DEC 2012

Client: Enbridge Energy

Project Description: Pump Station Capacity Increase Project Title: N/A

Location: Indiana USA

Project management, project scoping, preliminary design and detailed cost estimate to increase the delivery capacity from the terminal to a connecting carrier.

Project included detailed station hydraulic study, redesign of the central manifold, manifold relief, three 900 hp vertical can booster pumps, sump system, custody transfer meter skid for 400mbpd, sampling skid, electrical control building, terminal electrical load study and interconnection to a connecting carrier pump station.

Final design is in progress and the work includes, project management, detailed design material specifications and construction support.

Client: BP Pipelines

Project Description: Pump Station Capacity Increase Project Title: N/A

Location: Indiana USA

Project management, project scoping, preliminary design and detailed cost estimate to increase the pipeline delivery capacity. Project included grass roots 10,000 hp VFD drive pump station including two 5000 hp pumping units with plans for a future unit, sump system, 24-inch launcher, electrical control building. The project included modifications to the pump station including pipeline repairs, addition of a mainline MOV, replacement of relief system, new receiver and a mile 22-inch pipeline replacement, and pipeline hydrotest. Final design is in progress and the work includes project management, detailed design, procurement and construction support.

Client: Enbridge Energy

Project Description: Grass Roots Pump Stations and Terminal Project Title: N/A

Location: Illinois and Wisconsin USA

Project management, engineering design, construction support for two grass roots pump stations, launcher receiver site and origin terminal for a refined products system. The grass roots pump stations consisted of two 2000hp mailing pumps, sump pump electrical and control building, and modifications to substations. The origin terminal included 3 custody transfer meter skids, prover loop sample building three 250,000 tanks, three 2000 hp VFD drive pumps, sumps, fire protection system, office building, electrical and control building.

   

Page 61 of 102

Client: Enbridge Energy Project Description: Meter Facility

Project Title: N/A

Location: Minnesota USA

Project management, detailed design, preparation of material lists and construction documentation for a 900,000 bpd custody transfer meter system, interconnect to 7 headers in the existing central manifold, connection to third party terminal and a new electrical and control building.

Client: BP

Project Description: Convert Crude Pipeline to Refined Products Pipeline Project Title: Milan to Wood River Pipeline Reactivation

Location: Missouri and Illinois USA

Provided the project management, design, preparation of all construction documents, and construction coordination to convert and reactivate a 95 mile pipeline system from crude oil to refined products. The project included pipeline cleaning, hydrotesting, installation of a new 1,000 hp pump station, modifications to 4 terminals, and the upgrade of 4 custody meter facilities.

Client: TEPPCO

Project Description: Rebuild Refined Products Terminal

Project Title: P-35 Refined Products Pipeline Expansion Project Location: Indiana USA

Provided project management, detailed design, and preparation of material lists and construction documents for the rebuilding of a refined products terminal including: new manifold, replacement of tank lines, new 150,000 barrel floating roof tank with geodesic dome, retrofit of six existing external floating roof tanks with geodesic domes, and the addition of internal floating roofs to existing cone roof tanks.

Client: Enbridge Energy

Project Description: Redesign Crude Terminal To Accept 42 in Pipeline Project Title: Terminal Re-Design

Location: Illinois, USA

Re-design of an existing crude oil terminal to accommodate a new incoming 42-inch pipeline. The facilities included a 42-42-inch multiple pig launcher, relief systems, control valve, a new 42-inch central manifold, addition of 42-inch tank lines to existing tanks, and crude quality monitoring systems.

     

Recently Completed Projects - Liquid Projects

 

Note: Inclusion in this list does not imply any endorsement of EN Engineering.

Companies wishing to be removed from this publication may contact EN Engineering at: [email protected]

 

DEC 2012

Client: Enbridge Energy

Project Description: Redesign & Construction Management for Crude Terminal Expansion

Project Title:

Location: Indiana USA

Designed and provided construction management to interconnect two 36-inch crude lines between two terminals. The work included hydraulic analysis of the new pipelines and terminal, connection of the pipelines to two manifolds, modifications to the existing central manifolds, addition of two new headers, interconnection to a third party pipeline, and the addition of a vertical can booster pump. Total footage was 1.5 miles.

Client: Enbridge Energy

Project Description: Interconnection of Crude Oil Pipeline To an Existing Terminal

Project Title: Line 64 Station Interconnect Location: Indiana USA

Provided all engineering design for the interconnection of a crude oil pipeline to an existing terminal. The facilities included 1,800 feet of 24-inch pipeline, a receiver, gravitometer, ultrasonic line balance meter, control valve, relief system, interconnections to the tank manifold, modifications to the manifold and new electrical and control building.

Client: Enbridge Energy

Project Description: Crude Oil Pump Station and Terminal Expansion Project Title: Pump Station

Location: Illinois USA

Provided project management, detailed design, preparation of material lists, and construction documentation for a terminal origin 18,000 hp pump station, multiple pig launcher, and ultrasonic mainline metering, electrical control building and substation design.

Client: AuxSable

Project Description: Propane Terminal Interconnect Design Project Title: Propane Terminal Connection

Location: Illinois USA

Designed the interconnection between a pipeline terminal and connecting carrier.

The project included two miles of new 6-inch pipeline, conversion of 35 miles of pipeline from natural gas to propane, design of a 4-inch custody meter facility on each end of the pipeline, the interconnection of the two pipelines, and the connections to the manifolds and propane caverns.

Page 63 of 102

Client: TEPPCO

Project Description: Design New Refined Products Pump Station Project Title: P-35 Refined Products Pipeline Expansion Project

Phase II

Location: Indiana USA

Design and preparation of material lists and construction documents for a new refined products 3,500 hp pump station.

Client: TEPPCO

Project Description: Project Management and Design For Custody Transfer Metering Facilities

Project Title: P-35 Refined Products Pipeline Expansion Metering Project

Location: Indiana USA

Project management and engineering design including preparation of material lists and construction documents for the three new custody transfer metering facilities..

Client: AuxSable

Project Description: Propane Terminal Interconnect Modifications Project Title: N/A

Location: Illinois USA

Design-build project for the modification of two pipeline connections at each of two propane terminal manifolds. Included was the installation of two pig launchers, one pig receiver, and modifications to the station piping.

Client: Wolverine

Project Description: Pipeline Terminal Meeting System Project Title: N/A

Location: Indiana USA

Project management, detailed design, preparation of material lists and construction documentation for a 10-inch custody transfer products meter facility and modifications to the terminal manifold system.

   

Recently Completed Projects - Liquid Projects

 

Note: Inclusion in this list does not imply any endorsement of EN Engineering.

Companies wishing to be removed from this publication may contact EN Engineering at: [email protected]

 

DEC 2012

Client: BP Pipelines Project Description: Existing Pipeline Lowering Project Title: N/A

Location: Iowa and Indiana USA

Provide project management, engineering to lower various pipelines ranging in size from 6-inch to 24-inch. Included lowering calculations, lowering procedure and required drawings. Lowering projects were required to prevent third-party damage in existing agriculture areas.

Client: Enbridge Energy Project Description: Tankage Additions at Terminal Project Title: N/A

Location: Indiana USA

Project management, detailed deism, and construction support for the addition of one 650,000 barrel and 250,000 storage tank at an existing terminal new 36-inch tank lines, interconnection to the central manifold and associated electrical and controls work.

Client: BP Pipelines

Project Description: Pipeline Relocations For Public Improvement Project Title: N/A

Location: Various Locations in the Midwest USA

Provided project management, detailed design, preparation of material lists, and construction documentation for the relocation of pipelines ranging from 6-inch to 20-inch throughout the company's pipeline system for public improvements.

Client: West Shore Pipeline

Project Description: Relocation of 12 in & 16 in Products Pipelines Project Title: N/A

Location: Illinois USA

Project management, engineering design and construction management for the relocation of one mile each of a 12-inch and 16-inch pipelines paralleling railroad rights-of-way. The project included negotiating an acceptable agreement between the railroad and West Shore for the location of the pipeline relocation.

   

Page 65 of 102

Client: West Shore Pipeline

Project Description: Relocation of 16 in Pipeline for Public Improvements Project Title: N/A

Location: Illinois USA

Engineering design for the relocation of a half mile of 16-inch pipeline for public roadway improvements.

Client: BP Pipelines Project Description: Crude Oil Pipeline Purge Project Title: N/A

Location: Midwest USA

Project management, detailed design, and preparation of construction documentation for the purging of 330 miles of 22-inch crude oil pipeline from Missouri to Indiana.

Client: Buckeye Pipeline Project Description: As-Built Drawing Development Project Title: N/A

Location: Ohio USA

As-built various pipeline stations and terminals. Scope of the services performed consisted of field survey of the stations, physical measurements of all piping and equipment, updating and redrawing the station drawings to meet the current company drafting standards.

 

   

Recently Completed Projects - Liquid Projects

 

Note: Inclusion in this list does not imply any endorsement of EN Engineering.

Companies wishing to be removed from this publication may contact EN Engineering at: [email protected]

 

DEC 2012

Client: Enbridge Project Description: System Expansion Project Title: Eastern Access

Location: Illinois, Indiana, Michigan

Project management, project scoping, cost estimates, and detailed design. The facilities included the following:

 Expansion of terminal for receipts and delivery of over 1 MMbpd heavy crude oil. Including 6 new 400,000 bbl tanks, new tank lines, manifold, addition/replacement of vertical can booster pumps and addition/replacement of mainline pumping units, hydraulic analysis for the terminal and surge analysis for rapid pump shutdown.

 Two grass roots pump stations including 3 – 3000hp VFD pumping units, line balance metering, pump building, ESB and VFD buildings, electrical infrastructure and tie-ins to an existing pipeline.

 Replacement of existing terminal including new manifold, new tank lines, multiple sets of vertical can booster pumps, transfer lines and associated electrical substation and electrical switchgear building, hydraulic analysis for terminal and surge analysis for rapid pump shutdown, relief system for multiple pipelines and transfer lines.

 Origin pump station for a pipeline including four 6000 hp mainline pumps, line balance metering, pump building, 36-inch multi-pig launcher, launcher building, new substation, new electrical switchgear building, VFDs, densitometer, relief system and other required infrastructure.

 Replacement of two mainline pump stations. New facilities include three 6000hp mainline pumps, line balance metering, pump building, new substations, new electrical switchgear building, VFDs and other site development requirements.

 Replacement of 160 miles of pipeline with 36-inch pipeline paralleling the existing pipeline corridor.

 Replacement of existing terminal including new manifold, replacement of tank lines, vertical can booster pumps, 6000 hp mainline pump station. Pump building, 36-inch multi-pig receiver, pig receiver building and pig repair facility, 20-inch launcher, electrical switchgear buildings, VFDs, hydraulic analysis for terminal and surge analysis for rapid pump shutdown, relief system for multiple pipelines station facilities.

 New 37 miles of 20-inch pipeline

 Pipe receiver and launcher site

 Custody transfer meter facility, including two 12-inch meters, prover, flow computer, pipeline interconnects, launchers and receivers, electrical switchgear building, and power for the facility.

 10 mainline valve sites including power and automation for the valve sites.

 

Page 67 of 102

Client: Sunoco

Project Description: Blending butane into gasoline at products trucking terminals

Project Title: Butane Blending

Location: Texas, South Carolina, Georgia, Michigan, Virginia At multiple terminals provided project management and design of Butane blending systems. The work including interfacing facilities with existing product trucking terminals. The facilities included truck offloading, butane bullet tanks, blending skid, metering, analysis skid, new roads and infrastructure, electrical, PLC programing and commissioning.

Client: Texon

Project Description: Bio-diesel blending at a products terminal Project Title: Bio-diesel Blending

Location: Texas

Project management, design of a bio-diesel blending system at a products terminal.

The facilities included 10,000 bbl tank, truck unloading, measurement facilities, blending system for the injection of bio-diesel into pipeline transporting diesel.

Client: Buckeye

Project Description: Revamp existing meter station to allow proving with portable prover.

Project Title: Upgrade Meter Facility Location: Illinois

Project management, detailed design and field coordination to rebuild a meter facility to allow for meter proving. The facilities included addition of double block and bleed valves, portable prover connections, revamp of electrical to include the new block valves, pressure and temperature transmitters.

Client: Buckeye

Project Description: Addition of provers to existing metering facilities Project Title: Meter Prover Projects

Location: Indiana

At multiple locations provided project management and engineering for the detailed design of the addition of new small volume provers on a products pipeline meter station. The work included the addition of double block and bleed valves, small volume prover, electrical system upgrades, programing of Omni flow computer and commissioning.

 

Recently Completed Projects - Liquid Projects

 

Note: Inclusion in this list does not imply any endorsement of EN Engineering.

Companies wishing to be removed from this publication may contact EN Engineering at: [email protected]

 

DEC 2012

CONFIDENTIAL CLIENT

Client: Confidential

Project Description: Preliminary engineering and cost estimate for terminal Project Title: Pipeline Terminal Expansion

Location: Midwest

Preliminary design and detailed cost estimate for the addition of 1MMbbl of crude oil storage. The project included new tanks, tank lines, manifold expansion, pipeline interconnects, vertical can booster pumps, expansion of fire water system and associated expansion of the electrical infrastructure.

CONFIDENTIAL CLIENT

Client: Confidential

Project Description: Preliminary design and detailed cost estimate for a new crude oil terminal

Project Title: New Crude Oil Terminal Location: Midwest

Preliminary design and detailed cost estimates for a new grass roots terminal.

Facilities included tankage, booster pumps, site development, new sub-station, custody transfer metering, transfer lines and pipeline interconnects, associated electrical infrastructure, relief systems and fire protection system.

Client: BP Pipelines

Project Description: Revamp custody transfer metering system on a products pipeline system to meet the company’s custody transfer metering standards.

Project Title: Custody Transfer metering.

Location: Indiana, Michigan

Project management and detailed design for the upgrade of 5 metering facilities.

The project included replacement of turbine meters, addition of pressure and temperature transmitters, modification of pipe systems, access to sites from main access roads, revamp of drain system.

CONFIDENTIAL CLIENT

Client: Confidential

Project Description: Preliminary design and detailed cost estimate for CO2 Pipeline form a coal gasification plant.

Project Title: CO2 Pipeline Study Location: Midwest

Project management, preliminary design and detailed cost estimate for options to move CO2 from a coal gasification plant to underground storage or injection into existing oil fields for enhanced recovery. The project evaluated multiple pipeline routes ranging from 100 to 290 miles. The faculties included the pipeline, launchers and receivers, pipeline interconnects, custody transfer metering systems, substation, pump stations and other associated facilities. In addition, provided a table top evaluation of the environmental permitting, and associated risks of each route.

 

   

Page 69 of 102

Client: OneOk

Project Description: Detail Design to install a spare mainline pump.

Project Title: Lemont Terminal Mainline Pump Location: Illinois

Detailed design to install a new 1250 hp Mainline Pump in parallel with the existing one along with piping modifications to allow more pumping flexibility. Project included the specifying of automated valves, instrumentation and electrical equipment.

Client: Buckeye

Project Description: Installation of new vertical can booster pump Project Title: New Booster pump

Location: Indiana

Project management and engineering design for the installation of a new 300 hp booster pump. The project included a detailed terminal and pipeline hydraulic analysis, new 300 hp vertical can booster pump, VFD, piping modifications, associated electrical upgrades.

Client: Buckeye

Project Description: Installation of a drain system at a terminal to keep the terminal facilities dry to high water table and large rain storms.

Project Title: Drainage System Location: Indiana

Project management and detailed design for the installation of a drainage system to remove surface water from a terminal manifold area to prevent water accumulation.

The system included drain tile, water oil separator, lifter pumps and discharge piping.

Client: OneOk

Project Description: Install a second canned gasoline pump Project Title: Lemont Terminal Gasoline Pump Location: Illinois