PIPELINE PRE-COMMISSIONING

PRE-QUALIFICATION DOCUMENT

Offshore Construction Specialists (OCS)

20 Toh Guan Road

CJ GLS Building #07-02

Singapore 608839

Tel: +65 6567-9080

Fax: +65 6567-8082

Web: http://www.offshore-ocs.com/index.html

Contact Information

Contact Company Position Email Address.

Keith Jackson Managing and Technical Director [email protected]

Seto Jian Operations Manager [email protected]

William Wijaya Project Manager [email protected]

Loke Kah Poh Project Manager [email protected]

Rakul Remanan Engineering Manager [email protected]

Henry Chuy Subcontracts & Procurement Manager [email protected]

Alastair Wong Senior Project Engineer [email protected]

(2)

TABLE OF CONTENTS

1.  INTRODUCTION ... 3 

2.  OCS ORGANISATION CHART ... 4 

3.  TYPICAL PRECOMMISSIONING ORGANISATION CHART... 6 

4.  PIPELINE PRECOMMISSIONING ACTIVITIES ... 7 

5.  SAFETY AND SAFE WORKING PRACTICES. ... 7 

6.  ENGINEERING AND PROCEDURES. ... 8 

7.  PROCUREMENT. ... 8 

8.  FABRICATION. ... 8 

9.  PIPELINE FLOODING, CLEANING AND GAUGING. ... 8 

10.  PIPELINE INTELLIGENT AND CALLIPER PIGGING. ... 8 

11.  PIPELINE HYDROTESTING ... 8 

12.  PIPELINE BULK DEWATERING ... 8 

13.  PIPELINE AIR DRYING. ... 8 

14.  PIPELINE VACUUM DRYING ... 8 

15.  NITROGEN PACKING ... 8 

16.  EXISTING AND PAST CLIENTS ... 9 

17.  COMPLETED PROJECTS ... 10 

18.  EQUIPMENT DATA SHEETS ... 18 

(3)

1. INTRODUCTION

Offshore Construction Specialists (OCS) was formed in 2007 from a core group of marine construction engineers to provide construction management, engineering and strategic support equipment services primarily to the offshore oil and gas sector.

Our key personnel come from previous careers at J.Ray McDermott in the marine operations department. Our managing and technical director Mr Keith Jackson worked for 17 years in the group the last 5 years as the marine division manager.

As a matter of policy under Mr Jackson J.Ray McDermott would execute work peripheral to that being undertaken by the major work vessel (normally executed using third party subcontractors) using in-house resources. Pipeline pre-commissioning, pre and post trenching, flexible flowline / umbilical lay are examples of work that was routinely carried out in-house and not subcontracted. One of the main reasons for doing this was that it prevented the activities of the subcontractor impinging on the work of the high cost marine spread. The work was always planned with maximum operational synergy in mind

In JRM large pipeline pre-commissioning projects such as the 650 km West Natuna gas gathering pipeline network and many other major projects were planned and executed in-house. OCS has taken the model developed in JRM and applied it to our own activities. Our equipment is managed and operated by people who come from the same background as the main marine contractor. We help the marine contractor plan the work such that the pre-commissioning has the least impact on operations. We are proactive in highlighting potential issues and ensuring both parties win. Our engineering capabilities are very sophisticated and significantly more advanced than our competitors.

OCS has now completed a range of pre-commissioning projects for many different customers with great success. OCS is certified by Nata for pipeline hydrotesting which is the preeminent qualification for pre-commissioning contractors. The OCS organisation has also been qualified to IS0 9001 since 2009.

Our in-house equipment spread has grown significantly and is described in detail in this document. OCS is equipped to handle the full range of pre-commissioning activities including flooding, cleaning, gauging, hydrotesting, dewatering, drying and nitrogen packing. We work with established intelligent and caliper pig suppliers to complement our service. We have established long term relationships with key Singapore and overseas vendors.

OCS is equipped to handle large projects or discrete project elements depending on the specific needs of the customer.

The company has grown steadily since incorporation and now employs 60 personnel of whom 30 are civil/structural and mechanical engineers working with our pre-commissioning technicians. The company office in Toh Guan Rd, Singapore has been leased until 2014 and has room for additional expansion. The office can accommodate customer representatives for liaison as necessary.

(4)

2.

OCS ORGANISATION CHART

KEY PERSONNEL CONTACTS

Keith Jackson Managing and Technical Director [email protected]

Seto Jian Operations Manager [email protected]

William Wijaya Project Manager [email protected]

Loke Kah Poh Project Manager [email protected]

Rakul Remanan Engineering Manager [email protected]

Henry Chuy Subcontracts & Procurement Manager [email protected]

Alastair Wong Senior Project Engineer [email protected]

(5)

PROJECT & CONSTRUCTION MANAGEMENT PROCUREMENT & SUBCONTRACTS SETO JIAN OPERATIONS MANAGER KP LOKE PROJECT MANAGER NG BEE KIM

ACCOUNTS, HR & ADMIN LEAD

CHUY CHUN FEI

SUBCONTRACTS & PROCUREMENT MANAGER CONSTRUCTION ENGINEERING FIELD CONSTRUCTION OPERATIONS SAYED DEDY PRE-COMM ENGINEER DRAFTING PRAVIN THORAT SENIOR STRUCTURAL ENGINEER SUDHAKAR ANDY K. PRIYA PANJIROSA ZIA AL AKBAR STRUCTURAL ENGINEERS CHANIN SRIYAPORN SNR. DRAFTING ALASTAIR WONG SNR PROJECT ENGINEER/ PRE-COMM MANAGER FERY WIJAYA PROJECT MANAGER BODIE MALLET SETTHA Y. IVAN CHAI (OPERATIONS/ SNR. FIELD ENGINEER) LENI TALAVERA RECEPTIONIST CUM ADMIN CLERK

KRISBEL BUDIMAN ZACK INDRA IDHAM TECHNICIANS MECHANICS OPERATIONS ADMINISTRATION GILBERT GREJALDO ACCOUNT EXECUTIVE UDAY SARATHY MOHAN CHAND SENIOR PIPELINE ENGINEER JOYCE LIM SUBCONTRACT / PROCUREMENT ADMINISTRATOR MONICA ZHANG ACCOUNTANT JULIANNE OOI HR ADMINISTRATOR ARYO PRAKOSO SNR. DRAFTSMAN CHARLESTAN BUYER / EXPEDITOR ACCOUNTS PLANT & EQUIPMENT ADI CAHYA AARON LIAN TRACY EE ZHONG ZHIYUAN DAVID SHAW CHEAH WIN LOONG CHATCHAI W. SEAN SIA TIN WEI DANIEL CAO FIELD ENGINEERS ENGINEERING RAMIL ZAPANTA VINOTH KUMAR DRAFTSMAN RAKULREMANAN ENGINEERING MANAGER OPERATIONS STRATEGIC EQUIPMENT

TEAM CONSTRUCTION FIELD SUPERVISION TEAM JAMIE JACOBSEN LEON COAD DAVID WOOD FIELD FOREMANS JAMES CARROLL FIELD

SUPERINTENDENT TRACY TEEURISA L

DOCUMENT CONTROLLER EQUIPMENT MANAGEMENT WILLIAM WIJAYA EQUIPMENT MANAGER *ADMINITRATION *ADMINITRATION SUPPORT TEAM: TRACY & URISA

JAW LE E & M COORDINATOR RONI GROUTING SUPERVISOR TOOLAYA R IT ENGINEER REMARK: HERYANTHO Y L TAUFAN S. SAINUL ABID SAVOY AMITH PRASAD NAVAL ARCHITECT

(6)

3. TYPICAL

PRECOMMISSIONING ORGANISATION CHART

OCS Pre-commissioning Team offshore ONSHORE OFFSHORE CLIENT KP LOKE WILLIAM WIJAYA PROJECT  MANAGERS RAKUL  REMANAN ENGINEERING  MANAGER PRAVIN THORAT HERY LEMBANG SUDHAKAR  SUBRAMANIAM UDAYSARATHY MOHAN ZIA AKBAR TAUFAN SIREGAR PRIYA PANJIROSA AMITH PRASAD SAVOY SAINUL ABID CONSTRUCTION  SUPPORT  ENGINEERS CHANIN  SRIYAPORN ARYO PAKOSO RAMIL ZAPANTA VINOTH DRAFTING ALASTAIR WONG FERY WIJAYA PROJECT  ENGINEERS SAYED DEDY  MAHDI ADI CAHYA BODIE MALLET SETTHA Y. IVAN CHAI CHONG CHIA YAN AARON LIAN DAVID SHAW CHEAH WIN  LOONG CHATCHAI SEAN SIA FIELD ENGINEERS HENRY CHUY SUBCONTRACTS &  PROCUREMENT  MANAGER JOYCE LIM EXPEDITOR/ BUYER CHARLES TAN BUYER/ SUBCONTRACTS  EXECUTIVE

(7)

4. PIPELINE

PRECOMMISSIONING

ACTIVITIES

OCS experience embraces the full range of pipeline pre-commissioning activities from the initial flooding, cleaning, gauging and hydrotesting to dewatering, drying and nitrogen purging and packing.

Specific activities undertaken by OCS:

No. Description

1 Flooding, Cleaning and Gauging. 2 Calliper and Intelligent Pigging. 2 Hydrotesting 3 Dewatering/ Swabbing 4 Air Drying 5 Vacuum Drying 6 Nitrogen Purging 7 Nitrogen Packing

OCS provides a cradle to grave pipeline pre-commissioning services including complete engineering, procurement, fabrication and execution services. Our in-house inventory is extensive and our personnel are well trained.

5.

SAFETY AND SAFE WORKING PRACTICES

OCS is acutely aware of the dangers involved in the marine construction industry in general and in pipeline pre-commissioning particularly where high pressure water and air and heavy equipment, chemicals etc combine to create a range of potential hazards if not managed properly.

All OCS activities on specific projects are the subject of hazids and risk assessments to ensure levels of risk are reduced to as low as reasonably practical. These risk assessments are ideally attended by the main contractor and the ultimate client.

Other specific safety and operational measures that are taken:

i) All OCS personnel have appropriate Bosiet offshore sea survival training ii) OCS technicians are Nata qualified and well trained for their specific duties iii) All OCS equipment is provided with a specific safety passport.

iv) Offshore hazardous areas are barricaded as required and unauthorized personnel are excluded.

v) All installation aids are properly engineered and subject to structural checks by the OCS CSE group.

(8)

6.

ENGINEERING AND PROCEDURES

OCS prepares project specific engineering and procedures for each job undertaken. What sets OCS apart from other pre-commissioning contractors is our engineering skills base which means that all structural, mechanical, hydrodynamic and aerodynamic considerations are addressed in-house. OCS procedures will address:

i) Project specific procurement requirements.

ii) Equipment specification requirements and preparations.

iii) Designs of Pig launchers and receivers for Flooding, Cleaning and Gauging. iv) Designs of Hydrotest heads.

v) Designs of Pig Launchers and Receivers for Dewatering and Drying. vi) Pig Requirements and Designations.

vii) Intelligent and Calliper Pigging requirements. viii) Chemical injection requirements.

ix) Hydrotesting pressurization, strength and leak tests.

x) Bulk Dewatering.

xi) Drying Procedures using Air or Vacuum drying techniques. xii) Nitrogen Packing.

7. PIPELINE PRE-COMMISSIONING PROCEDURES

PLEASE REFER TO APPENDIX 1

8. FABRICATION

9.

PIPELINE FLOODING, CLEANING AND GAUGING

10. PIPELINE INTELLIGENT AND CALLIPER PIGGING

11. PIPELINE

HYDROTESTING

12. PIPELINE

BULK

DEWATERING

13. PIPELINE

AIR

DRYING

14. PIPELINE VACUUM DRYING

15. NITROGEN

PACKING

(9)

8 EXISTING AND PAST CLIENTS

OCS has built up a significant customer base during four (4) years of operations. OCS past and present clients are listed below. References can be provided on request.

No. Client Name

1 Star Petroleum ( Indonesia) 2 HESS ( Indonesia)

3 Asia Petroleum Developments (Salamander) ( Indonesia)

4 Kangean Energy ( Indonesia) 5 NuCoastal ( Thailand)

6 Chevron (Thailand)

7 EMAS ( Singapore)

8 Larsen & Toubro ( Malaysia/ India)

9 SapurasAcergy ( Malaysia)

10 TLO SapuraCrest ( Malaysia)

11 Heerema (Holland)

12 NorCe ( Singapore)

13 Offshore Marine Contractors

14 Vietsovpetro (VSP) (Vietnam)

15 Timas Suplindo ( Indonesia)

16 Nippon Steel (Indonesia)

17 Newfield Peninsula Malaysia ( Malaysia)

18 Franklin Offshore ( Singapore)

19 M3 Energy ( Malaysia)

20 Sarku ( Malaysia)

21 Hako Offshore ( Singapore)

22 Global Industries ( Malaysia)

23 Sea Drill ( Singapore)

24 Origin Energy (Australia)

25 Swiber ( Singapore)

26 Galoc ( Philipines)

(10)

9. COMPLETED

PROJECTS

Year Project Title Client Pipeline

Dia (“)

Length

(km) Scope Of Work Location

2007 GFI EOCP EMAS

offshore Construction and Production 10” 6” Flexible 0.8 0.1 Flood, Clean, Gauge and Hydrotest/Leak test Gulf of Thailand 2008 Galoc Development Project EOCP EMAS offshore Construction and Production 6 “ Spool 6” Flexible

0.7 Leak Test 65km off

North West Coast of Palawan Island 2008 Nexus Australia- Bass Strait

Nexus PLEM &

Startup Heads

- Leak Test Singapore

2009 Asia Petroleum

Development (APD) – Glagah

Kambuna Field Development

PT Timas 14 “ 42 Flood, Clean,

Gauge and Hydrotest From the Kambuna platform offshore North Sumatera to a landfall Northeast of Medan 2009 Star Petroleum Kakap Field Redevelopment PT Timas 10” 6” 6” 11.2 2 2.3 Flood, Clean, Gauge and Hydrotest Kakap Field located in the Indonesian West Natuna Sea 2009 M3nergy JDA Sdn Bhd/ Carigali-PTTEPI-JDA Block B-17 Franklin Offshore

11” Flexible 0.24 Leak Test Offshore Malaysia 2010 HESS Ujung Pangkah Development PT Timas 6” 12” 16” 5.5 5.5 5.5 Flood, Clean, Gauge, Hydrotest, Dewater, Air &

Vacuum Dry and Nitrogen Packing Ujung Pangkah, Gresik in Surabaya Indonesia

(11)

Year Project Title Client Pipeline Dia (“)

Length

(km) Scope Of Work Location

2011 Kangean Energy Indonesia Limited – TSB Development PT Timas 18” 20” 20” 25 5.5 5.5 Flood, Clean, Gauge and Hydrotest, Dewater, Dry and Nitrogen Packing Bali Sea, approximately 120km from Pagerubgan Island

2011 Kodeco Project PT Timas 6” 7 km &

6km Flood, Clean, Gauge and Hydrotest Java Sea 2011 Chevron (Thailand) EMAS 10” 16” 35 km & 35 km Flood, Clean, Gauge and Hydrotest Gulf Of Thailand 2011 TSB Kangean PT Timas 18” 20” 25.745 km & 5.2km Flood, Clean, Gauge and Hydrotest, Dewater, Dry and Nitrogen Packing Java Sea

2012 Bawal PT Timas 14” 40 km Flood, Clean,

Gauge and Hydrotest

Natuna Sea

2012 Bien Dong DOF Subsea 6” flexible 400m LeakTest Vietnam

2013 Zawtika L&T 18” 18” 11.3 km & 9.7km Flood, Clean, Gauge and Hydrotest Myanmar 2013 PTTEP Bongkot Riser Replacement

DOF Subsea 6” 80m LeakTest Gulf Of

Thailand 2013 Pertamina EP MOL Project Leighton Offshore 12” 28km Flood, Clean, Gauge, Hydrotest and Dewater Java Sea 2012 Pertamina UL Project

PT Timas 12” 12 km Flood, Clean,

Gauge and Hydrotest Java Sea 2012 Pertamina EP L-Parigi PT Timas 20’ / 14” 500m/3.3 km Flood, Clean, Gauge, Hydrotest Java Sea

(12)

2014 Petronas Ketapang

PT Timas 12” 111 km Flood, Clean,

Gauge, Hydrotest, Dewater, Dry, N2 Pack. 2014 Petronas Ketapang PT Timas 8/12”/16” 700 m each Flood, Clean, Gauge, Hydrotest, .

(13)

GFI (Thailand) Pigging and Hydrotesting Photos (Nov 2007 to Jan 2008)

Flexible Riser Leak For M3nergy JDA Sdn Bhd / Carigali-PTTEPI - JDA Block B-17, Offshore Malaysia. ( Sep 2009) Photos

(14)

Star Energy (KAKAP) Pipeline Project– Pigging & Hydrotest (Oct 2009) Photos

Asia Petroleum Development (APD) Pigging and Hydrotesting. - Glagah Kambuna Field Development Project (Mar 2009) Photos

(15)

HESS (UJUNG PANGKAH) Pipeline Project–

Pigging, Hydrotest, Dewatering, Drying & N2 Pack (Jan – Feb 2010) Photos

Chevron Thailand Project

(16)

Kangean Project

Pigging, Hydrotest, Dewatering, Air drying and N2 packing (Aug- Nov 2011) Photos

Kodeco Project

(17)

Zawtika Project, 2013

(18)

18. EQUIPMENT DATA SHEETS

OCS operates a comprehensive range of pre-commissioning equipment. Each piece of equipment has it own equipment passport which is maintained from project to project. This helps ensure that only appropriately maintained equipment is supplied to projects.

A sample of our equipment passport is included below.

7.1. FLOODING PUMP SERIES 1

FLOODING PUMP - 03 Nos.

Capacity 320 Cu.m / Hr

Maximum Head 171 meters

Engine Make Detroit Diesel 8V-92TA 450BHP

(19)
(20)
(21)

7.2. FEED PUMP

FLOODING PUMP - 02 Nos.

Capacity 1590 Cu.m / Hr

Maximum Head 25 meters

Engine Make Detroit Diesel 8V-92TA 450BHP

(22)
(23)
(24)

7.3. DIESEL DRIVEN FLOODING / JETTING PUMP SERIES 2

(HIGH PERFORMANCE)

FLOODING PUMP - 02 Nos.

Capacity 335 Cu.m / Hr

Maximum Head 260 meters

Engine Make Detroit Diesel 12V-149TI 1130BHP

(25)
(26)
(27)

7.4. DIESEL DRIVEN HIGH PRESSURE PUMP SERIES 2 (HIGH

PERFORMANCE)

HIGH PRESSURE DISEL DRIVEN

PUMP - 01 Nos.

Capacity 180 liters / Minute

Maximum Pressure 7250 psig

Engine Make Johndeere 160kw 6 cylinder diesel engine

Pump Make Woma 2502 P40

(28)
(29)

7.5. HIGH PRESSURE DISEL DRIVEN PUMP SERIES 1

HIGH PRESSURE DISEL DRIVEN

PUMP - 01 Nos.

Capacity 35-37 liters / Minute

Maximum Pressure 8000 psig

Engine Make Isuzu 50 HP-4 cylinder (turbocharged & water cooled)

Pump Make Den-Jet CD 40-550

7.6. HIGH PRESSURE AIR DRIVEN PUMP

HIGH PRESSURE AIR DRIVEN

PUMP - 01 Nos.

Capacity 20 liters / Minute

Maximum Pressure 7,500 psig

Maximum Air Supply Pressure 125 psig

(30)

HIGH PRESSURE AIR DRIVEN

PUMP - 04 Nos.

Capacity 4 liters / Minute

Maximum Pressure 600 psig

Maximum Air Supply Pressure 120 psig

(31)

7.7. DEAD WEIGHT TESTER DEAD WEIGHT TESTER + WEIGHT

SET - 02 Nos.

Make DH –BUDENBERG MODEL 580 DX

Range 0-700 bar

Accuracy 0.025 %

(32)

7.8. PRESSURE/TEMPERATURE RECORDER

PRESSURE RECORDER - 03 Nos.

Make BARTON

Range 0-5000 psi

Accuracy ± 1 % FS

TEMPERATURE RECORDER - 02 Nos.

Make SCOTECH Range 0-50o C Accuracy ± 1 % FS PRESSURE-TEMPERATURE DUAL RECORDER - 02 Nos. Make BARTON Range 0-5000 psi/0-100o C Accuracy ± 1 % FS

(33)

7.9. 8 X 10 FT BREAK TANK (18 Cu.m Capacity) - 01 Nos

(34)

7.10. VACUUM PUMP

VACUUM PUMP - 01 Nos.

Capacity 1020 Cu.m / Hr

Booster Make Edwards mechanical booster Model EH1200, Hydrokinetic Drive

Pump Make Edwards high vacuum pump Serial 220. EIM 275

7.11. PRESSURE TRANSDUCER & READOUT)

- 03 Nos.

Type 750C, ABSOLUTE PRESSURE TRANSDUCER

Make/ Range MKS

Accuracy/ Input/ Output

10 MILLIBAR , 100 MILLIBAR , 1000 MILLIBAR

1% OF FULL SCALE

+13 TO +32 VDCINPUT, 0-10VDC O/P

- 02 Nos.

Type DIGITAL SUPPLY AND READOUT

Make/ Range MKS

Input Power

(35)

7.12. HEATED REGENERATIVE DESICCANT AIR DRYER & AIR COOLED AFTER COOLER

Regenerative compressed air dryer use desiccant to absorb water vapour from the compressed airstream. In the twin tower design, one tower dries the air from the After-cooler while the dessicant in the other tower is being regenerated to provide continuous operation. A heater is added to heat the purge air. It not only benefits the regeneration effect but also decreases regeneration purge loss.

Desiccant: activated alumina + molecular sieve Purge air: <3 ~ 6%

Working pressure: 24 barg Inlet oil content: < 0.1 mg/m3

Pressure dew point: - 40oC to - 50oC Inlet temperature: - 0oC to 45oC Capacity: 150 Nm3/min

Heater: 50 kW

Dimension: 2.9 x 2.2 x 3.5m Weight: 5.9 mT

Lifting skid are mounted.

Air Cooled After Cooler is auxiliary equipment of air compressor, after which the high temperature and high pressure air is cooled. Most of the vapour is condensated and discharged out of compressor in order to meet the working conditions of downstream drying equipment. The medium of cooling is air.

Capacity: 150 Nm3/min Power requirement: 2.5 kW Dimension: 2.9 x 2.2 x 3.5m Weight: 5.9 mT

(36)

7.13. LIQUID N2 CONVERTER

1. Operating parameters:

 Design temperature load bearing/pressure retaining –20 Deg to + 50 Deg C.  Design temperature machinery –20 Deg to + 50 Deg C.

2. Diesel Engine

 Detroit Diesel model 8V 71T

 Rated to produce 420 BHP @ 2100 RPM. (Continuous) 3.. Gearbox

 Marco 3 pad hydraulic pump drive gearbox

 Marco Gearbox will be enclosed coupled on engine flywheel 4. Start System

 Air starter 5 . Hydraulic System

 Twin Commercial hydraulic pumps for Low and High pumping rate, motors and relief valves.  heat exchanger.

6. Cryogenic High Pressure System  Paul triplex.

 Max. Pressure: 10,000 psi.  Flow Rate: 3,000 SCFM.  Discharge Temperature: 70o

F. 7. Control Panel

 A stainless steel control panel 8. Skid/Frame

(37)
(38)

ATTACHMENT # 5 OCS NATA Certification

(39)

NATA is Australia’s government-endorsed laboratory accreditor, and a leader in accreditation internationally.

National Association of Testing Authorities, Australia

(ABN 59 004 379 748)

has accredited

Offshore Construction Specialists Pte Ltd

Singapore

following demonstration of its technical competence

to operate in accordance with

ISO/IEC 17025

This facility is accredited in the field of

MECHANICAL TESTING

for the tests, calibrations and measurements shown on the

Scope of Accreditation issued by NATA

Jennifer Evans

Chief Executive Officer

Date of accreditation:15 July 2013

Accreditation number:19122

(40)

ATTACHMENT # 6 OCS Personnel CVs

(41)

Offshore Construction Specialists Pte. Ltd.

Sayed Dedy Mahdy

Career Summary

• 4 Months University Field Practical, Tunu Field Development “Tunu Phase 8 EPSC 3 Project”- TotalFinaElf Indonesie.

• 9 Months as Field Engineer for PT. McConnell Dowell Indonesia.

• 1 year and 8 months working with PT McDermott Indonesia

• Currently working with Offshore Construction Specialists Pte. Ltd.

Experience

Field Engineer

June 2009 - January 2010

Amerada Hess Ujung Pangkah Phase 2, Indonesia

Offshore Construction Specialists Pte Ltd

• Responsible for all Offshore Pigging Operation, Hydrotesting and Leak test of 3 subsea flowlines, 6”, 12” and 16” between WHP B and WHP A.

• Manage the offshore operation at site, together with the barge supt & the other field engineers. Work included the wellhead platform, WHP B installation, 6”, 12” and 16” flowline installation between WHP B and WHP A. Post trenching of 6”, 12” and 16” flowline.

Field Engineer

Sept 2008 – May 2009

Asia Petroleum Development (APD) - Glagah Kambuna Project, Indonesia

Offshore Construction Specialists Pte Ltd

• Responsible for all Offshore Pigging Operation, Hydrotesting and Leak test of 42 km 14” gas export pipeline from the Kambuna platform offshore North Sumatera to a landfall north east of Medan.

• Manage the offshore operation at site, together with the barge supt & the other field engineers. Work included 5 km beach approach, Pre and Post trenching of 13 km of the pipeline to a cover of 2.0 metres. Topsides installation and Hook up.

(42)

• Responsible for all Offshore Pigging Operation, Hydrotesting and Leak test of 800mtr pipeline, Flexible risers and spools.

• Manage the offshore operation at site, together with the barge supt & the other field engineers. 1 jacket(sidelift & upend) + 1 deck + 2 pipeline (10 in) + 1 SPC + 1PLEM + 4 sp tie in (10 in) + 2 flexible riser (6 in) + 1 mooring hawser

Field Engineer

November 2006 – October 2007

Project : Kerisi Field Development Phase II CPP Jacket and Deck Installation

PT. McDERMOTT INDONESIA

Working with procedures and instruments preparation for 12”∅and 16”∅ spools hydrotesting. Responsible for almost all load out preparation for 3 material barges, 4 nos of Central Processing modules over 1000MT and 8 Legs Jacket load out for Central Processing Platform

Field Engineer

November 2006 – October 2007

Project : Angel Project – Substructure Installation and Pipelay

PT. McDERMOTT INDONESIA

Manage and supervise technical on field for fabrication of 5 sections Articulated Stinger and refurbishment 3 sections Articulated Stinger.

Field Engineer

January 2007 – August 2007 Project : SSB T&I

PT. McDERMOTT INDONESIA

Manage and supervise technical on field for structural modification 5 sections Articulated Gulf Of Mexico Stinger and refurbishment 3 sections Articulated Stinger and 1 section truss stinger.

Field Engineer

August 2006 – September 2006

Project : Kerisi Field Development Phase I

PT. McDERMOTT INDONESIA

Manage and supervise readiness of marine installation on field in subcontractor yard of 1420 MT Wellhead Platform and 1113 MT Jacket load out.

Field Engineer

July 2006 – August 2006

Project : PM3 Camau – Gas Pipeline

PT. McDERMOTT INDONESIA

(43)

Offshore Construction Specialists Pte. Ltd. Project : EMEPMI Seligi A- To Tapis Pump Pipeline Replacement

PT. McDERMOTT INDONESIA

Prepared and manage of fabrication and refurbishment for engineering installation aid for 18”∅ crude pipeline installation, assisting in procedures and instruments preparation associated with pigging and hydrotesting. Over 60 days was spent offshore time on board DB30 to manage 21,2 KM 18”∅ crude pipeline installation, riser and two sub sea spool trough the commissioning stage.

Field Engineer

December 2005 – January 2006

Contract Value USD 2.5m – PT. NewMont NTT. Batu Hijau-Scavenger Maintenance Phase I

PT. McCONNELL DOWELL INDONESIA

Performance as Project Planner for Scavenger Shut Down Project on PT. NewMont NTT. Project Mobilization coordinator and controlling material take off.

Field Engineer

April 2005 – December 2005

Contract Value USD 4.6m + USD 1,2m Variation – Kaltim Prima Coal Service Wharf and Shiploader Jetty Refurbishment.

PT. McCONNELL DOWELL INDONESIA

Employed with PT McConnell Dowell Indonesia to manage the shiploader jetty and service wharf rehabilitation works contract. Contract involves the partial demolition and reinstatement of 15years old reinforced concrete service wharf at KPC and rehabilitation of Structural steel shiploader jetty paintwork.

Field Practical

April 2002 - June 2002

Contract Value – USD 3.5m - Tunu Field Development Phase 8-EPSC 3, Aerial Pipe Installation

PT. CITRA PANJI MANUNGGAL

• Preparing Pilling Equipment that Needed for Pilling Activities

• Responsible for daily Report

• Assisting Surveying

• Liaise with third Party Inspector Badan Kualifikasi Indonesia (BKI)

• Assisting with application of work Permit

(44)

Diponegoro University, 2004

On Job Training and Courses

HUET – MSTS ASIA SDN. BHD, Johor Malaysia, 2006 Sea Survival – MSTS ASIA SDN. BHD, Johor Malaysia, 2006 Fire Fighting – MSTS ASIA SDN. BHD, Johor Malaysia, 2006

Wire Rope Inspector - Carl Stahl Evita Ltd, Batam Indonesia, February 2007 Field Engineer training 1st Module : General Topics, Singapore, 2007 Field Engineer training 2nd Module : Structural Installation, Singapore 2007

Incident Investigation training, Batam, Indonesia 2007 Task Risk Assessment training, Batam, Indonesia 2007

Firms

Nov 2007 Offshore Construction Specialist

Jan 2006 to 8 Oct 2007 PT McDermott Indonesia

Apr 2005 to Dec 2005 PT Mc Connell Dowell Indonesia

Personal Details

Date of Birth : November 29, 1979

Age : 34

Nationality : Indonesian Citizenship

Languages : Bahasa Indonesia – oral & written

English – oral & written

Contacts : Mobile +62-8127011155

(45)

Page 1 of 2

PERSONAL DATA

Name : Roni

DOB : 20 August 1975

Place / DOB : Belawan

Sex : Male

Marital Status : Married

Nationality : Indonesia

Religion : Moslem

DOCUMENT

No Document Number Date Of Issued Date Of Expiry Place Of Issued

1 Passport W 259674 30 Nov 2010 30 Nov 2015 Batam

CERTIFICATE OF COMPETENCY

No Certificate Number Date OF

issued

Date Of Expiry

Place Of Issued 1. BOSIET & Travel Safely

by Boat - 24 Nov 2010 23 Nov 2014 Batam

WORK EXPERIENCES

Pre-Comm Supervisor

August 2013 to present

Offshore Construction Specialists Pte Ltd

Responsible for the maintaining High Pressure pumps and Flooding Pumps in good condition after project and prepare, function test of High Pressure pumps and Flooding Pumps before offshore work. Operate and ensure High Pressure Pumps and Flooding pump working in good condition for Pre-commissioning work.

(46)

Completed Project:

No Company Project position Location Client Vessel Name Periode

1. Neptune SONSUB Grouting

Tech

Thailand PTT BODO

SUPLIER

10 Aug 2004 25 Sept 2004

2. Neptune SAIPEM Grouting

Tech

Chinese SAIPEM MERMAID

OFFSHORE

18 Jun 2006 29 Jul 2006

3. Neptune HYUNDAI Grouting

Tech Indonesia/ Kalimantan TOTAL HYUNDAI OFFSHORE 1 09 Jul 2007 20 Aug 2007

4. Neptune SWIBER Grouting

Tech

Brunei BSP SHELL SARKU 2000 06 Oct 2007 30 Dec 2007

5. Neptune SWIBER Grouting

Tech

Brunei BSP SHELL SWIBER

GLORIOUS

07 May 2008 11 Jul 2008 6. Neptune SUBSEA 7 Grouting

Tech

Malaysia PETRONAS ROCK WATER

2

15 Sept 2008 20 Oct 2008

7. Neptune SWIBER Grouting

Tech

Brunei BSP SHELL SWIBER

RESOLUTE

05 Jan 2009 10 Mar 2009

8. Neptune SWIBER Grouting

Tech

Myanmar SWIBER SWIBER 05 Apr 2010

30 May 2010

9. Neptune HALLIN Grouting

Tech Indonesia/ Aceh EXXON MOBIL PENRITH 27 Nov 2011 18 Jan 2012

10. Neptune CRUEZ Grouting

Tech Indonesia/ Natuna CONOCO PHILLIPS CRUEZ SUPPOTER 08 Sep 2012 28 Oct 2012

11. Neptune HALLIN Supervisor Thailand PTT KENDAL 31 Des 2012

29 Jan 2013

12. Neptune ALESTA Grouting

Tech

Turkey/ Istanbul

DOGTAS DEEP BLUE 06 Feb 2013

04 Mar 2013

13. Neptune Seamat

mattresses

Supervisor Brunei BSP SHELL ONSHORE 25 Mar 20013

(47)

Page 1 of 5

NAME: KRISBEL SIMANJUNTAK

DATE OF BIRTH 4 May 1963

NATIONALITY Indonesian

MARITAL STATUS Married

EDUCATION/TRAINING :

 May 07, 2007. Basic Offshore Safety Induction & Emergency Training Including Additional OLF Modules (OPITO Approved)

 February 06, 2007. Confine Space Entry and Rescue.

LANGUAGES Bahasa Indonesian (written and spoken)

English (Fair Spoken)

Career Summary

Over 26 years experience in maintain heavy equipment, engines, High Pressure pumps and flooding pumps, pipe fittings, operating related machinery.

Work Experience

Mechanic

Mar 2009 to present

Offshore Construction Specialists Pte Ltd

Responsible for the maintaining High Pressure pumps and Flooding Pumps in good condition after project and prepare, function test of High Pressure pumps and Flooding Pumps before offshore work. Operate and ensure High Pressure Pumps and Flooding pump working in good condition for Pre-commissioning work.

Completed Projects

Oct 2013 – Nov 2013

Offshore Construction Specialists Pte Ltd Project : Leighton Offshore

Location : Jakarta - Cirebon

S513 Main Oil Line from X-Ray Field to Balongan Plant Project

(48)

Task Description

Jetting Technician

April 2013 – May 2013

Offshore Construction Specialists Pte Ltd

Project : Brunei Shell Petroluem – Domgas Pipeline Installation Project Location : Bulan Bulan Field Development - Brunei

Jetting services for the Pile Refusal Remedial Project

Task Description

Jetting Technician responsible for operating of jetting spread, monitoring the performance of equipment and troubleshooting the jetting equipment in the event of equipment breakdown.

Jetting Technician

August 2012 – January 2013

Offshore Construction Specialists Pte Ltd

Project : Chevron (Australia) – Domgas Pipeline Installation Project Location : Domgas Field Development, North West Coast of Australia

Jetting services for the 6” & 20” pipeline 1.5 km and 5.9km CW-DW and PPP-DW installation

Task Description

Jetting Technician responsible for operating of jetting spread, monitoring the performance of equipment and troubleshooting the jetting equipment in the event of equipment breakdown.

Mechanic

April 2012 to May 2012

Offshore Construction Specialists Pte Ltd

Project : Conoco Philips Indonesia – Develop the Bawal Field Location : Bawal Field – Natuna Sea

Offshore Pigging and Hydrotesting work for 14” newly laid pipeline to connect the two Bawal

wells (BW1 and BW2) to inline Tee and valve assemblies on the new pipeline, using rigid

spools.

Mechanic

October 2011 – November 2011

Offshore Construction Specialists Pte Ltd

Project : Korea Development Company LTD. – Gas Lift Compression Project. Location : Poleng Field – Gresik, West Java, Indonesia.

Offshore Pigging and Hydrotesting work for newly laid pipeline 6” Gas Lift Pipeline DW-PP

and 6” Gas Lift DW-PP in total length 6.3 Km.

Mechanic

September 2011 – October 2011

Offshore Construction Specialists Pte Ltd

(49)

Page 3 of 5

Location : TSB Field, Kangean Block – Bali Sea Indonesia.

Offshore Pigging and Hydrotesting work on DSV.Crest Odyssey of 25.745km x 18” Rigid

Pipeline and 2 nos of 5.2km x 20” Rigid Pipelines

Mechanic

February 2011 – July 2011

Offshore Construction Specialists Pte Ltd

Project : CHEVRON 2011 INSTALLATION CAMPAIGN. PLATFORMS AND PIPELINES INSTALLATION Location : Chevron Thailand Oil and Gas Fields, Gulf of Thailand

Flooding and gauging work of newly laid pipelines: 16” NPPLL, 5.4 Km Long Pipeline

10” FUPLP, 5.9 Km Long Pipeline 10” PDPLB, 6,7 Km Long Pipeline 10” KPPLG, 2.7 Km Long Pipeline 10” ERPLZC, 2.4 Km Long Pipeline

As well leak testing of spools before subsea tie in of: NPWL Platform (3 ea x 16” Spools)

FUWP Platform (2 ea x 10” Spools) PDWB Platform (5 ea x 10” Spools) KPWG Platform (2 ea x 10” Spools) ERWZC Platform (2 ea x 10” Spools) Mechanic

January 2010 – March 2010

Offshore Construction Specialists Pte Ltd

Project : Hess (Indonesia – Pangkah) Ltd. – Ujung Pangkah Development Project. Location : Ujung Pangkah oil & gas field, East Java. Indonesia

Pigging, Hydrotesting and Leak test work of 3 subsea flowlines, 6”, 12” and 16” between WHP B and WHP A.

Mechanic

August 2009 to November 2009

Offshore Construction Specialists Pte Ltd

Project : Star Energy Ltd. – Kakap Gas Development Project. Location : Kakap Field West Natuna, Indonesia.

Offshore Pigging and Hydrotesting work for newly laid pipeline:

 6” gas flowline, 2.3 Km long, KG-West 1 subsea wellhead to KG Platform,  6” gas flowline, 2 Km long, Lukah-1X subsea wellhead to KG Platform  10” pipeline 11.2 Km long. KG Platform to KF Platform

Mechanic and Project Leader Man

March 2009 - June 2009

Offshore Construction Specialists Pte Ltd

(50)

Location : Gelagah Kambua Field Development, Malacca Strait, North Sumatra, Indonesia

Diameter 14” 42 Km long Pipeline installations from WHP Kambuna A to onshore receiving facilities, 5km beach pull preparation operation (trenching Work), 10km jetting operation, lowering pipeline 2mtr TOP. Pre-commissioning of laid pipeline

Task Description

Mechanic & Leader man on 5KM trenching work from near shore to shore for beach pull operation, ensure the generator, air compressor and 2 unit of excavator running in good condition for 24hrs trenching operation. Maintain 24hrs operation on 5 unit jetting pumps during jetting operation and pre-commissioning job including pigging operation and hydrotesting of Dia. 14”, 42 KM pipeline.

Mechanic 1

February 2002 – August 2008

J.Ray McDermott,

Location : Batam, Indonesia

Marine onshore facility maintenance and projects preparation.

Task Description

Maintain all running heavy equipments in marine onshore facilities to ensure working in best performance. Refurbish and prepare including function test of marine E&M equipment before send to offshore for project including forklift, loader, Skagit Winch, Hydraulic Hammer, Generators, Compressors.

Special in preparing flooding pumps and high pressures pumps for offshore use.

Mechanic and Project Leader Man

March 2006 – July 2006

J.Ray McDermott

Project : PM3-Camau (Offshore Gas Pipeline Installation) Location : Vietnam

Dia.16” 300KM long Pipeline installation. Beach pull preparation, 6KM trenching from near shore to shore operation to buried pipeline in various depth from 4mtr near shore to 6mtr at offshore

Task Description

Mechanic & Leader man on 6KM trenching work from near shore to shore for beach pull operation, ensure the generator, air compressor and 2 unit of excavators running in good condition for 24hrs trenching operation. Maintain 24hrs operation on 6 unit jetting pumps during jetting operation.

Mechanic 1

May 1990 – July 1999

PT. McDermott Indonesia Location : Batam, Indonesia

Fabrication yard facility maintenance

Task Description

Maintain all running heavy equipments and engines in Batam fabrication yard including: fork lift, hydraulic crane, loader, generators and compressors.

(51)

Page 5 of 5

Mechanic Helper

August 1987 – June 1989

PT. Barakaz Lumber Coy Location : Riau, Indonesia Logging Operation

Task Description

Helping mechanic in maintain heavy equipment including Bulldozer, Low Vehicle Trailer, Fork Lift, Compressors and Generators.

(52)

Mohd

Zakaria

Bin

Abdul

Aziz

Mechanic / Technician

Nationality: Malaysian

Date of Birth: 11-March-1986

Marital Status: Single

Languages: English and Bahasa Melayu

Education / Training

 High School Graduate

 Basic Offshore Safety Induction & Emergency Training Including Additional OLF Modules and Travel Safety By Boat (OPITO Approved)-Validity 06-Jan-2015

Career Summary

Eight years of experience in offshore construction and engineering as a technician commissioning team. Specialists in Pipeline Pigging, Flooding, Hydro Test, Dewatering, Drying, Nitrogen Purging, Commissioning & Decommissioning

He start his career in November 2004 in Oil and Gas Pipeline Installation and commissioning and he’s project completion and work experience in Malaysia and Singapore.

During his time as a technician, he gained much experience in the offshore jobs for Cleaning, Hydro Testing, Dewatering, Drying and Nitrogen Packing.

He is also familiar with the Blowing, Flushing and Leak Testing jobs

.

Work Experience

Mechanic

Jan 2010 to present

(53)

Page 2 of 6

Responsible for the maintaining High Pressure pumps and Flooding Pumps in good condition after project and prepare, function test of High Pressure pumps and Flooding Pumps before offshore work. Operate and ensure High Pressure Pumps and Flooding pump working in good condition for Pre-commissioning work.

Completed Projects:

Mechanic

July 2013 – August 2013

Offshore Construction Specialists Pte Ltd

Project : TIMAS-EHMRS

Location : Indonesia – South China Sea

Provision of Engineering Services and Subcontract Equipment associated with the installation of Flexible flowlines for COPI Belanak Project

Precom Technican July 2013

Project: Hess Exploration & Production Malaysia BV. FPSO for FPSO North Malay Basin – Grouting Project

Location: North Malay Basin (Kota Bahru)

Kamelia Field – precommissiong work for Flooding Production, Storage and offloading vessel Lewek Arunothai.

Mechanic

January 2013 – April 2013

Offshore Construction Specialists Pte Ltd

Project : Asian Energy Services – AES VSP Dangdo Thang Long Launch

Location : Su Tu Vang Field, Thang Long-Dong Do Field, Vietnam

The preparation, rig up and execution of the jacket launch. The jacket weighed 4100mT was loaded and launch off the launch engineering, procedure preparation, physical barge rig up and site supervision and management of the launch operation, while Asian Energy performed the launch and transportation engineering.

Mechanic

August 2012 – January 2013

Offshore Construction Specialists Pte Ltd

Project : Chevron (Australia) – Domgas Pipeline Installation Project Location : Domgas Field Development, North West Coast of Australia

Jetting services for the 6” & 20” pipeline 1.5 km and 5.9km CW-DW and PPP-DW installation

Task Description

Jetting Technician responsible for operating of jetting spread, monitoring the performance of equipment and troubleshooting the jetting equipment in the event of equipment breakdown.

(54)

Mechanic

April 2012 to May 2012

Offshore Construction Specialists Pte Ltd

Project : Conoco Philips Indonesia – Develop the Bawal Field Location : Bawal Field – Natuna Sea

Offshore Pigging and Hydrotesting work for 14” newly laid pipeline to connect the two Bawal

wells (BW1 and BW2) to inline Tee and valve assemblies on the new pipeline, using rigid

spools.

Mechanic

September 2011 – October 2011

Offshore Construction Specialists Pte Ltd

Project : Kangean Energy Indonesia Ltd. –Pre-Commissioning Services for Subsea

Facilities of TSB Field Development

Location

: TSB Field, Kangean Block – Bali Sea Indonesia.

Offshore Pigging and Hydrotesting work on DSV.Crest Odyssey of 25.745km x 18” Rigid

Pipeline and 2 nos of 5.2km x 20” Rigid Pipelines

Mac 2011 – May 2011

Offshore Construction Specialists Pte Ltd

Project : Dai Hung Field Development VSP -WHP DH2 JACKET LAUNCH Project

Location : VietsovPetro, Vung Tau, Vietnam

Commence reeving of port side sheave blocks using a messenger to pull 56mm wire through 500T construction blocks back to 70t hydraulic winch. ‘Straight’ lace configuration. Launched with VSP-05 (WD ~100m)

 EMAS - Chevron Offshore (Thailand) Ltd.

 HESS (Indonesia-Pangkah) Ltd Phase II Transportation and Installation

Location - Surabaya, East Java Sea, Indonesia

Transport of CPP Deck, AUP Deck and LQ, Compression module, Bridges and flare

boom

CPP and AUP Jackets were installed during the first campaign in the 4th Quarter 2010

utilizing the DLB QP 2000. CPP and AUP jackets are 4 legged jackets with an

approximate unit weight of 300 tonne and 48” diameter steel pile foundations. The piles

were driven with a MHU270T to 95 meter penetration.

HESS Ujung Pangkah –Phase 1

Location - East Java Sea, Indonesia

Transporation and Installation of one 8 legged Well Head platform (WHP-B) and 3 pipelines (6” Gas lift, 12” Oil and 16” Gas) x ~5.5km between WHP-B and WHP-A (existing) including pre-commissioning.

(55)

Page 4 of 6

Kakap Field KG Gas Development Project – Provision of EPCI of KG Gas Development Project

Services including pre-commissioning.

Project:

REINSTATEMENT TEST FOR CAKERAWALA

TOP SIDE N2 HE LEAK TEST FOR BULAN A

Client:

Pertonas Carigali

Year:

(Dec) 2007

Scope of work:

Leak testing.

Project:

EPCC of Segamat Compressor Station Expansion Project

Client:

PETRONAS GAS

Year:

(July)

2007

Scope of work:

Blowing,Flushing,Hydrotesting and Nitrogen Packing

Project:

EPCC of Nutral Gas Disiribution to Semenyih

FL stage 1/05 Jalan Persekutuan 1 Semenyih-Beranang

Client:

Gas Malaysia

Year:

(Mar) 2007

SCOPE OF WORK: CLEANING, HYDRO TEST, DEWATERING, DRYING, NITROGEN

PACKING.

Project:

EPCC of Nutral Gas Disiribution to Kundang

FL DL stage 1/05 Kundang Sungai Buloh Selangor.

Client:

Gas Malaysia

Year:

(Jan) 2006

Scope of work:

Cleaning,Hydro Test,Dewatering,Drying,Nitrogen Packing

Project:

EPCC of Nutral Gas Disiribution to Setiawan

FL stage 2/05 Setiawan Perak.

Client:

Gas Malaysia

Year:

(Feb)2006

Scope of work:

Cleaning,Hydro Test,Dewatering,Drying,Nitrogen Packing.

Project:

EPCC of Nutral Gas Disiribution to Kapar

FL stage 1/05,Kapar Klang Selangor.

Client:

Gas Malaysia

Year:

(Jan) 2006

(56)

Project:

EPCC of Nutral Gas Distribution System to Sungai Buloh

FL Stage 3/05, Sungai Buloh selango

Client:

Gas Malaysia.

Year:

(Dec)2005

Scope of work:

Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.

Project:

EPCC of GPRW at Road B15 From SKVE to KVDT Precint 11,

Putrajaya Selangor.

Client:

Gas Malaysia.

Year:

(Dec)2005

Scope of Work:

Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.

PROJECT:

EPCC OF NUTRAL GAS DISTRIBUTION SYSTEM TO NORTH PORT

FL DL STAGE 1/05, PORT KLANG SELANGOR.

Client:

Gas Malaysia.

Year:

(Nov)2005

Scope of Work:

Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.

Project:

EPCC of Nutral Gas Disiribution to Bukit Rambai

FL DL Stage 1/05 Bukit Rambai Melaka

Client:

Gas Malaysia

Year:

(Oct) 2005

Scope of work:

Cleaning,Hydro Test,Dewatering,Drying,Nitrogen Packing

Project:

EPCC of Nutral Gas Disiribution to Tangga Batu

FL DL Stage 1/05 Tangga Batu Area Melaka.

Client:

Gas Malaysia

Year:

(Sept)2005

Scope of work:

Cleaning, Hydro Test, Dewatering, Drying, Nitrogen Packing.

Project:

EPCC of Nutral Gas Disiribution System to Ayer Keroh

FL DL Stage 1/04, Industri Area Ayer Keroh Melaka.

Client:

Gas Malaysia.

Year:

(Sept)2005

Scope of work:

Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.

Project:

EPCC of Nutral Gas Disiribution to Ijok

FL Stage 1/05, Ijok, Kuala Selangor

Client:

Gas Malaysia

(57)

Page 6 of 6

SCOPE OF WORK: CLEANING, HYDRO TEST, DEWATERING, DRYING, NITROGEN

PACKING.

Project:

EPCC of Nutral Gas Disiribution System to Pasir Gudang

FL DL Stage 1/05, Pan Century Edible Oils Sdn Bhd.

Client:

Gas Malaysia.

Year:

(Sept)2005

Scope of work:

Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.

Project:

EPCC of Nutral Gas Disiribution to Pulau Indah-Westport

FL Stage 1/05, Pulau Indah Port Klang, Selangor.

Client:

Gas

Malaysia

Year:

(May)2005

(58)

NAME: INDRA JAYA DATE OF BIRTH 24 February 1979

NATIONALITY Indonesian

MARITAL STATUS Married

EDUCATION/TRAINING :

• Technical High School, Dabo Singkep

• Alkon, “Pressure vessel training”

• JRM, In-house, “Confined Space Entry And Rescue Training”

• JRM, In-house, “PTW Performing Training”

• JRM, In-house, “Pressure Vessel Training”

• JRM, In-house, “Dead Weight Tester Operating Training”

• AST, “ Over Head Crane Training”

• JRM, In-house, “BBSM”

LANGUAGES Bahasa Indonesian (written and spoken) English (Fair Spoken)

Career Summary

Over 7 years experience in repair and maintain instrumentation for pressure, temperature and flow measurement device i.e. Dead Weight Tester, Pressure Recorder, Pressure Gauge, Temperature Gauge, Temperature Recorder, Turbine Flow Meter, Pinger Detector, Subsea Temperature device, for offshore pre-commissioning work including in-house calibration check, pipe fittings, familiar with rigging certification system and operating related machinery.

Instrument Technician

March 2012 to present

Offshore Construction Specialists Pte Ltd

Responsible for the maintaining small flow High Pressure pumps, Pressure, Temperature and Flow measurement device for Pigging and hydrotesting operation and grouting for the following projects in Indonesia, Brunei and Myammar.

(59)

Page 2 of 3 Current Project:

Work Experience

Technician/Mechanic

Oct 2013 – Nov 2013

Offshore Construction Specialists Pte Ltd

Project : Leighton Offshore

Location : Jakarta - Cirebon

S513 Main Oil Line from X-Ray Field to Balongan Plant Project

Post Trenching, Free Span Correction, and Pre-commissiong Services

Task Description

Sep to Oct 2013

Offshore Construction Specialists Pte Ltd

Project : Su Tu Vang North East Development Project

Location : Vietnam

Task Description

Responsible for performing the cleaning, gauging, flooding, hydrostatic testing of pipelines Hydrotesting & Precommissioning.

April 2013 – May 2013

Offshore Construction Specialists Pte Ltd

Project : Swiber Shell - Air Lift Jetting

Location : Bulan Bulan Field Development - Brunei Jetting services for the Pile Refusal Remedial Project Task Description

Jetting Technician responsible for operating of jetting spread, monitoring the performance of equipment and troubleshooting the jetting equipment in the event of equipment breakdown.

Mechanic

January 2013 – April 2013

Offshore Construction Specialists Pte Ltd

Project : PTTEPI – Installation of WP1, 2 and 3 well platforms and Intrafield Sealines Location : Zawtika Field Development Project Phase I - Myamar

Offshore Pigging and Hydrotesting work on LTS 3000 for installation of WP1, 2, 3 Well Platforms including Jackets, Piles, jacket appurtenances and decks and WP2-ZPQ and WP3-ZPQ infield pipelines.

(60)

Mechanic

April 2012 to May 2012

Offshore Construction Specialists Pte Ltd

Project : Conoco Philips Indonesia – Develop the Bawal Field

Location : Bawal Field – Natuna Sea

Offshore Pigging and Hydrotesting work for 14” newly laid pipeline to connect the two Bawal wells (BW1 and BW2) to inline Tee and valve assemblies on the new pipeline, using rigid spools.

Hydrotesting Instrument Technician

26 January 2006 to 28 Feb 2012 PT. McDermott Indonesia

Responsible for the maintaining all hydrotesting instrumentations and related equipment and gears in good condition for onshore and offshore pre-commissioning work. Preparation of all related instrumentation and hydrotesting gears, work side by side with field engineer for offshore work. Maintenance of all JRM stinger for all air lines and water lines and tanks in good and water tight condition. Project Involved : • Camau Project • Kerisi Project • Esso Project • SUTUVANG Project • Sutuden Project • Rubi Project • Guntong A Project • Guntong B Project

• Dai Hung Project

• Bien Dong Project

• TGT Project

• Angel Project

• Chevron Project

• Sakhalin Project

(61)

Page 1 of 5

NAME: BUDIMAN SAGALA DATE OF BIRTH 16 Jul 1983

NATIONALITY Indonesian

MARITAL STATUS Single

MOBIL :+6281370977227 +6281372223565

EDUCATION/TRAINING :

• May 03, 2008 (MSTS) Tropical Basic Offshore Safety Induction & Emergency with EBS

• May 18, 2007 (J.Ray McDermott) Permit To Work

• December 21, 2006 (J.Ray McDermott) Confined Space Entry And Rescue

• November 27, 2006 (Indonesia Labor Department) Hoist Crane Operator

• May 2006, (DH. Budenberg) Dead Weight Tester Usage and Maintenance

• April, 2004 (Carl Stahl Evita Ltd), Level 1, Wire Rope Inspector

LANGUAGES Bahasa Indonesian (written & spoken) English (fair spoken)

Career Summary

Over 12 years experience in repair and maintain instrumentation for pressure, temperature and flow measurement device i.e. Dead Weight Tester, Pressure Recorder, Pressure Gauge, Temperature Gauge, Temperature Recorder, Turbine Flow Meter, Pinger Detector, Subsea Temperature device, for offshore pre-commissioning work including in-house calibration check, pipe fittings, familiar with rigging certification system and operating related machinery.

Work Experience

Instrument Technician

March 2009 to present

Offshore Construction Specialists Pte Ltd

Responsible for the maintaining small flow High Pressure pumps, Pressure, Temperature and Flow measurement device for Pigging and hydrotesting operation for the following projects in Indonesia, Thailand and Myammar.

(62)

Completd Project: Technician

Jul 2013 – Sep 2013

Offshore Construction Specialists Pte Ltd

Project : PERTAMINA EP - REROUTE GAS PL L-PARIGI-CILAMAYA

Location : PT TIMAS SUPLINDO,INDONESIA

Provision of Engineering Services associated with the Provision of Hot Tap and pipeline Lima complex by pass, perform the pipeline pre-commissioning on the assumption that the scope is as Flooding and gauging, hydrotesting, bulk dewatering and nitrogen packing to 5 psi pressure.

Technician

Nov – Dec 2013

Offshore Construction Specialists Pte Ltd

Project : PT Timas Suplindo

Location : Jakarta UL Project

Pre-commissiong Services

Task Description

Oct 2013 – Nov 2013

Offshore Construction Specialists Pte Ltd

Project : Leighton Offshore

Location : Jakarta - Cirebon

S513 Main Oil Line from X-Ray Field to Balongan Plant Project

Post Trenching, Free Span Correction, and Pre-commissiong Services

Task Description

Jan 2013 – Apr 2013

Offshore Construction Specialists Pte Ltd

Project : PTTEP MYANMAR – L&T-Zawtika Grouting Project

Location : PTTEP INTERNTIONAL LIMITED, Gulf of Moattama, Myanmar

Zawtika Field Development Project Phase 1A EPCI for WP1, WP2, WP3 and Intrafield Sealines – Flooding, Gauging and Hydrotesting of pipeline.

Technician

November 2012

Offshore Construction Specialists Pte Ltd

Project : Galoc Ph 2 Development – Leak Testing for 6” Flexible pipeline Project

Location : Bien Dong Development Field - Vietnam

Leak test for flexible riser and flowlines for 1 off 3” Fuel Gas Riser (347.5 m length, 76.2 mm ID) + 3” Fuel Gas Flowline (2060 m length, 76.2 mm ID)

(63)

Page 3 of 5

2 off 7” condensate riser (355.7 m and 365.5 m length, 177.8 mm ID) + 7” condensate flowline (2060 m length, 177.8 mm ID).

Task Description

Leak test for flexible riser and flowlines for 1 off 3” Fuel Gas Riser (347.5 m length, 76.2 mm ID) + 3” Fuel Gas Flowline (2060 m length, 76.2 mm ID) and 2 off 7” condensate riser (355.7 m and 365.5 m length, 177.8 mm ID) + 7” condensate flowline (2060 m length, 177.8 mm ID).

Technician

October 2011 – November 2011

Offshore Construction Specialists Pte Ltd

Project : Korea Development Company LTD. – Gas Lift Compression Project.

Location : Poleng Field – Gresik, West Java, Indonesia.

Offshore Pigging and Hydrotesting work for newly laid pipeline 6” Gas Lift Pipeline DW-PP and 6” Gas Lift DW-PP in total length 6.3 Km.

Technician

September 2011 – October 2011

Offshore Construction Specialists Pte Ltd

Project : Kangean Energy Indonesia Ltd. –Pre-Commissioning Services for Subsea Facilities

of TSB Field Development

Location : TSB Field, Kangean Block – Bali Sea Indonesia.

Offshore Pigging and Hydrotesting work on DSV.Crest Odyssey of 25.745km x 18” Rigid Pipeline and 2 nos of 5.2km x 20” Rigid Pipelines

Technician

February 2011 – July 2011

Offshore Construction Specialists Pte Ltd

Project : CHEVRON 2011 INSTALLATION CAMPAIGN. PLATFORMS AND PIPELINES INSTALLATION

Location : Chevron Thailand Oil and Gas Fields, Gulf of Thailand Flooding and gauging work of newly laid pipelines:

16” NPPLL, 5.4 Km Long Pipeline 10” FUPLP, 5.9 Km Long Pipeline 10” PDPLB, 6,7 Km Long Pipeline 10” KPPLG, 2.7 Km Long Pipeline 10” ERPLZC, 2.4 Km Long Pipeline

As well leak testing of spools before subsea tie in of: NPWL Platform (3 ea x 16” Spools)

FUWP Platform (2 ea x 10” Spools) PDWB Platform (5 ea x 10” Spools) KPWG Platform (2 ea x 10” Spools) ERWZC Platform (2 ea x 10” Spools)

Technician

(64)

Offshore Construction Specialists Pte Ltd

Project : Hess (Indonesia – Pangkah) Ltd. – Ujung Pangkah Development Project.

Location : Ujung Pangkah oil & gas field, East Java. Indonesia

Pigging, Hydrotesting and Leak test work of 3 subsea flowlines, 6”, 12” and 16” between WHP B and WHP A.

Technician

August 2009 to November 2009

Offshore Construction Specialists Pte Ltd

Project : Star Energy Ltd. – Kakap Gas Development Project.

Location : Kakap Field West Natuna, Indonesia.

Offshore Pigging and Hydrotesting work for newly laid pipeline:

• 6” gas flowline, 2.3 Km long, KG-West 1 subsea wellhead to KG Platform,

• 6” gas flowline, 2 Km long, Lukah-1X subsea wellhead to KG Platform 10” pipeline 11.2 Km long. KG Platform to KF Platform

Technician

November 2008 – June 2009

Offshore Construction Specialists Pte Ltd Project : Gelagah Kambuna Field Development Location : Malacca Strait, North Sumatra, Indonesia

Diameter 14” 42 Km long Pipeline installations from WHP Kambuna A to onshore receiving facilities, 5km beach pull preparation operation (trenching Work), 10km jetting operation, lowering pipeline 2mtr TOP. Pre-commissioning of laid pipeline

Task Description

Preparation of pre-commissioning equipments for Pigging and Hydrotesting operation. Set up offshore flooding and pigging operation for Diameter 14” 42 Km long newly laid Pipeline ensure sea water chemical treatment composition against sea water as per company spec. Set up hydrotesting of Diameter 14” 42 Km long newly laid Pipeline, operating Dead weight tester, monitor pressure and volume indicator on hydrotesting operation on site under supervision of Pre-commissioning/Project Engineer.

Technician

November, 2008 – June, 2009 J.Ray McDermott

Project : Shell Malaysia

Location : Terengganu, Malaysia Task Description

Preparation of pre-commissioning equipments for Pigging and Hydrotesting operation. Ensure all required fittings to be complete for Pigging and hydrotesting set up. Set up offshore flooding and pigging operation for Diameter 14” 10km long pipeline and Diameter 28” 9km long pipeline, ensure sea water chemical treatment composition against sea water as per company spec. Set up hydrotesting of Diameter 14” 10km long pipeline and Diameter 28” 9km long pipeline, operating Dead

(65)

Page 5 of 5

weight tester, monitor pressure and volume indicator on hydrotesting operation on site under supervision of Pre-commissioning/Project Engineer.

Instrumentation Technician

July 2001 – October 2008 J.Ray McDermott

Marine Instrumentation and Rigging Certification Division Task Description

Prepare of instrumentation for offshore pre-commissioning work. Ensure all pressure and temperature measurement device i.e. Dead Weight Tester, Pressure Gauges, Temperature Gauge, Pressure Recorder, Temperature Recorder, Holiday Detector, Pinger, Pinger Detector, Turbine Flowmeter and etc. in valid certificate and in-house checking all the mentioned instrumentation after project for maintenance.

Responsible of Leak test for offshore project installation aid fabricated in marine workshop i.e. Pig Launcher, Pig Receiver, Spool Pipe and Test Header and etc.

Function test all the J.Ray McDermott Asia Pacific Stinger after maintenance in Batam, Marine facility before attached to all J.Ray McDermott Pipe Lay Barge.

Responsible as well for ensure all rigging and lifting gears to be color coded and ensure all rigging to be with valid certificate before send to offshore project.

(66)

NAME: IDHAM JAWAHIR DATE OF BIRTH 1 Jul 1972

NATIONALITY Indonesian

MARITAL STATUS Married

LANGUAGES Bahasa Indonesian (written & spoken)

English (fair spoken)

Career Summary

Over 8 years’ of experience in offshore construction and engineering as a technician commissioning team. Specialists in Pipeline Pigging, Flooding, Hydro Test, Dewatering, Drying, Nitrogen Purging, Commissioning & Decommissioning.

Work Experience

Grouting/Pre-com

March 2012 to present

Offshore Construction Specialists Pte Ltd

Responsible for the maintaining High Pressure pumps and Flooding Pumps in good condition after project and prepare, function test of High Pressure pumps and Flooding Pumps before offshore work. Operate and ensure High Pressure Pumps and Flooding pump working in good condition for Pre-commissioning work.

Completed Project:

Precom Supervisor

September to October 2013

Offshore Construction Specialists Pte Ltd Oct 2013 – Nov 2013

Offshore Construction Specialists Pte Ltd

Project : Leighton Offshore

Location : Jakarta - Cirebon

S513 Main Oil Line from X-Ray Field to Balongan Plant Project

Post Trenching, Free Span Correction, and Pre-commissiong Services

Task Description

References

Related documents

and Action in Diabetes: Evaluation of Cardiovascular Outcome Results (LEADER) trial in patients with T2DM and high cardiovascular risk, treatment with the glucagon-

Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions. Start

Solar Energy Strategy for Sri Lanka: The Solar Village Solution for Sustainable Development and Poverty Reduction..

Gagnon and Simon’s sexual scripts theory suggests that what we know to be sexual is socially constructed. Larger cultural scenarios dictate what individuals identify as sex or

Figures 29 and 30 show modified characteristics for parallel and opposed blade dampers based on various ratios of series resistance to full open damper resistance... Damper

The amount of calcined ox bone also allows the addition of more colourful patterns (or more colours to stain the china), thus Bone China usually has the most exquisite patterns of

The students having open, friendly, attentive, animated, and impression leaving communication styles were found to have higher conflict resolution skills, whereas those

Clean Energy Communities is a three-step program in which a community must (1) commit to the Clean Energy Communities pledge, (2) fulfill the pledge by taking certain actions