ATTACHMENT # 5 OCS NATA Certification
NATA is Australia’s government-endorsed laboratory accreditor, and a leader in accreditation internationally.
National Association of Testing Authorities, Australia
(ABN 59 004 379 748)
has accredited
Offshore Construction Specialists Pte Ltd Singapore
following demonstration of its technical competence to operate in accordance with
ISO/IEC 17025
This facility is accredited in the field of
MECHANICAL TESTING
for the tests, calibrations and measurements shown on the Scope of Accreditation issued by NATA
Jennifer Evans
Chief Executive Officer
Date of accreditation:15 July 2013
Accreditation number:19122
ATTACHMENT # 6 OCS Personnel CVs
Offshore Construction Specialists Pte. Ltd.
Sayed Dedy Mahdy
Career Summary
• 4 Months University Field Practical, Tunu Field Development “Tunu Phase 8 EPSC 3 Project”- TotalFinaElf Indonesie.
• 9 Months as Field Engineer for PT. McConnell Dowell Indonesia.
• 1 year and 8 months working with PT McDermott Indonesia
• Currently working with Offshore Construction Specialists Pte. Ltd.
Experience
Field Engineer
June 2009 - January 2010
Amerada Hess Ujung Pangkah Phase 2, Indonesia Offshore Construction Specialists Pte Ltd
• Responsible for all Offshore Pigging Operation, Hydrotesting and Leak test of 3 subsea flowlines, 6”, 12” and 16” between WHP B and WHP A.
• Manage the offshore operation at site, together with the barge supt & the other field engineers. Work included the wellhead platform, WHP B installation, 6”, 12” and 16”
flowline installation between WHP B and WHP A. Post trenching of 6”, 12” and 16”
flowline.
Field Engineer Sept 2008 – May 2009
Asia Petroleum Development (APD) - Glagah Kambuna Project, Indonesia Offshore Construction Specialists Pte Ltd
• Responsible for all Offshore Pigging Operation, Hydrotesting and Leak test of 42 km 14” gas export pipeline from the Kambuna platform offshore North Sumatera to a landfall north east of Medan.
• Manage the offshore operation at site, together with the barge supt & the other field engineers. Work included 5 km beach approach, Pre and Post trenching of 13 km of the pipeline to a cover of 2.0 metres. Topsides installation and Hook up.
• Responsible for all Offshore Pigging Operation, Hydrotesting and Leak test of 800mtr pipeline, Flexible risers and spools.
• Manage the offshore operation at site, together with the barge supt & the other field engineers. 1 jacket(sidelift & upend) + 1 deck + 2 pipeline (10 in) + 1 SPC + 1PLEM + 4 sp tie in (10 in) + 2 flexible riser (6 in) + 1 mooring hawser
Field Engineer
November 2006 – October 2007
Project : Kerisi Field Development Phase II CPP Jacket and Deck Installation PT. McDERMOTT INDONESIA
Working with procedures and instruments preparation for 12”∅and 16”∅ spools hydrotesting. Responsible for almost all load out preparation for 3 material barges, 4 nos of Central Processing modules over 1000MT and 8 Legs Jacket load out for Central Processing Platform
Field Engineer
November 2006 – October 2007
Project : Angel Project – Substructure Installation and Pipelay PT. McDERMOTT INDONESIA
Manage and supervise technical on field for fabrication of 5 sections Articulated Stinger and refurbishment 3 sections Articulated Stinger.
Field Engineer
January 2007 – August 2007 Project : SSB T&I
PT. McDERMOTT INDONESIA
Manage and supervise technical on field for structural modification 5 sections Articulated Gulf Of Mexico Stinger and refurbishment 3 sections Articulated Stinger and 1 section truss stinger.
Field Engineer
August 2006 – September 2006
Project : Kerisi Field Development Phase I PT. McDERMOTT INDONESIA
Manage and supervise readiness of marine installation on field in subcontractor yard of 1420 MT Wellhead Platform and 1113 MT Jacket load out.
Field Engineer
July 2006 – August 2006
Project : PM3 Camau – Gas Pipeline PT. McDERMOTT INDONESIA
As-built for survey for over 289 KM from Bunga Raya (Malaysian Area) to GDS (Vietnamese
Offshore Construction Specialists Pte. Ltd.
Project : EMEPMI Seligi A- To Tapis Pump Pipeline Replacement PT. McDERMOTT INDONESIA
Prepared and manage of fabrication and refurbishment for engineering installation aid for 18”∅ crude pipeline installation, assisting in procedures and instruments preparation associated with pigging and hydrotesting. Over 60 days was spent offshore time on board DB30 to manage 21,2 KM 18”∅ crude pipeline installation, riser and two sub sea spool trough the commissioning stage.
Field Engineer
December 2005 – January 2006
Contract Value USD 2.5m – PT. NewMont NTT. Batu Hijau-Scavenger Maintenance Phase I PT. McCONNELL DOWELL INDONESIA
Performance as Project Planner for Scavenger Shut Down Project on PT. NewMont NTT.
Project Mobilization coordinator and controlling material take off.
Field Engineer
April 2005 – December 2005
Contract Value USD 4.6m + USD 1,2m Variation – Kaltim Prima Coal Service Wharf and Shiploader Jetty Refurbishment.
PT. McCONNELL DOWELL INDONESIA
Employed with PT McConnell Dowell Indonesia to manage the shiploader jetty and service wharf rehabilitation works contract. Contract involves the partial demolition and reinstatement of 15years old reinforced concrete service wharf at KPC and rehabilitation of Structural steel shiploader jetty paintwork.
Field Practical April 2002 - June 2002
Contract Value – USD 3.5m - Tunu Field Development Phase 8-EPSC 3, Aerial Pipe Installation
PT. CITRA PANJI MANUNGGAL
• Preparing Pilling Equipment that Needed for Pilling Activities
• Responsible for daily Report
• Assisting Surveying
• Liaise with third Party Inspector Badan Kualifikasi Indonesia (BKI)
• Assisting with application of work Permit
• Assisting with safety procedures
Diponegoro University, 2004
On Job Training and Courses
HUET – MSTS ASIA SDN. BHD, Johor Malaysia, 2006 Sea Survival – MSTS ASIA SDN. BHD, Johor Malaysia, 2006 Fire Fighting – MSTS ASIA SDN. BHD, Johor Malaysia, 2006
Wire Rope Inspector - Carl Stahl Evita Ltd, Batam Indonesia, February 2007 Field Engineer training 1st Module : General Topics, Singapore, 2007 Field Engineer training 2nd Module : Structural Installation, Singapore 2007
Incident Investigation training, Batam, Indonesia 2007 Task Risk Assessment training, Batam, Indonesia 2007
Firms
Nov 2007 Offshore Construction Specialist Jan 2006 to 8 Oct 2007 PT McDermott Indonesia
Apr 2005 to Dec 2005 PT Mc Connell Dowell Indonesia
Personal Details
Date of Birth : November 29, 1979
Age : 34
Nationality : Indonesian Citizenship
Languages : Bahasa Indonesia – oral & written English – oral & written
Contacts : Mobile +62-8127011155
Page 1 of 2
PERSONAL DATA
Name : Roni
DOB : 20 August 1975
Place / DOB : Belawan
Sex : Male
Marital Status : Married Nationality : Indonesia Religion : Moslem
DOCUMENT
No Document Number Date Of Issued Date Of Expiry Place Of Issued 1 Passport W 259674 30 Nov 2010 30 Nov 2015 Batam
CERTIFICATE OF COMPETENCY
No Certificate Number Date OF issued
Date Of Expiry
Place Of Issued 1. BOSIET & Travel Safely
by Boat
- 24 Nov 2010 23 Nov 2014
Batam
WORK EXPERIENCES Pre-Comm Supervisor
August 2013 to presentOffshore Construction Specialists Pte Ltd
Responsible for the maintaining High Pressure pumps and Flooding Pumps in good condition after project and prepare, function test of High Pressure pumps and Flooding Pumps before offshore work.
Operate and ensure High Pressure Pumps and Flooding pump working in good condition for Pre-commissioning work.
Completed Project:
No Company Project position Location Client Vessel Name Periode 1. Neptune SONSUB Grouting
Chinese SAIPEM MERMAID OFFSHORE
Malaysia PETRONAS ROCK WATER 2
Supervisor Brunei BSP SHELL ONSHORE 25 Mar 20013 16 May 2013
Page 1 of 5
NAME: KRISBEL SIMANJUNTAK
DATE OF BIRTH 4 May 1963
NATIONALITY Indonesian
MARITAL STATUS Married EDUCATION/TRAINING :
May 07, 2007. Basic Offshore Safety Induction & Emergency Training Including Additional OLF Modules (OPITO Approved)
February 06, 2007. Confine Space Entry and Rescue.
LANGUAGES Bahasa Indonesian (written and spoken)
English (Fair Spoken)
Career Summary
Over 26 years experience in maintain heavy equipment, engines, High Pressure pumps and flooding pumps, pipe fittings, operating related machinery.
Work Experience
Mechanic
Mar 2009 to present
Offshore Construction Specialists Pte Ltd
Responsible for the maintaining High Pressure pumps and Flooding Pumps in good condition after project and prepare, function test of High Pressure pumps and Flooding Pumps before offshore work.
Operate and ensure High Pressure Pumps and Flooding pump working in good condition for Pre-commissioning work.
Completed Projects
Oct 2013 – Nov 2013
Offshore Construction Specialists Pte Ltd Project : Leighton Offshore
Location : Jakarta - Cirebon
S513 Main Oil Line from X-Ray Field to Balongan Plant Project
Post Trenching, Free Span Correction, and Pre-commissiong Services
Task Description Jetting Technician April 2013 – May 2013
Offshore Construction Specialists Pte Ltd
Project : Brunei Shell Petroluem – Domgas Pipeline Installation Project Location : Bulan Bulan Field Development - Brunei
Jetting services for the Pile Refusal Remedial Project Task Description
Jetting Technician responsible for operating of jetting spread, monitoring the performance of equipment and troubleshooting the jetting equipment in the event of equipment breakdown.
Jetting Technician
August 2012 – January 2013
Offshore Construction Specialists Pte Ltd
Project : Chevron (Australia) – Domgas Pipeline Installation Project Location : Domgas Field Development, North West Coast of Australia
Jetting services for the 6” & 20” pipeline 1.5 km and 5.9km CW-DW and PPP-DW installation Task Description
Jetting Technician responsible for operating of jetting spread, monitoring the performance of equipment and troubleshooting the jetting equipment in the event of equipment breakdown.
Mechanic
April 2012 to May 2012
Offshore Construction Specialists Pte Ltd
Project : Conoco Philips Indonesia – Develop the Bawal Field Location : Bawal Field – Natuna Sea
Offshore Pigging and Hydrotesting work for 14” newly laid pipeline to connect the two Bawal wells (BW1 and BW2) to inline Tee and valve assemblies on the new pipeline, using rigid spools.
Mechanic
October 2011 – November 2011
Offshore Construction Specialists Pte Ltd
Project : Korea Development Company LTD. – Gas Lift Compression Project.
Location : Poleng Field – Gresik, West Java, Indonesia.
Offshore Pigging and Hydrotesting work for newly laid pipeline 6” Gas Lift Pipeline DW-PP and 6” Gas Lift DW-PP in total length 6.3 Km.
Mechanic
September 2011 – October 2011
Offshore Construction Specialists Pte Ltd
Project : Kangean Energy Indonesia Ltd. –Pre-Commissioning Services for Subsea Facilities
Page 3 of 5
Location : TSB Field, Kangean Block – Bali Sea Indonesia.
Offshore Pigging and Hydrotesting work on DSV.Crest Odyssey of 25.745km x 18” Rigid Pipeline and 2 nos of 5.2km x 20” Rigid Pipelines
Mechanic
February 2011 – July 2011
Offshore Construction Specialists Pte Ltd
Project : CHEVRON 2011 INSTALLATION CAMPAIGN.
PLATFORMS AND PIPELINES INSTALLATION Location : Chevron Thailand Oil and Gas Fields, Gulf of Thailand
Flooding and gauging work of newly laid pipelines:
16” NPPLL, 5.4 Km Long Pipeline 10” FUPLP, 5.9 Km Long Pipeline 10” PDPLB, 6,7 Km Long Pipeline 10” KPPLG, 2.7 Km Long Pipeline 10” ERPLZC, 2.4 Km Long Pipeline
As well leak testing of spools before subsea tie in of:
NPWL Platform (3 ea x 16” Spools) FUWP Platform (2 ea x 10” Spools) PDWB Platform (5 ea x 10” Spools) KPWG Platform (2 ea x 10” Spools) ERWZC Platform (2 ea x 10” Spools) Mechanic
January 2010 – March 2010
Offshore Construction Specialists Pte Ltd
Project : Hess (Indonesia – Pangkah) Ltd. – Ujung Pangkah Development Project.
Location : Ujung Pangkah oil & gas field, East Java. Indonesia
Pigging, Hydrotesting and Leak test work of 3 subsea flowlines, 6”, 12” and 16” between WHP B and WHP A.
Mechanic
August 2009 to November 2009
Offshore Construction Specialists Pte Ltd
Project : Star Energy Ltd. – Kakap Gas Development Project.
Location : Kakap Field West Natuna, Indonesia.
Offshore Pigging and Hydrotesting work for newly laid pipeline:
6” gas flowline, 2.3 Km long, KG-West 1 subsea wellhead to KG Platform,
6” gas flowline, 2 Km long, Lukah-1X subsea wellhead to KG Platform
10” pipeline 11.2 Km long. KG Platform to KF Platform Mechanic and Project Leader Man
March 2009 - June 2009
Offshore Construction Specialists Pte Ltd
Project : Serica Energy – Asia Petroleum Development Project
Location : Gelagah Kambua Field Development, Malacca Strait, North Sumatra, Indonesia
Diameter 14” 42 Km long Pipeline installations from WHP Kambuna A to onshore receiving facilities, 5km beach pull preparation operation (trenching Work), 10km jetting operation, lowering pipeline 2mtr TOP. Pre-commissioning of laid pipeline
Task Description
Mechanic & Leader man on 5KM trenching work from near shore to shore for beach pull operation, ensure the generator, air compressor and 2 unit of excavator running in good condition for 24hrs trenching operation. Maintain 24hrs operation on 5 unit jetting pumps during jetting operation and pre-commissioning job including pigging operation and hydrotesting of Dia. 14”, 42 KM pipeline.
Mechanic 1
February 2002 – August 2008 J.Ray McDermott,
Location : Batam, Indonesia
Marine onshore facility maintenance and projects preparation.
Task Description
Maintain all running heavy equipments in marine onshore facilities to ensure working in best performance. Refurbish and prepare including function test of marine E&M equipment before send to offshore for project including forklift, loader, Skagit Winch, Hydraulic Hammer, Generators, Compressors.
Special in preparing flooding pumps and high pressures pumps for offshore use.
Mechanic and Project Leader Man March 2006 – July 2006
J.Ray McDermott
Project : PM3-Camau (Offshore Gas Pipeline Installation) Location : Vietnam
Dia.16” 300KM long Pipeline installation. Beach pull preparation, 6KM trenching from near shore to shore operation to buried pipeline in various depth from 4mtr near shore to 6mtr at offshore
Task Description
Mechanic & Leader man on 6KM trenching work from near shore to shore for beach pull operation, ensure the generator, air compressor and 2 unit of excavators running in good condition for 24hrs trenching operation. Maintain 24hrs operation on 6 unit jetting pumps during jetting operation.
Mechanic 1
May 1990 – July 1999 PT. McDermott Indonesia Location : Batam, Indonesia
Fabrication yard facility maintenance Task Description
Maintain all running heavy equipments and engines in Batam fabrication yard including: fork lift, hydraulic crane, loader, generators and compressors.
Page 5 of 5
Mechanic Helper
August 1987 – June 1989 PT. Barakaz Lumber Coy Location : Riau, Indonesia Logging Operation
Task Description
Helping mechanic in maintain heavy equipment including Bulldozer, Low Vehicle Trailer, Fork Lift, Compressors and Generators.
Mohd Zakaria Bin Abdul Aziz
Mechanic / Technician Nationality: Malaysian
Date of Birth: 11-March-1986 Marital Status: Single
Languages: English and Bahasa Melayu
Education / Training
High School Graduate
Basic Offshore Safety Induction & Emergency Training Including Additional OLF Modules and Travel Safety By Boat (OPITO Approved)-Validity 06-Jan-2015
Career Summary
Eight years of experience in offshore construction and engineering as a technician commissioning team. Specialists in Pipeline Pigging, Flooding, Hydro Test, Dewatering, Drying, Nitrogen Purging, Commissioning & Decommissioning
He start his career in November 2004 in Oil and Gas Pipeline Installation and commissioning and he’s project completion and work experience in Malaysia and Singapore.
During his time as a technician, he gained much experience in the offshore jobs for Cleaning, Hydro Testing, Dewatering, Drying and Nitrogen Packing.
He is also familiar with the Blowing, Flushing and Leak Testing jobs
.
Work Experience
MechanicJan 2010 to present
Offshore Construction Specialists Pte Ltd
Page 2 of 6
Responsible for the maintaining High Pressure pumps and Flooding Pumps in good condition after project and prepare, function test of High Pressure pumps and Flooding Pumps before offshore work.
Operate and ensure High Pressure Pumps and Flooding pump working in good condition for Pre-commissioning work.
Completed Projects:
Mechanic
July 2013 – August 2013
Offshore Construction Specialists Pte Ltd Project : TIMAS-EHMRS
Location : Indonesia – South China Sea
Provision of Engineering Services and Subcontract Equipment associated with the installation of Flexible flowlines for COPI Belanak Project
Precom Technican July 2013
Project: Hess Exploration & Production Malaysia BV. FPSO for FPSO North Malay Basin – Grouting Project
Location: North Malay Basin (Kota Bahru)
Kamelia Field – precommissiong work for Flooding Production, Storage and offloading vessel Lewek Arunothai.
Mechanic
January 2013 – April 2013
Offshore Construction Specialists Pte Ltd
Project : Asian Energy Services – AES VSP Dangdo Thang Long Launch Location : Su Tu Vang Field, Thang Long-Dong Do Field, Vietnam
The preparation, rig up and execution of the jacket launch. The jacket weighed 4100mT was loaded and launch off the launch engineering, procedure preparation, physical barge rig up and site supervision and management of the launch operation, while Asian Energy performed the launch and transportation engineering.
Mechanic
August 2012 – January 2013
Offshore Construction Specialists Pte Ltd
Project : Chevron (Australia) – Domgas Pipeline Installation Project Location : Domgas Field Development, North West Coast of Australia
Jetting services for the 6” & 20” pipeline 1.5 km and 5.9km CW-DW and PPP-DW installation Task Description
Jetting Technician responsible for operating of jetting spread, monitoring the performance of equipment and troubleshooting the jetting equipment in the event of equipment breakdown.
Mechanic
April 2012 to May 2012
Offshore Construction Specialists Pte Ltd
Project : Conoco Philips Indonesia – Develop the Bawal Field Location : Bawal Field – Natuna Sea
Offshore Pigging and Hydrotesting work for 14” newly laid pipeline to connect the two Bawal wells (BW1 and BW2) to inline Tee and valve assemblies on the new pipeline, using rigid spools.
Mechanic
September 2011 – October 2011
Offshore Construction Specialists Pte Ltd
Project : Kangean Energy Indonesia Ltd. –Pre-Commissioning Services for Subsea Facilities of TSB Field Development
Location : TSB Field, Kangean Block – Bali Sea Indonesia.
Offshore Pigging and Hydrotesting work on DSV.Crest Odyssey of 25.745km x 18” Rigid Pipeline and 2 nos of 5.2km x 20” Rigid Pipelines
Mac 2011 – May 2011
Offshore Construction Specialists Pte Ltd
Project : Dai Hung Field Development VSP -WHP DH2 JACKET LAUNCH Project Location : VietsovPetro, Vung Tau, Vietnam
Commence reeving of port side sheave blocks using a messenger to pull 56mm wire through 500T construction blocks back to 70t hydraulic winch. ‘Straight’ lace configuration. Launched with VSP-05 (WD ~100m)
EMAS - Chevron Offshore (Thailand) Ltd.
HESS (Indonesia-Pangkah) Ltd Phase II Transportation and Installation Location - Surabaya, East Java Sea, Indonesia
Transport of CPP Deck, AUP Deck and LQ, Compression module, Bridges and flare boom
CPP and AUP Jackets were installed during the first campaign in the 4th Quarter 2010 utilizing the DLB QP 2000. CPP and AUP jackets are 4 legged jackets with an approximate unit weight of 300 tonne and 48” diameter steel pile foundations. The piles were driven with a MHU270T to 95 meter penetration.
HESS Ujung Pangkah –Phase 1 Location - East Java Sea, IndonesiaTransporation and Installation of one 8 legged Well Head platform (WHP-B) and 3 pipelines (6”
Gas lift, 12” Oil and 16” Gas) x ~5.5km between WHP-B and WHP-A (existing) including pre-commissioning.
Page 4 of 6
Kakap Field KG Gas Development Project – Provision of EPCI of KG Gas Development Project Services including pre-commissioning.Project: REINSTATEMENT TEST FOR CAKERAWALA TOP SIDE N2 HE LEAK TEST FOR BULAN A Client: Pertonas Carigali
Year: (Dec) 2007
Scope of work: Leak testing.
Project: EPCC of Segamat Compressor Station Expansion Project
Client:
PETRONAS GASYear: (July) 2007
Scope of work: Blowing,Flushing,Hydrotesting and Nitrogen Packing
Project: EPCC of Nutral Gas Disiribution to Semenyih
FL stage 1/05 Jalan Persekutuan 1 Semenyih-Beranang Client: Gas Malaysia
Year: (Mar) 2007
SCOPE OF WORK: CLEANING, HYDRO TEST, DEWATERING, DRYING, NITROGEN PACKING.
Project: EPCC of Nutral Gas Disiribution to Kundang
FL DL stage 1/05 Kundang Sungai Buloh Selangor.
Client: Gas Malaysia Year: (Jan) 2006
Scope of work: Cleaning,Hydro Test,Dewatering,Drying,Nitrogen Packing
Project: EPCC of Nutral Gas Disiribution to Setiawan FL stage 2/05 Setiawan Perak.
Client: Gas Malaysia
Year: (Feb)2006
Scope of work: Cleaning,Hydro Test,Dewatering,Drying,Nitrogen Packing.
Project: EPCC of Nutral Gas Disiribution to Kapar
FL stage 1/05,Kapar Klang Selangor.Client: Gas Malaysia Year: (Jan) 2006
Scope of work: Cleaning,Hydro Test,Dewatering,Drying,Nitrogen Packing.
Project: EPCC of Nutral Gas Distribution System to Sungai Buloh FL Stage 3/05, Sungai Buloh selango
Client: Gas Malaysia.
Year: (Dec)2005
Scope of work: Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.
Project: EPCC of GPRW at Road B15 From SKVE to KVDT Precint 11, Putrajaya Selangor.
Client: Gas Malaysia.
Year: (Dec)2005
Scope of Work: Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.
PROJECT: EPCC OF NUTRAL GAS DISTRIBUTION SYSTEM TO NORTH PORT
FL DL STAGE 1/05, PORT KLANG SELANGOR.Client: Gas Malaysia.
Year: (Nov)2005
Scope of Work: Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.
Project: EPCC of Nutral Gas Disiribution to Bukit Rambai FL DL Stage 1/05 Bukit Rambai Melaka
Client: Gas Malaysia Year: (Oct) 2005
Scope of work: Cleaning,Hydro Test,Dewatering,Drying,Nitrogen Packing
Project: EPCC of Nutral Gas Disiribution to Tangga Batu
FL DL Stage 1/05 Tangga Batu Area Melaka.Client: Gas Malaysia
Year: (Sept)2005
Scope of work: Cleaning, Hydro Test, Dewatering, Drying, Nitrogen Packing.
Project: EPCC of Nutral Gas Disiribution System to Ayer Keroh FL DL Stage 1/04, Industri Area Ayer Keroh Melaka.
Client: Gas Malaysia.
Year: (Sept)2005
Scope of work: Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.
Project: EPCC of Nutral Gas Disiribution to Ijok
FL Stage 1/05, Ijok, Kuala SelangorClient: Gas Malaysia
Year: (Jun) 2005
Page 6 of 6