• No results found

Data Center Solutions - The Containerized Evolution

N/A
N/A
Protected

Academic year: 2021

Share "Data Center Solutions - The Containerized Evolution"

Copied!
24
0
0

Loading.... (view fulltext now)

Full text

(1)

Data Center Solutions - The Containerized Evolution

7th Green Connected World

Tsikogias Thanassis

Cooling IT

(2)

We are the global specialist

in energy management

25

billion € revenue

(FY 2014)

170 000+

employees in 100+ countries

5%

of sales dedicated to R&D

A large company, with a balanced geographical footprint and a commitment to sustainability

(3)

More than 45 years in the Greek

market

Operating in 2 entities

(Commercial & Industrial)

Local Production Site at Inofita

(Oil type transformers factory)

1976 – The former ElVIM plant joins the Schneider Electric Group for the production of oil type

(4)

Moving from Products to Complete Market Solutions

Energy

Power

Industry

Data Centers

Buildings

(5)

Schneider Electric Solutions

for the New Generation of Data Centers

What is Prefabrication ?

(6)

Ruggedized, Mobile Solutions for Industrial, Government,

Emerging Economies, Manufacturing

Scalable Solutions for Service Providers and Large Scale

Deployments

Quick Deploy, Pre-Engineered Solutions for S/M Enterprise,

Healthcare, Education

Three major applications for prefab

(7)
(8)

DX – Chilled Water – Direct Air – Indirect Air

Po w er IT Spac e Cool in g

One-Size Does Not Fit All

100kW – 1.2MW

(9)

100kW

20ft Enclosure with UPS, Switchgear, cooling, DCIM

500kW

40ft Enclosure with UPS, Switchgear, cooling, DCIM

1.2 MW

Skid mounted, UPS, Switchgear, DCIM

Power Modules

(10)

Critical Output Switchboard Air Conditioners 500kW Symmetra PX UPS Primary Switchboard Fire Suppression System • Symmetra N+1 UPS(250/500kW) • 5 min Runtime

• Switchboard w/ integrated ATS • Power monitoring, management

and controls

• Environmental cooling • Fire Suppression

• UL Listed

500kW Module

(11)

 ISO shipping container is defined to 8ft wide and lengths of 10ft, 20ft, 40ft.

 Containers are designed to be strong, rugged, environmentally sound and easily transportable anywhere in the world

 8ft width limits usable space for hot and cold aisles. Height is also limited

 Schneider has unique solutions for slide racks and

flexible cable trays to allow full access to front and rear of racks to overcome space limitations

 Overhead cooling units (DX and CW) are available to maximize rack space

IT Module - ISO Shipping Container

(12)

 Non-ISO design is wider, taller, deeper than container and engineered to provide a spacious, functional

workspace for IT personnel

 Efficient, scalable design allows for custom, multi-module configurations from 5 – 240 racks

 Multiple cooling solutions for chilled water, DX and air economization (In-row, Perimeter, End-of-Row)

 Robust frame design simplifies installation and ganging together

 Best option for a complete configurable space.

IT Module - Non ISO

(13)

• Quickly add secure data centre rooms to a minimal finished building

• All wall panels, ceiling, and doors are pre-engineered to meet customer specs and delivered on-site for fast

assembly

• All of the advantages of a modular build – Scalable, simple design and deployment, and preserve Capex…

with the all of the flexibility of a traditional IT space

• Highly Secure – Fire rated, Water-tight, Dust-tight

• Energy Efficient – minimal thermal transmission losses • Cleaner installation than traditional build – no

construction, conservation of materials

IT Module - Modular Room

(14)

24 NetShelter Racks • 240kW cooling capacity • 400V distribution @11kW per rack (2N) • Power monitoring, management and controls

• Fire detection and suppression

• Staging lobby for outside isolation In-Row Cooling Units Aisle Containment 400V Modular Power Distribution Staging Lobby and Electrical Room

2 bay, In-Row, 240kW shown

(15)

Hydronics Modules

Chiller Skids & Enclosures

Packaged Chiller, pump, and Tank with connecting piping

100kW – 1.2 MW Packaged Air

Cooled Chillers

-

Options with and without free cooling

Ecobreeze ISO frame

Cooling Modules

(16)

Chillers (install in field)

•Enable Greater Flexibility to handle Varying load and ambient conditions • Utilize 3rd party chillers as required

Hydronics Module

•Mechanical Packaging designed to

handle flow rates based on design loads based on pipe size

• Pumps and Electrical will be

configured based on specific customer Requirements

Thermal Storage Option

•Provides flexibility to offer as required •Adaptable to different ride through requirements

Base Designs - Hydronics Module

(17)

StruxureWare DCIM

(18)

Predictable

Performance

• The density, availability

and efficiency you expected

• The cost you were

promised

• Less “hands” involved,

less changes to design

Faster

Deployment

• Shorten planning cycle

and reduce complexity

• Simplify build process • Delivery in 16-20 weeks

or less (upon design sign-off and receipt of PO)

Flexibility and

Scalability

• Defer capital expenses

and minimize over sizing.

• Adjust quickly changes

in your demand, up or down.

• Build in smaller, more

granular phases

(19)

5 Compelling Reasons to Choose Schneider Electric for

Your Prefabricated Data Center

14 Years proven experience in prefabricating data centers

Broad offer of customizable Prefabricated Building Blocks

Global capabilities - supply chain, design, applications

and engineering support

StruxureWare for Data Centers - award winning DCIM

software suite

Extensive library of Prefabricated Data Center reference

designs to

(20)
(21)

Louros Green Data Center

The Project

Cooling through River Water

PUE < 1.3

Containerized Solution

Increased Availability

Deployment in less than 25 weeks

Power, Cooling & IT Module

Personnel Module & Substation

Chiller as back-up

DCIM

(22)
(23)

Advanced Customer Support

Prefab Management System Reference Designs Website with technical content Technical Documentation Trade Off tools: Cost Analysis of traditional vs Prefabrication Schneider Electric personnel

(24)

References

Related documents

How to Maximize Data Center Efficiencies with Rack Level Power Distribution and Monitoring..

Today, France and Germany are not just partners in European integration, but also competitors on political and economic terms. 8 Not only are France and Germany the two

Plus, they integrate rack level power and environmental monitoring information from the rack PDUs with higher level data center management software provided by Emerson or

includes the physical infrastructure products (including network cabling, power and cooling solutions, racks and cabinets, security as well as management and monitoring) and

The most recent MDI data used in this study was January 2014, and at that time, the MDI identified all regions except the South Texas Plains as being in a slightly more severe

Location Building Rack Power Cooling Security Fire Protection Network Service Support Certificate/Compliance NTT Communications Hong Kong Financial. Data Center (FDC

Nowhere is this more critical than in the data center of the corporation, which can consume 25 percent of the total energy in a typical IT intensive organization (Raritan estimate

A rack-oriented design allows cooling capacity and redundancy to be targeted to the actual needs of specific racks, for example, different power densities for blade servers vs...