CMS Capital Improvements Program Monthly Report
November 2015
T
ABLE
O
F
C
ONTENTS
C
APITAL
P
ROGRAM
S
ERVICES
Capital Improvement Program
N
OVEMBER
2015
M
ONTHLY
R
EPORT
P
ROGRAM
O
VERVIEW
Project Management and Quality Management
Design and Bidding
Controls
M/W/SBE
Bond Progress Summary
Project Procurement Dates - Next 90 Days
Mobile Swing Space Utilization
Project Contractor Teams; in Design/Construction or Substantially Completed/Closed
School Site Location Maps
P
ROJECT
S
TATUS
R
EPORT
P
ROJECT
P
ROGRESS
P
HOTOS
MWSBE
P
ARTICIPATION
R
EPORT
P
ROJECT
C
ONTROLS
Budget Summary Reports
-
2002 Bond Series
-
2006 – 2007 Certificates of Participation
-
2007 Bond Series
-
2008 Certificates of Participation
-
2013 Bond Series
Effectiveness and Efficiency of Financial Management
CMS Capital Improvements Program Monthly Report
November 2015
Page 2
P
ROGRAM
O
VERVIEW
P
ROJECT
M
ANAGEMENT AND
Q
UALITY
M
ANAGEMENT
The following is a summary of the activity on the projects in construction during the month of November.
The Construction Manager for
Myers Park High School
continues with building footings and foundations. The
below grade poured-in-place foundation walls are being formed and poured. The underground utilities to support the
new building are also being installed. The Construction Manager is coordinating with the local utility companies to
provide service. The CPS team continues to evaluate and fine tune the site logistics and mobile relocation schedule
for this summer turnover including parking lot contingencies. The first building is scheduled for occupancy August
2016.
The Construction Manager at the new
Nations Ford Elementary School
continues with construction of the building
and site work. The load bearing masonry, structural steel and metal decking is complete in all areas except the two
story classroom wing. The roofing is complete in the kitchen/cafeteria allowing the main electrical and mechanical
rooms to progress. The spray foam insulation was installed on 50% of the building exterior with the brick veneer
following close behind. The MEP trades are progressing with the overhead rough-in in the areas that have received
metal decking. The landscape contractor is installing the plantings and preparing areas to receive seed. The Nations
Ford Elementary School project is scheduled for occupancy August 2016.
The Construction Manager at
Olympic High School
is progressing with building slab on grade installation. The
footings and foundations are complete. The under slab utilities are being installed. This project will include core
classrooms and six (6) specialized Career, Technology, Education (CTE) areas. The classroom addition is scheduled
for occupancy August 2016.
The Construction Manager at new
Statesville Road Elementary School
completed the installation of the slab on
grade activities and has poured the first elevated slab. The classroom first floor overhead mechanical, plumbing and
electrical work has begun and will continue for several months. The load bearing masonry, structural steel and metal
decking is complete. This new school is scheduled for occupancy August 2016.
D
ESIGN AND
B
IDDING
The
East Mecklenburg High School
addition project continues in its schematic design progress. The project’s scope
will include CTE culinary arts spaces that replace the current program spaces. This project is scheduled to start
construction in the fall of 2016 and be occupied in January 2018, ahead of the original bond plan.
Permitting approval for the
J. M. Alexander
replacement school continues with the Town of Huntersville,
Engineering Department, DOI and DPI. First round of LUESA building permit comments have been received,
incorporated and submitted to the prequalified bidders. The water main extension project at the front of the school
through Charlotte Water is coordinated with the overall project plan. The project’s bid schedule completed in late
November 2015. Bid results will be analyzed and a GMP change order developed for the BOE approval in January
2016.
The new
Language Immersion K-8 Albemarle Road Relief
project has been placed on hold in the schematic design
phase. Land acquisition and site development discussions continue with the City. Once the site for the project is
finalized the design can progress.
The
Myers Park High School
new Building 2 redesign scope continues with is progress. The redesign effort has
found savings in site work, interior casework, classroom reconfiguration and exterior fenestration. Submission for the
CMS Capital Improvements Program Monthly Report
November 2015
Page 3
P
ROGRAM
O
VERVIEW
revised building permit to LUESA has been changed to early January 2016. The procurement phase for Building 2 is
expected to be complete in the early 2nd quarter of 2016. The final phase of the multi-phased plan is scheduled to
start construction summer of 2016 and be complete August 2018.
Northwest School of the Arts
renovation project has completed its reconciliation of the schematic estimate. The
project’s scope includes selected renovations in Building D and the comprehensive renovation of the
auditorium/theater. The project is in the design development design phase.
Permitting approval for the
PK-8 Berryhill-Reid Park Relief
project continues with the state and local agencies.
First round of LUESA building permit comments have been received, incorporated and submitted to the prequalified
bidders. The project is scheduled to complete its bidding phase in mid-December 2015.
The design for the additions at
South Mecklenburg High School
continues in the design development phase.
Additional survey information has been obtained and furnished to the architect. A follow-up meeting with the
Principal and school staff is scheduled in December to re-review their scope and site logistic concerns.
Indoor air quality design projects continue to progress in the design development and construction phase. These
mechanical design projects address Chantilly Montessori, Briarwood Academy, University Meadows, Lebanon Road,
and Crown Point elementary schools. The construction work associated with these projects are subject to available
funding and will be required to start and complete over a future summer break period.
CPS continues to work diligently to identify options to reduce cost, control any scope creep and keep the new square
footage efficient. The current design projects are being strained by a very active construction market. The use of
savings from completed funding authorized projects is being evaluated for use on the affected projects. Utilizing
these funds would maintain the overall bond totals.
C
ONTROLS
Expenditures for November 2015 were $5.4M. This brings our fiscal year total to date to $31.6M against the 2016
fiscal year cash flow projection of $101M. The Controls team is continuing the reconciliation and financial closeout
of projects turned over for occupancy. Available funds identified have been compiled and submitted for approval to
reallocate to meet additional approved needs, unforeseen conditions and/or escalation.
Board of Education approval was received on November 10, 2015
for
Security Enhancements at Vance High School.
The Controls team continues to submit notices of potential change at school sites so senior staff can adequately
evaluate the issues. Additionally, the Controls team continues the processing of contracts, invoices, preparing notices
of potential change, change orders, pay applications and check requests for projects under construction. Captured
construction cost data is used to prepare financial reports such as detailed cost reports, budget summaries,
reconciliation to CMS books, revisions to and updated cash flows and complete special financial requests by CMS
and Mecklenburg County. This process, along with data compilation and management, allows senior staff to provide
the proper guidance/direction and accurate information to the program stakeholders.
MWSBE
As of November 2015 the overall MWSBE utilization percentage related to design and construction of the 2007
and 2013 bond projects is 36.35%, which includes 8.06% participation by minority contractors, 25.59%
CMS Capital Improvements Program Monthly Report
November 2015
Page 4
P
ROGRAM
O
VERVIEW
participation by women contractors and 2.71% participation of small business contractors. This accounts for
more than $190 million spent on the utilization of Minority, Women and Small Business contractors.
The MWSBE Office of Charlotte-Mecklenburg Schools continued to conduct several individual orientations
with new MWSBE contractors and prime contractors. In addition, team members also attended/hosted the
following outreach sessions/pre-bid meetings:
North Carolina MWBE Coordinators’ Network Educational Conference. Attendees participated in a
variety of workshops, legislative update, and celebration luncheon.
Pre-K8 Berryhill/Reid Park Relief pre-bid meeting hosted by Rodgers Builders
Atrium building 4335 pre-bid meeting hosted by CMS
J E Dunn Minority Contractors Business Development graduation
Good –Faith Efforts:
Reviewed Paving and Storm Water Design Request for Qualification submittals
Over the next month, team members will continue to work with contractors interested in bidding on school
projects. Contractors are encouraged to review bid advertisements in Charlotte Observer, Greater Diversity
News, Que Pasa, and register as a vendor on the North Carolina Interactive Purchasing System for notification
of the various opportunities.
CMS Capital Improvements Program Monthly Report
November 2015
Page 5
P
ROGRAM
O
VERVIEW
B
OND
P
ROGRESS
S
UMMARY
As of November 2015
Funding Source and Value
Amount
Committed/
Pending
Amount Paid to
Date
Amount
Expended This
Period
‘96 Bond
$119.8 M
$119,830,058
$119,830,058
$0
‘97 Bond
$415.0 M
$415,000,000
$415,000,000
$0
‘99 COPs
$50.0 M
$50,000,000
$50,000,000
$0
‘00 Bond
$275.5 M
$275,500,000
$275,500,000
$0
‘02 Bond
$224.0 M
$224,000,000
$224,000,000
$0
‘04 COPs
$98.5 M
$98,500,000
$98,500,000
$0
’05 COPs
$73.9 M
$73,900,000
$73,900,000
$0
’06 COPs
$154.7 M
$145,720,479
$145,720,479
$0
‘07 COPs
$16.5 M
$15,102,325
$15,102,325
$0
‘07 Bond - Local
$465.0 M
$452,294,134
$429,596,281
$1,744,996
‘07 Bond - QSCBs
$51.0 M
$51,042,943
$51,042,943
$0
‘08 COPs
$58.0 M
$52,592,885
$52,592,885
$0
’13 Bond
$295.2 M
$72,498,311
$26,049,001
$3,616,783
Grand Total
$2297.1 M
$2,045,981,135 $1,976,833,972
$5,361,779
CMS Capital Improvements Program Monthly Report
November 2015
Page 6
P
ROGRAM
O
VERVIEW
U
PCOMING
M
AJOR
C
ONSTRUCTION
P
ROCUREMENT
D
ATES
School Name
Procurement Dates*
Myers Park Building #2 Prequalification
Bids managed by BE&K (CM)
January – February 2016
CMS Capital Improvements Program Monthly Report
November 2015
Page 7
P
ROGRAM
O
VERVIEW
S
WING
S
PACE
U
TILIZATION
Creating a temporary space for students and staff to occupy during construction on a school’s campus has
proven to be beneficial to the project’s schedule and cost and overall safety and efficiency of school
operations. When the renovation or expansion of a facility is performed and the facility must remain
functionally operational, there are benefits to the owner in using swing space. At the conception of this
program several swing space options were identified.
We have successfully utilized both onsite and offsite swings. The most desirable swings are “offsite” ones.
Onsite swing using mobiles or modulars, likewise has been successfully used. The following is a summary of
current swing options in use.
School
No. of Mobiles/Relocation Site
Status (From – To)
School
Architect
Project Status
General Contractor/CM
J.M. Alexander Middle School
FWA
Design
Balfour Beatty (CM)
Myers Park High School (2013) Building #2
Boomerang Design
Design
BE&K (CM)
New PK-8 #1 (Berryhill-Reid Park Relief)
Little Diversified
Design
Rodgers Construction (CM)
New Language Immersion PK-8 Albemarle Road ES-MS Relief
Morris Berg
Design
Edifice, Inc.(CM)
Myers Park High School Building #1
MBAJ Architecture
Construction
BE&K (CM)
Security Enhancements
Various
Construction
Various
Statesville Road Elementary School
ADW
Construction
J.E. Dunn (CM)
Nations Ford Elementary School (at Waddell)
Wash Hatem Nelson
Construction
Messer Construction (CM)
Olympic High School (2013)
McMillan, Pazdan, Smith
Design
Turner Construction (CM)
Capital Improvements Program
Projects in Design or Under Construction
Projects In Design
School
Turnover Year
Architect
General Contractor
Carmel Middle
Jan-08
Shook Kelly
Shelco, Inc.
Ballantyne Elementary
Aug-08
Cort Architectural Group
Shelco, Inc.
Barnette Elementary
Aug-08
Wash Hatem Nelson
Edison Foard
Carmel Middle - Ballfields
Aug-08
Shook Kelly
Lee Morgan, Inc.
Croft Community
Aug-08
Cort Architectural Group
Beam Construction Co., Inc.
Elon Park Elementary
Aug-08
Wash Hatem Nelson
Edifice, Inc.
Marie G. Davis Middle
Aug-08
Shook Kelly
Edison Foard
Whitewater Academy
Aug-08
Wash Hatem Nelson
Sorenson Gross
Northeast Middle
Jan-09
Morris-Berg
Hunter Roberts Construction Group
Quail Hollow Middle
Jan-09
Gantt Huberman Associates
LeChase Construction
Randolph Middle
Jan-09
FWA Group
Sorenson Gross
Alexander Graham Middle
Aug-09
MBAJ Architecture
Hunter Roberts Construction Group
Berewick ES (E07-01)
Aug-09
ADW
Hendrick Construction
Idlewild Elementary
Aug-09
Little Diversified
BE & K Building Group
Long Creek Elementary
Aug-09
ADW
Edifice, Inc.
North Mecklenburg High
Aug-09
Shook Kelly
Shelco, Inc.
Ridge Road Middle
Aug-09
FWA Group
Edison Foard
River Gate ES (E07-06)
Aug-09
ADW
Beam Construction Co., Inc.
River Oaks Academy (E07-02)
Aug-09
Cort Architectural Group
Matthews Construction Co., Inc.
Sedgefield Middle - Phase II
Aug-09
Boney Architects
Beam Construction Co., Inc.
South Mecklenburg High
Aug-09
Little Diversified
BE & K Building Group
Stoney Creek ES (E07-03)
Aug-09
Cort Architectural Group
LeChase Construction
Whitewater Middle
Aug-09
FWA Group
Shelco, Inc.
Harding University High
Dec-09
ADW
Edifice, Inc.
Hough High
Aug-10
Little Diversified
Rodgers Construction
Rocky River High
Aug-10
Little Diversified
Balfour Beatty
Cochrane - kitchen
Aug-11
MBAJ Architecure
Sorenson Gross
Alexander Graham Middle Gym Reno
Aug-12
MBAJ Architecure
Edison Foard
First Ward - Demolition & Bus lot
Aug-12
MBAJ Architecure
T.K. Browne
South Meck Parking Lot Renovation
Aug-12
Little Diversified
Sorenson Gross
Sedgefield Elementary Demolition
Oct-12
Cort Architectural Group
EHG, LLC
Bain Elementary
Aug-13
ADW
Edison Foard
Grand Oak Elementary
Aug-13
ADW
Matthews Construction Co., Inc.
McClintock Middle
Aug-13
FWA Group
Shelco, Inc.
Pineville Elementary
Aug-13
Cort Architectural Group
Beam Construction Co., Inc.
Palisades Park Elementary School
May-14
Wash Hatem Nelson
Clancy & Theys
East Mecklenburg High Auditorium
Jan-14
Gantt Huberman Associates
Godfrey Construction Co., Inc.
Independence High - Gym
Jun-14
Shook Kelly
Shelco, Inc.
Garinger High - Track & Field
Jul-14
Site Solutions
Turner Construction
Garinger High - Renovations/Addition
Aug-14
Adams Group Architects
Turner Construction
Olympic High - Stadium
Aug-14
Site Solutions
Turner Construction
West Mecklenburg High - Stadium
Aug-14
Site Solutions
Turner Construction
Collinswood - Indoor Air Quality
Aug-14
PEA
The Bowers Group
Lansdowne - Indoor Air Quality
Aug-14
AeroRaq
Tyler 2
McKee Road - Indoor Air Quality
Aug-14
McCracken & Lopez
Godfrey Construction
Vance High
Jan-15
LS3P
Matthews Construction Co., Inc.
Lawrence Orr Elementary
Aug-15
Cort Architecural Group
DH Griffin/Metcon
Parkside Elementary
Aug-15
Wash Hatem Nelson
Clancy & Theys
Capital Improvements Program
School
Turnover Year
Architect
General Contractor
Capital Improvements Program
Projects Substantially Completed/Closed *
Hawthorne High Renovations
Aug-15
Morris-Berg
Balfour Beatty
Newell Elementary
Aug-15
Perkins Eastman
New Atlantic Contracting
Ranson Middle
Aug-15
Morris-Berg
Edifice, Inc.
Oakhurst STEAM Magnet ES/Starmount ES
Aug-15
ALR
Turner Construction
STONEY CREEK BEREWICK RIVER OAKS ACADEMY RIVER GATE IRWIN ACADEMIC MARIE G. DAVIS GRAND OAK PALISADES PARK TRILLIUM SPRINGS NATIONS FORD REPLACEMENT OAKHURST STARMOUNT BAIN EE WADDELL
LANGUAGE ACADEMY SELWYN SHARON NEWELL BLYTHE OAKLAWN OAKDALE STERLING DILWORTH MOREHEAD MCALPINE ENDHAVEN MATTHEWS PINEWOOD EAST-OVER COTSWOLD IDLEWILD DAVIDSON BARRINGER REID PARK BERRYHILL PINEVILLE LANSDOWNE PARK ROAD RAMA ROAD CHANTILLY J.H. GUNN BRIARWOOD BRUNS AVE PAW CREEK CORNELIUS DEVONSHIRE LAKE WYLIE HAWK RIDGE SMITHFIELD MCKEE ROAD SEDGEFIELD MONTCLAIRE MERRY OAKS J.W. GRIER FIRST WARD THOMASBORO ALLENBROOK LONG CREEK BARNETTE DRUID HILLS WINGET PARK J.V. WASHAM COLLINSWOOD CROWN POINT WINTERFIELD PINEY GROVE CLEAR CREEK REEDY CREEK ASHLEY PARK TUCKASEEGEE WHITEWATER ACADEMY WINDSOR PARK NATIONS FORD STEELE CREEK LEBANON ROAD HORNETS NEST HUNTERSVILLE ELON PARK BILLINGS -VILLE BEVERLY WOODS GREENWAY PARK HICKORY GROVE HIDDEN VALLEY MALLARD CREEK CROFT COMMUNITY HIGHLAND CREEK TORRENCE CREEK ALBEMARLE ROAD ELIZABETH LANE WESTERLY HILLS DAVID COX ROAD POLO RIDGE OLDE PROVIDENCE BYERS
MOUNTAIN ISLAND WINDING SPRINGS
SHAMROCK GARDENS STATESVILLE ROAD REPLACEMENT HUNTINGTOWNE FARMS UNIVERSITY MEADOWS BALLANTYNE NATHANIEL ALEXANDER ELIZABETH UNIVERSITY PARK PROVIDENCE SPRING HIGHLAND RENAISSANCE MYERS PARK HIGHLAND MILL
S
I-7
7
H
y
N I
-7
7 H
y
N
I-8
5 H
y
S
I-8
5 H
y
S I-85 Hy
CIP ELEMENTARY SCHOOLS
´
0
2.5
Miles
5
10
CMS Planning Services
2013 Bond Schools
#
Other
Interstates
County
REID PARK ACADEMY DAVIDSON K-8 COULWOOD BRADLEY SOUTH CHARLOTTE JAY M ROBINSON ALEXANDER GRAHAM MINT HILL NORTHEAST MCCLINTOCK CRESTDALE COCHRANE EASTWAY RANDOLPH COLLINSWOOD LANGUAGE SEDGEFIELD PIEDMONT MARIE G. DAVIS JAMES MARTIN MOREHEAD STEM OAKLAWN THOMASBORO
MARTIN LUTHER KING
New STEAM K-8 New PK-8 BERRYHILL RELIEF RIDGE ROAD RANSON SOUTHWEST E.E.WADDELL LANGUAGE WESTERLY HILL ACADEMY BAILEY BERRYHILL DRUID HILLS ACADEMY NORTHWEST SCHOOL QUAIL HOLLOW WHITEWATER KENNEDY NORTHRIDGE WALTER G. BYERS CARMEL ALBEMARLE ROAD COMMUNITY HOUSE J.M. ALEXANDER BRUNS ACADEMY ASHLEY PARK PK-8
S
I-7
7
H
y
N
I-
77
H
y
N I-85 H
y
S I-85 H
y
S
I-8
5 H
y
S I-85 H
y
CIP MIDDLE SCHOOLS
2013 Bond Schools
#
Other
Interstates
County
´
0
2.5
Miles
5
10
CMS Planning Services
MARIE G. DAVIS W.A. HOUGH ROCKY RIVER COCHRANE WEST MECKLENBURG CHARLOTTE ENGINEERING EARLY COLLEGE LEVINE MIDDLE COLLEGE VANCE ARDREY KELL BUTLER OLYMPIC HARDING GARINGER HOPEWELL NORTHWEST PROVIDENCE
MYERS PARK INDEPENDENCE
MALLARD CREEK CATO MIDDLE COLLEGE WEST CHARLOTTE WEST MECKLENBURG EAST MECKLENBURG SOUTH MECKLENBURG NORTH MECKLENBURG PERFORMANCE LEARNING CTR BERRY
S
I-7
7 H
y
N
I-77
H
y
N
I-8
5 H
y
S I-85
Hy
S I
-85
Hy
CIP HIGH SCHOOLS
2013 Bond Schools
#
Other
Interstates
County
´
0
2.5
Miles
5
10
CMS Planning Services
PROJECT STATUS
REPORTS
Monthly Project Status
Summary
November 2015
Project Status
Construction
Progress
Design
Phase
** Occupy
On
Project Scope
Current Project
Estimate
Project
Project currently planned to be funded by the
County in FY18.
August 2019
This project includes CTE modifications at the following:
Garinger HS - automotive, carpentry, cosmetology, culinary;
North Mecklenburg HS - automotive, carpentry, culinary;
West Mecklenburg; Independence HS - automotive,
carpentry, cosmetology, culinary.
Career and Technology
Education Phase I (13)
0
$
8,640,000
%
Project currently planned to be funded by the
County in FY18.
December 2019
This project includes new general and specialty
classrooms for conversion to K-8.
Davidson K-8 Conversion (13
$
9,500,000
0
%
The East Mecklenburg High School addition
project continues in its schematic design
progress. The project's scope has been
modified to add a CTE culinary arts program.
The overall footprint of the building has
changed to accommodate the incorporation
of this CTE program.
August 2018
This project includes the addition of a 30-classroom
building; renovations to selected areas including locker
rooms.
East Mecklenburg High
School (13)
0
Pre-Schematic
$
12,744,000
%
The project is complete.
August 2014
This project includes the design and construction of a new
science building, required demolition and associated site
work. Also included will be renovations to the gym and
locker rooms.
Garinger High School ('02)
$
14,875,473
Complete
100
%
The project is complete.
August 2014
Renovation of the football field from natural grass to a
synthetic field, renovation/rework to the 6-lane track.
Additional scope to be accommodated by the Bond
includes the addition of stadium lighting, security cameras,
and a new PA system.
Garinger High School (07) -
Track & Field
100
Complete
$
1,262,567
%
Financial closeout is progressing.
August 2015
The project includes a full renovation to the existing facility
and the incorporation of the requirements to make this a
Medical Magnet High School. The project originally
included only renovations to plumbing and HVAC.
Hawthorne High School
$
16,248,343
Complete
98
%
Five school projects are currently under
design.
To provide the required abatement, HVAC, electrical, and/or
general renovations required to improve air quality for the
learning enviroment.
IAQ/Asbestos Removal
$
2,925,678
90
%
Printed on: 12/23/2015
* Current Budget includes all budget allocations to the facilities included within the 96/97 Bond; 99 COPs; 00, 02, 07 & 13 Bonds; and 04, 05, 06, 07 & 08 COPs.
Page No. 1
** Blank Occupy on Dates designate projects without construction funding or awaiting determination of County bond sales.
Projects completed prior to August 2014 are no longer represented on this report.
Monthly Project Status
Summary November 2015
Project Status
Construction
Progress
Design
Phase
** Occupy
On
Project Scope
Current Project
Estimate
Project
The project is complete.
August 2014
This project includes the design and construction of
additions and renovations to the physical education,
athletic, and administrative support facilities. A new gym
will be constructed and the existing gym will become an
auxiliary gym. A new addition will be constructed to allow
for a new main entrance and expand the administrative
offices.
Independence High School
(07)
100
Complete
$
13,379,009
%
Permitting approval for the J. M. Alexander
replacement school continues with the Town
of Huntersville, Engineering Department, DOI
and DPI. First round of LUESA building
permit comments have been received,
incorporated and submitted to the
prequalified bidders. The water main
extension project at the front of the school
through Charlotte Water is coordinated with
the overall projects plan. The project's bid
schedule completed in late November 2015.
Bid results will be analyzed and a GMP
change order developed for the BOE approval
in January 2016.
August 2017
This project includes a replacement facility consisting of a
54-classroom clone.
J.M. Alexander Middle
School (13)
0
Construction
Documents
$
31,172,000
%
The school was occupied August 2015. The
team is awaiting final consent documents to
make final payment..
August 2015
A new 39 classroom elementary school. This project
relieves overcrowding at Hickory Grove ES. Additionally a
16-classroom pre-k wing will be attached to the school.
Lawrence Orr Elementary
School
99
Complete
$
22,733,436
%
The gym project is complete (August 2014).
The Construction Manager continues with
Building 1 footings and foundations. The
below grade poured-in-place foundation
walls are being formed and poured. The
Construction Manager is coordinating with the
local utility companies to provide service. The
CPS team continues to evaluate and fine tune
the site logistics and mobile relocation
schedule for this summer turnover including
parking lot contingencies.
August 2016
This project will include a new gymnasium connected to
the current gym; the current gym will become the auxiliary
gym. Additional scope includes replacement of cafeteria
windows and sitework, building to replace LA.
Myers Park High School (07)
$
25,658,010
Complete
60
%
Printed on: 12/23/2015
* Current Budget includes all budget allocations to the facilities included within the 96/97 Bond; 99 COPs; 00, 02, 07 & 13 Bonds; and 04, 05, 06, 07 & 08 COPs.
Page No. 2
** Blank Occupy on Dates designate projects without construction funding or awaiting determination of County bond sales.
Projects completed prior to August 2014 are no longer represented on this report.
Monthly Project Status
Summary November 2015
Project Status
Construction
Progress
Design
Phase
** Occupy
On
Project Scope
Current Project
Estimate
Project
The Myers Park High School new Building 2
redesign scope continues with is progress.
The redesign effort has found savings in site
work, interior casework, classroom
reconfiguration and exterior fenestration.
Submission for the revised building permit to
LUESA has been changed to early January
2016. The procurement phase for Building 2
is expected to be complete in the early 2nd
quarter of 2016. The final phase of the
multi-phased plan is scheduled to be
complete August 2018.
August 2018
This project includes two multi-story classroom buildings;
renovations to kitchen/cafeteria; demolition of buildings that
house chemistry, biology and information technology
classrooms.
Myers Park High School (13)
Construction
1
Documents
$
16,648,000
%
The Construction Manager at the new Nations
Ford Elementary School continues with
construction of the building and site work.
The load bearing masonry, structural steel
and metal decking is complete in all areas
except the two story classroom wing. The
roofing is complete in the kitchen/cafeteria
allowing the main electrical and mechanical
rooms to progress. The spray foam
insulation was installed on 50% of the
building exterior with the brick veneer
following close behind. The MEP trades are
progressing with the overhead rough-in in the
areas that have received metal decking. The
landscape contractor is installing the
plantings and preparing areas to receive
seed.
August 2016
This project includes the design and construction of a 39
classroom replacement facility on the E.E. Waddell
Academy campus.
Nations Ford Elementary
School (at Waddell) (13)
42
Complete
$
19,440,000
%
The new Language Immersion K-8 Albemarle
Road Relief project has been placed on hold
in the schematic design phase. Land
acquisition and site development
discussions continue with the City. Once
these discussions have completed with the
City the design can progress.
August 2018
This project includes a new PK-8 to provide relief for
Albemarle Road ES/MS; dual language immersion to
provide additional magnet program capacity.
New Language Immersion
K-8 Albemarle Road ES/MS
Relief (13)
0
Schematic
$
31,876,000
%
Permitting approval for the PK-8 Berryhill-Reid
Park Relief project continues with the state
and local agencies. First round of LUESA
building permit comments have been
received, incorporated and submitted to the
prequalified bidders. The project is
scheduled to complete its bidding phase in
mid-December 2015.
August 2017
This project includes a new 54-classroom PK-8 to provide
relief for Berryhill and Reid Park.
New PK-8 Berryhill/Reid Park
Relief (13)
0
Construction
Documents
$
31,376,000
%
Printed on: 12/23/2015
* Current Budget includes all budget allocations to the facilities included within the 96/97 Bond; 99 COPs; 00, 02, 07 & 13 Bonds; and 04, 05, 06, 07 & 08 COPs.
Page No. 3
** Blank Occupy on Dates designate projects without construction funding or awaiting determination of County bond sales.
Projects completed prior to August 2014 are no longer represented on this report.
Monthly Project Status
Summary November 2015
Project Status
Construction
Progress
Design
Phase
** Occupy
On
Project Scope
Current Project
Estimate
Project
Project currently planned to be funded by the
County in FY18. Land for the school is in the
final stage of due dilligence.
August 2020
This project includes a new K-8 to provide relief for
Ballantyne, Elon, Hawk Ridge, Polo Ridge, Community
House, J.M. Robinson.
New STEAM K-8 (13)
$
32,476,000
0
%
Newell Elementary School building was
completed and occupied in August. The
closeout phase including financial
reconciliation and commissioning is ongoing.
August 2015
This project will include construction of a new elementary
school facility in lieu of the renovation/addition project
originally in the Bond.
Newell Elementary School
(07)
98
Complete
$
19,117,518
%
Project currently planned to be funded by the
County in FY17.
August 2018
This project includes a new addition to increase classroom
count to 54; improve facility condition and bring campus to
baseline.
Northridge Middle School (13
$
6,858,550
0
%
Northwest School of the Arts renovation
project has completed its reconciliation of the
schematic estimate. The project's scope
includes selected renovations in Building D
and the comprehensive renovation of the
auditorium/theater. The project is in the
design development design phase.
August 2018
This project includes complete renovation of auditorium;
comprehensive renovation of 1969 classroom building;
improve facility condition.
Northwest School of the Arts
(13)
0
Schematic
$
13,420,000
%
Financial closeout is progressing.
August 2015
This project includes converting Oakhurst into a Science
Technology Engineering Arts Mathematics (STEAM)
magnet. Starmount will receive renovations and provide
relief for Montclaire and Huntingtowne Farms.
Oakhurst STEAM Magnet
ES/Starmount ES Conversion
(13)
98
Complete
$
5,940,000
%
Project is complete.
August 2014
Construction of a new 4000 seat stadium and field house
including concession stands and restroom facilities.
Replacement of the existing track and installation of
artificial turf.
Olympic High School (07) -
Stadium, Track & Field
100
Complete
$
9,201,758
%
The Construction Manager at Olympic High
School is progressing with building slab on
grade installation. The footings and
foundations are complete. The under slab
utilities are being installed. This project will
include core classrooms and six (6)
specialized Career, Technology, Education
(CTE) areas. The classroom addition is
scheduled for occupancy August 2016.
August 2016
Construction of a 20-classroom addition and ADA
renovation of the auditorium.
Olympic High School (13)
$
8,964,000
Complete
15
%
Project is complete.
August 2014
A new 39 classroom elementary school. This project
relieves overcrowding at Winget Park ES and Lake Wylie
ES.
Palisades Park Elementary
School
100
Complete
$
17,110,905
%
Printed on: 12/23/2015
* Current Budget includes all budget allocations to the facilities included within the 96/97 Bond; 99 COPs; 00, 02, 07 & 13 Bonds; and 04, 05, 06, 07 & 08 COPs.
Page No. 4
** Blank Occupy on Dates designate projects without construction funding or awaiting determination of County bond sales.
Projects completed prior to August 2014 are no longer represented on this report.
Monthly Project Status
Summary November 2015
Project Status
Construction
Progress
Design
Phase
** Occupy
On
Project Scope
Current Project
Estimate
Project
The new Parkside Elementary School is
complete. The students and staff
successfully occupied the facility in August
2015. Project closeout is progressing and
the Construction Manager has finalized the
building commissioning.
August 2015
A new 39 classroom elementary school. This project
relieves overcrowding at Highland Creek ES.
Parkside Elementary School
$
18,585,600
Complete
99
%
Project currently planned to be funded by the
County in FY17.
August 2019
This project will bring Ashley Park, Bruns Avenue, WG
Byers, Druid Hills, Reid Park and Westerly Hills up to Pre
K-8 standards including gymnasium; exploratory and arts
classrooms; technology classrooms; cafeteria
upgrades/expansion.
PK8 Conversion Phase II
(13)
0
$
24,732,000
%
The Construction Manager at Ranson Middle
School is preparing the final chagne order for
final payment to be made. All other closeout
documents are complete.
August 2015
This project includes the design and construction for major
renovation to the existing facility, a new classroom building
and required demolition. The project also includes
modifications to the parking lots and associated site work.
Ranson Middle School (07)
$
19,826,853
Complete
99
%
The Security Enhancement project is 97%
complete overall. Bi-directional amplifiers
and selective high school camera sysetm
upgrades are currently in progress.
August 2014
Project includes the implementation of security cameras,
student and staff identification systems, electronic access
and visitor management systems. The project also
includes installation of bidirectional amplifiers to improve
communication.
Security Enhancement
Project
99
Complete
$
19,118,772
%
Project currently planned to be funded by the
County in FY17.
January 2018
This project includes comprehensive renovation of the
original 12-classroom building currently in use; improve
condition of existing facility and removal of buildings
beyond economical repair; bring school to new baseline.
Selwyn Elementary School
(13)
0
$
2,592,000
%
The design for the additions at South
Mecklenburg High School continues in the
design development phase. Additional
survey information has been obtained and
furnished to the architect. A follow-up meeting
with the Principal and school staff is
scheduled in December to re-review their
scope and site logistic concerns.
August 2018
This project includes new kitchen and cafeteria building;
new three-story, 30-classroom building; demolition of
buildings; improve facility condition.
South Mecklenburg High
School (13)
0
Schematic
$
18,860,000
%
The Construction Manager at new Statesville
Road Elementary School completed the
installation of the slab on grade activities and
has poured the first elevated slab. The
classroom first floor overhead mechanical,
plumbing and electrical began and will
continue for several months. The load
bearing masonry, structural steel and metal
decking is complete. This new school is
scheduled for occupancy August 2016.
August 2016
This project includes the design and construction of a
39-classroom replacement facility.
Statesville Road ES (13)
$
19,929,450
Complete
47
%
Printed on: 12/23/2015
* Current Budget includes all budget allocations to the facilities included within the 96/97 Bond; 99 COPs; 00, 02, 07 & 13 Bonds; and 04, 05, 06, 07 & 08 COPs.
Page No. 5
** Blank Occupy on Dates designate projects without construction funding or awaiting determination of County bond sales.
Projects completed prior to August 2014 are no longer represented on this report.
Monthly Project Status
Summary November 2015
Project Status
Construction
Progress
Design
Phase
** Occupy
On
Project Scope
Current Project
Estimate
Project
The project is complete.
January 2015
Construction of a multi-story 25 classroom building
addition.
Vance High School
$
10,048,875
Complete
100
%
Project is complete.
August 2014
Construction of a new 4000 seat stadium and field house
including concession stands and restroom facilities and
installation of artificial turf.
West Mecklenburg High
$
8,651,203
Complete
100
%
Printed on: 12/23/2015
* Current Budget includes all budget allocations to the facilities included within the 96/97 Bond; 99 COPs; 00, 02, 07 & 13 Bonds; and 04, 05, 06, 07 & 08 COPs.
Page No. 6
** Blank Occupy on Dates designate projects without construction funding or awaiting determination of County bond sales.
Projects completed prior to August 2014 are no longer represented on this report.
MONTHLY PROJECT
PHOTOS
P
ROJECT
P
ROGRESS
P
HOTOS
Myers Park High School
P
ROJECT
P
ROGRESS
P
HOTOS
Myers Park High School
P
ROJECT
P
ROGRESS
P
HOTOS
Myers Park High School
P
ROJECT
P
ROGRESS
P
HOTOS
Myers Park High School
P
ROJECT
P
ROGRESS
P
HOTOS
Statesville Road Elementary School
P
ROJECT
P
ROGRESS
P
HOTOS
Statesville Road Elementary School
P
ROJECT
P
ROGRESS
P
HOTOS
Statesville Road Elementary School
P
ROJECT
P
ROGRESS
P
HOTOS
Statesville Road Elementary School
P
ROJECT
P
ROGRESS
P
HOTOS
Statesville Road Elementary School
P
ROJECT
P
ROGRESS
P
HOTOS
Nations Ford Elementary School
P
ROJECT
P
ROGRESS
P
HOTOS
Nations Ford Elementary School
P
ROJECT
P
ROGRESS
P
HOTOS
Nations Ford Elementary School
P
ROJECT
P
ROGRESS
P
HOTOS
Nations Ford Elementary School
P
ROJECT
P
ROGRESS
P
HOTOS
Nations Ford Elementary School
P
ROJECT
P
ROGRESS
P
HOTOS
Olympic High School
P
ROJECT
P
ROGRESS
P
HOTOS
Olympic High School
P
ROJECT
P
ROGRESS
P
HOTOS
Olympic High School
M/WBE PARTICIPATION
REPORT
Contract
Status
Report
‐
MWBE
Participation
Commitments
Report
Date
12/8/2015
12/8/2015
11:51:38
AM
November
2015
Monthly
Report
Charlotte
‐
Mecklenburg
Schools
2007
&
2013
Bond
Projects
Facility
Contract
Amount
African
American
MBE$
Other
MBE
$
Other
WBE
$
Other
SBE
$
Total
Total
MBE
$
%
%
%
%
%
%
$737,319
$907,900
5.17%
4.20%
9.37%
$1,633,705
9.30%
$116,969
0.67%
$3,395,893
19.33%
$17,567,114
$1,645,219
Alexander
Graham
Middle
School
('0
$8,266
$93,540
1.28%
0.11%
1.39%
$842,819
11.52%
$735,212
10.05%
$1,679,837
22.96%
$7,315,259
$101,806
Atrium
$84,723
$1,530,927
11.02%
0.61%
11.63%
$854,477
6.15%
$822,316
5.92%
$3,292,443
23.71%
$13,887,451
$1,615,650
Bain
Elementary
School
$1,145,722
$19,125
0.13%
7.75%
7.87%
$1,429,668
9.66%
$190,260
1.29%
$2,784,775
18.83%
$14,792,620
$1,164,847
Berewick
Elementary
School
(E07
‐
01
$0
$0
0.00%
0.00%
0.00%
$0
0.00%
$0
0.00%
$0
0.00%
$549
$0
Davidson
K
‐
8
Conversion
(13)
$74,878
$414
0.01%
1.84%
1.85%
$942,081
23.20%
$234,077
5.76%
$1,251,450
30.81%
$4,061,249
$75,292
East
Mecklenburg
High
School
(07)
$0
$0
0.00%
0.00%
0.00%
$0
0.00%
$0
0.00%
$0
0.00%
$846,760
$0
East
Mecklenburg
High
School
(13)
$466,031
$1,110,046
8.07%
3.39%
11.46%
$3,835,813
27.88%
$1,209,832
8.79%
$6,621,723
48.13%
$13,758,109
$1,576,077
Garinger
High
School
('02)
$506
$0
0.00%
0.04%
0.04%
$0
0.00%
$1,577
0.13%
$2,083
0.18%
$1,181,421
$506
Garinger
High
School
(07)
‐
Track
&
F
$266,940
$160,946
1.20%
1.98%
3.18%
$2,187,776
16.26%
$12,344
0.09%
$2,628,005
19.53%
$13,457,911
$427,886
Grand
Oak
Elementary
School
(E07
‐
0
$545,824
$2,970,406
19.71%
3.62%
23.33%
$2,770,643
18.38%
$203,046
1.35%
$6,489,919
43.05%
$15,074,242
$3,516,229
Hawthorne
High
School
$256,393
$996
0.00%
0.51%
0.52%
$45,032,364
90.39%
$0
0.00%
$45,289,753
90.91%
$49,820,296
$257,389
Hough
High
School
(H07
‐
02)
$403
$0
0.00%
0.01%
0.01%
$478,960
16.57%
$0
0.00%
$479,363
16.59%
$2,889,701
$403
IAQ/Asbestos
Removal
$62,922
$74,592
0.58%
0.49%
1.07%
$1,254,203
9.79%
$158,363
1.24%
$1,550,079
12.10%
$12,808,594
$137,514
Independence
High
School
(07)
$1,286
$12,000
0.67%
0.07%
0.74%
$131,370
7.35%
$0
0.00%
$144,656
8.10%
$1,786,640
$13,286
J.M.
Alexander
Middle
School
(13)
$1,354,208
$889,694
4.66%
7.09%
11.74%
$8,363,357
43.77%
$3,390
0.02%
$10,610,649
55.53%
$19,108,177
$2,243,902
Lawrence
Orr
Elementary
School
$426,284
$2,387,849
11.84%
2.11%
13.95%
$5,323,849
26.39%
$2,123,069
10.52%
$10,261,051
50.87%
$20,172,706
$2,814,133
McClintock
Middle
School
(07)
$2,833,665
$1,521,124
6.26%
11.66%
17.91%
$2,831,375
11.65%
$137,470
0.57%
$7,323,633
30.13%
$24,308,178
$4,354,788
Myers
Park
High
School
(07)
$13,895
$0
0.00%
0.77%
0.77%
$0
0.00%
$0
0.00%
$13,895
0.77%
$1,803,151
$13,895
Myers
Park
High
School
(13)
$807,202
$2,344,023
14.00%
4.82%
18.82%
$2,358,800
14.09%
$479,801
2.87%
$5,989,826
35.78%
$16,740,000
$3,151,225
Nations
Ford
Elementary
School
(at
$210,000
$12,790
0.70%
11.54%
12.24%
$17,469
0.96%
$0
0.00%
$240,259
13.20%
$1,819,616
$222,790
New
Language
Immersion
K
‐
8
Albem
$40,700
$22,260
1.11%
2.03%
3.15%
$122,210
6.11%
$0
0.00%
$185,170
9.26%
$2,000,444
$62,960
New
PK
‐
8
Berryhill/Reid
Park
Relief
(
$0
$0
0.00%
0.00%
0.00%
$0
0.00%
$0
0.00%
$0
0.00%
$99,864
$0
New
STEAM
K
‐
8
(13)
$127,072
$728,682
4.14%
0.72%
4.86%
$2,697,503
15.32%
$2,075
0.01%
$3,555,332
20.19%
$17,608,268
$855,754
Newell
Elementary
School
(07)
$0
$0
0.00%
0.00%
0.00%
$0
0.00%
$0
0.00%
$0
0.00%
$38,689
$0
Northridge
Middle
School
(13)
Facility
Contract
Amount
African
American
MBE$
Other
MBE
$
Other
WBE
$
Other
SBE
$
Total
Total
MBE
$
%
%
%
%
%
%
$6,012
$0
0.00%
0.54%
0.54%
$0
0.00%
$4,687
0.42%
$10,699
0.96%
$1,113,538
$6,012
Northwest
School
of
the
Arts
(13)
$111,867
$252,000
8.69%
3.86%
12.54%
$880,714
30.36%
$0
0.00%
$1,244,581
42.90%
$2,900,884
$363,867
Oakhurst
STEAM
Magnet
ES/Starmo
$203,857
$652,495
7.64%
2.39%
10.03%
$4,058,474
47.55%
$234,155
2.74%
$5,148,981
60.33%
$8,535,057
$856,352
Olympic
High
School
(07)
‐
Stadium,
$43,000
$0
0.00%
0.56%
0.56%
$48,250
0.63%
$0
0.00%
$91,250
1.19%
$7,686,455
$43,000
Olympic
High
School
(13)
$601,406
$108,182
0.74%
4.13%
4.87%
$1,533,140
10.52%
$1,872
0.01%
$2,244,600
15.40%
$14,572,753
$709,589
Palisades
Park
Elementary
School
$1,324,720
$197,699
1.30%
8.70%
10.00%
$3,182,662
20.90%
$588,474
3.86%
$5,293,555
34.76%
$15,229,655
$1,522,419
Parkside
Elementary
School
$148,490
$192,774
1.38%
1.06%
2.44%
$2,135,294
15.24%
$173,853
1.24%
$2,650,411
18.91%
$14,014,300
$341,264
Pineville
Elementary
School
$765,047
$304,884
1.70%
4.27%
5.97%
$2,599,768
14.50%
$89,473
0.50%
$3,759,172
20.97%
$17,928,778
$1,069,931
Ranson
Middle
School
(07)
$2,786,258
$1,661,047
8.76%
14.70%
23.46%
$3,010,018
15.88%
$57,720
0.30%
$7,515,042
39.64%
$18,956,885
$4,447,305
Ridge
Road
Middle
School
$101,386
$684
0.01%
0.84%
0.84%
$11,273,598
92.88%
$10,716
0.09%
$11,386,385
93.81%
$12,137,816
$102,070
River
Gate
Elementary
School
(E07
‐
0
$115,055
$1,005,204
8.26%
0.95%
9.21%
$2,092,340
17.20%
$1,498,398
12.31%
$4,710,997
38.72%
$12,167,896
$1,120,259
River
Oaks
Academy
(E07
‐
02)
$487,726
$2,596,631
5.45%
1.02%
6.48%
$3,677,550
7.72%
$2,166,528
4.55%
$8,928,435
18.75%
$47,623,491
$3,084,357
Rocky
River
High
School
(H07
‐
01)
$0
$40,304
0.33%
0.00%
0.33%
$2,418,384
20.10%
$678,577
5.64%
$3,137,265
26.07%
$12,032,875
$40,304
Security
Enhancement
Project
$74,500
$0
0.00%
6.33%
6.33%
$14,125
1.20%
$0
0.00%
$88,625
7.54%
$1,176,170
$74,500
South
Mecklenburg
High
School
(13)
$1,045,494
$297,235
1.71%
6.01%
7.72%
$3,977,601
22.88%
$78,296
0.45%
$5,398,626
31.06%
$17,381,644
$1,342,729
Statesville
Road
ES
(13)
$99,160
$104,468
0.83%
0.79%
1.62%
$2,223,242
17.71%
$14,522
0.12%
$2,441,391
19.45%
$12,555,182
$203,627
Stoney
Creek
Elementary
School
(E0
$164,480
$921,975
10.34%
1.85%
12.19%
$1,760,409
19.75%
$280,688
3.15%
$3,127,552
35.09%
$8,913,901
$1,086,455
Vance
High
School
$143,786
$920,433
11.55%
1.80%
13.36%
$3,437,069
43.14%
$174,120
2.19%
$4,675,408
58.69%
$7,966,343
$1,064,219
West
Mecklenburg
High
$249,752
$161,733
0.94%
1.46%
2.40%
$2,402,011
14.00%
$1,676,442
9.77%
$4,489,938
26.17%
$17,154,076
$411,485
Whitewater
Middle
School
$522,994,708
$24,205,060
$17,936,237
$42,141,297
$133,833,092
$14,158,320
Grandtotal
4.63%
3.43%
8.06%
25.59%
2.71%
$190,132,709
36.35%
CHARLOTTE-MECKLENBURG BOARD OF EDUCATION 2002 BOND SERIES-CAPITAL IMPROVEMENT PROGRAM
BUDGET STATUS REPORT
Original Project Estimate Current Project Estimate Committed Amount Approved Change Orders Total Committed Pending Commitments To Be Committed Previous
Paid To Date Paid to Date
Balance to Complete
Monthly Expenditure
(A) (B) (C) (D) (E)=(C+D) (F) (G)=(B-E-F) (H) (I) (J)=(B-I) (K)=(I-H)
A. REPLACEMENT & RENOVATIONS
1. Albemarle Road Elementary 4,428,000 3,997,143 3,478,888 518,255 3,997,143 0 0 3,997,143 3,997,143 0 0
2. Alexander Graham Middle equity des, façade 2,512,000 2,512,000 2,041,902 470,098 2,512,000 0 0 2,512,000 2,512,000 0 0
3. Alexander Middle equity design 1,112,000 421,051 976,413 (555,362) 421,051 0 0 421,051 421,051 0 0
4. Berryhill Elementary equity 7,256,000 3,717,914 3,164,109 553,805 3,717,914 0 0 3,717,914 3,717,914 0 0
5. Butler High 0 453,917 453,917 0 453,917 0 0 453,917 453,917 0 0
6. Carmel Middle structural repair, equity 16,598,000 16,519,163 15,282,451 1,236,712 16,519,163 0 0 16,519,163 16,519,163 0 0
7. Clear Creek Elementary equity 6,822,000 5,410,864 4,874,738 536,126 5,410,864 0 0 5,410,864 5,410,864 0 0
8. Cochrane Middle equity design 998,000 958,897 869,611 89,286 958,897 0 0 958,897 958,897 0 0
9. Cotswold Elementary equity 8,698,000 9,169,740 8,327,131 842,609 9,169,740 0 0 9,169,740 9,169,740 0 0
10. M.G. Davis Middle 0 528,131 684,905 (156,774) 528,131 0 0 528,131 528,131 0 0
Dilworth Elementary equity 5,995,000 5,976,712 5,151,510 825,202 5,976,712 0 0 5,976,712 5,976,712 0 0
12. First Ward Elementary 0 426,502 408,491 18,011 426,502 0 0 426,502 426,502 0 0
13. Garinger High equity Phase II design 760,000 760,000 748,127 11,873 760,000 0 0 760,000 760,000 0 0
14. Hickory Grove Elementary ( R ) 10,529,000 9,557,692 9,471,885 85,807 9,557,692 0 0 9,557,692 9,557,692 0 0
15. Hidden Valley Elementary plbg, hvac, elect 4,993,000 3,268,775 2,991,760 277,015 3,268,775 0 0 3,268,775 3,268,775 0 0
16. Huntingtowne Farms Elementary equity 6,714,000 6,575,675 6,149,115 426,560 6,575,675 0 0 6,575,675 6,575,675 0 0
17. Long Creek Elementary equity design 1,064,000 466,856 479,536 (12,680) 466,856 0 0 466,856 466,856 0 0
18. North Meck High equity Phase I design 760,000 760,000 808,122 (48,122) 760,000 0 0 760,000 760,000 0 0
19. Northeast Middle equity 10,790,000 12,632,629 11,086,522 1,546,107 12,632,629 0 0 12,632,629 12,632,629 0 0
20. Oakdale Elementary equity 11,300,000 12,440,395 11,620,090 820,305 12,440,395 0 0 12,440,395 12,440,395 0 0
21. Pinewood Elementary replacement ( R ) 11,505,000 9,915,762 9,903,370 12,392 9,915,762 0 0 9,915,762 9,915,762 0 0
22. Quail Hollow Middle equity 10,847,000 11,038,509 10,068,849 969,660 11,038,509 0 0 11,038,509 11,038,509 0 0
23. Randolph Middle equity 9,392,000 8,951,935 7,915,374 1,036,561 8,951,935 0 0 8,951,935 8,951,935 0 0
24. Reedy Creek Elementary equity 7,716,000 5,407,002 5,175,736 231,266 5,407,002 0 0 5,407,002 5,407,002 0 0
25. Sedgefield Middle equity design 1,064,000 1,053,928 937,437 116,491 1,053,928 0 0 1,053,928 1,053,928 0 0
26. Sharon Elementary equity 6,231,000 4,749,965 4,658,425 91,540 4,749,965 0 0 4,749,965 4,749,965 0 0
27. Tuckaseegee Elementary equity 6,416,000 6,351,225 6,262,343 88,882 6,351,225 0 0 6,351,225 6,351,225 0 0
28. Windsor Park Elementary replacement ( R ) 11,712,000 10,009,976 9,932,800 77,176 10,009,976 0 0 10,009,976 10,009,976 0 0
29. Winterfield Elementary equity 8,935,000 8,815,066 8,764,116 50,950 8,815,066 0 0 8,815,066 8,815,066 0 0
Total Replacement & Renovations 175,147,000 162,847,424 152,687,671 10,159,753 162,847,424 0 0 162,847,424 162,847,424 0 0
B. RESPONSE TO ENROLLMENT GROWTH
1. Highland Creek Elementary E02-01 1,064,000 1,036,946 518,476 518,470 1,036,946 0 0 1,036,946 1,036,946 0 0
2. New Elementary School design E02-02 (Idlewild) 1,064,000 638,653 647,017 (8,364) 638,653 0 0 638,653 638,653 0 0
3. JV Washam Elementary (Westmoreland) 0 995,735 (535,545) 1,531,280 995,735 0 0 995,735 995,735 0 0
4. Winget Park Elementary 0 18,101 (379,497) 397,598 18,101 0 0 18,101 18,101 0 0
5. Barnette Elementary (fka New Bradley Elementary School) 0 150,728 135,693 15,035 150,728 0 0 150,728 150,728 0 0
6. Bailey Middle M02-01 13,300,000 12,997,098 12,522,506 474,592 12,997,098 0 0 12,997,098 12,997,098 0 0
7. New High School design H02-01 (Ardrey Kell) 2,500,000 2,439,036 2,131,178 307,858 2,439,036 0 0 2,439,036 2,439,036 0 0
8. New High School design H02-02 (Mallard Creek) 2,500,000 11,756,950 3,991,809 7,765,141 11,756,950 0 0 11,756,950 11,756,950 0 0
Total Response to Enrollment Growth 20,428,000 30,033,247 19,031,637 11,001,610 30,033,247 0 0 30,033,247 30,033,247 0 0
C. OTHER CAPITAL NEEDS
1. Plumbing Replacement 525,000 523,134 356,027 167,107 523,134 0 0 523,134 523,134 0 0
2. Roof Replacement Program 768,000 752,099 713,076 39,023 752,099 0 0 752,099 752,099 0 0
3. HVAC Replacement Program 1,480,000 3,045,000 3,143,162 (98,162) 3,045,000 0 0 3,045,000 3,045,000 0 0
4. Fire Alarm Systems 226,000 222,208 192,220 29,988 222,208 0 0 222,208 222,208 0 0
5. ADA Compliance Program 300,000 293,835 293,330 505 293,835 0 0 293,835 293,835 0 0
6. Structural Improvements (Devonshire Elem.) 1,855,000 1,578,928 1,359,066 219,862 1,578,928 0 0 1,578,928 1,578,928 0 0
7. High School Track Resurface 1,100,000 1,100,000 831,000 269,000 1,100,000 0 0 1,100,000 1,100,000 0 0
8. Middle School Track Resurface 910,000 909,979 909,979 0 909,979 0 0 909,979 909,979 0 0
9. Instructional Technology 3,740,000 3,995,636 4,082,654 (87,018) 3,995,636 0 0 3,995,636 3,995,636 0 0
Mobile Classroom Replacement 3,600,000 3,594,958 3,592,878 2,080 3,594,958 0 0 3,594,958 3,594,958 0 0
Stadium Renovations 4,500,000 4,495,466 4,478,547 16,919 4,495,466 0 0 4,495,466 4,495,466 0 0
Paving & Sitework 421,000 421,000 286,992 134,008 421,000 0 0 421,000 421,000 0 0
Structural Improvements 0 4,712,305 1,232,919 3,479,386 4,712,305 0 0 4,712,305 4,712,305 0 0
Total Other Capital Needs 19,425,000 25,644,548 21,471,850 4,172,698 25,644,548 0 0 25,644,548 25,644,548 0 0
D. CONTINGENCY 9,000,000 5,474,781 5,185,961 288,820 5,474,781 0 0 5,474,781 5,474,781 0 0
PROGRAM TOTAL $ 224,000,000 $ 224,000,000 $ 198,377,119 $ 25,622,881 $ 224,000,000 $ 0 $ 0 $ 224,000,000 $ 224,000,000 $ 0 $ 0
Bond Year Total
(R)These schools are total replacement schools.
Original Project estimated costs as outlined in the January 28, 2003, Capital Project Ordinance Amendments approved by the Board of Education on January 28, 2003. 11. 13. 10. 11. 12. As of 11/30/15
CHARLOTTE-MECKLENBURG BOARD OF EDUCATION 2006 2007 CERTIFICATES OF PARTICIPATION
BUDGET STATUS REPORT
Original Project Estimate Current Project Estimate Committed Amount Approved Change Orders Total Committed Pending Commitments To Be Committed Previous
Paid To Date Paid to Date
Balance to Complete
Monthly Expenditure
(A) (B) (C) (D) (E)=(C+D) (F) (G)=(B-E-F) (H) (I) (J)=(B-I) (K)=(I-H)
2006 CERTIFICATES OF PARTICIPATION
A. RENOVATION OF EXISTING SPACE FOR EDUCATIONAL APPROPRIATENESS
1. Cochrane Middle 17,956,000 14,533,773 13,315,061 1,218,712 14,533,773 0 0 14,533,773 14,533,773 0 0
2. Harding High (Preconstruction) 1,061,895 2,290,389 2,451,542 (161,153) 2,290,389 0 0 2,290,389 2,290,389 0 0
3. Idlewild Elementary Preconstruction) 1,642,637 3,102,510 3,137,795 (35,285) 3,102,510 0 0 3,102,510 3,102,510 0 0
4. Long Creek Elementary (Preconstruction) 1,360,000 1,359,973 1,360,541 (568) 1,359,973 0 0 1,359,973 1,359,973 0 0
5. Sedgefield Middle (Phase I) 14,000,000 13,357,797 12,440,275 917,522 13,357,797 0 0 13,357,797 13,357,797 0 0
Total Renovation of Existing Space For Educational Appropriateness 36,020,532 34,644,442 32,705,215 1,939,227 34,644,442 0 0 34,644,442 34,644,442 0 0
B. RESPONSE TO ENROLLMENT GROWTH
1. Alexander Graham Middle (Phase 1) 9,300,000 9,036,887 8,549,153 487,734 9,036,887 0 0 9,036,887 9,036,887 0 0
2. North Mecklenburg High (Phase I) 9,300,000 9,137,782 8,729,339 408,443 9,137,782 0 0 9,137,782 9,137,782 0 0
3. South Mecklenburg (Preconstruction) 744,000 2,033,630 2,150,943 (117,313) 2,033,630 0 0 2,033,630 2,033,630 0 0
4. Land Acquisition 19,200,000 16,059,349 15,958,138 101,211 16,059,349 0 0 16,059,349 16,059,349 0 0
5. Whitewarter Academy (fka New Belmeade Road Elementary) 16,500,000 15,049,621 13,652,447 1,397,174 15,049,621 0 0 15,049,621 15,049,621 0 0
6. Barnette Elementary (fka New Bradley Elementary) 15,500,000 13,413,833 12,889,495 524,338 13,413,833 0 0 13,413,833 13,413,833 0 0
7. Croft Community School (fka New Hucks Road Elementary) 16,600,000 14,198,163 13,658,644 539,519 14,198,163 0