Southwest study group

WELCOME > RDA Access Point Design > How We Got Here > Design Concepts > Final Design & Construction Schedule > Q&A

Westside Trail RDA Access Point

Design Updates January 28

@ 6:30pm

@atlantabeltline

@atlantabeltline

@atlantabeltline

(2)

Tonight’s on + off camera team

WELCOME > SOUTHSIDE TRAIL (WEST) CONSTRUCTION > QUESTIONS & ANSWERS

(3)

Virtual meeting format

• Your line is muted, and you won’t be able to share your video or screen during the meeting.

• A recording of this meeting, the presentation, a copy of tonight’s Q&A and all other supporting materials will be made available online at www.beltline.org/meetings.

• If you are having technical difficulties during the meeting, please email [email protected].

WELCOME > How We Got Here > Design Process > Final Design & Construction Schedule > Q&A

(4)

Legacy resident retention program

WELCOME > How We Got Here > Design Process > Final Design & Construction Schedule > Q&A

• The Legacy Resident Retention Program aims to mitigate

displacement by helping current homeowners pay property tax increases.

• Residents who live in the designated program areas along the southern and western neighborhoods of the BeltLine who meet the following criteria are eligible for relief:

• Currently living in their home

• Lived there before March 2017

• Have an annual household income below 100% of AMI

Visit beltline.org/retentionfund

or call 678-718-5469

(5)

Job opps: grow on the BeltLine

WELCOME > How We Got Here > Design Process > Final Design & Construction Schedule > Q&A

STRIVE Atlanta:

• STRIVE’s proven five-pillar model (job readiness training,

occupational skills training, career coaching/case management, job placement, and lifetime support) creates a clear pathway to long-term career success. The partnership will provide residents with skills they need to secure family-sustaining jobs so they can live, work, and thrive along the BeltLine transportation corridor.

Visit beltline.org/workforce-partnerships

or call 404-446-4404

(6)

Job opps: grow on the BeltLine

WELCOME > How We Got Here > Design Process > Final Design & Construction Schedule > Q&A

Juvo Jobs:

• Juvo360 helps residents find hyper-local work inside their

communities. Download the Juvo Jobs app and apply for jobs on your mobile device. Whether walking, driving, or taking public transportation, the app alerts you about job openings nearby.

The Juvo Jobs app also assists businesses by sharing their openings to talented people who are near them.

Visit beltline.org/workforce-partnerships

or call 404-446-4404

(7)

partnership: Business facade program

WELCOME > How We Got Here > Design Process > Final Design & Construction Schedule > Q&A

ABI Business Façade pARTnership:

• The 2020-2021 Business Façade pARTnership Grant program kicked off last year with the selection of four Business Partners and sites in late 2020. An Open Call for Quotes from the artist and maker community is now open and closes on February 8th 20201 at 5pm. Be sure to share this opportunity with a talented artist in your life!

Visit beltline.org/workforce-partnerships

or call 404-446-4404

(8)

PoLL Questions

Poll Question #1

What neighborhood do you live in?

• Westview

• West End

• Westwood

• Bush Mountain

• Oakland City

• Cascade Avenue

• Adair Park

• A neighborhood in the City of Atlanta not on this list

• A neighborhood not in the City of Atlanta

WELCOME > How We Got Here > Design Process > Final Design & Construction Schedule > Q&A

(9)

PoLL Questions

Poll Question #2

How do you feel about the Access Point

coming to Ralph David Abernathy Blvd. on the Westside Trail?

• Thrilled

• Happy

• No opinion

• Apprehensive

• Upset

WELCOME > How We Got Here > Design Process > Final Design & Construction Schedule > Q&A

(10)

PoLL Questions

Poll Question #3

How many BeltLine meetings have you been to?

• None

• 1-4 meetings

• 5 or more meetings

WELCOME > How We Got Here > Design Concepts > Final Design & Construction Schedule > Q&A

(11)

PoLL Questions

Poll Question #4

How would you rate your knowledge of the BeltLine's full portfolio of projects?

• I'm an expert

• I know more than most people

• I don't know a lot, but I want to learn more

• I don't know anything about the BeltLine

WELCOME > How We Got Here > Design Process > Final Design & Construction Schedule > Q&A

(12)

Atlanta Beltline vision

WELCOME > How We Got Here > Design Process > Final Design & Construction Schedule > Q&A

(13)

How Did We Get Here?

• ABI purchased the property for the purpose of building an access point for the Westside Trail

• 2017: ABI & Westview Community collaboration on the Complete Street Vision for Ralph David Abernathy Blvd.

• 2018: ABI began developing concepts, but had to be put on hold due to staff resourcing challenges

• 2019: Due to the hiring of new staff, ABI restarted the effort to deliver the project

Welcome > HOW WE GOT HERE> Design Process > Final Design & Construction Schedule > Q&A

(14)

Why Do We Need Another Access Point?

• Provide closer access to the Westside Trail for the Westview neighborhood

• Upgrade road elements for safer crossing of Ralph David Abernathy Blvd SW.

Welcome > HOW WE GOT HERE> Design Process > Final Design & Construction Schedule > Q&A

(15)

Design Process and Schedule

• Presented initial concepts at November 2019 meeting

• Collected and incorporated feedback from the November 2019 meeting into concepts presented in the January 2020 meeting

• Collected feedback in January 2020 meeting to select the preferred concept design to incorporate into the final design

• Tonight’s meeting will discuss the final design that will be permitted for construction

Welcome > How We Got Here > DESIGN PROCESS > Final Design & Construction Schedule > Q&A

(16)

Initial Concept A

Welcome > How We Got Here > DESIGN PROCESS > Final Design & Construction Schedule > Q&A

(17)

Initial Concept B

Welcome > How We Got Here > DESIGN PROCESS > Final Design & Construction Schedule > Q&A

(18)

Initial Concept C

Welcome > How We Got Here > DESIGN PROCESS > Final Design & Construction Schedule > Q&A

(19)

Community Feedback Highlights

• Maintain separate entry and circulation path away from plaza/seating area

• Add landscaping closer to RDA to provide a sound, shade and visual buffer

• Add fencing/barrier between sidewalk along RDA at access point area

• Keep tiered seating overlooking the BeltLine

• Adjust crosswalk location across S. Gordon Street

Welcome > How We Got Here > DESIGN PROCESS > Final Design & Construction Schedule > Q&A

(20)

Revised Concept C

Welcome > How We Got Here > DESIGN PROCESS > Final Design & Construction Schedule > Q&A

(21)

South Gordon Street Intersection Improvements

Welcome > How We Got Here > DESIGN PROCESS > Final Design & Construction Schedule > Q&A

1

(22)

South Gordon Street Intersection Improvements

Welcome > How We Got Here > DESIGN PROCESS > Final Design & Construction Schedule > Q&A

2

(23)

South Gordon Street Intersection Improvements

Welcome > How We Got Here > DESIGN PROCESS > Final Design & Construction Schedule > Q&A

3

(24)

South Gordon Street Intersection Improvements

Welcome > How We Got Here > DESIGN PROCESS > Final Design & Construction Schedule > Q&A

4

(25)

South Gordon Street Intersection Improvements

Welcome > How We Got Here > DESIGN PROCESS > Final Design & Construction Schedule > Q&A

5

(26)

6

South Gordon Street Intersection Improvements

Welcome > How We Got Here > DESIGN PROCESS > Final Design & Construction Schedule > Q&A

(27)

Final Design

Welcome > How We Got Here > Design Process > FINAL DESIGN & CONSTRUCTION SCHEDULE > Q&A

PLAZA RAMP STAIRS

GREEN SPACE

CROSS WALKS S. GORDON ST SW

1384 RDA 1114 S.

GORDON

(28)

Final Design

Welcome > How We Got Here > Design Process > FINAL DESIGN & CONSTRUCTION SCHEDULE > Q&A

SECTION A

SECTION B

(29)

Final Design – Section A Views

Welcome > How We Got Here > Design Process > FINAL DESIGN & CONSTRUCTION SCHEDULE > Q&A

Westside Trail

Looking North

<<< Ralph David Abernathy Blvd

ADA-Accessible Ramp

Plaza with Landscaping Bike Lane

Sidewalk

(30)

Final Design – Section B Views

Welcome > How We Got Here > Design Process > FINAL DESIGN & CONSTRUCTION SCHEDULE > Q&A

Westside Trail

<<< Ralph David Abernathy Blvd

Existing Tree

Stairs from RDA sidewalk Looking North

Sidewalk

Bike Lane

(31)

Final Design Facts

Welcome > How We Got Here > Design Process > FINAL DESIGN & CONSTRUCTION SCHEDULE > Q&A

• How will/when will this project be funded?

• Funding for this project was allocated in ABI’s 2021 Fiscal Year budget

• How much greenspace/pervious area is being added?

• 2,471 sq feet (.056)

Pre-development: Impervious – 27,300 SF (0.626 ac); Pervious – 4,256 SF (0.098 ac)

Post-development: Impervious – 24,829 SF (0.570 ac); Pervious – 6,727 SF (0.154 ac)

(32)

Final Design & Construction Schedule

Welcome > How We Got Here > Design Process > FINAL DESIGN & CONSTRUCTION SCHEDULE > Q&A

• Final Design will be submitted to GDOT and the City of Atlanta for permitting in February

• ABI will begin the procurement process to solicit bids from contractors

• Once permitting has been completed and a contractor has been selected, the project will start construction (tentatively Summer 2021)

• The Design Team has estimated a 6 to 8-month

construction timeline that will go into early 2022

(33)

Questions & answers

Welcome > How We Got Here > Design Process > Final Design & Construction Schedule > Q&A

Phone Attendees

• Press *9 on telephone keypad to “raise your hand” during the Q&A to indicate you want to speak. Facilitator will unmute your mic.

Online Attendees:

• Submit a question or comment any time in Q&A box.

• The “raise your hand” feature is available to all Zoom participants however we are prioritizing phone attendees.

Facebook Live Attendees:

• Please feel free to participate in the “Comments Section.”

Someone on our staff will make sure I see your questions.

(34)

PoLL Questions

Poll Question #5

How did you hear about this meeting?

• Email from Atlanta BeltLine, Inc.

• Social Media

• Communication from a family member, friend or neighbor

• Other

Welcome > How We Got Here > Design Process > Final Design & Construction Schedule > Q&A

(35)

PoLL Questions

Poll Question #6

How did you hear about this meeting?

• Email from Atlanta BeltLine, Inc.

• Social Media

• Communication from a family member, friend or neighbor

• Other

Welcome > How We Got Here > Design Process > Final Design & Construction Schedule > Q&A

(36)

PoLL Questions

Poll Question #7

Was this meeting helpful?

• Yes

• No

• No opinion

Welcome > How We Got Here > Design Process > Final Design & Construction Schedule > Q&A

(37)

PoLL Questions

Poll Question #7

Was this meeting helpful?

• Yes

• No

• No opinion

Welcome > How We Got Here > Design Process > Final Design & Construction Schedule > Q&A

(38)

Welcome > How We Got Here > Design Process > Final Design & Construction Schedule > Q&A

Whitney Fuller

[email protected] (404) 477-3574

Hope Gist

[email protected]

(404) 477-3634

(39)

Upcoming public meetings

First Quarterly Briefing of 2021

• February 18 th at 6 p.m.

Special Service District

Building the BeltLine for ALL

• Westside Study Group on February 15

th

at 6 p.m.

• Southwest Study Group on February 16

th

at 6 p.m.

• Northeast Study Group on February 23

rd

at 6 p.m.

• Westside Study Group on March 1

st

at 6 p.m.

Welcome > How We Got Here > Design Process > Final Design & Construction Schedule > Q&A

(40)

Thank you!

First Public Meeting of 2021!

WELCOME > How We Got Here > Design Concepts > Final Design & Construction Schedule > Q&A

References

Related documents

◆ Auto-antifreeze: To prevent the pipes and pumps from being frozen, the unit will defrost automatically when it meets the condition as follows: the ambient temperature is

1 DEPRESS FOOT PEDAL 2 DISENGAGE ATTACHMENT 3 CHECK OIL INDICATOR LIGHTS RED BLACK RED RED BLACK BLACK BLACK BLACK WHITE WHITE RED RED YELLOW RED WHITE WHITE BLACK RED

To set an access point group for mail, select Menu &gt; Messaging &gt; Mailbox &gt; Options &gt; E-mail settings &gt; Connection settings &gt; Incoming e-mail &gt;

Government expenditure levels used in the analysis for 1996 are based on the most recent estimates of annual costs of secondary and tertiary education as provided by the Ministry

Corrosion of Materials Other than Metal; Early Corrosion Studies; Fundamentals; Electrochemical Principles; Electromotive Force; Ionization; The Corrosion Cell; Oxidation and

The objectives of the association is to conduct studies on major problems of apiculture development in Ethiopia and to prepare proposals on behalf of member companies and submit

Jacada WorkSpace is well suited for contact center environments where agents are either burdened with multiple desktop applications or where complex business rules (whether

Solution: AVEVA’s Asset Life Cycle Information Management solution; AVEVA’s Control of Work solution; AVEVA Enterprise Asset Management™.. Asset Visualisation