• No results found

Orders and Settlement

In document SAP CO Configuration ECC6.0 EHP6 (Page 17-35)

.3.2.2.1 Maintaining Allocation Structures Use

An allocation structure defines how an order is settled.

The allocation structure differentiates the different possibilities of allocations.

Procedure

Carry out the following steps:

1.Access the activity using one of the following navigation options:

IMG Menu Controlling Internal Orders Actual Postings Settlement

Maintain Allocation Structures Transaction Code SPRO

2.On the Change View “Allocation Structures”: Overview screen, choose New Entries.

3.On the New Entries: Overview of Added Entries screen, make the following entries:

Alloc.str. Text

Y1 CO allocation structure Y2 No Split - All cost elements

Y9 Rework Orders

YH PS Settlement

YL Service Order Settlement YM Allocation Structure IM

YP PP Valuated

YR R&D Orders

YS Sales Order Settlement

4.Save your entries.

Result

The allocation structures are added.

.3.2.2.1.1 Maintaining Allocation Structures — Assignments Use

Assignments are added to the allocation structures.

Prerequisites

Allocation structures are added in previous step.

Procedure

Carry out the following steps:

1. Access the activity using one of the following navigation options:

IMG Menu Controlling → Internal Orders → Actual Postings → Settlement

Maintain Allocation Structures Transaction Code SPRO

2. On the Change View “Allocation Structures”: Overview screen, select the allocation structure (right-hand side of the screen).

3. Choose Assignments with a double-click (left-hand side of the screen).

4. Choose New Entries.

5. On the New Entries: Overview of Added Entries screen, make the following entries and save.

Allocation

Structure Assignment Text

Y1 010 Personnel costs

Y1 020 Raw-/service material consump.

Y1 030 Other costs

Y1 040 Secondary costs

Y1 050 Revenues

Y2 100 All cost elements

Y9 100 Rework Costs

YH 10 Revenues Results Analysis

YH 20 Costs Internal Settlement

YH 30 Personnel costs

YH 40 Raw-/service material consump.

YH 50 Other costs

YH 60 Secondary costs

YH 70 Revenues

YH 80 Production Material

YL 100 Service revenues

YL 200 Service costs

YM 010 External procurement

YM 020 Material

YM 030 Internal services

YP 100 PP Valuated

YR 100 R&D Costs

YS 100 Sales order

Result

The assignments are added.

.3.2.2.1.2 Maintaining Allocation Structures — Source (CE-Group)

Use

Cost element groups are assigned as sources.

Prerequisites

The allocation structures and assignments are maintained.

Procedure

Carry out the following steps:

1.Access the activity using one of the following navigation options:

IMG Menu Controlling → Internal Orders → Actual Postings → Settlement

Maintain Allocation Structures Transaction Code SPRO

2.On the Change View “Allocation Structures”: Overview screen, select the allocation structure (right hand side of the screen).

This step and the following steps have to be repeated for each allocation structure and each assignment. You can find the required entry data in the table below.

3. Choose Assignments with a double-click (left hand side of the screen).

4. Select the assignment (right hand side of the screen).

5. Select Source with a double-click (left hand side of the screen).

6. If the Set Controlling Area dialog box appears, enter controlling area 1000.

7. On the Change View “Source”: Details screen, make the following entries and save.

Allocation

Structure Assignment Cost Elem.Group

Y1 010 YBMF_001

Y1 020 YBMF_002

Y1 030 YBMF_003

Y1 040 200_CE

Y1 050 20_CE

Y2 100 YB_ALL

Y9 100 YB_ALL

YH 10 932000

YH 20 931110 to 931140

YH 30 YBMF_001

YH 40 YBMF_002

YH 50 YBMF_003

Allocation

Structure Assignment Cost Elem.Group

YH 60 YBMF_004

YH 70 5100_CE

YH 80

YL 100 20_CE

YL 200 10_CE

YM 010 1400_CE

YM 020 1200_CE

YM 030 4500_CE

YP 100 YB_ALL

YR 100 YB_ALL

YS 100 YB_ALL

Result

The cost element groups are assigned to the allocation structures as sources.

.3.2.2.1.3 Maintaining Allocation Structures — Settlement Cost Elements (CE)

Use

There are two types of settlement:

settlement by cost elements

settlement by settlement cost element

Prerequisites

The allocation structure, assignments and sources are maintained.

For the second type you have to define the following cost elements, to ensure that settlement is successfully executed:

Internal settlement (means internal CO): Cost element category 21 (secondary).

• External settlement (means receivers in external accounting e.g. in Asset Management):

Cost element category 22 (primary).

Procedure

Carry out the following steps:

1.Access the activity using one of the following navigation options:

IMG Menu Controlling Internal Orders Actual Postings Settlement

Maintain Allocation Structures

Transaction Code SPRO

2. On the Change View “Allocation Structures”: Overview screen, select the allocation structure (right hand side of the screen).

3. Choose Assignments with a double-click (left-hand side of the screen).

4. Select the assignment (right-hand side of the screen).

This step and the following steps have to be repeated for each assignment. You can find the required entry data in the table below.

5. Choose Settlement Cost Elements with a double-click (left-hand side of the screen).

6. On the Change View “Settlement Cost Elements”: Overview screen, choose New Entries.

7. On the New Entries: Overview of added Entries screen, make the following entries and save.

Allocation

Structure

Assign-ment Receiver

cat. By

Cost Element Settlement Cost Element

Y1 010 CTR Select

Y1 010 ORD Select

Y1 010 WBS Select

Y1 010 FXA Select

Y1 020 CTR Select

Y1 020 ORD Select

Y1 020 WBS Select

Y1 020 FXA Select

Y1 030 CTR Select

Y1 030 ORD Select

Y1 030 WBS Select

Y1 030 FXA Select

Y1 040 CTR Select

Y1 040 ORD Select

Y1 040 WBS Select

Y1 040 FXA Select

Y1 050 CTR Select

Y1 050 ORD Select

Y1 050 WBS Select

Y1 050 FXA Select

Y2 100 FXA Select

Y2 100 CTR Select

Y2 100 SDI Select

Y2 100 WBS Select

Allocation

Structure

Assign-ment Receiver

cat. By

Cost Element Settlement Cost Element

Y9 100 CTR 921015

YH 10 PSG 921100

YH 20 PSG 921110

YH 30 CTR Select

YH 30 ORD Select

YH 30 WBS Select

YH 40 CTR Select

YH 40 ORD Select

YH 40 WBS Select

YH 50 CTR Select

YH 50 ORD Select

YH 50 WBS Select

YH 60 CTR Select

YH 60 ORD Select

YH 60 WBS Select

YH 60 PSG Select

YH 70 CTR Select

YH 70 ORD Select

YH 70 WBS Select

YH 80

YL 100 PSG 921050

YL 200 PSG 921055

YL 200 SDI Select

YL 200 CTR 921055

YM 010 FXA Select

YM 010 CTR 921010

YM 020 FXA Select

YM 020 CTR 921020

YM 030 FXA 530100

YM 030 CTR 921030

YP 100 CTR Select

YP 100 ORD Select

Allocation

YR 100 PSG 921017

YR 100 CTR 921017

YS 100 PSG 921019

Result

Settlement cost elements are added to allocation structures.

.3.2.2.2 Maintaining Settlement Profiles Use

In the settlement profile, you define a range of control parameters for settlement.

Procedure

Carry out the following steps:

1. Access the activity using one of the following navigation options:

IMG Menu Controlling Internal Orders Actual Postings Settlement

Maintain Settlement Profiles Transaction Code OKO7

2. On the Change View “Settlement Profile”: Overview screen, select the settlement profile.

This step and the following steps have to be repeated for each settlement profile.

You can find the required entry data in the table below.

3. Choose Details.

4. On the Change View “Settlement Profile”: Details screen, make the following sets of entries:

YB0020 YB0030 YB0050 YB00AI YB00R1

Text Overhead

settled in set set set set set

Field

Structure Y1 Y1 Y1 Y1 YR

PA Transfer str, Default object type

CTR ORD FXA FXA PSG

Indicators 100%

validation set

%-Settlement set set set set set

Equivalenc

e numbers set set set set set

Amount

not allowed Settlement not allowed

not allowed Settlement not Material Settlement Settlement Settlement Settlement Settlement

Field

not allowed not

allowed not allowed not allowed not allowed Network Settlement

not allowed Settlement not allowed

Settlement

not allowed Settlement

not allowed Settlement not allowed Profit.

Segment Settlement

not allowed Settlement not allowed

Settlement

not allowed Settlement

not allowed Settlement optional Sales order Settlement

not allowed Settlement not allowed

Settlement

not allowed Settlement

not allowed Settlement not allowed Cost

objects Settlement

not allowed Settlement not allowed

Settlement

not allowed Settlement

not allowed Settlement not allowed Order item Settlement

not allowed Settlement not allowed

Settlement

not allowed Settlement

not allowed Settlement not allowed Business

proc. Settlement

not allowed Settlement not allowed

Settlement

not allowed Settlement

not allowed Settlement not allowed Real

Est.Object Settlement

not allowed Settlement not allowed

Settlement

not allowed Settlement

not allowed Settlement not allowed

5. Choose Save and Back.

Result

You have created the settlement profiles.

.3.2.2.3 Defining Order Types Use

There are several kinds of order types in controlling. The order category determines the technical properties of orders.

The most important order categories in overhead controlling are:

Order category Description

01 Internal order

02 Accrual Calculation Order

03 Model Order

Accrual Orders

You use accrual orders to monitor the period-related accrual calculation between the

expenses posted in Financial Accounting and the accrued costs charged in Cost Accounting.

You can therefore take the expenses you record in Financial Accounting and distribute them as accrued costs across multiple periods.

• Order Type:Y9A0 Internal Order – Accrual Cost Accounting

• External Number Assignment: 9A00 + Sequence Number

• Settlement Profile: 20

• Not Matched with Revenue Internal order

These order types differ in two attributes in revenue management and the settlement profile.

You can uncheck the “Revenue Postings” flag for order type Z010 (Third-Party Services) if necessary.

As cost centers cannot manage true revenues, special customizing settings are needed to settle cost centers with orders for which costs are matched with revenues.

You define a number of control parameters for settlement in the settlement profile. The settlement profile is a prerequisite for later entering a settlement rule for a sender in the order master record. The settlement profile is usually defined in the order type.

If the costs are for information only you could create a statistical internal order. In this case you have to mark the checkbox ‘statistical order’ on tab index ‘Controlling data’ by creating an internal order.

The statistical order does not require a settlement profile, since statistical costs and revenues cannot be charged further.

Procedure

Carry out the following steps:

1. Access the activity using the following navigation options:

IMG Menu Controlling → Internal Orders → Order Master Data → Define Order Types

Transaction Code KOT2_OPA

2. On the Change View “Order Types”: Overview screen, choose New Entries.

3. On the Order type: New Entry screen, provide Order Category 01 and choose Enter.

4. On the New Entries: Details of Added Entries screen, make the following entries:

Field name Description User actions and values Comment Order category 1 Internal Order (Controlling)

Order Type Y010

Field name Description User actions and values Comment Short Text Internal Order: Third-party

services

5. Choose Assign/Change Intervals to assign the number range.

6. To assign an Internal Order Type to the related Number Ranges Group perform the following steps:

a) Select the number range group checkbox.

b) Choose an order type with ‘Select element F2’. (The color of the order type changes from black to blue.)

c) Assign the order type to the number range group by selecting Element/Group (F5).

Order Type Number Range group

Y010 Internal Order: Third-party services

7. On New Entries: Details of Added Entries screen, make the following entries:

Field name Description User actions and values Comment

Order Type Y010 Already maintained

in preceding steps Short Text Third-party services Already maintained

in preceding steps

Order category 1 Internal Order

(Controlling) Already maintained in preceding steps Number range

interval 500000 – 599999

Number range group:

Services

Already maintained in preceding steps

Settlement

profile YB0030 Production

measure

Planning profile 000001 General plan

profile

Budget Profile 000001 General budget

profile

Collective order without

automatic goods movement Select from the drop down menu

Residence Time 1

3 Calendar Months

CO Partner

Update X ACTIVE Select from the

drop down menu Commitments

Management set Commitments

Management Active

Revenue postings

set Identifier "Revenue

posting allowed"

Field name Description User actions and values Comment Integrated

Planning set Indicator for

Integrated Planning

Status profile 00000002 Internal Orders

Release immediately

Not set

8. Save your entries.

9. Repeat the entries and enter the required fields for order type Y020:

Field name Description User actions and values Comment

Order Type Y020

Short Text Internal Order : Overhead costs

Order category 1 Internal Order

(Controlling) Number range

interval 200000 - 299999

Number range group:

Design Settlement

profile

YB0020 Overhead costs

Planning profile 000001 General plan

profile

Budget Profile 000001 General budget

profile

Collective order without automatic goods

10. Save your entries.

11. Repeat the entries and enter the required fields for order type Y090:

Field name Description User actions and values Comment

Order Type Y090

Short Text Internal Order: Statistical orders

Order category 1 Internal Order

(Controlling) Number range

interval

300000 – 399999 Number range group:

Tools and Equipment Settlement

profile Not set

Planning profile 000001 General plan profile

Budget Profile 000001 General budget

profile Object Class

Functional area Not set

Collective order with /without automatic goods movement

Collective order without automatic goods movement

Select from the drop down menu Residence

Time 1 3

CO Partner

Update X ACTIVE Select from the

drop down menu

Status profile 00000002 Internal Order

Release

immediately Set "Release

immediately"

indicator 12. Save your entries.

13. Repeat the entries and enter the required fields for order type Y100:

Field name Description User actions and values Comment

Order Type Y100

Short Text Internal Order: Research and Development

Order category 1 Internal Order

(Controlling) Number range

interval

100000 - 199999 Number range group:

Development Settlement

profile

YB00R1 R&D Internal Order Settlement

Planning profile 000001 General plan

profile

Budget Profile 000001 General budget

profile Object class

Functional area

Field name Description User actions and values Comment Collective order with

/without automatic goods movement

Collective order without automatic goods movement

Select from the drop down menu Residence

Time 1

3 CO Partner

Update X Active Select from the

drop down menu

Status profile 00000002 Internal Orders

Release

immediately Not set

14. Save your entries.

15. Repeat the entries and enter the required fields for order type Y400:

Field name Description User actions and values Comment

Order Type Y400

Short Text Internal Order: Marketing

Order category 1 Internal Order

(Controlling) Number range

interval 500000 – 599999

Number range group:

Services Settlement

profile Not set Not for settlement

Planning profile 000001 General plan

profile

Budget Profile 000001 General budget

profile Object class

Functional area

Collective order with /without automatic goods movement

Collective order without automatic goods movement

Select from the drop down menu

Update X Active Select from the

drop down menu

Status profile 00000002 Internal Orders

Release set

Field name Description User actions and values Comment immediately

16. Save your entries.

17. Repeat the entries and enter the required fields for order type Y600:

Field name Description User actions and values Comment

Order Type Y600

Short Text Internal Orders:

Investment

Order category 1 Internal Order

(Controlling) Number range

interval 600000 - 699999

Number range group:

Capital Spending Settlement

profile YB00AI Assets under

construction settlement

Planning profile 000001 General plan

profile

Budget Profile 000001 General budget

profile

Object class INVST

Functional area

Collective order with /without automatic goods movement

Collective order without automatic goods movement

Select from the drop down menu

Update X Active Select from the

drop down menu

Status profile 00000002 Internal Orders

Release

immediately Not set

18. Save your entries.

19. Repeat the entries and enter the required fields for order type Y9A0:

Field name Description User actions and values Comment

Order Type Y9A0

Short Text Internal orders: Accrual cost accounting

Order category 2 Accrual Calculation

Order (Controlling) Number range

interval 9A0000000000 -

9AZZZZZZZZZZ Number range group:

Field name Description User actions and values Comment Imputed cost orders

Settlement

profile YB0020 Overhead costs

Planning profile 000001 General plan

profile

Budget Profile 000001 General budget

profile Object class

Functional area

Collective order with /without automatic goods movement

Collective order without automatic goods movement

Select from the drop down menu

Update X Active Select from the

drop down menu

Status profile 00000002 Internal Orders

Release

immediately Set

20. Save your entries.

.3.2.2.4 Assigning Strategy Sequence to Order Type Use

In this IMG activity, you assign a strategy sequence for relevant order type. For new orders, the system transfers the strategy sequence to a corresponding order type in the settlement parameters.

Procedure

Carry out the following steps:

1. Access the activity using the following navigation options:

IMG Menu Controlling Internal Orders Actual Postings Settlement

Automatic Generation of Settlement Rules → Assign Strategy Sequence To Order Type

Transaction Code KSR3_ORC

2. On Change View “Assignment of Strategy Sequence to the Order Type”: Overview screen, make the following entries:

Field name Description User actions and

values Comment

Order type Y020 Internal Order : Overhead costs

Strat. Sequ. SAP040 Use standard

Modifiable 2 Always Overwrite Standard

Status REL Release Standard

Order type Y100 Research and Development

Strat. Sequ. SAP040 Use standard

Modifiable 2 Always Overwrite Standard

Status CRTD Create Standard

3. Save your entries.

4 Configuration Budget and Plan

.4.1 Budgeting and Budget Management (Define Tolerance Limits for Availability Control)

Use

The monitoring of allotted funds is a primary element of order controlling. At any time, you can call up the funds overview, an overview of all allotments and their types. Particularly with critical orders, the allotted funds can exceed the funds made available at an early stage.

In addition to the funds overview as a “passive availability control”, an “active availability control” has been implemented that enables you to prevent excessive allotments from occurring in the first place. Based on the defined tolerance limits and when certain activities are recorded, the system checks whether the available budget or available released budget (release) is still sufficient.

Procedure

Carry out the following steps:

1. Access the activity using the following navigation options:

IMG Menu Controlling Internal Orders Budgeting and Availability Control Define Tolerance Limits for Availability Control Transaction Code SPRO

2. On the Change View “Order Availability Control: Tolerance Limits”: Overview screen, choose New Entries.

3. On the New Entries: Overview of Added Entries screen, make the following entries:

Field name Description User actions and values Comment

COAr Controlling Area 1000

Prof. Budget profile 000001

Tr.grp Availability-control

activity group ++ All activity

groups allowed

Act. Availability control action 1 Only warning

message

Usage Usage rate in % 90,00%

4. Save your entries.

Result

You have defined the tolerance limits for the availability control for profile 000001 in controlling area 1000.

.4.2 User Defined Planning

4.2.1 Creating Planning Layouts for Cost Element

In document SAP CO Configuration ECC6.0 EHP6 (Page 17-35)

Related documents