Cheat Sheet for Project Managers

A Reference

1

Project Methodology Process

Summary

A guide to Project Management Resources can be found here: http://www.lmu.edu/Page30853.aspx.

1. Project Approved – The portfolio of projects each year will be approved during the budgeting process. The Director of Project Management will create a stub project for all approved projects in Project Server and set the phase to

Initiated.Approved. Proj ect prov Ap e d Dire ctor – n ig Ass Proj ect nag Ma er PM – Com ple te ect Proj Siz ing X LS tta a and ch to Doc ume nt rary Lib PM - Com ple te tion tia Ini

Pla n a nd ach att to ume Doc nt rary Lib PM - Cre ate Proj ect n/B Pla uil d Proj ect am Te PM - ve Sa Proj ect se Ba line PM a nd onsor Sp - Cond uct k-O Kic ff ng eti Me PM - Tra ck sk Ta Prog ress PM - Col le ct tus Sta Re port s. ch tta A to Doc ume nt Lib rary (if ne ce ssa ry) PM - Cond uct tus Sta Me eti ng s PM – Clos e out proj ect s

(2)

Figure 1: Setting the Phase from Microsoft Project

2. Director – Assign Project Manager. The Director for the group primarily responsible for completing the project will assign the Project Manager. Though the Project Manager will usually be the IT Subject Matter Expert, some projects will be managed by the Director of Project Management.

3. PM – Complete Project Sizing Spreadsheet. The Project Sizing Spreadsheet is available via the Project Management Resources web site and also directly by using this link: http://www.lmu.edu/AssetFactory.aspx?did=12841. Once the project has been sized, attach the spreadsheet to the Document Library (See below for brief overview on how to do this).

4. PM – Complete Project Initiation Plan. The Project Manager should complete the Project Initiation Plan. If the Project Sizing Spreadsheet yielded a small or medium-size Project Management Methodology, then you should use the Abridged Initiation Plan Template. If the Project Sizing Spreadsheet yielded a Large Project Methodology, use the Full Initiation Plan Template. Once the high level planning has been completed, set the Project Phase to

“Planning.High Level Planning Complete.”

5. PM – Create Project Plan/Build Project Team. The Project Manager should create a project plan in Microsoft Project. Guidelines for creating a healthy project plan can be found in the Living Binder Document. In addition to creating the Project Plan, the Project Manager should build the Project Team to include as many Enterprise Resources as possible. Using Enterprise Resources will enable the collaborative features of Project Server.

6. PM – Save Project Baseline. After the Project Plan has been reviewed and it is agreed that the plan adheres to Project Management best practices, the Project Manager should save the Project Baseline. This baseline is equivalent to the agreed-upon schedule of deliverables. Once this is done, set the Project Phase to “Planning.Project Baseline Saved.”

(3)

everyone is aware of their role on the Project Team. Also include in the meeting details about the schedule of deliverables. Highlight what is out of scope for the project. If the project was sized for a “Large Project

Methodology”, use this template: Full Agenda. If the project was sized as “Medium” or “Small Project Methodology,” then use the Abridged Agenda. Once the kick-off meeting has been conducted, set the Project Phase to

“Execution/Control.Work in Progress.”

8. PM – Track Task Progress. Work to create the deliverables of the project has begun. It is a best practice for the Project Manager to publish tasks to the web (see the Living Binder Document) so that each team member is able to update progress on the tasks to which they are assigned. Only Enterprise Resources can submit the tasks via the Project Web interface, so it is ultimately the Project Manager’s responsibility to ensure that the task tracking is up-to-date. This should be done at least on a weekly basis. 9. PM – Collect Status Reports. The Project Manager may collect narrative

status reports from members on the team. (See the Living Binder Document for guidelines on how to do this.)

10.PM – Conduct Status Meetings. Using the information collected by using the Status Reporting function (See Step #9), the issues, and the risks, conduct status meetings at the frequency that was established in the Project Initiation Plan.

11.PM – Close out Projects. Make sure that the deliverables established in the Project Initiation Plan have all been successfully completed. Request sign-off from the Project Sponsor.

2

Working with Project Documentation

All documentation for a project should be accessed, edited, and stored by using the Document Library (Windows Sharepoint Services) feature of Project Server. In general, to access documents, complete the following steps:

1. Go to Project Center.

2. Click on the “Manage Project Documents” link. (See Figure 1 below)

Figure 2: Accessing Project Documents

3. Click on the “Shared Documents” hyperlink. This will give you full access to the features of document collaboration available in Windows Sharepoint Services.

Hint: Hovering over a “hyperlink” gives a full range of options. Click on the

(4)

Figure 3: Document Library Options

3

Project Phases

The following phases are used to track a project through its life-cycle. The table also includes the trigger that corresponds to the project moving into a phase.

Phase Stand ard Order

Description Trigger

Initiation.Approved 1 The project has become part of the project portfolio through either the budget process or explicit approval by the CIO.

The project has been approved.

Planning.High Level

Planning Complete 2 The high-level communication plan, Work Breakdown Structure, team structure, and other high-level planning items have been discussed and documented. The Project Initiation Plan is attached to the project in Project Server. Planning.Project

Baseline Saved 3 The team has agreed to a schedule of deliverables and the corresponding tasks.

The Project Manager has saved the Project Baseline.

Execution/Control. Work in Progress

4 The team is doing work on the project and the Project

Manager is tracking progress.

The kick-off

meeting has been conducted and work has begun on the Project. Close.Pending

Closing Activities 5 Work has been completed on the project, but the Project Manager is conducting post-project activities (conducting a lessons-learned meeting or post go-live survey or other activity relating to measuring the success of the project).

The project’s deliverables have been signed-off.

(5)

Close.Closed 6 All project-related activities

have been completed The closing activities complete. Close.Cancelled Not

typical The project has been removed from IT’s portfolio of projects The CIO signs off on the cancellation of the project. The sponsor has been notified that the project has been cancelled.

Close.Hold Not

typical

The project has been put on hold, usually because resources have had to be re-allocated. This status should not be confused with a project that is experiencing delays.

The CIO signs off on the

“Close.Hold” status.

References

Related documents

Inbound Inbound Pad •Pre-inspection •Vendor cleaning •Pest control •Toilet dump Spot 1 •Inspection •Strip Seats •Draft gear and couplers •Diaphragms •MPT1000

This study aims to find out and test the effect of Profitability with Proxy Return on Assets (ROA), Debt to Asset Ratio (DAR), Debt to Equity Ratio (DER) to Tax Avoidance

The association between RAI treatment failure and various clinical parameters includ- ing age, sex, height, weight, body mass index (BMI), thyroid gland volume, and isthmus length

□ Join the SC Bar’s Solo and Small Firm Section and email listserv for access to a network of other solo and small firm lawyers. www.scbar.org/solo Also, consider attending the

Security incidents can be reported by anyone, as long as they are related to the information processing facilities of the Hogeschool van Arnhem en Nijmegen.. 3.3 Sponsorship

benzylpenicillin + levofloxacin (3 weeks) then oral amoxicillin (8 weeks) Cured (4 months) Reported case F, 68 - Alcoholism, gout, systemic steroids to treat very itchy

One aspect is to test the implication of the joint permanent income hypothesis with rational expectations is that no other lagged variable other than the previous

Host Analytics’ Corporate Performance Management Suite includes integrated budgeting, consolidation, and scorecard and dashboard reporting solutions built on the Microsoft platform