Sardinia pilot project

Giuseppe Desogus (UNICA) LAORE Sardegna Agency

(2)

Short description of the pilot (1)

Location: Province of Sassari (Alghero, Sassari) Ownership: LAORE Sardegna Agency

Contracting authority responsible for the payment of the Contracting authority responsible for the payment of the retrofitting financed by ELIH-Med: LAORE Sardegna Agency

(3)

Short description of the pilot (2)

Number of dwellings 30

Characteristic of the area: rural

Type of housing: individual houses Type of housing: individual houses Date of construction: 1950

Low income housing compatibility: YES All Tenants can be defined as “low income”.

Projet financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF

(4)

Retrofitting workings

► Targets in energy consumption decrease: 40%

► Energy-saving measures: Add attic insulation and internal

height reduction; Windows replacement (New units with double-Glazed insulating panes and insulating frames)

double-Glazed insulating panes and insulating frames)

► The audit carried out so far shows that more than 50% of

buildings have no heating system (excluding a simple fireplace or wood stove in the living room).

► Planned evaluation methodology: Energy efficiency

calculation. calculation.

(5)

Financial plan

Projet financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF

(6)

Financial plan (2)

► Innovative financial mechanisms used:

►Co-financing by construction companies in change of

professional training and certification.

►Bank support to work contractors in change of sponsorship

►ESCO support trough new Italian incentives program called

“Conto termico”. DM 28/12/2012

Co-financing up to 40% of works expenses (120,000 € VAT Co-financing up to 40% of works expenses (120,000 € VAT

excl.), but only if the whole program will be in full force in the next month

(7)

Ongoing activities

►Pilot project evaluation (initial phase)

►Definitive and executive design for works. ►Definitive and executive design for works.

Projet financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF

(8)

► Initial phase:

► As already shown in Malaga SC a monitoring campaign of

Pilot project Evaluation

► As already shown in Malaga SC a monitoring campaign of

internal comfort on two building samples was carried out in 2012.

(9)

► Building diagnostic: winter indoor temperature

measurements:

Pilot project Evaluation

Projet financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF

(10)

► Building diagnostic: winter indoor temperature

measurements:

(11)

► Building diagnostic: opaque wall U-value measurements (ISO

9869):

Pilot project Evaluation

Projet financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF

(12)

► Building diagnostic: opaque wall U-value measurements (ISO

9869):

(13)

► Initial phase:

► At the moment a new campaign on the all 30 building is

Pilot project Evaluation

► At the moment a new campaign on the all 30 building is

ongoing. Internal temperatures are being monitored in 2013 winter and a similar procedure will be repeated in summer on building not yet interested by works.

► Energy bills will be collected after winter and summer.

► Initial comfort questionnaire in winter and then in summer.

Projet financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF

(14)

► Definitive and executive design will be concluded by external

designer in a few days.

(15)

TMG and PPCG

► What has been done:

PPCG:

PPGC activities: Preparation Report, Administrative Activities, Choice of dwellings, data collection, technical, elaborate

Choice of dwellings, data collection, technical, elaborate preparation and preliminary design, launch procurement procedures

17 meetings TMG:

Third meeting 8th January 2013

Projet financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF

Third meeting 8 January 2013

(16)

Awarness Campaign

► What has been done:

► A first meeting with all the tenants was hold the 12th

(17)

Providers selection for the

retrofitting workings

what to do in the near future

Phase: Phase:

• Definitive and executive design ongoing*

• Call of tender 60 days*

• Execution phase of the work and 245 days*

Assessment

Projet financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF

(*estimated time of phase)

(18)

Expected time frame

► Detailed schedule of each step till the end of the project

with dates

Launch of the call for tenders for the selection of providers Launch of the call for tenders for the selection of providers for the workings (31/01/2013)

Selection of providers (31/03/2013)

Launch of the refurbishing workings (30/04/2013) Delivery of the workings (December 2013)

References

Related documents

“Benchmarking of parental control tools for the online protection of children” SIP-Bench II SMART 2009/0047 Tools for PCs 1st cycle best tool: 3,3 worst tool: 2,0 2nd cycle best

Large accumulations of light oil and liquid-rich gas are found within the sands and carbonates in these zones and Taylor Hill sees a number of good opportunities on its

files, such operations for accessing and modifying the data in files and for creating and deleting. To perform these primitive file operations correctly and efficiently, typical

Research of the religious context of Pentecostalism in Costa Rica, which is primarily characterized by the official Catholic Church and the Catholic lay

Projet co-financé par le Fonds Européen de Développement Régional - FEDER Project co- financed by European Regional Development Fund - ERDF.. 24 January

Projet co-financé par le Fonds Européen de Développement Régional - FEDER Project co- financed by European Regional Development Fund - ERDF.. Context : 13 Habitat launched last year a

Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF