Ad
07-03714 LFUCG Trail
Town Branch Commons Table 6A - add funding to the Town Branch Commons Corridor project to construct a multimodal greenway connecting the Legacy Trail and the Town Branch Trail with $14,100,000 of TIGER funds.
LexTran Transit
Purchase 40' Electric Bus Table 6A - Add a project to purchase one 40’ electric bus with $683,400 in FTA Section 5339 funds.
07-03212 LFUCG Trail Town Branch Trail Phase 6 Table 6A - Add $693,000 in TA design funds 07-03212 LFUCG Trail Armstrong Mill sidewalks Table 6A - Add new project with $72,000 in federal TA design funds 07-03214 LFUCG Trail East High in Nicholasville shared use trail Table 6A - Add new project with $117,000 in federal TA design funds 07-03215 LFUCG Trail West High in Nicholasville shared use trail Table 6A - Add new project with $126,000 in federal TA design funds 07-03216 LFUCG Trail Wilson Downing sidewalks Table 6A - Add new project with $90,000 in federal TA design funds 07-03217 LFUCG Trail Elizabeth Street sidewalks Table 6A - Add new project with $113,000 in federal TA design funds 07-03218 LFUCG Trail Beaumont YMCA trail and crossing Table 6A - Add new project with $23,000 in federal TA design funds 07-03219 LFUCG Trail Rosemont Garden sidewalks Table 6A - Add new project with $113,000 in federal TA design funds 07-03220 LFUCG Trail Oxford Circle sidewalks Table 6A - Add new project with $23,000 in federal TA design funds 07-03221 LFUCG Trail Old Todds Road sidewalks Add new project with $90,000 in federal TA design funds 07-03222 LFUCG Trail South Elkhorn Trail Table 6A - Add new project with $68,000 in federal TA design funds 07-03223 LFUCG Trail Citation Trail Table 6A - Add new project with $135,000 in federal TA design funds
Lextran Transit
Improve Access at Bus Stops Table 6A - Add a project to improve access at a number of bus stops with $141,171 in FTA 5310 funds.
ITN
Bluegrass Transit
Continue Transportation for Persons 60 and Over and with Visual Impairment
Table 6A - Add a project to continue transportation for persons 60 and over and adults with visual impairment with $60,000 in FTA 5310 funds
Mod #2 5/1/2017 Richmond Rd (US 25) Access management
and offset turn lanes
Table 1 – SLX projects: Add $56,800 in federal SLX funding to the project to allow for
N/A 5/2/2016 ( 2016.054) N/A 11/29/2016
(2016.021) Mod #1 11/23/2016
Ad 07-03213 LFUCG Bike/Ped
Armstrong Mill sidewalks Table 6A - Add federal CMAQ funds to project: $20,000 for utility and $982,720 for construction phase
07-03220 LFUCG Bike/Ped
Oxford Circle Sidewalks Table 6A – Add federal CMAQ funds to project: $2,400 for utility phase and $48,974 for construction phase
Pending LFUCG
Mercer at Greendale Rd Turn Lanes Table 6A – Add new project to improve intersection; add federal CMAQ funds; $68,000 for design; $60,000 for utility; $48,00 for right of way; 627,840 for construction
Amend #1
8/20/2017
07-08902 KYTC KY 1927
Liberty Rd - extend the existing 4 lane from Graftons Mill Rd to New Circle Rd
Table 2 - Add Liberty Rd project to reflect STP funding for design phase ($1,600,000 federal). Table 4 - Remove design phase for Liberty Rd project (previously SPP funding) . Updated right-of-way phase cost to $4,300,000 KYTC SP funds; utility phase cost to $4,330,000
KYTC SP funds; and construction phase cost to $11,250,000 KYTC SP funds.
8/16/17-8/31/17 9/12/2017 (2016.098)
Lextran Transit
Purchase 1 40’ Electric Bus and on-route electric bus charger
Table 6A – Lextran – add project to purchase 1 40’ electric bus and 1 on-route electric bus charger. Total project amount is $1,250,000. Federal funds are from the FTA No or Low Emissions Deployment Program Grant ($1,000,000 in federal 5339 funds). 07-03220 Valley View Ferry Authority Ferry
Valley View Ferry – purchase 4 acres, construct new boat ramp, parking area and retaining wall
Table 6A – Valley View Ferry Authority – add project to purchase 4 acres, construct new boat ramp, parking area and retaining wall. Total project cost is $451,985 for design, right of way, utility and construction from the KYTC Ferry Boat Program ($361,588 federal FBP funds). Federal FBP funds by phase are: Design = $109,208 federal funds; Right of Way = $30,800 federal funds; Utility = $6,820 federal funds; Construction = $214,760 federal funds.
N/A 7/31/2017 (2016.078) N/A 11/1/2017 (2016.122) Mod #3 7/27/2017 Mod #4 10/25/2017
Ad Mod #5 11/1/2017
07-01145 LFUCG CS 7038
Wilson Downing Rd Bridge Replacement - replace deteriorated bridge section across West Hickman Creek along west bound lane of Wilson Downing Rd
Table 1 – SLX Projects - add project: Wilson Downing Road Bridge Replacement - to replace the deteriorated west bound lane bridge section of the Wilson Downing Road bridge across West Hickman Creek. Total project cost is $350,000 for design and construction ($280,000 federal SLX funds). Federal funds by phase include $60,000 for design and $220,000 for construction.
N/A 11/2/2017 (2016.126)
07-3103.00 LFUCG Trail
Legacy Trail Phase 3 Table 6A – modify project: Legacy Trail Phase III - move $92,650 from the construction phase to the right of way phase. Add $9,265 for state forces to the right of way phase and $330,935 for state forces to the construction phase for a total of $340,200 in additional funds (from federal funds and toll credits). Shift funds for both phases to FY 2018.
07-366.00 07-366.02 07-366.03
KYTC KY 4
New Circle Road widening from Georgetown Rd to Boardwalk
Table 2 – combine construction funding amounts shown for item numbers 366.00, 366.02 and 366.03 - New Circle Road widening from Georgetown Rd to Boardwalk including Newtown Interchange frontage roads and ramps at Georgetown - and increase construction funding in the amount of $3,530,290 for a total of $38,460,290 in FY 2018 Mod # 6 REVISED 5/24/2018 07-366.00 KYTC KY 4
Widen New Circle Road from Georgetown Road to Boardwalk Avenue including Interchange reconstruction at Newtown Pike and Georgetown Road
Table 2 - increase construction funding in the amount of $7,440,000 for a total of $45,900,290 in FY 2018.
N/A 5/29/2018 (2016.184)
07-9003.50 KYTC CS 4904
Virginia Ave Table 6A - add project: Virginia Ave – extend the eastbound right turn lane at US 27 (S Limestone), update the signal to include reflective backplates and updating the striping. Add $111,000 in federal funds for construction phase in FY 2018. 1/26/2018 (2016.145) N/A N/A 2/22/2017 (2016.149) Mod #6 1/25/2018 Mod #7 2/22/2018
Ad
07-8909.00 KYTC I-64 / I-75
I-64 / I-75 Table 2 – modify project description for F 8909.00 and combine project limits with F 8910.00: I-64/I-75 - reduce congestion from southern split (MP 111.00) to the northern split (MP 117.67); project length=6.7 mi. Increase design funds from $500,000 to $1,750,000 in FY 2018.
07-3702:00 KYTC Trail
Town Branch Trail Crossing at Old Frankfort Pk and McConnell Springs Rd; includes ped signal, pavement markings, traffic calming, signage, and sight distance improvement
Table 6A – modify project: Town Branch Trail Crossing at Old Frankfort Pk and McConnell Springs Rd. - shift $106,000 in funds ($84,800 federal funds) from the construction phase to the right of way phase in FY 2018. Add $10,600 for state forces for a total of $116,600 ($95,400 federal funds). Update the total construction estimate to $1,100,000, which includes the remaining $314,000, and shift it to FY 2020.
07-931.00 KYTC KY 169
KY 169 Safety Improvements - Improve superelevation, add embankment, improve sight-distance and remove roadside hazards on KY 169 from KY 1267 to Jessamine-Woodford County Line.
Table 6A – add project: KY 169 Safety Improvements - Improve superelevation, add embankment, improve sight-distance and remove roadside hazards on KY 169 from KY 1267 to Jessamine-Woodford County Line. Add $57,000 in federal funds for right of way phase and $300,000 in federal funds for construction phase in FY 2018.
07-9003.10 KYTC US 25
US 25 Safety Improvements - Reconfigure the median noses, update the signing and striping, reconstruct the sidewalk ramps, and install a right turn overlap at the intersection of US 25 and Man O War Blvd.
Table 6A – add project: US 25 Safety
Improvements - Reconfigure the median noses, update the signing and striping, reconstruct the sidewalk ramps, and install a right turn overlap at the intersection of US 25 and Man O’ War Blvd. Add $52,000 in federal funds for construction phase in FY 2018.
Mod #8 4/3/2018 N/A 4/9/2018
Ad
07-9003.20 KYTC CS 4524
Pink Pigeon/MOW Safety Improvements - Update the signal to include reflective backplates, and update the signing, striping, and sidewalk ramps at the intersection of Pink Pigeon Pkwy and Man O War Blvd.
Table 6A – add project: Pink Pigeon/MOW Safety Improvements - Update the signal to include reflective backplates, and update the signing, striping, and sidewalk ramps at the intersection of Pink Pigeon Pkwy and Man O’ War Blvd. Add $26,000 in federal funds for construction phase in FY 2018.
07-9003.30 KYTC KY 1974
KY 1974 Safety Improvements - Cross-hatch paved median along the NB Tates Creek Rd approach, update signing, and update signal to include reflective backplates at the intersection of Tates Creek Rd and Man O War Blvd.
Table 6A – add project: KY 1974 Safety Improvements - Cross-hatch paved median along the NB Tates Creek Rd approach, update signing, and update signal to include reflective backplates at the intersection of Tates Creek Rd and Man O’ War Blvd. Add $64,000 in federal funds for construction phase in FY 2018.
07-9003.40 KYTC CS 4524
Pleasant Ridge/MOW Safety Improvements -Add a second left turn lane along WB Man O War Blvd., and update the striping, signing, and sidewalk ramps at the intersection of Man O War Blvd. and Pleasant Ridge Dr.
Table 6A – add project: Pleasant Ridge/MOW Safety Improvements - Add a second left turn lane along WB Man O War Blvd., and update the striping, signing, and sidewalk ramps at the intersection of Man O War Blvd. and Pleasant Ridge Dr. Add $162,000 in federal funds for construction phase in FY 2018.
Mod #8 cont.
4/3/2018 N/A 4/9/2018
Ad
07-9003.60 KYTC US 27
US 27 & Cooper/Waller Safety
Improvements - Update the signal to include reflective backplates, construct a bus turnout, and update the signing at the intersection of US 27 with Waller Ave. and Cooper Dr.
Table 6A – add project: US 27 & Cooper/Waller Safety Improvements - Update the signal to include reflective backplates, construct a bus turnout, and update the signing at the intersection of US 27 with Waller Ave. and Cooper Dr. Add $85,000 in federal funds for construction phase in FY 2018.
07-944.00 KYTC KY 1968
KY 1968 - Roadside Improvements. Table 6A – add project: KY 1968 Roadside improvements. Add $350,000 in federal funds for construction phase in FY 2018.
Mod #9 4/23/2018
7-3714.00 KYTC Trail
Town Branch Commons - Midland Section construct bike/ped facilities from Vine/Quality St to Third St at the Legacy Trail; length=0.7 mi
Table 6A - Shift $736,000 in funds ($588,800 federal funds) from the
construction phase to the right of way phase in FY 2018. Move $350,000 in funds ($280,000 federal funds) from the utilities phase from FY 2017 to FY 2018. N/A Mod #8 cont. 4/30/2018 N/A 4/9/2018 (2016.159)
Ad Clays Mill Rd widen from Harrodsburg Rd
to New Circle Rd - Section 1; Length=2.0 mi (Mod #10)
Table 1: Update schedule & cost estimate (Construction reduced from $11,375 to $11,000)
07-0229.20
7/13/2018 (2016.198)
South Elkhorn Trail from Joseph Bryan Way through NS RR tunnel to Waveland - Section 2; Length=0.3 mi (Mod #10)
Table 1: Update schedule 07-0224.10 LFUCG 4174CS -
LFUCG NA
F 229.30 LFUCG NA
South Elkhorn Trail from Lochdale Terrace extending N under Man o' War Blvd to Shillito Park - Section 3; Length=0.3 mi (Mod #10)
Table 1: Update schedule
F 113.02 KYTC KY 4
New Circle Road rehab and widening from Leestown Rd to near Georgetown Rd.; Length=3.4 mi (Mod #10)
Table 2: Update schedule & cost estimate
F 252.00 KYTC KY 922
Newtown Pike six-lane from KY 4 to I-75; Length=1.8 mi (Mod #10)
Table 2: Change funding source from STP to NH Update schedule & cost estimate
J 414.00 KYTC KY 1980
Brannon Rd improve geometrics, typical section, and roadway hazards from US 68 (Harrodsburg Rd) to US 27 (Nicholasville Rd); Length=3.2 mi (Mod #10)
Table 2: R, U and C phases moved to Table 3
J 915.00 KYTC US 68
KY 29 N of Wilmore reconstruct intersection with US 68; Length=0.7 mi (Mod #10)
Table 2: Update schedule & cost estimate
US 421
US 421 replace bridge over fork of Town Branch at intersection with Bracktown Rd; Length=0.1 mi (Mod #10)
Table 2: Update schedule & cost estimate
Mod #10 7/10/2018 N/A
Ad Mod #10
cont.
7/10/2018
KY 39
KY 39 replace bridge over Hickman Creek at Black Bridge 1.3 mi north of KY 1268; Length=0.1 mi (Mod #10)
Table 2: Update schedule & cost estimate
F 1141.00 KYTC CR 1001
Hume Rd replace bridge over branch of North Elkhorn Creek 0.7 mi NW of US 60; Length=0.1 mi (Mod #10)
Table 2: Update schedule & cost estimate J 1136.00 KYTC
J 1144.00 KYTC CR-1238
CR-1238 replace bridge over NS System; Length=0.1 mi (Mod #10)
Table 2: Update schedule & cost estimate
J 8851.00 KYTC KY 169
US 169 (North 3rd St) replace railroad bridge between Meadowlark Ln and Ilhardt Ave; Length=0.1 mi (Mod #10)
Table2: Update schedule
F 8902.00 KYTC KY-1927
Liberty Rd extend the existing 4-lane on Liberty Rd from Graftons Mill Ln (MP 1.145) to New Circle Rd (MP 0.0) and improve intersection with New Circle Rd; Length=1.1 mi (Amend #1) (Mod #10)
Table 2: Update schedule & cost estimate
F 8909.00 KYTC I-75
I-64/I-75 reduce congestion from southern split (MP 111.00) to the northern split (MP 117.67) (16CCN); length=6.7 mi (Mod#7) (Mod #10)
Table 2: Update schedule & cost estimate
N/A 7/13/2018 (2016.198)
Ad
F 10009.00 KYTC CR-1121
CR-1121 Repair McCall’s Mill Rd. bridge over Boggs Creek (Mod #10)
Table 2: New project delineated from Grouped Project Bridge Replacement
J 10011.00 KYTC KY 1268
KY 1268 Repair bridge over Hickman Creek (Mod #10)
Table 2: New project delineated from Grouped Project Bridge Replacement
F 20009.00 KYTC I-64
I-64 Address pavement condition both directions from MP 73.94 to MP 74.729 Length = 0.79 mi (Mod #10)
Table 2: New project delineated from Grouped Project Pavement Resurfacing/Rehabilitation
F 20015.00 KYTC I-75
I-75 Address pavement condition both directions from MP 111.82 to MP 120.792 Length = 8.97 mi (Mod #10)
Table 2: New project delineated from Grouped Project Pavement Resurfacing/Rehabilitation
Table 2: New project delineated from Grouped Project Pavement Resurfacing/Rehabilitation
J 414.00 KYTC KY 1980
Brannon Rd improve geometrics, typical section, and roadway hazards from US 68 (Harrodsburg Rd) to US 27 (Nicholasville Rd); Length=3.2 mi (Mod #10)
Table 3: R, U, & C Phases Moved from Table 2 Mod #10
cont.
7/10/2018 N/A 7/13/2018
(2016.198)
F 20016.00 KYTC US 421
US 421 Address pavement condition (Mod #10)
Ad Mod #10 cont. 7/10/2018 J 87.20 KYTC New Route
East Nicholasville Bypass Section 1A from 50 feet S of KY 39 to 125 feet N of KY 169; Length=2.9 mi (Mod # 10)
Table 4: Remove from Informational Supplement No phases in SHP
J 87.30 KYTC New Route
East Nicholasville Bypass Section 1B from north of KY 169 to tie-in to west bypass; Length=2.9 mi (Mod # 10)
Table 4: Remove from Informational Supplement No phases in SHP
F 384.00 KYTC
Stream restoration along Cane Run at the Kentucky Horse Park (Mod # 10)
Table 4: Remove from Informational Supplement No phases in SHP
F 412.00 KYTC US 27
L&N RR bridge overpass replace, improve drainage and typical section on North Broadway; Length=0.3 mi (Mod # 10)
Update schedule
F 415.00 KYTC KY 2335
Ware Rd improve typical section and pavement from Briar Hill Rd (KY57) to N entrance of Lex Bluegrass Army Depot; Length=2.1 mi (Mod # 10)
Table 4: Remove from Informational Supplement No phases in SHP
J 419.00 KYTC KY 169
KY 169 reconstruct E of Keene to eliminate drop-offs; Length=0.5 mi (Mod # 10)
Table 4: Remove from Informational Supplement No phases in SHP
F 429.10 KYTC Alumni Dr
Alumni Dr install lighting to complete upgrade between Nicholasville Rd and Tates Creek Rd; Length=1.2 mi (Mod # 10)
Table 4: Remove from Informational Supplement No phases in SHP
N/A 7/13/2018 (2016.198)
Ad
F/J 430.00 KYTC US 27
US 27 (Nicholasville Rd) Access Management between Nicholasville and Man O' War Blvd; Length=5.4 mi (Mod # 10)
Table 4: Remove from Informational Supplement No phases in SHP
F 8340.00 KYTC US 60
US 60 (Winchester Rd) Scoping Study to reconstruct/widen to 4 lanes; Length=0.9 mi (Mod # 10)
Table 4: Update Schedule
F 8801.00 KYTC KY 4
New Circle Rd sound barriers along outer loop between Tates Creek Rd and Nicholasville Rd; Length=1.2 mi
Table 4: Update Schedule
F 8341.00 KYTC US 60
US 60 (Winchester Rd) Scoping Study to reconstruct/widen from MOW Blvd to Clark Co.; Length=5.9 mi
Table 4: Remove from Informational Supplement No phases in SHP
F 8342.00 KYTC KY 4
KY 4 (New Circle Rd) Scoping Study to reconstruct/widen from Newtown Pk to Winchester Rd; Length=3.3 mi
Table 4: Remove from Informational Supplement No phases in SHP
F 8804.00 KYTC KY 4
New Circle Rd sound barriers along inner loop between Tates Creek Rd and Alumni Dr; Length=1.6 mi
Table 4: Remove from Informational Supplement No phases in SHP
F 8805.00 KYTC KY 4
New Circle Rd sound barriers along outer loop between Tates Creek Rd and Nicholasville Rd; Length=1.2 mi
Table 4: Remove from Informational Supplement No phases in SHP
F 8806.00 KYTC KY 4
New Circle Rd sound barriers along outer loop between Tates Creek Rd and Alumni Dr; Length=1.6 mi
Table 4: Remove from Informational Supplement No phases in SHP Mod #10
cont.
7/10/2018 N/A 7/13/2018
Ad
Mod #11 7/31/2018
7-09009.00 KYTC US 68
US 68 – Harrodsburg Road – Perform low cost safety improvements from Mercer County Line (MP 0.000) to NE of Clear Creek Road (MP 4.807). Length = 4.807
Table 6A - This project provides provides federal funds in the amount of $175,000 for initial design in FY 2018 and $2,000,000 for construction in FY 2020.
N/A 8/1/2018 (2016.204)
Mod #12 8/10/2018
07-3220.00 LFUCG Bike/Ped
*Oxford Circle sidewalks - construct sidewalk to connect Cambridge Dr to Versailles Rd; length=0.1 mi
• Table 6A – LFUCG – Oxford Circle Sidewalks -add to project $7,200 in funding for right of way phase ($5,760 federal CMAQ funding). A 20% local match of $1,440 will be provided by LFUCG.
N/A 8/14/2018 (2016.209) F 8812.00 KYTC KY 57
Bryan Station Rd sidewalk installation from Preakness Dr to Hermitage Dr; Length=0.4 mi
Table 4: Remove from Informational Supplement No phases in SHP
F 8901.00 KYTC / LFUCG
Citation Blvd
Citation Blvd extend from Silver Springs Dr to Russell Cave; Length=1.0 mi
Table 4: Remove from Informational Supplement No phases in SHP
J 8906.00 KYTC KY 169
KY 169 reconstruct from US 68 to 0.54 mi north of Clear Creek Rd; Length=4.6 mi
Table 4: Remove from Informational Supplement No phases in SHP Mod #10 cont. N/A 7/13/2018 (2016.198) 7/10/2018
Ad Mod #13 10/31/2018
Lextran Transit
Purchase 3 40' electric buses • Table 6A – Lextran – add project to purchase three (3) 40’ electric buses. Total project amount is $2,862,500. Federal funds are from the FTA No or Low Emissions Deployment Program Grant ($2,290,000 (80%) in federal 5339 funds with a local match of $572,500 (20%)).
N/A 11/2/2018
Mod #14 1/8/2019
07-3213.00 LFUCG Bike/Ped
Armstrong Mill sidewalks - construct sidewalks between Tates Creek Rd and Greentree Rd; length=0.3 mi
Table 6A –
- Add to project $50,000 in CMAQ funding for design phase
- Add to project $15,000 in CMAQ funding for right-of-way phase
- Shift $62,000 in CMAQ funding from construction phase to design phase
N/A 1/31/2019
Mod #15 2/1/2019
07-8507.00 LFUCG New Blvd
Polo Club Blvd complete construction at Deerhaven Lane and Todds Rd; Length=0.2 mi.
Table 1 –
- Update funding for the construction phase from $1,600,000 to $2,230,000 with toll credits match.
- Move the construction phase from FY 2018 to FY 2019
Ad Mod #16 4/15/2019
Various LFUCG & Lextran Various
This action updates the previously published TIP document and tables. The modification adds new or modifies existing projects which were awarded CMAQ funding in April 2019.
Table 6A –
- Add project: Lextran – Purchase of two electric long-range buses and depot charging stations to replace two diesel buses that are currently beyond their useful life. Additionally, two ITS packages will be purchased to be installed on each of the buses.
- Add project: LFUCG - Mt. Tabor Rd Multimodal Improvements: Construction of sidewalks, bike lanes and associated infrastructure along Mt. Tabor Rd between Patchen Dr and the Richmond Rd service road. - Modify Project: LFUCG - Wilson Downing Sidewalks: Add funding for the right-of-way, utility, and construction phases to build new sidewalks on Wilson Downing Road. - Modify Project: LFUCG - Town Branch Trail Mid-Block Crossing: Add funding for the construction phase of the pedestrian and bicycle crossing for the Town Branch Trail - Update funding for the construction phase from $1,600,000 to $2,230,000 with toll credits match
- Move the construction phase from FY 2018 to FY 2019
N/A 5/13/2019
Mod #17 4/25/2019
F 227.13 KYTC I-75
This action updates the previously published TIP document and tables. This modification is considered Grouped Projects*
(Intersection Improvements for Safety or Efficiency) which does not impact financial constraint of the TIP.
I-75 SB Exit Ramp at Man O’ War Blvd. – safety project to widen I-75 SB exit ramp at Man O’ War to construct left turn lanes and install traffic signal. Total project cost is $550,000. $50,000 in SPP funds for design and $500,000 for construction ($500,000 federal SLX funds with toll credits match).
Ad Mod #18 5/9/2019 NA Valley View Ferry Authority
This action updates the previously published TIP document and tables. The modification adds a new project which was awarded Ferry Boat Program funding in April 2019. This project is considered a Grouped Project* (Ferry Boat Capital and Operating Assistance) which does not impact the financial constraint of the TIP.
o Add project: Valley View Ferry Authority – Restoration and Preservation of the Valley View Ferry Car Barge, including replacement of attaching guide wire cables, pulleys and other hardware associated with the safety cable guidance system. ($80,000 total cost - $64,000 in federal FBP funds with a local match of $16,000 in FY2019)
N/A 5/13/2019
Mod #19 7/11/2019
F 8507.00 LFUCG Blvd.New
This action updates the previously published TIP document and tables.
Table 1 – LFUCG – Polo Club Blvd.: o Update funding for the construction phase from $2,230,000 to $2,891,250. The additional $661,250 will be federal SLX funds matched with toll credits.
Ad Mod #20 8/9/2019
F 224.10 LFUCG CS 4174
• Clays Mill Road (Harrodsburg Rd to New Circle Rd)
o Shift C funding from SLX (Table 1) to CMAQ (Table 6A) in FY 2019
F 8902.00 KYTC KY 1927
• Liberty Road (Grafton’s Mill Ln to New Circle Rd)
o Shift R and U funding from STP (Table 2) to SLX (Table 1) in FY 2020
F 113.02 KYTC KY 4
• New Circle Road (Georgetown Rd to Leestown Rd)
o Shift R funding from NH (Table 2) to SLX (Table 1) in FY 2019
J 414.00 KYTC KY 1980
• West Brannon Rd.
o Shift R funding from SPP (Table 3) to SLX (Table 1) in FY 2020
F 3714.00 LFUCG US 60
• Town Branch Commons – Midland Section o Increase C funding by $2,500,000 (CMAQ with Local Match) (Table 6A) in FY 2019
N/A Pending
This action updates the previously published TIP document and tables. The modifications are:
Ad
N/A Lextran
o Lextran - Covered storage area and the incremental cost of additional zero emission vehicles.
$2,750,000 for Design & Construction ($2,200,000 FTA 5339 + $550,000 Local)
F 3221.00 LFUCG
o Old Todds Road Sidewalks
$260,000 for Construction ($208,000 TAP + $52,000 Local)
F 3223.00 LFUCG
o Citation Trail (Phase 1)
$365,000 for Construction ($292,000 TAP + $73,000 Local)
J 3214.00 Nich. KY 29
o East High Shared Use Trail
$68,000 for Design ($54,000 TAP + $14,000 Local)
$457,000 for ROW ($366,000 TAP + $91,000 Local)
$180,000 for Utilities ($144,000 TAP + $36,000 Local)
J 3215.00 Nich. KY 29
o West High Shared Use Trail
$80,000 for Design ($64,000 TAP + $16,000 Local)
$192,000 for ROW ($154,000 TAP + $38,000 Local)
$48,000 for Utilities ($38,000 TAP + $10,000 Local)
F 3219.00 LFUCG CS 4735
Table 1 – SLX Projects: Rosemont Garden Sidewalks
o Add $30,000 for ROW and $360,000 for Construction in FY 2020 $390,000 ($312,000 SLX + $78,000 Local Match)
F 113.02 KYTC KY 4
Table 1 – SLX Projects: New Circle Road – Leestown to Georgetown
o Add $3,000,000 for Utilities in FY 2020 $3,000,000 SLX with Toll Credits Match
o Note: The Utilities phase was previously shown as NH funds in Table 2.
Mod #22 9/26/2019 This action updates the previously published TIP document and tables.
NA 9/26/2019
Mod #21 8/26/2019 This action updates the previously published N/A 8/27/2019
TIP document and tables. The modification updates existing projects which were awarded TAP funding, and adds a transit project that was recently awarded a Low-Emissions Deployment Program Grant. These projects are considered Grouped Projects* which do not impact the financial constraint of the TIP. The modifications are:
Ad Mod #23 10/17/2019
NA LFUCG CS 1257
This action updates the previously published TIP document and tables. This modification is considered Grouped Projects* (Intersection Improvements for Safety or Efficiency) which does not impact financial constraint of the TIP. These updates only shift the current funding between phases, and do not affect the overall cost.
Table 6A – LFUCG – Mercer Rd at Greendale Rd Turn Lanes. Update funding for phases including: • Increase funding for ROW phase from $81,000 to $279,000
• Reduce funding for utilities phase from $65,000 to $43,000
• Reduce funding for construction phase from $834,000 to $658,000
NA 10/21/2019
Mod #24 1/13/2020
NA LFUCG Trail
This action updates the previously published TIP document and tables. This modification is considered Grouped Projects* (Bicycle and Pedestrian Facilities) which does not impact financial constraint of the TIP. This modification shifts funding between phases and does not affect the overall cost.
Table 6A – LFUCG – Citation Trail:
Shift $39,800 in funding ($31,840 TAP/ $7,960 Local) remaining in the design phase to the construction phase.