vif – The Virtual Vehicle
vif – The Virtual Vehicle
04.07.06
1
Reference Model for the Cooperative
Exchange of Simulation Data
Production
Partner
vif – The Virtual Vehicle
vif – The Virtual Vehicle
04.07.06
2
Content
Challenges
Situation
Project Aim
Scope of the Reference Model
Solution: VPT Reference Model (VPT = Virtual Prototype)
Reference Process
Data Synchronization Points
Reference Data Model
Interaction Scenarios
Expected Benefits
vif – The Virtual Vehicle
vif – The Virtual Vehicle
04.07.06
3
Challenges
Internal:
Coordination of the various simulation disciplines
Heterogeneous system environment
Consistent data management in functional, geometric and
manufacturing oriented integration
Insufficient access to existing knowledge/information
External:
Many different development partners (OEM - general contractor -
supplier)
vif – The Virtual Vehicle
vif – The Virtual Vehicle
04.07.06
4
Internal and External Data Exchange
BoM
ERP
CAD
OEM 1
BoM
ERP
CAD
OEM 2
BoM
ERP
CAD
Supplier 1
EDM
BoM
ERP
CAD
Supplier 2
emServer
DMU
VPT
VPM
RPT
Source: MAGNA STEYR
vif – The Virtual Vehicle
vif – The Virtual Vehicle
04.07.06
5
Target: One „Platform“ for Internal and External Exchange
BoM
ERP
CAD
OEM 1
BoM
ERP
CAD
OEM 2
emServer
VPM
DMU
EDM
VPT
BoM
ERP
CAD
Supplier 1
BoM
ERP
CAD
Supplier 2
RPT
vif – The Virtual Vehicle
vif – The Virtual Vehicle
04.07.06
6
Reference Model
Geometric
Integration
Integration
Functional
Manufacturing Oriented
Integration
Scope (1)
DMU
Virtual Factory
VPT
Project Scope
vif – The Virtual Vehicle
vif – The Virtual Vehicle
04.07.06
7
Project scope is
Functional Simulation
… with interfaces to
Production planning / production
Design (PDM)
Testing
Digital Mockup
Change & release management
Consideration of
Concept and serial development phase
Internal and external data exchange
Focused on exchange with customer/OEM
Simulation methods: MBS, CFD, FEA
OEMs: DC, VW, Audi, BMW, Porsche?
Verification with Use Cases
UC1: spotweld optimization (interdisciplinary)
UC2: virtual front axle simulation (brake disc, NVH, Crash,…)
UC3: pedestrian safety
UC4: …..
vif – The Virtual Vehicle
vif – The Virtual Vehicle
04.07.06
8
Situation in Cooperative Simulation
Synchronisation problems between project partners
Different partners along the simulation process
Structured data exchange necessary
Coordination of partner specific processes necessary
Different methods, systems and data per project and partner
Complex data conversion / quality losses
Difficult tracking of simulation maturity
No versioning of simulations
No direct reference of simulation results to the geometry
Long lead time for system integration
vif – The Virtual Vehicle
vif – The Virtual Vehicle
04.07.06
9
Solution: VPT Reference Model
Each partner works with his own VPT processes and methods and with
his own IT-systems.
the VPT reference process defines the „common language“ between the VPT
process of the OEM and the supplier
the VPT reference data model is neccessary for the communication of the
data in a neutral format
Partner A
(internal/external)
VPT Process
VPT Methods
VPT Systems
VPT Data
Partner B
(internal/external)
VPT Process
VPT Methods
VPT Systems
VPT Data
VPT Reference Model
VPT Reference
Process
VPT Reference
Data Model
Process mapping
Data mapping
vif – The Virtual Vehicle
vif – The Virtual Vehicle
04.07.06
10
Spezifischer VPT-Prozess Partner 1
Spezifischer VPT-Prozess Partner 2
Process Oriented Solution
Specific VPT Process Partner 1
Specific VPT Process Partner 2
Coordinator
Participant
VPT Reference
VPT Reference
Process
Process
Mapping
Mapping
Consolidation
Phase
Postprocessing
and Analysis
Solving
Phase
Data Preparation
Phase
Data Collection
Phase
Preparation
Phase
Harmonized synchronisation with the VPT reference process and
the data synchronization points
Source: PDTec,
adapted
vif – The Virtual Vehicle
vif – The Virtual Vehicle
04.07.06
11
Example for an interaction scenario
VPT Coordinator
VPT Participant
Scenario: External assembly of a module for crash simulation
Auftrag zur
Modulerstellung
• Simulationsauftrag
• Firmenstandards
• relevante Teile
• Vorhandene
Geometrie und
FE-Netze
• Verbindungsdaten
• Werkstoffkennwerte
• …
Preparation
Data Collection
Data Preparation
Solving
Postprocessing and
analysis
Consolidation
Fertig
parametrisiertes
Modul
• Verwendete
Geometrien
• Erstellte Netze
• Fertiggestelles Modul
inkl. aller Parameter
• Eingearbeitete
Verbindungsdaten
• …
vif – The Virtual Vehicle
vif – The Virtual Vehicle
04.07.06
12
Data Model Overview
Simulation
Order
Simulation
Task
Simulation class
Simulation method
Input Data
Output Data
task
number
status
Simulation
Run
Input data
Output data
order
CAD-Geometry
Simulation
Model
Component
Usage
Assembly
Usage
used parts S[1:?]
Vehicle
component
re
pr
es
en
ta
ted_
th
rou
gh
designated parts S[1:?]
derived
from
Load Case
Solver
Settings
Parameters
Parameters
Solver
Output
Simulation
Report
vif – The Virtual Vehicle
vif – The Virtual Vehicle
04.07.06
13
Benefits (1)
OEM-dept. A
OEM-dept. B
Tier 2
Tier 3
Tier 1
OEM-dept. C
Receive Request Creation ECR Technic al Analysis and Detailing ECR Comments of ECR ECR Ac ceptance and Approval Receive Request
Receive Request Creation ECRCreation ECR Technic al Analysis and Detailing ECRTechnic al Analysis and Detailing ECR Comments of ECRComments of ECR ECR Ac ceptance and ApprovalECR Ac ceptance and Approval
Receive Request Creation ECR Technical Analysis and Detailing ECR Comments of ECR ECR Acceptance and Approval Receive Request
Receive Request Creation ECRCreation ECR Technical Analysis and Detailing ECRTechnical Analysis and Detailing ECR Comments of ECRComments of ECR ECR Acceptance and ApprovalECR Acceptance and Approval Receive Request Creation ECR Technical A nalysis and Detailing ECR Comments of ECR ECR A cceptance and A pproval
Receive Request
Receive Request Creation ECRCreation ECR Technical A nalysis and Detailing ECRTechnical A nalysis and Detailing ECR Comments of ECRComments of ECR ECR A cceptance and A pprovalECR A cceptance and A pproval
VPT
Coordinator
VPT
Participant
Partner spezifischer
VPT Prozess
Partner spezific
Partner spezific
VPT Process
VPT Process
VPT Reference
VPT Reference
Process
Process
Receive Request Creation ECR Technical A nalysis and Detailing ECR Comments of ECR ECR A cceptance and A pproval Receive Request
Receive Request Creation ECRCreation ECR Technical A nalysis and Detailing ECRTechnical A nalysis and Detailing ECR Comments of ECRComments of ECR ECR A cceptance and A pprovalECR A cceptance and A pproval
Rec eiv e Reques t Cr eation ECR Tec hnic al A nalys is and Detailing ECR Comments of ECR ECR A c c eptanc e and A ppr ov al Rec eiv e Reques t
Rec eiv e Reques t Cr eation ECRCr eation ECR Tec hnic al A nalys is and Detailing ECRTec hnic al A nalys is and Detailing ECR Comments of ECRComments of ECR ECR A c c eptanc e and A ppr ov alECR A c c eptanc e and A ppr ov al Rec eiv e Reques tRec eiv e Reques tRec eiv e Reques t Cr eation ECRCr eation ECRCr eation ECR Tec hnic al A nalys is and Detailing ECRTec hnic al A nalys is and Detailing ECRTec hnic al A nalys is and Detailing ECR Comments of ECRComments of ECRComments of ECR ECR A c c eptanc e and A ppro va lECR A c c eptanc e and A ppro va lECR A c c eptanc e and A ppro va l
Receive Request Creation ECR Technical A nalysis and Detailing ECR Comments of ECR ECR A cceptance and Approval Receive Request
Receive Request Creation ECRCreation ECR Technical A nalysis and Detailing ECRTechnical A nalysis and Detailing ECR Comments of ECRComments of ECR ECR A cceptance and ApprovalECR A cceptance and Approval
Coordinator
(other VPT)
Participant
(other VPT)
in
te
rn
al
ex
te
rn
al
Standardized interaction patterns (process templates) in a VPT network according
to the VPT Reference Model
Cost reduction with reduction of the variants of processes and communication between
OEM and supplier
Transparent VPT-status for all involved partners independent from their internal
processes (CAE-supplier-monitoring)
Re-use of process definitions, interfaces and tools
Source: PDTec,
adapted
vif – The Virtual Vehicle
vif – The Virtual Vehicle
04.07.06
14
Benefits (2)
Minimization of time and cost for integration of customers or suppliers
in a vehicle development project
Shorter start-up phase for vehicle development projects
Integration support of internal and external partners
Pre-defined and transparent information flow with data
synchronization points
Based on process templates and process interfaces for cross-department
and cross-company collaboration
Quicker integration of other systems (e.g. OEMs, suppliers, service
providers, mergers…)
Improvement of data- process- and result quality
Less information losses at interfaces
vif – The Virtual Vehicle
vif – The Virtual Vehicle
04.07.06
15
Outlook
VPT Reference Process
VPT Reference Data Model
Prototypical Data Exchange
VPT-Guideline
Sim
ulati
ons-auftr
ag
Sim
ulati
ons-aufg
abe
simulationsklasse
simulationsverfahren
Inpu
tdat
en
Out
putd
aten
aufgabe
num
mer
statu
s
Sim
ulati
ons-lauf
eingabedaten
ausgabedaten
auftrag
kon
stru
ktive
Geo
metr
ie
Sim
ulati
ons-mod
ell
Baut
eil-verw
end
ung
Bau
grup
pen-verw
end
ung
benutzter_teileumf
ang S[1:?]
Fahr
zeug
-kom
pon
ente
re
pr
äs
en
tie
rt
_d
ur
ch
vorgesehener_teileumfang S[1:?]
abgeleitet
aus
Last
fall
Solv
er-eins
tellu
nge
n
Para
met
er
Para
met
er
Solv
erou
tput
Sim
ulati
ons-repo
rt
VPT Interaction Scenarios
VPT Coordinator VPT ParticipantAuftrag zur Modulerstellung
• Simulat ions auftrag • Firmenstan dards • relevante Teile • Vorhandene Geometrie und FE-Netze • Verbindun gsdaten • Werkstoffk ennwerte • …
Vorber eitung Datenbeschaffung Datenaufbereitung Simulation Ergebnisaufbereitung Konsolidierung Fertig parametrisiertes Modul • Verwendete Geometrie n • Erstellte Netze • Fertiggeste lles Modul inkl. aller Parameter • Eingearbeit ete Verbindun gsdaten • …