~ Power Supply
GENERAL INFORMATION
1
ORGANISATION : ORGANISATION :
( SUPPLIER REPRESENTATIVE ) ( ERECTION AGENCY ) (POWERGRID SITE I/C) ( POWERGRID COMM TEAM ) (WHEREVER APPLICABLE)
CONTINUITY TEST OF BUSHING CTs
POLARITY TEST OF BUSHING CTs VECTOR GROUP TEST & POLARITY CHECK
NAME OF TEST
MEASUREMENT OF WINDING RESISTANCE SECONDARY WINDING RESISTANCE OF BUSHING CTs
TAN DELTA & CAPACITANCE MEASUREMENT OF BUSHING
INSULATION RESISTANCE MEASUREMENTS OF BUSHING CTs
VOLTAGE RATIO TEST
INSULATION RESISTANCE MEASUREMENT
MAGNETISING CURVES PERFORMANCE
FREQUENCY RESPONSE ANALYSIS STABILITY TEST OF DIFFERENTIAL AND REF PROTECTION
MAGNETISATION CURRENT TEST
FLOATING NEUTRAL VOLTAGE MEASUREMENT SHORT CIRCUIT IMPEDANCE TEST
CHECK LIST OF ELECTRICAL TESTS CARRIED OUT FOR TRANSFORMER
TAN DELTA & CAPACITANCE MEASUREMENT OF WINDINGS
CONTACT RESISTANCE MEASUREMENT
2 a
b
YES NO
Note: Impact Recorder should be detached from the Transformer/ Reactor preferably when the main unit has been placed on its foundation.
c
APPLY 1.0 KV DC BETWEEN CL & CC+G
( RECOMMENDED VALUE > 10 M Ohms)'
3
a ACTIVE PART OF TRANSFORMER SHOULD MINIMUM EXPOSED TO ATMOSPHERE b DURING EXPOSURE OF ACTIVE PART OF TRANSFORMER TO ATMOSPHERE :
YES NO
DRY AIR GENERATOR/ DRY AIR CYLINDERS USED : c
YES NO
d
BETWEEN CL-G BETWEEN CC-CL
* Please write 'NIL' in case of No Remarks
AMBIENT TEMP.
IMPACT RECORER ANALYSIS
Remarks*
REMARKS
CORE INSULATION CHECK
WHILE ENTERING IN TRANSFORMER TANK, CHECK AVAILABILITY OF PROPER OXYGEN
TRANSFORMER KEPT SEALED WITH N2 IN BETWEEN DIFFERENT ERECTION ACTIVITIES
REMARKS NO
CHECKS/ PRECAUTIONS DURING ERECTION INSULATION VALUE
Note: SHORTING LINK BETWEEN CC, CL & G TO BE REMOVED AND IR VALUE TO BE TAKEN BETWEEN CC-G, CL-G & CC-CL BETWEEN CC-G N2 PRESSURE & DEW POINT RECORD
DURING DISPATCH
NOTE: N2 PRESSURE AND DEW POINT SHOULD BE WITHIN PERMISSIBLE RANGE AS PER GRAPH PROVIDED BY MANUFACTURER AND ALSO GIVEN IN OS DOC NO D-2-03-XX-01-01 REV-01. DURING STORAGE AT SITE, DEW POINT HAS TO BE MEASURED WHENEVER ANY DROP IN N2 PRESSURE IS OBSERVED. DURING STORAGE AT SITE BEFORE COMMISSIONING, N2 PRESSURE HAS TO BE MEASURED DAILY AND RECORD TO BE MAINTAINED IN A SEPARATE SHEET.
CHECKS AFTER RECEIPT OF TRANSFORMER AT SITE:
4
CHECK MAIN TANK HAS BEEN PROVIDED WITH DOUBLE EARTHING
REMARK
RECORD DEFICIENCIES, IF ANY STATUS
ICT AND ITS AUXILIARIES ARE FREE FROM VISIBLE DEFECTS ON PHYSICAL INSPECTION
DESCRIPTION
CHECK THAT MASHALLING BOX, T/C DRIVING GEAR, DIVERTER, RADIATOR BANK PUMP & FAN MOTOR ETC HAS BEEN EARTHED
1
CHECK NEUTRAL IS GROUNDED THROUGH SEPARATE CONNECTIONS. ENSURE METALLIC REQUIREMENTS AS PER SPECIFICATION (e.g. Cu) IN EARTHING STRIPS USED ALL FITTINGS AS PER OUT LINE GENERAL ARRANGEMENT DRAWING .
ALL NUTS AND BOLTS ARE TIGHTENED CORRECTLY AS PER SPECIFIED TORQUE (AS PER MANUFACTURERS
RECOMMENDATION)
CHECK OIL DRAIN VALVES ARE PROPERLY CLOSED AND LOCKED.
ERECTION COMPLETION CERTIFICATE ALONG WITH LIST OF OUTSTANDING ACTIVITIES REVIEWED
CHECK TIGHTNESS OF TERMINAL CONNECTORS
CHECK LEVELLING OF TRANSFORMER AND ITS ACCESSORIES
OIL LEVEL IS CORRECT ON ALL BUSHINGS
BUSHINGS ARE CLEAN AND FREE FROM PHYSICAL DAMAGES
CHECK HERMETICALLLY SEALING IS INTACT IN ALL BUSHINGS
CHECK OIL LEAKAGE THROUGH ANY JOINTS / VALVES ETC.
CHECK OIL LEVEL IN MAIN / OLTC CONSERVATOR TANK
17
CKECK ALL VALVES FOR THEIR OPENING & CLOSING SEQUENCE
CHECK CABLES ARE PROPERLY FIXED AND ENSURE CABLE ENTRY AT THE BOTTOM.
ENSURE ALL POWER AND CONTROL CABLE TERMINALS ARE TIGHTENED
CHECK OIL LEVEL AT CONSERVATOR MATCHES WITH OIL TEMPERATURE OF TRANSFORMER
CHECK THAT LABELLING AND IDENTIFICATION IS PERMANENT AND SATISFACTORY
CHECK OTI AND WTI POCKETS AND REPLENISH THE OIL , IF REQUIRED
CHECK THAT BUCHHOLZ RELAY IS CORRECLY MOUNTED WITH ARROW POINTING TOWARDS CONSERVATOR
CHECK GEAR BOX OIL LEVEL IN OLTC
CHECK AVAILABILITY OF OIL IN THE BREATHER CUP
CHECK ALL ROLLERS ARE LOCKED AND TACK WELDED WITH RAILS ( WHEREEVER APPLICABLE )
CHECK DOOR SEALS OF MARSHALLING BOX IS INTACT AND ALL CABLE GLAND PLATES UNUSED HOLES ARE SEALED
CHECK STAR POINT HAS BEEN FORMED PROPERLY AND GROUNDED AT ONE END ONLY AS PER SCHEME
CHECK BUSHING TEST TAP IS GROUNDED
CHECK NO DEBRIS , LOOSE T & P AND OIL STRAINS ON AND AROUND THE TRANSFORMER
ENSURE UNUSED SECONDARY CORES OF BUSHING CT's, IF ANY, HAS BEEN SHORTED
CKECK THAT PERMANENT AND ADEQUATE LIGHITING ARRANGEMENTS ARE READY
CHECK THAT PRESSURE RELIEF VALVE IS CORRECTLY MOUNTED
CHECK THE COLOUR OF BREATHER SILICA GEL ( BLUE WHEN DRY )
35
36
37
38
39
40
41
42
43
44 CHECK VARIOUS INTERLOCKS PROVIDED WITH FIRE FIGHTING AS PER THE SCHEMATIC REF. DRG NO :
5
6 YES NO
7
MAKE
DETAILS OF RELAYS/ CONTACTORS USED : SCHEMATIC DRAWING NO.:
CHECK THAT AIR HAS BEEN RELEASED FROM THE RADIATORS AND THEIR HEADERS / OLTC BUCHHOLZ RELAY / MAIN TANK / TANK/ BUSHING TURRETS ETC.
CHECK FIRE PROTECTION SYSTEM & EMULSIFIRE SYSTEM IS ADEQUATE & READY
DESCRIPTION OF INTERLOCKS CHECKED CHECK THAT CC-CL&G ARE SHORTED
CHANGE OVER OPERATION OF AC SUPPLY FROM SOURCE-I TO SOURCE-II CHECKED
CHECK THAT ALL RADIATOR BANK VALVES ON TOP AND BOTTOM HEADERS ARE OPEN
CHECK THE FLANGES OF BUSHING & OLTC FOR ANY CRACK AFTER FIXING
CALIBRATION OF OTI & WTI PERFORMED AS PER PROCEDURE MEASUREMENT OF EARTH RESISTANCE OF ELECTRODE
SERIAL NO.
CHECK THAT ALL CABLES ARE CORRECTLY GLANDED
CHECK EXTERNAL CABLING FROM JUNCTION BOX TO RELAY / CONTROL PANEL COMPLETED
CHECK ALL CABLES AND FERRULS ARE PROVIDED WITH NUMBER AS PER CABLE SCHEDULE (CROSS FERULING TO BE CHECKED)
NO+NC
CIRCUIT REFERENCE TYPE
NOTE: VALUE OF EARTH RESISTANCE< 1.0 OHM LOCATION
VALUE (Before connection to grid) VALUE (After connection to grid)
8
8.1 BEFORE FILLING OIL, EACH DRUM HAS BEEN PHYSICALLY CHECKED FOR FREE MOISTURE AND APPEARANCE YES NO
8.2
a) CAPACITY :
b) MAKE :
c) LUBRICATING OIL OF VACUUM PUMP CHANGED OR NOT :
d) FILTER PACKS CLEANED OR NOT :
e) WHOLE FILTER MACHINE FLUSHED WITH FRESH OIL OR NOT :
f) VACUUM OBTAINED WITHOUT LOAD (milli bar) :
8.3
a) LUBRICATING OIL CHANGED OR NOT :
b) VACUUM OBTAINED WITHOUT LOAD (milli bar) :
c) DIAMETER OF VACUUM HOSE (50 mm) :
d) DRY ICE CHAMBER EMPLOYED OR NOT :
8.4
a) INSIDE PAINTED OR NOT :
b) SILICA GEL BREATHER PROVIDED OR NOT :
c) ANY OPENING LEFT UNCOVERED :
d) CAPACITY & QUANTITY :
e) CLEANLINESS OF INSIDE OF PIPES/ HOSES TO THE STORAGE TANK :
8.5 EXPOSURE DURING ERECTION Transformer to be kept sealed with N2 in between
a) First day Hrs :
b) Second day Hrs :
c) Third Day Hrs :
d) N2 pressure applied after each days erection work PSI :
e) Ambient Temperature DegC :
f) Average Relative Humidity :
g) Weather Condition rainy/ stormy/ cloudy/sunny :
8.6
a) No. of Cylinders used for displacing the air inside the tank :
b) N2 admitted from bottom valave :
c) Valve at diametriccaly opposite end at top kept open : d) No. of Cylinders used for building up 2 PSI :
N2 SEALING IN CASE OF DELAY IN OIL FILLING VACUUM PUMP FOR EVACUATION OF TRANSFORMER :
REMARKS
e. LEAKAGE = (P2-P1)xV=
a. START EVACUATING ON COMPLETE UNIT
CHECKED
(HOURLY READING TO BE TAKEN)
DATE TIME OTI OF
TANK
Record of filteration and Dry out shall be kept in a register and shall be made a part of the Pre-commissioning document.
DRYING OUT STARTED ON
IF LEAKAGE >3.6, CONTINUE EVACUATING
a. OIL FILLING IS MADE 5. DIVERTER SWITCH HOUSING
VACUUM READING IN TRANSFORMER
TANK OIL CONSERVATOR WITH AIR CELL
diverter switch housing filled and has an air cushion
Above 420 KV, 120 HRS
VACUUM READING IN FILTRATION MACHINE
RECORD OF DRYING OUT PROCESS (IF CARRIED OUT)
REMARKS & SIGN OF Mtc ENGINEER AMBIENT TEMP :
9 a AMBIENT TEMPERATURE AT THE TIME OF TEST :
TEMPERATURE OF OIL :
15 SEC. 60 SEC. 600 SEC.
10
CONNECT NEUTRAL POINT WITH EARTH JOIN 1RI AND 3 RI TERMINALS
-APPLY 415V, 3-PHASE SUPPLY TO HV TERMINALS
3Y1- 1B1
3Y1- N 1R1- N
HV+IV to LV (For 3 Wdg Tr) HV+IV Tto E (For 3 Wdg Tr)
VECTOR GROUP TEST & POLARITY CKECKING
IN CASE THERE IS ANY TEMPERATURE DIFFERENCE BETWEEN MANUFACTURERS TEST CERTIFICATE VALUE AND SITE VALUE, USE TEMPERATURE CORRECTION FACTOR PROVIDED IN OS MANUAL DOC. NO. D-2-03-XX-01-01-Rev01
1B1- 1R1
INSULATION RESISTANCE MEASUREMENT : (USING 500 V MEGGER)
REMARK, IF ANY
HV+IV + LV to E (For 3 Wdg Tr) TESTING INSTRUMENT DETAILS:
STATUS
TESTING EQUIPMENT CALIBRATION VALID OR NOT TESTING EQUIPMENT CALIBRATION VALID OR NOT
DESCRIPTION
ENSURE 2R1 -N = 2Y1 -N = 2B1 - N = CONSTANT AS 3R1 -N > 3Y1 - N > 3B1 - N, AND 3Y1 - 1B1 > 3Y1 - 1Y1
VECTOR GROUP Ynaod11 IS CONFIRMED AND POLARITY VERIFIED
11
: TESTING EQUIPMENT CALIBRATION VALID OR NOT : AMBIENT TEMPERATURE AT THE TIME OF TEST :
TEMPERATURE OF OIL :
c
DISCONNENT THE TRANSFORMER NEUTRAL FROM THE GROUND
APPLY 3 PHASE 415 VOLTS TO THE HIGH VOLTAGE WINDING AND MAKE THE MEASUREMENT IN THE
Check: After the test, neutral reconnected to Ground 3R - N
NOTE: LV WINDING RESISTANCE AT FACTORY MEASURED WITHOUT FORMATION OF DELTA. HOWEVER MEASUREMENTS CARRIED OUT AT SITE ARE AFTER FORMATION OF DELTA. HENCE A CORRECTION FACTOR OF 1.5 TIMES TO BE APPLIED IN SITE RESULTS
BETWEEN (3)
APPLY SINGLE PHASE 230 V ACROSS ONE PHASE OF HV WINDING TERMINAL AND NEUTRAL THEN MEASURE VOLTAGE IN OTHER TWO HV TERMINALS ACROSS NEUTRAL. REPEAT THE TEST FOR EACH OF THE THREE PHASES.
RESISTANCE AT 75 ºC
FLOATING NEUTRAL VOLTAGE MEASUREMENT
1 Y - N
13
:
TESTING EQUIPMENT CALIBRATION VALID OR NOT : AMBIENT TEMPERATURE AT THE TIME OF TEST :
TEMPERATURE OF OIL :
Compare with factory test results if carried out at factory
14
: TESTING EQUIPMENT CALIBRATION VALID OR NOT : AMBIENT TEMPERATURE AT THE TIME OF TEST :
TEMPERATURE OF OIL :
Remarks: To be done by Automatic Turns ratio meter BETWEEN
CURRENT MEASURED (IN LV SIDE) R - PH m AMPS
Y - PH m AMPS B - PH m AMPS Y - PH m AMPS VOLTAGE APPLIED CURRENT
MEASURED
RATIO FACTORY RATIO
MAGNETISATION CURRENT TEST :
B - PH m AMPS
TAP POS. VOLTAGE MEASURED
9
* The limiting values given in the above table to be revised as per revision in IS 1866 in future OIL
SAMPLE TAP POS.
OIL CHARACTERISTICS :
VOLTAGE APPLIED VOLTAGE MEASURED
FACTORY RATIO RATIO
16
a CHECKING OF COOLING EQUIPMENTS : i. ROTATION DIRECTION OF PUMPS
VISUAL INSPECTION OF EQUIPMENT DESCRIPTION
CHARGING CHARGING
OVER LOAD DEVICE OF DRIVING MOTOR LOCAL OPERATION (ELECTRICAL)
STEP BY STEP CONTACTOR
MANUAL OPERATION ON ALL TAPS ( LOCAL ) WITH CONFIRMATION OF THE NO. OF REVOLUTIONS AND LOCKING AT EXTREME TAPS
WINDING RESISTANCE AT ALL TAPS REMOTE OPERATION (ELECTRICAL) TAP POSITION INDICATOR
CHECK OPERATION WITH MASTER FOLLOWER SCHEME ( PARALLEL OPERATION )
OPERATIONAL TEST OF OTHER EQUIPMENTS
AFTER
12 CONTINUITY TEST OF WINDING DURING ONE COMPLETE CYCLE OF OPERATION
b PROTECTION CHECKS
R-PH Y-PH B-PH R-PH Y-PH B-PH
MOHM
R-PH Y-PH B-PH R-PH Y-PH B-PH MEGGER
MOHM
INSULATION RESISTANCE MEASUREMENT OF BUSHING CT's : ( USING 500V MEGGER)
EARTH - CORE I
20
CONTINUTY, CHECK BETWEEN TERMINAL: OK / NOT OK
a CORE BETWEEN HV IV
TERMINAL R-PH Y-PH B-PH R-PH Y-PH B-PH
CORE I 1S1 - 1S2 CORE II 2S1 - 2S2 CORE III 3S1 - 3S2 CORE IV 4S1 - 4S2
b CORE BETWEEN LV NEUTRAL
TERMINAL R-PH Y-PH B-PH
CORE I 1S1 - 1S2 CORE II 2S1 - 2S2 CORE III 3S1 - 3S2 CORE IV 4S1 - 4S2
21
a HV SIDE
CORE BETWEEN R -PHASE Y -PHASE
TERMINAL FACTORY SITE FACTORY SITE FACTORY SITE
CORE I 1S1 - 1S2 OHM
CORE II 2S1 - 2S2 OHM
CORE III 3S1 - 3S2 OHM
CORE IV 4S1 - 4S2 OHM
b IV SIDE
CORE BETWEEN R -PHASE Y -PHASE
TERMINAL FACTORY SITE FACTORY SITE FACTORY SITE
CORE I 1S1 - 1S2 OHM
CORE II 2S1 - 2S2 OHM
CORE III 3S1 - 3S2 OHM
CORE IV 4S1 - 4S2 OHM
FACTORY TEST REPORT REF NO :
c LV SIDE
CORE BETWEEN R -PHASE Y -PHASE
TERMINAL FACTORY SITE FACTORY SITE FACTORY SITE
CORE I 1S1 - 1S2 OHM
CORE II 2S1 - 2S2 OHM
CORE III 3S1 - 3S2 OHM
CORE IV 4S1 - 4S2 OHM
d NEUTRAL SIDE
CORE BETWEEN NEUTRAL TERMINAL FACTORY SITE CORE I 1S1 - 1S2
SECONDARY WINDING RESISTANCE OF BUSHING CT's (IN OHM) CONTINUITY TEST OF BUSHING CT's :
B -PHASE
B -PHASE
B -PHASE
22
(CONNECT +VE AT P1 AND - VE AT P2 )
a CORE BETWEEN HV IV
R-PH Y-PH B-PH R-PH Y-PH B-PH
CORE I 1S1 (+VE) 1S2 (-VE) CORE II 2S1 (+VE) 2S2 (-VE) CORE III 3S1 (+VE) 3S2(-VE) CORE IV 4S1 (+VE) 4S2 (-VE)
b CORE BETWEEN LV NEUTRAL
R-PH Y-PH B-PH
CORE I 1S1 (+VE) 1S2 (-VE) CORE II 2S1 (+VE) 2S2 (-VE) CORE III 3S1 (+VE) 3S2(-VE) CORE IV 4S1 (+VE) 4S2 (-VE)
23
MEASURE CURRENT ON THE SECONDARY TERMINALS
a R - PHASE HV SIDE
CORE PRIMARY CURRENT SECONDARY THEORET- ACTUAL % OF
S1 - S2 % ACTUAL CURRENT ICAL RATIO RATIO ERROR
CORE I 20 % (1S1 - 1S2) 40 %
80 %
CORE II 20 % (2S1 - 2S2) 40 %
80 %
CORE III 20 % (3S1 - 3S2) 40 %
80 %
CORE IV 20 % (4S1 - 4S2) 40 %
80 %
b Y - PHASE CORE I 20 % (1S1 - 1S2) 40 % 80 % CORE II 20 % (2S1 - 2S2) 40 % 80 % CORE III 20 % (3S1 - 3S2) 40 % 80 % CORE IV 20 % (4S1 - 4S2) 40 % 80 %
POLARITY TEST OF BUSHING CT's : WITH 1.5 V DC SUPPLY
CURRENT RATIO TEST
c B - PHASE
24
(NOT TO BE DONE FOR METERING CORE)
KNEE POINT VOLTAGE (KVp) = ______________ VOLT
a R - PHASE
MAGNETISING CURVES PERFORMANCE
HV SIDE
INTERMEDIATE VOLTAGE SIDE
O.50 X KVp
e Y - PHASE 10 MICRO-OHMS PER JOINT / CONNECTOR
R-PH Y-PH B-PH
DETAILS R-PH Y-PH B-PH R-PH Y-PH B-PH
MAKE
CONTACT RESISTANCE MEASUREMENT
INTERMEDIATE VOLTAGE SIDE
INTERMEDIATE VOLTAGE SIDE CURRENT MEASUREMENT ACROSS HV BUSHING TERMINAL JOINT ACROSS IV BUSHING TERMINAL JOINT ACROSS LV BUSHING TERMINAL JOINT ACROSS NEUTRAL CONNECTION POINT ACROSS SURGE ARRESTOR CONNECTION
27
: TESTING EQUIPMENT CALIBRATION VALID OR NOT : AMBIENT TEMPERATURE AT THE TIME OF TEST :
TEMPERATURE OF OIL :
a
VOLTAGE R PHASE Y PHASE B PHASE REMARK SITE FACTORY SITE FACTORY SITE FACTORY
2 KV 10 KV
1 KV
VOLTAGE R PHASE Y PHASE B PHASE REMARK SITE FACTORY SITE FACTORY SITE FACTORY
2 KV 10 KV
1 KV
b
VOLTAGE R PHASE Y PHASE B PHASE REMARK SITE FACTORY SITE FACTORY SITE FACTORY
2 KV 10 KV
1 KV
VOLTAGE R PHASE Y PHASE B PHASE REMARK SITE FACTORY SITE FACTORY SITE FACTORY
2 KV 10 KV
1 KV
CAPACITANCE ( MEASURED VALUE ) TAN DELTA ( MEASURED VALUE ) CAPACITANCE ( MEASURED VALUE )
INTERMEDIATE VOLTAGE SIDE HIGH VOLTAGE SIDE
TAN DELTA AND CAPACITANCE MEASUREMENT OF BUSHING
MEASUREMENT OF C2 CAPACITANCE*
MEASUREMENT OF C1 CAPACITANCE
MEASUREMENT OF C1 CAPACITANCE
MEASUREMENT OF C2 CAPACITANCE*
TAN DELTA ( MEASURED VALUE )
MEASUREMENT OF C1 TAN DELTA MEASUREMENT OF C1 TAN DELTA
MEASUREMENT OF C2 TAN DELTA*
TESTING INSTRUMENT DETAILS
MEASUREMENT OF C2 TAN DELTA*
c
VOLTAGE R PHASE Y PHASE B PHASE REMARK SITE FACTORY SITE FACTORY SITE FACTORY
2 KV 10 KV
1 KV
VOLTAGE R PHASE Y PHASE B PHASE REMARK SITE FACTORY SITE FACTORY SITE FACTORY
2 KV 10 KV
1 KV
FACTORY TEST REPORT REF NO :
* NOTE C2 VALUES SHALL BE ONLY FOR RECORD PERPOSE.
28
: TESTING EQUIPMENT CALIBRATION VALID OR NOT : AMBIENT TEMPERATURE AT THE TIME OF TEST :
TEMPERATURE OF OIL :
LV/ HV-IV with Guard GSTg Test Mode WINDING
COMBINATION VOLTAGE
* SHOULD BE COMPARABLE (+/- 0.001) WITH FACTORY VALUE SUBJECTED TO MAX OF 0.005.
MEASUREMENT OF C1 TAN DELTA
TESTING INSTRUMENT DETAILS
TAN DELTA AND CAPACITANCE MEASUREMENT OF WINDINGS LOW VOLTAGE SIDE
CAPACITANCE ( MEASURED VALUE )
MEASUREMENT OF C2 TAN DELTA*
CAPACITANCE MEASUREMENT OF C1 CAPACITANCE
MEASUREMENT OF C2 CAPACITANCE*
TAN DELTA ( MEASURED VALUE )
29
: TESTING EQUIPMENT CALIBRATION VALID OR NOT : AMBIENT TEMPERATURE AT THE TIME OF TEST :
TEMPERATURE OF OIL :
SHORT ALL 3 LV BUSHINGS, HV OPEN SHORT ALL 3 LV BUSHINGS, HV OPEN SHORT ALL 3 LV BUSHINGS, HV OPEN
………A
1U1-N, ……….V ………A
1W1-N, ………V
1V1-N,………..V ………A
2U1-N, ……….V
SHORT ALL 3 LV BUSHINGS, IV OPEN
2V1-N,………..V ………A
2W1-N, ………V
SUPPLY SHORT ALL 3 LV BUSHINGS, IV OPEN SHORT ALL 3 LV BUSHINGS, IV OPEN
………A
SHORT ALL 3 LV BUSHINGS, IV OPEN
………A
SUPPLY SHORT ALL 3 LV BUSHINGS, IV OPEN SHORT ALL 3 LV BUSHINGS, IV OPEN
1V1-N,………..V ………A
1U1-N, ……….V ………A
1W1-N, ………V ………A
SUPPLY SHORT ALL 3 LV BUSHINGS, IV OPEN SHORT ALL 3 LV BUSHINGS, IV OPEN SHORT ALL 3 LV BUSHINGS, IV OPEN
1U1-N, ……….V ………A
1V1-N,………..V ………A
1W1-N, ………V ………A
30
SL DEVICE SET FOR PROVED
NO ALARM TRIP ALARM TRIP
1 EXCESSIVE WINDING TEMPERATURE.
2 EXCESSIVE OIL TEMPERATURE.
3 OIL FLOW FAILURE NA NA
4 PRESSURE RELIEF VALVE NA NA
5 MAIN TANK BUCHHOLZ RELAY
6 OLTC BUCHHOLZ RELAY NA NA
7 FAN FAILURE NA NA
8 LOW OIL LEVEL (MOG) NA NA
9 DIFERENTIAL RELAY NA NA
10 OVER LOAD RELAY NA NA
11 EARTH FAULT RELAY ( REF ) NA NA
12 OVER CURRENT RELAY NA NA
13 INTER TRIP , IF ANY NA NA
14 TRIP FREE CHECK NA NA
15 BACKUP OVER CURRENT NA NA
16 OVER FLUX
17 PROTECTION SETTINGS APPLIED AS PER ENGG. APPROVED SETTINGS YES NO
18 STABILITY TEST OF DIFFERENTIAL & REF PROTECTION: OK NOT OK
31
a CARRIED OUT AFTER COMPLETION OF ALL COMMISSIONING ACTIVITIES YES NO
b INTERPRETATION OF TEST RESULTS CARRIED OUT YES NO
c TEST RESULTS MATCHING WITH THE FACTORY RESULTS YES NO
d FACTORY & SITE FRA TEST REPORT AVAILABLE AT SITE YES NO
32
33
a ANY ABNORMAL SOUND EMANATING FROM THE TRANSFORMER: YES NO REMARKS NO
CHECKS AFTER CHARGING OF TRANSFORMER
YES PROTECTION AND ALARMS
RECORD THE FOLLOWING AFTER CHARGING ALL ELECTRICAL TEST RESULTS COMPARED WITH FACTORY TEST RESULTS AND FOUND TO BE IN ORDER FREQUENCY RESPONSE ANALYSIS (FRA)
NOTE : PROVE THE TRIPPING OF ASSOCIATED BREAKERS BY ACTUAL OPERATION OF THE VARIOUS DEVICES AND RELAYS AS PER THE SCHEMES.
b NO LOAD CURENT AT RELAY TERMINAL
R PHASE
Y PHASE CT RATIO
B PHASE
c TEMPERATURE (AT THE TIME OF CHARGING)
OTI WTI AMBIENT
d
e YES NO
f YES NO
34
a FACTORY TEST RESULTS ARE AVAILABLE YES NO
b FINAL DOCUMENT OF PRE-COMMISSIONING CHECKS YES NO
REVIEWED AND APPROVED
c DOCUMENTS REGARDING SPARES, EQUIPMENT, O & M YES NO MANNUALS ETC AVAILABLE AT SITE FOR O & M
PURPOSE
d AFTER MODIFICATION, IF ANY, "AS BUILT DRAWINGS" YES NO ARE AVAILABLE AT SITE
SIGNATURE : SIGNATURE : SIGNATURE : SIGNATURE :
NAME : NAME : NAME : NAME :
DESIGNATION : DESIGNATION : DESIGNATION : DESIGNATION :
ORGANISATION : ORGANISATION :
( SUPPLIER REPRESENTATIVE ) ( ERECTION AGENCY ) (POWERGRID SITE I/C) ( POWERGRID COMM TEAM ) (WHEREVER APPLICABLE)
OLTC ELCTRICAL OPERATION CHECKED IN IDLE CHARGED CONDITION FROM MIN POSITION TO MAX POSITION AND BACK TO NORMAL POSITION
THERMOVISION SCANNING DONE ATLEAST AFTER 24 HOURS OF LOADING
AND REPEATED AFTER ONE WEEK REMARKS
MAXIMUM TEMPERATURE AFTER 24 HOURS
FINAL DOCUMENTATION REVIEW
REMARKS ºC
A A A
ºC ºC ºC
1
` a REGION : b DATE OF
RECEIPT AT SITE :
c DATE OF COMPLETION OF d DATE OF
ERECTION & OIL FILLING : ENERGISATION : e DETAILS OF EQUIPMENT :
i LOA NO :
viii TYPE OF NEUTRAL GROUNDING : ix YEAR OF MANUFACTURE : ORGANISATION : ORGANISATION :
( SUPPLIER REPRESENTATIVE ) ( ERECTION AGENCY ) (POWERGRID SITE I/C) ( POWERGRID COMM TEAM ) (WHEREVER APPLICABLE)
WINDING RESISTANCE MEASUREMENT OF NGR
SEC WDG RESISTANCE OF BUSHING CTs INSULATION RESISTANCE MEAS OF BUSHING CT
NAME OF TEST PERFORMED YES/ NO TEST RESULTS OK/
NOTOK INSULATION RESISTANCE MEASUREMENT
CONTACT RESISTANCE MEASUREMENT CAPACITANCE & TAN DELTA OF BUSHING
CONTINUITY TEST OF BUSHING CTs
PROTECTION AND ALARM TEST
STABILITY TEST OF DIFFERENTIAL & REF PROT.
POLARITY TEST OF BUSHING CTs
CAPACITANCE & TAN DELTA OF NGR WINDING CAPACITANCE & TAN DELTA OF WINDING GENERAL INFORMATION
CHECK LIST FOR ELECTRICAL TESTS CARRIED OUT FOR REACTOR
WINDING RESISTANCE MEASUREMENT
3 a
* Please write 'NIL' in case of No Remarks
b
YES NO
c
APPLY 1.0 KV DC BETWEEN CL & CC+G
( RECOMMENDED VALUE > 10 M Ohms)'
4
a ACTIVE PART OF REACTOR SHOULD MINIMUM EXPOSED TO ATMOSPHERE b DURING EXPOSURE OF ACTIVE PART OF REACTOR TO ATMOSPHERE :
c DRY AIR GENERATOR/ DRY AIR CYLINDERS USED : YES NO
d
Note: Impact Recorder should be detached from the Transformer/ Reactor preferably when the main unit has been placed on its foundation.
REMARKS DURING STORAGE AT
SITE BEFORE COMM.
BRIEF ANALYSIS STATUS
NOTE: N2 PRESSURE AND DEW POINT SHOULD BE WITHIN PERMISSIBLE RANGE AS PER GRAPH PROVIDED BY MANUFACTURER AND ALSO GIVEN IN OS DOC NO D-2-03-XX-01-01 REV-01. DURING STORAGE AT SITE, DEW POINT HAS TO BE MEASURED WHENEVER ANY DROP IN N2 PRESSURE IS OBSERVED. DURING STORAGE AT SITE BEFORE COMMISSIONING, N2 PRESSURE HAS TO BE MEASURED DAILY AND RECORD TO BE MAINTAINED IN A SEPARATE SHEET.
CHECKS AFTER RECEIPT OF REACTOR AT SITE N2 PRESSURE AND DEW POINT RECORD
ANALYSIS REPORT
Note: SHORTING LINK BETWEEN CC, CL & G TO BE REMOVED AND IR VALUE TO BE TAKEN BETWEEN CC-G, CL-G & CC-CL
REMARKS
WHILE ENTERING IN REACTOR TANK, CHECK AVAILABILITY OF PROPER OXYGEN REACTOR KEPT SEALED WITH N2 IN BETWEEN DIFFERENT ERECTION ACTIVITIES
5
SL. DESCRIPTION STATUS REMARK
NO YES NO RECORD DEFICIENCIES, IF ANY
5.1 REACTOR AND ITS AUXILIARIES ARE FREE FROM VISIBLE DEFECTS ON PHYSICAL INSPECTION
5.2 ALL FITTINGS AS PER OUT LINE GENERAL ARRANGEMENT DRAWING .
5.3 CHECK MAIN TANK HAS BEEN PROVIDED WITH DOUBLE EARTHING
5.4
5.5 CHECK THAT MASHALLING BOX,RADIATOR BANK, PUMP & FAN MOTOR ETC HAS BEEN EARTHED 5.6 ALL NUTS AND BOLTS ARE TIGHTENED
CORRECTLY AS PER SPECIFIED TORQUE (AS PER MANUFACTURER RECOMMENDATION)
5.7 CHECK TIGHTNESS OF TERMINAL CONNECTORS
5.8 CHECK LEVELLING OF REACTOR AND ITS ACCESSORIES
5.9 ERECTION COMPLETION CERTIFICATE ALONG WITH LIST OF OUTSTANDING ACTIVITIES REVIEWED
5.10 ANY PAINT REMOVED / SCRATCHED IN TRANSIT HAS BEEN TOUCHED UP
5.11 BUSHINGS ARE CLEAN AND FREE FROM PHYSICAL DAMAGES
5.12 OIL LEVEL IS CORRECT ON ALL BUSHINGS
5.13 CHECK HERMETICALLLY SEALING IS INTACT IN ALL BUSHINGS
5.14 CHECK OIL LEAKAGE THROUGH ANY JOINTS / VALVES ETC.
CHECK NEUTRAL IS GROUNDED THROUGH SEPARATE CONNECTIONS. ENSURE METALLIC REQUIREMENTS AS PER SPECIFICATION (e.g. Cu) IN EARTHING STRIPS USED
DETAILS :
PRE-COMMISSIONING CHECKS:
5.15 CHECK OIL DRAIN VALVES ARE PROPERLY CLOSED AND LOCKED.
5.16 CHECK OIL LEVEL IN MAIN TANK AND CONSERVATOR TANK
5.17 CHECK OTI AND WTI POCKETS AND REPLENISH THE OIL , IF REQUIRED
5.18 CKECK ALL VALVES FOR THEIR OPENING &
CLOSING SEQUENCE
5.19 CHECK THE COLOUR OF BREATHER SILICA GEL ( BLUE WHEN DRY )
5.20 CHECK AVAILABILITY OF OIL IN THE BREATHER CUP
5.21 CHECK ALL ROLLERS ARE LOCKED AND TACK WELDED WITH RAILS
( WHEREEVER APPLICABLE )
5.22 CHECK BUSHING TEST TAP IS GROUNDED
5.23 CHECK NO DEBRIS , LOOSE T & P AND OIL STRAINS ON AND AROUND THE REACTOR
5.24 CHECK DOOR SEALS OF MARSHALLING BOX
5.24 CHECK DOOR SEALS OF MARSHALLING BOX