LAMDA AND A3 PROBLEM SOLVING IN PRODUCT DEVELOPMENT

In document The_Mastery_of_Innovation.pdf (Page 68-73)

DJO Global: The Fundamentals of Lean Product Development

LAMDA AND A3 PROBLEM SOLVING IN PRODUCT DEVELOPMENT

A.visitor.to.DJO’s.R.&.D.labs.near.San.Diego,.California,.cannot.help.but.

notice.that.the.walls.are.covered.with.a.variety.of.A3.reports..At.some.

FIGURE 4.1

Tom.Bachinski.in.a.protostorming.session.at.DJO.Global.

DJO Global: The Fundamentals of Lean Product Development  •  47 point,.the.company’s.engineers.even.developed.a.special.system.to.hang.

these.A3s.on.the.walls.so.that.they.could.be.taken.down.easily.to.update.

or.bring.into.a.meeting..These.A3s.support.a.PDP.that.is.built.around.

learning.cycles.

Problem-solving. A3s. support. good. systematic. problem. solving. by.

encouraging. collaboration. and. visualization.. The. problem. solving. A3.

captures. the. problem. solver’s. current. thinking. about. the. problem. and.

potential.solutions..It.is.meant.to.be.shared.as.soon.as.the.first.section,.

the.problem.statement,.gets.drafted..Sections.on.the.problem.solving.A3.

template.guide.the.problem.solver.to.make.observations.about.the.current.

state,.analyze.the.root.causes,.develop.multiple.alternative.solutions,.and.

get. constant. feedback. before. committing. to. a. recommendation.. At. the.

same.time,.the.problem.solving.template.is.not.a.straitjacket;.the.problem.

solver.can.add,.subtract,.rearrange,.and.resize.elements.of.the.A3.report.

to.fit.the.needs.of.a.specific.problem,.as.long.as.he.or.she.can.justify.the.

changes.with.a.good.A3.that.tells.the.story.of.the.problem.solving.process.

and.the.resolution.

A3 RePoRtS: WHAt AnD WHY

Many. of. the. companies. featured. in. this. book. have. incorporated.

A3. reports. into. their. Lean. Product. Development. programs.. The.

first.question.people.usually.ask.is,.“What.is.an.A3?”.An.A3.is.an.

especially. effective. communication. tool. for. supporting. the. sys-tematic.problem.solving.and.selectively.standardized.work.that.we.

encourage. in. a. Lean. environment.. Over. time,. A3. reports. replace.

PowerPoint®.slide.sets,.lengthy.text.documents,.and.e-mail.chains.as.

the.primary.means.for.communicating.knowledge.and.ideas.within.

a.Lean.organization.

The.A3.refers.to.the.paper.size:.11.×.17.inches.in.the.United.States.

and.297.×.420.mm.everywhere.else..It.turns.out.that.this.paper.size.

is.especially.conducive.to.developing.reports.that.are.concise.yet.rich.

in.content..The.next.smaller.size—A4.or.letter.size—is.simply.too.

small..Any.larger.paper.size.is.unwieldy..Any.report.that.is.double.

sided,.especially.two.pages.front.and.back,.hides.some.of.the.infor-mation.all.the.time.

tHe FiVe tYPeS oF A3 RePoRtS

The. original. research. into. Toyota’s. processes. classified. their. A3.

reports.into.three.types:.the.Problem.Solving.A3,.the.proposal.A3,.

and.the.Status.Reporting.A3..I.have.found.that.there.are.five.different.

kinds.that.Lean.organizations.primarily.use..I’ve.listed.them.from.

the.most.free.form.to.most.standardized.in.format:

•. Knowledge capture A3s,.sometimes.called.knowledge.briefs.

or. K-Briefs,. are. reports. about. some. area. of. knowledge. that.

the.author.wishes.to.share..I.have.seen.excellent.examples.of.

Knowledge.Briefs.written.about.test.procedures,.market.fore-casting. methods,. platform. architecture. models,. and. many.

others..To.make.a.good.Knowledge.Brief,.the.author.needs.the.

flexibility.to.use.the.space.on.the.page.in.whatever.way.will.best.

suit.the.subject.matter.

•. Problem solving A3s. document. systematic. problem. solving.

and. support. LAMDA/PDCA. cycles.. Good. Problem. Solving.

A3s. tell. a. story. about. the. problem,. the. analysis,. and. the.

recommendations.

•. Proposal A3s.resemble.Problem.Solving.A3s.in.the.sense.that.

they.document.the.solution.to.a.problem,.and.many.proposal.

A3s.began.as.Problem.Solving.A3s..But.the.purpose.of.a.pro- posal.A3.is.to.get.a.specific.decision.to.implement.a.specific.rec-ommendation..The.focus.shifts.from.analyzing.the.problem.to.

executing.the.solution..The.Proposal.A3.contains.information.

about.risks,.resources.required,.and.an.implementation.plan.

•. Documentation Replacement A3s. replace. standard. reports.

with.a.streamlined.report.that.fits.on.an.A3..The.purpose.of.the.

Documentation.Replacement.A3.is.to.communicate.precisely.

what. the. readers. of. the. report. need. to. know,. with. nothing.

extra.. Examples. of. documentation. replacement. A3s. include.

product.and.technology.road.maps,.product.portfolios,.prod-uct.program.charters,.technical.specifications.(usually.a.series.

of.A3s.grouped.by.topic),.market.forecasts,.business.case.anal-yses,.team.resource.allocations,.validation.plans,.localization.

plans,.customer.visit.reports,.etc..Documentation.Replacement.

A3s.usually.have.standard.templates.

DJO Global: The Fundamentals of Lean Product Development  •  49

As.DJO’s.Lean.Product.Development.practices.have.matured,.they.have.

placed.more.emphasis.on.the.importance.of.solving.technical.challenges.

systematically.and.capturing.the.knowledge.created.immediately.so.that.

others.in.the.company.can.benefit.from.it..Unlike.most.of.the.documenta-tion.in.a.typical.product.development.process,.A3.reports.are.meant.to.be.

shared.as.works.in.progress,.which.ensures.that.developers.get.feedback.

before.they.have.gone.too.far.down.a.path.that.won’t.work..Some.of.the.

best.A3.reports.I’ve.seen.over.the.years.have.been.handwritten.with.crude.

sketches..The.finished.A3.only.needs.minimal.work.to.be.stored.as.a.piece.

of.reusable.knowledge.for.future.product.development.teams.

In. addition. to. the. standard. problem. solving. A3. and. the. SKU. A3.

mentioned.previously,.DJO’s.product.development.process.has.a.num-ber.of.A3s.that.serve.as.replacements.for.the.complex.documentation.

that.other.product.development.organizations.require.their.engineers.

to.write:

•. Status Report A3s. reduce. project. management. overhead. by.

streamlining. status. reports.. Unlike. the. other. A3. forms,. the.

Status. Report. A3. benefits. from. as. much. standardization. as.

possible..People.who.must.review.multiple.status.reports.from.

many. different. people. and/or. teams. benefit. from. having. the.

same.information.in.exactly.the.same.place.

PRoBLeM titLe AnD AUHoR

CURRENT.STATE DATA.AND.ANALYSIS

ROOT.CAUSE.ANALYSIS RECOMMENDATIONS

EXPERIMENTAL.METHODS NEXT.STEPS

. . Problem-solving.A3.report..

•. technology Road maps.outlines.the.key.areas.of.development.for.

DJO’s.core.technology.areas.for.the.next.several.years.

•. new concept Definitions. defines. the. customer. need,. market.

opportunity,. and. technical. challenges. for. a. concept. that. is. under.

investigation.

•. Project Status Reports. summarizes. the. key. status. information.

about.a.project.

•. Vender Background and capabilities.Reports.share.the.outcome.

of.an.investigation.into.a.new.vendor’s.ability.to.meet.DJO’s.needs.

•. Kaizen event objectives and Plans.define.the.goals,.purpose,.tar-gets,.core.parameters,.and.team.for.a.kaizen.blitz.

•. Knowledge capture Reports.captures.knowledge.in.reusable.form.

DJO’s.PDP.model.incorporates.the.A3s.right.into.the.process.(Figure 4.2)..

These.A3s.work.together.to.keep.documentation.and.approvals.at.a.mini- mum,.keep.the.most.important.information.about.R.&.D.activities.vis-ible. to. everyone. at. all. times,. and. facilitate. more. productive. meetings..

Problems.can.lurk.undiscovered.in.project.documentation.that.is.overly.

complicated.and.lengthy.and.that.contains.a.lot.of.boilerplate.language..

On.an.A3,.problems.have.no.place.to.hide.

FIGURE 4.2

DJO.Global’s.PDP.model.

DJO Global: The Fundamentals of Lean Product Development  •  51

METRICS TO DRIVE A LEAN PRODUCT

In document The_Mastery_of_Innovation.pdf (Page 68-73)