SOLID WASTE MANAGEMENT IN TURKEY Current Status and Developments

N/A
N/A
Protected

Academic year: 2021

Share "SOLID WASTE MANAGEMENT IN TURKEY Current Status and Developments"

Copied!
14
0
0

Loading.... (view fulltext now)

Full text

(1)

SOLID WASTE MANAGEMENT

IN TURKEY

Current Status and Developments

SOLID WASTE

SOLID WASTE

MANAGEMENT

MANAGEMENT

IN TURKEY

IN TURKEY

Current Status and

Current Status and

Developments

Developments

Res. Asst.

Başak TARHAN,

M.Sc

.

Prof. Dr.

Kahraman ÜNLÜ

Middle East Technical University

(2)

INTRODUCTION

INTRODUCTION

INTRODUCTION

„

81 provinces in Turkey

„

3215 municipalities (16 of them are

metropolitan municipalities)

A total of 13 sanitary landfills

3 composting plants

3 incineration plants

„

33% of wastes are disposed in sanitary

landfills

„

1% of wastes are being composted

„

66% of wastes are being disposed of using

(3)

Solid Waste Management Strategies

Solid Waste Management Strategies

Solid Waste Management Strategies

Distribution of Solid Waste Management Applications

Dump of municipality %40.29 other municipalities %2.68 burning %1.37 composting plant %0.87 river discharge %0.40 dump %1.92 others %4.44 Dump of Metropolitan Municipality %15.00 sanitary landfill %33.04

(4)

Situation of Landfilling among

Municipalities

Situation of

Situation of

Landfilling

Landfilling

among

among

Municipalities

Municipalities

„

„ Sanitary Landfills (13):Sanitary Landfills (13):

– İstanbul, Bursa, Gaziantep, İzmir, Mersin, Kocaeli, Balıkesir, Antalya-Patara, Muğla-Marmaris, İzmir-Foça, Muğla-Göcek, Antalya, Denizli

„

„ Sanitary Landfills under Construction (4):Sanitary Landfills under Construction (4):

– Ankara, Aydın-Didim, İzmir-Foça, Muğla-Göcek

„

„ Municipalities with EIA Approval (9):Municipalities with EIA Approval (9):

– Adapazarı, Antalya, Muğla-Fethiye, Isparta, İzmir-Çeşme, Konya, Nevşehir, Rize, Trabzon

„

„ Municipalities preparing Municipalities preparing EIA&PreEIA&Pre--EIA Reports for LF Sites EIA Reports for LF Sites (18):

(18):

– Adıyaman, Afyon, Antalya-Belek, Muğla-Fethiye, Antalya-Kekova, Aydın-Datça, Batman, Bismil, Diyarbakır-Silvan, Gaziantep-Nizip, Kilis, Mardin-Kızıltepe,

Mersin-Göksu, Muğla-Göcek, Nevşehir-Ihlara, Siirt, Şırnak,

Şanlıurfa-Viranşehir

„

„ Rehabilitated Old Landfill Sites (Rehabilitated Old Landfill Sites (66):): – Adana, Bursa, İstanbul (4)

(5)

Current Issues in Solid Waste

Management in Turkey

Current Issues in Solid Waste

Current Issues in Solid Waste

Management in Turkey

Management in Turkey

„

Waste management refers to collection of the

wastes and cleanness of the city in most

municipalities

„

Reuse or recycling, and sanitary disposal of

wastes are usually ignored

„

Inappropriate site selection & operation of

landfills combined with the above concerns lead

to:

Open waste dumps causing environmental

pollution,

Risks of fires and explosions due to stored

gases

(6)

Problems of Solid Waste

Management in Turkey

Problems of Solid Waste

Problems of Solid Waste

Management in Turkey

Management in Turkey

„ Financial problems;

– Insufficient financial resources of municipalities

– Lack of encouragement for self-sufficiency in financial subjects

– Lack of regular accounting systems

„ Lack of a superior legal institution responsible for

supervising waste management services, having a budget and an investment program

„ Lack of technical capabilities

„ Lack of sufficient trained personnel

„ Lack of information about the Solid Waste Control

Regulation

(7)

STATISTICS

STATISTICS

STATISTICS

(State Statistics Institute, 2001. Solid Waste Statistics of Municipalities. Ankara, Turkey) (State Statistics Institute, 1996. Environmental Inventory for Municipalities. Ankara, Turkey)

1996 2001

No. of Municipalities 2322 3215

No. of Municipalities with SW Management Services

2157 2915

Amount of SW Collected (million tons/year) SW per capita (kg/ cap/ day)

22.8 1.31

25.1 1.31

No. of Sanitary Landfills 6 13

Capacity of Sanitary Landfills (million tons) 127 261

Number Of Municipalities Incompliance with the Regulation

Lack of information about the regulation 521 974 Financial restrictions 942 1768

(8)

EXAMPLE CASES

EXAMPLE CASES

EXAMPLE CASES

„

„

CASES FOR GOOD MANAGEMENT:

CASES FOR GOOD MANAGEMENT:

– Bursa Sanitary Landfill

– Kocaeli İZAYDAŞ Municipal and Industrial Solid Waste Landfill

„

„

CASES FOR REHABILITATION OF OLD

CASES FOR REHABILITATION OF OLD

WASTE DUMP SITES:

WASTE DUMP SITES:

– Rehabilitation of Four Dumps in İstanbul

(9)

Example Case for Good Management:

Bursa Sanitary Landfill

Exam

Exam

p

p

le Case for Good Management:

le Case for Good Management:

Bursa Sanitary Landfill

Bursa Sanitary Landfill

„ The landfill is composed of a

main and two sub-valleys (X and T)

„ Total Area……….: 175 ha „ Total Landfill Area: 77 ha

„ Storage Capacity: 20,000,000 m3

„ Operational Lifetime: 30 years „ Amount of SW Stored:

– X-Valley….: 210,000 tons

– T-Valley….: 1,493,726 tons

(10)

Example Case for Good Management:

Bursa Sanitary Landfill

Example Case for Good Management:

Example Case for Good Management:

Bursa Sanitary Landfill

Bursa Sanitary Landfill

„

„ Gas Recovery from Landfill:Gas Recovery from Landfill:

Total cost: 1,500,000 USD Production capacity: 1.4 MW Gas suction capacity: 900 m3/hr

Time to produce electricity: November 1998

Electricity produced (Nov., 02): 5,500,000 kW/hr

„

„ LeachateLeachate Treatment:Treatment:

Flow rate (initial)……….: 403 m3/day

Flow rate (intermediate): 737 m3/day

(11)

Example Case for Good Management:

İ

ZAYDA

Ş

I&MSWLF

Example Case for Good Management

Example Case for Good Management

:

:

İ

ZAYDA

Ş

I&MSWLF

İ

ZAYDA

Ş

I&MSWLF

„ Total LF area: 363,007 m2 „ 6 lots for municipal wastes „ 1 lot for industrial wastes

„ Total Capacity: 3,163,000 m3 „ Operational Lifetime: 25-30 yr „ Rehabilitation after closure

„

„ LeachateLeachate treatment:treatment:

– Pre-treatment in chemical treatment plant

– Industrial & Municipal Wastewater Treatment Plant

„

„ Gas collection:Gas collection:

(12)

Rehabilitation of Old Waste Dump

Sites

Rehabilitation of Old Waste Dump

Rehabilitation of Old Waste Dump

Sites

Sites

„

„ Bursa-Bursa-DemirtaDemirtaşş::

Total area: 160,000 m2

Capacity: 2,000,000 m3

Rehabilitation cost: 1,880,000 USD

9 1.6 ha of land is rehabilitated and being

used as parks, etc.

„

„ İİstanbulstanbul-Yakac-Yakacıık:k:

Construction and sports facilities.

„

„ İİstanbulstanbul-Ümraniye:-Ümraniye:

3 football fields, 1 volleyball field, 1 basketball field, social facilities, jogging tracks, parks

„

„ İİstanbulstanbul-Halkal-Halkalıı::

Total area: 15 ha

Gas collection via gas pipes, prevention of leachate formation, vegetation

„

„ İİstanbulstanbul-Kemerburgaz:-Kemerburgaz:

Total area: 5.77 ha

Gas recovery and energy production studies: electricity produced: 1006 kW emissions (NOx) <500 mg/Nm3 Bursa-Demirtaş Rehabilitated Waste Site İstanbul-Halkalı İ stanbul-Kemerburgaz Landfill Gas Facility

(13)

CONCLUSION

CONCLUSION

CONCLUSION

„ The current strategy of solid waste management in Turkey

needs significant improvements.

„ Concrete steps will have been taken with the initiation of the

project Capacity Building for Solid Waste Management in Capacity Building for Solid Waste Management in Turkey (LIFE00TCY/TR/011)

Turkey (LIFE00TCY/TR/011) the Mof E

„ The targets are:

– Determining the institutional and regulatory obstacles in solid waste

management and suggesting solutions,

– Providing the information flow among ministry staff on solid waste

policies, techniques, and technologies via trainer training method.

– Demonstrating the developments, information and experiences in

solid waste management on local and regional level via workshops and seminars.

(14)

CONCLUSION

CONCLUSION

CONCLUSION

„ The following issues have been raised during the

discussions:

– Improvement of solid waste management planning: re-planning & construction of sanitary landfills, rehabilitation of old sites, reuse-recovery-recycling, composting concerns, etc…

– Legal reforms: compliance to EU Directives, polluter pays, publishing guidelines with case studies, private-sector

participation, etc…

– Institutional reforms: supporting municipalities, establishment of an independent environmental agency, etc…

– Training and communication: raising public awareness, training staff, etc…

– Monitoring the application of the action plan: determining

indicators for success and needs, systematic data collection, developing a system for information sharing and reporting

„ An action plan including the issues and cost-benefit analysis

has been prepared recently and the project was completed in April, 2004.

References

Related documents

This article presents the first nationwide assessment of the primary impacts of such a rise on the United States: (1) the cost of protecting ocean resort communities by pumping

The mapping of the lists and the list items depended on the actual type of list. Hence, for ‘lists’ that represent an evaluation re- sult, as ‘text fields’, clinical findings are

correctly by passing the ureter through a submucosal tunnel. The second operation or modification was pre- sented by Dr. The Paquin operation originally incorporated a

These include: safeguards concerning access to information about the child’s rights and the criminal justice procedures in place; protections in place for child suspects

This research has surfaced similarities and differences in digital curation activities, as well as broader sociotechnical factors impacting digital curation work, including the

Table S8 Assembly statistics for the Mycosphaerella graminicola version 1 (8.9 6 draft) and version 2 (finished) sequences compared to the 10 6 draft sequence of Stagonospora

Although a number of studies showed promising clinical applications, with sensitivity and specificity figures similar to that of accepted diagnostic tools, the quality of

Yedinci Bes Yillik Kalkinma Plani - Seventh Five Year Development Plan.. S ekizinci Bes Yillik Kalkinma Plani - Eighth Five-Year