Selected NextGen Capabilities by Portfolio for Implementation in 2011-

In document Implementation Plan March 2012 (Page 54-56)

This map shows the location of selected NextGen capabilities implemented in 2011 and capabilities we are planning to deliver in 2012. Additional details can be found in the individual implementation portfolios on the following pages. BWI JFK BOS ZBW MEM STL CLE ATL CHS MIA ZNY

ASDE-X to Additional Airports RNAV SIDs and STARs at single sites

Transition to PBN Routing for Cruise Operations

New York Metropolitan Area

Large-Scale Redesign of Airspace Leveraging PBN

New Jersey Metropolitan Area

Large-Scale Redesign of Airspace Leveraging PBN

Philadelphia Metropolitan Area

Large-Scale Redesign of Airspace Leveraging PBN

tASDE-X to Additional Airports tExternal Data Exchange

OPDs using RNAV and RNP STARs Expanded Low-Visibility

Operations Using Lower RVR Minima (Runway 24L)

PHL

CDTI with TIS-B and ADS-B for Surface

PCT

Moving Map with Own-Ship Position

IAH MKE MDW ZAB DEN NAS-Wide SLC MSP Transition to PBN Routing for Cruise Operations Transition to PBN Routing

for Cruise Operations

GBAS Category I Non-Federal System Approval LAS LAX SAN SFO ZOA SCT NCT HNL ANC PDX PHX ADS-C CDP ZLA ACM ZLC ACM

OPDs using RNAV and RNP STARs

OPDs using RNAV and RNP STARs Additional 7110.308 Airports

Traffic Management Advisor

tExternal Data Exchange tASDE-X to Additional Airports RNAV SIDs and STARs at single sites

RNAV SIDs and STARs at single sites RNAV SIDs and STARs

at single sites

Transition to PBN Routing for Cruise Operations Transition to PBN Routing

for Cruise Operations

Situational Awareness and Alerting of Ground Vehicles

Taxiway Improvements

EWR

RNAV SIDs and STARs at single sites tBasic Rerouting Capability

tEnhanced Congestion Prediction

External Data Exchange

External Data Exchange

DCA

External Data Exchange

IAD

External Data Exchange

ORD

External Data Exchange External Data Exchange

External Data Exchange

C90

External Data Exchange

External Data Exchange

Runway 9L/27R extension

Atlanta Metroplex

Optimization of Airspace Procedures in the Metroplex

Houston Metroplex

Optimization of Airspace Procedures in the Metroplex

North Texas Metroplex

Optimization of Airspace Procedures in the Metroplex

Northern California Metroplex

Optimization of Airspace Procedures in the Metroplex

Southern California Metroplex

Optimization of Airspace Procedures in the Metroplex

Washington Metroplex

Optimization of Airspace Procedures in the Metroplex

Charlotte Metroplex

Optimization of Airspace Procedures in the Metroplex tRunway 10L/28R extension tRehabilitation of Runway 10R/28L Runway 7R/25L extension Additional 7110.308 Airports ATPA N90 ATPA SDF ATPA A80 ATPA ATPA

Automated Terminal Proximity Alert (ATPA) ATPA

ATPA ATPA

ZSE

Adjacent Center Metering (ACM)

RNP and RNP AR Approaches ATPA

www.faa.gov/nextgen 53

Improved Surface Operations

Improved Approaches and Low-Visibility Operations Improved Multiple Runway Operations

Collaborative Air Traffic Management

Common Services and Infrastructure Airport

FAA Facility Metroplex

Performance Based Navigation Time Based Flow Management

Separation Management

Selected NextGen Capabilities by Portfolio

for Implementation in 2011-2012

This map shows the location of selected NextGen capabilities implemented in 2011 and capabilities we are planning to deliver in 2012. Additional details can be found in the individual implementation portfolios on the following pages. BWI JFK BOS ZBW MEM STL CLE ATL CHS MIA ZNY

ASDE-X to Additional Airports RNAV SIDs and STARs at single sites

Transition to PBN Routing for Cruise Operations

New York Metropolitan Area

Large-Scale Redesign of Airspace Leveraging PBN

New Jersey Metropolitan Area

Large-Scale Redesign of Airspace Leveraging PBN

Philadelphia Metropolitan Area

Large-Scale Redesign of Airspace Leveraging PBN

tASDE-X to Additional Airports tExternal Data Exchange

OPDs using RNAV and RNP STARs Expanded Low-Visibility

Operations Using Lower RVR Minima (Runway 24L)

PHL

CDTI with TIS-B and ADS-B for Surface

PCT

Moving Map with Own-Ship Position

IAH MKE MDW ZAB DEN NAS-Wide SLC MSP Transition to PBN Routing for Cruise Operations Transition to PBN Routing

for Cruise Operations

GBAS Category I Non-Federal System Approval LAS LAX SAN SFO ZOA SCT NCT HNL ANC PDX PHX ADS-C CDP ZLA ACM ZLC ACM

OPDs using RNAV and RNP STARs

OPDs using RNAV and RNP STARs Additional 7110.308 Airports

Traffic Management Advisor

tExternal Data Exchange tASDE-X to Additional Airports RNAV SIDs and STARs at single sites

RNAV SIDs and STARs at single sites RNAV SIDs and STARs

at single sites

Transition to PBN Routing for Cruise Operations Transition to PBN Routing

for Cruise Operations

Situational Awareness and Alerting of Ground Vehicles

Taxiway Improvements

EWR

RNAV SIDs and STARs at single sites tBasic Rerouting Capability

tEnhanced Congestion Prediction

External Data Exchange

External Data Exchange

DCA

External Data Exchange

IAD

External Data Exchange

ORD

External Data Exchange External Data Exchange

External Data Exchange

C90

External Data Exchange

External Data Exchange

Runway 9L/27R extension

Atlanta Metroplex

Optimization of Airspace Procedures in the Metroplex

Houston Metroplex

Optimization of Airspace Procedures in the Metroplex

North Texas Metroplex

Optimization of Airspace Procedures in the Metroplex

Northern California Metroplex

Optimization of Airspace Procedures in the Metroplex

Southern California Metroplex

Optimization of Airspace Procedures in the Metroplex

Washington Metroplex

Optimization of Airspace Procedures in the Metroplex

Charlotte Metroplex

Optimization of Airspace Procedures in the Metroplex tRunway 10L/28R extension tRehabilitation of Runway 10R/28L Runway 7R/25L extension Additional 7110.308 Airports ATPA N90 ATPA SDF ATPA A80 ATPA ATPA

Automated Terminal Proximity Alert (ATPA) ATPA

ATPA ATPA

ZSE

Adjacent Center Metering (ACM)

RNP and RNP AR Approaches ATPA

54 Ne xtG en I mplemen ta tion P lan