM number in plant 1000 is the same as the number you recorded earlier for the group BOM of usage production. A reference has been created. The BOM structure is saved under one number in the system.

4. Delete the plant assignment (plant 1000).

a) Change the plant assignment: Logistics → Production → Master data

→ Bills of material → Bill of material → Material BOM → Plant assignment → Change or use transaction code CS08.

b) Enter the data from the table below.

Field Value

Material T-F##

Plant <leave blank>

Usage 1

Choose Enter.

c) Display all assignments by choosing the All Assignments to BOM icon.

Select and delete the assignment to plant 1000 by choosing the Delete assignment button.

d) Go back to the Current Assignments and choose Save .

5. Create a plant -specific BOM for T-F## in plant 1000. Use the group BOM as a template. Make the following plant-specific changes:

Change the quantity of item 20 from 2 to 1.

Maintain item 20 with spare part indicator “A”

Continued on next page

TSCM40_I Lesson: Managing Bills of Material

Sort the BOM according to the sort string.

a) Choose Logistics → Production → Master Data → Bills of Material

→ Bill of Material → Material BOM → Create or use transaction code CS01.

Enter the data from the table below.

Field Value

Material T-F##

Plant 1000

Usage 1

Valid from Today’s date

Select the copy from icon or press F7.

In the Copy From.. dialog box, enter the material T-F## and BOM Usage 1 and choose Enter .

Hint: Do not enter the plant in the copy from box.

Select all of the components to copy and press the Copy icon again.

b) Make the following changes:

Change the quantity of item 20 from 2 to 1.

Maintain item 20 with spare part indicator “A”. Double-click in the item number to access the item details. Select the Status/Lng Text tab.

Enter A in the spare part indicator field.

c) Sort the BOM according to the sort string. Choose Back to return the General item Overview screen. Choose Edit → Sort → Sort by Sort string.

d) Save the BOM by choosing Save .

Task 3:

Extend your plant-specific BOM T-F## in plant 1000.

1. Change BOM T-F## in plant 1000.

a) Choose Logistics → Production → Master Data → Bills of Material

→ Bill of Material → Material BOM → Change or use transaction code CS01.

b) Enter the data from the table below.

Field Value

Material T-F##

Plant 1000

BOM Usage 1

c) Choose Enter .

2. You are not sure if the fly wheel component of your pump is the right material. Display the material master record to check the material group.

Do not exit the current transaction and do not create another session.

What is the name of the material group? _________

a) Double click on the material number 100-200 in the component table for Item 20.

b) This takes you to the material master for that component.

c) You can see that the material group is 001 (Metal processing) on the Basic Data 1 tab.

d) Click the green back arrow to return to the BOM.

3. Add component 100-600.

Item no. Item cat. Component Quantity

40 L 100-600 2

The two support bases are mounted on the pump.

The two support bases should be assembled at the front and the back of the pump.

Continued on next page

In document SAP - TSCM40 (Page 195-200)

Related documents