(1)

period Biogas Plant

BASILIANO

Italy 2012 triticale- and

cornsilage Concrete tank 2,450 m³ Gas engine 625 kWel

Agricultural biogas plant 1 first digester and 1 secondary digester with gas holder, 1 storage tank, thermophilic operation, heat usage

Detailde and construction plans, supervision of construction, start-up

Biogas Plant RIHA

Germany 2012 cattle manure,

cornsilage Steel tank enameled 1,500 m³ Gas engine 2 x 252 kWel

Agricultural biogas plant 1 first digester and 1 secondary digester with gas holder, 1 storage tank, mesophilic operation, heat usage

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up

Biogas Plant DIETZ

Germany 2012 cattle manure,

cattle dung, gras-, triticale- and cornsilage Concrete tank 2,597 m³ Gas engine 191 kWel

Agricultural biogas plant 1 first digester and 2 secondary digester with gas holder, 1 storage tank, mesophilic operation, heat usage

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up

Biogas Plant MEZDRA

Bulgaria 2012 cattle manure, corn

silage

Steel tank 2 x 4,580 m³

Gas engine 3 x 800 kWel

Agricultural biogas plant 2 first digester and 1 secondary digester with gas holder, thermophilic

operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up

Biogas Plant RUDA

Italy 2012 triticale- and

cornsilage

Steel tank 4,970 m³

Gas engine 999 kWel

Agricultural biogas plant 1 first digester and 1 secondary digester with gas holder, 1 storage tank, thermophile operation, heat usage

Detailed and construction plans, supervision of construction, start-up

(2)

period Biogas Plant

TORRE SANTAMARIA

Spain 2011 cattle manure, corn

silage

Concrete tank 2,100 m³

Gas engine 190 kWel

Agricutural biogas plant, Gas holder above first digester, mesophilic operation

Conception, detailed and final construction plans, start-up

Biogas Plant OTTERBEIN

Germany 2011 pig manure, cattle

dung, gras silage, corn silage, corn crop, whole crop silage, fodder mixture

Concrete tank 1,206 m³

dual fuel co-generator 265 kWel, (inkluding 30 kWel additional power of gas turbine)

first and secondary digester, storage, dual fuel

co-generator with additional power of gas turbine, heat usage

permission, technical advice for preplanning and final construction plans

Biogas Plant NEIßETAL

Germany 2010/11 pig manure, pig dung, cattle dung, lucerne silage, corn silage, sugar beet

Steel tank enameled 3,033 m³

Gas engine 716 kWel

Gas holder above secondary digester and storage tank, heat usage, mesophilic operation

Conception, preplanning,permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

ADENSEN II

Germany 2010 cornsilage Concrete

tank 2,400 m³

Gas engine 400 kWel

Extention of a biogas plant: co-generator, first and secondary digester

Conception, preplanning,permission, detailed and final construction plans, supervision of construction

Biogas Plant FORCATE

Italy 2010 gras-, corn silage Steel tank

1,726 m³

Gas engine 365 kWel

Gas holder above secondary digester, separation, thermophilic operation

Conception, detailed and final construction plans, supervision of construction, start-up

Biogas Plant SEMD

Germany 2009/10 corn silage Prestressed

concrete, prefabricated element tank 2,473 m³ injecting biomethane into the natural gas grid

Gas holder above first, secondary digester and digestate storage, mesophilic operation, gas conditioning, biogas

functional tender, award and supervision of construction, project management, final acceptance

(3)

period Biogas Plant

FALKENSTEIN

Germany 2008 corn silage, wheat

silage, sweet sorghum Steel tank 2 x 3,126 m³ Gas engine 2 x 716 kWel

Gas holder above secondary digester,

thermophilic operation, heat usage

Conception, preplanning, detailed and final construction plans, supervision of construction, start-up

Biogas Plant LORSCH

Germany 2008 corn silage, cattle

manure Concrete tank 1,593 m³ Gas engine 370 kWel

Gas holder above secondary digester, thermophilic operation, heat usage

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

GUT ALTENHOF

Germany 2007 corn silage, wheat

silage, grass silage

concrete tank 1,470 m³

Gas engine 365 kWel

Gas holder above secondary digester,

thermophilic operation, heat usage

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

WEIß II

Germany 2006/07 corn silage, grass silage, pig manure, cattle dung

Concrete tank 1,090 m³

Dual fuel co-generator, 250 kW

Extention of the waste digestion plant

Conception, detailed and final construction plans, start-up Biogas Plant

WIESENAU II

Germany 2007 cattle manure,

dung, wheat, corn silage

Steel tank 4,300 m³

Gas engine 2 x 526 kWel

Extention of the waste digestion plant

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

RIEDLINGEN

Germany 2007 cattle manure, corn

silage, grass silage, crop silage

Steel tank 4,300 m³

Gas engine 2 x 526 kWel

Gas holder above

secondary Digester, energy recovery of heat,

thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

AMELN

Germany 2006 corn silage, wheat

silage Steel tank 2.560 m³ Gas engine 650 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up

(4)

period Biogas Plant

SCHENK

Germany 2006 corn silage, grass

silage, wheat silage

Concrete tank 785 m³

Gas engine 190 kWel

Gas holder above secondary digester, heat usage, thermophilic Operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

THANNER

Germany 2006 corn silage, grass

silage, wheat silage

Concrete tank 1.357 m³

Gas engine 350 kWel

Gas holder above secondary digester, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

BAILER

Germany 2006 corn silage, wheat

silage

Conrete tank 785 m³

Gas engine 191 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

HOTTELN

Germany 2006 corn silage Concrete

tank 2.155 m³

Gas engine 536 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

BUCHLOE

Germany 2006 corn silage, grass

silage, wheat silage

Concrete tank 4.610 m³

Gas engine 2*526 kWel

Gas holder above secondary digester and storage tank, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

EICKHOFF

Germany 2006 corn silage Concrete

tank 2.155 m³

Gas engine 526 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

SECHZEHNEICHEN

Germany 2007 corn silage, grass

silage, wheat silage

Concrete tank 2.155 m³

Gas engine 536 kWel

Gas holder above secondary digester, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up

(5)

period Biogas Plant

BAESWEILER

Germany 2006 corn silage, wheat

silage Concrete tank 2.155 m³ Gas engine 536 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

ADENSEN

Germany 2006 corn silage Concrete

tank 1.357 m³

Gas engine 370 kWel

Gas Holder above secondary Digester, mesophilic Operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

HORGAU

Germany 2006 corn silage, grass

silage, wheat silage

Concrete tank 2.649 m³

Gas engine 536 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

STÖLZLE

Germany 2006 corn silage, grass

silage, wheat silage

Concrete tank 1.045 m³

dual fual co-generator 250 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

WANGEN

Germany 2006 cattle manure, corn

silage, grass silage

Concrete tank 2.562 m³

Gas engine 370 kWel dual fual co-generator 250 kWel

Gas holder above secondary digester and storage tank, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up

Biogas Plant PFEIFFER

Germany 2005 corn silage, grass

silage, crop silage

Concrete tank 1.357 m³

Dual fuel co-generator 2 * 180 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

HÖRNLE

Germany 2005 corn silage, grass

silage, wheat silage

Concrete tank 709 m³

Gas engine 180 kWel

Gas holder above secondary digester, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up

(6)

period Biogas Plant

DECKER

Germany 2005 corn silage, wheat

silage Concrete tank 1.357 m³ Gas engine 360 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

BUCHMANN

Germany 2005 corn silage, grass

silage, wheat silage, pig manure Concrete tank 573 m³ Gas engine 110 kWel

Gas Holder above secondary Digester, heat usage, mesophilic Operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

MILLER

Germany 2005 clovergrass silage,

corn silage Concrete tank 1.470 m³ Gas engine 360 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

NOOTBAAR

Germany 2005 corn silage Concrete

tank 950 m³

dual fuel co-generator 2 x 110 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

WEBER

Germany 2005 corn silage, grass

silage, wheat silage

Concrete tank 785 m³

Gas engine 2*90 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

EICHENHOFER

Germany 2004/05 corn silage, grass silage Concrete tank 508 m³ Gas engine 125 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

WIESENAU

Germany 2004/05 cattle manure, cattle dung, corn silage, grass silage

Concrete tank 2.615 m³

gas engine 526 kWel

Gas holder above secondary digester, heat usage, mesophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up

(7)

period Biogas Plant

BÖCKERMANN II

Germany 2004/05 pig manure, corn silage

Steel tank 4.070 m³

gas engine 2 x 536 kWel

Large-scale plant, Gas holder above secondary digester, energy recovery of heat, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up

Biogas Plant FAKLER

Germany 2004/05 corn silage, grass silage, wheat silage

Concrete tank 1.045 m³

gas engine 250 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

FREY

Germany 2004/05 corn silage, grass silage, wheat silage

Concrete tank 1.530 m³

Gas engine 330 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

DOBLER

Germany 2004/05 corn silage, grass silage Concrete tank 745 m³ Gas engine 2 x 90 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

KORNMAYER

Germany 2004/05 cattle manure, cattle dung, corn silage and grass cut

Concrete tank 622 m³ dual fuel co-generator 40 kWel

energy recovery of heat, mesophilic operation, storage tank

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

MENZ

Germany 2004/05 pig manure, cattle manure, corn and grass silage Concrete tank 997 m³ Gas engine 250 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

LEUTER

Germany 2004/05 pig manure, pig dung, corn and crop silage Concrete tank 402 m³ dual fuel co-generator 100 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up

(8)

period Biogas Plant

BIOENERGIE HEHLEN

Germany 2004/05 corn silage Concrete

tank, 2.000 m³

Gas engine 536 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

NATURGAS HEHLEN

Germany 2004/05 corn silage Concrete

tank, 2.000 m³

Gas engine 536 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

GRIMM + SCHÖNDIENST

Germany 2004/05 pig manure, energy crop, dung Concrete tank 903 m³ Gas engine 2 x 100 kWel

Gas holder above secondary digester, heat usage, thermophilic operation

Conception, preplanning, permission, detailed and final construction plans, supervision of construction, start-up Biogas Plant

HOLLANDHOF

Germany 2004 Pig dung, turkey

dung , energy crop

Concrete tank 350 m³

Gas engine, 60 kW

Gas holder above secondary digester, heat usage, thermophilic operation

Detailed final construction plans, supervision of construction, start-up

Biogas Plant BIOENERGIEDORF JÜHNDE

Germany 2004 manure, energy

crop Concrete tank 2.750 m³ Gas engine, 500 kW

Supplies heat to the village Conception, permission, detailed and final construction plans, preparation of the orders

Biogas Plant CUDWORTH PORK

Saskatoon, Canada

2003 Manure, potatoes Steel tank, 2.000 m³

microgas tubine 4 x 30 kW

Gas Holder above secondary Digester

Conception, preplanning, permission, detailed final construction plans, supervision of construction, start-up Biogas Plant

VAN GENNIP

Germany 2003 Pig manure, fats,

cornsilage, dung Steel tank, 4.300m³ gas engines 167 kW 2 x 344 kW

Gas holder above secondary digester, heat usage

Conception, preplanning, permission, detailed final construction plans, supervision of erection, start-up Biogas Plant

MILCHHOF

Germany 2002 Manure, corn Stainless

steel tank,

Dual fuel co-generator, 110

Gas holder above

secondary digester, solids

Conception, permission, detailed final construction plans

(9)

period Biogas Plant

KOERBER-HARRIEHAUSEN

Germany 2002 Gras, energy crops

in general

Concrete tank, 630 m³

Dual fuel co-generator, 110 kW

Gas holder above

secondary digester, solids input device, heat usage

Conception, preplanning, permission, detailed final construction plans, supervision of construction, start-up Biogas Plant

TODENDORF

Germany 2002 Manure, gras silage Steel tank, 2.400 m³

Dual fuel co-generator, 2 x 180 kW

Gas holder above

secondary digester, solids input device, heat usage

Conception, permission, detailed final construction plans, supervision of construction, start-up

Biogas Plant THODE

Germany 2001 Manure, corn silage Stainless steel tank, 600 m³

Dual fuel co-generator, 65 kW

Gas holder above digester Conception, permission, detailed final construction plans

Biogas Plant ECKERTZ

Germany 2001 Manure, energy

crops

Stainless steel tank, 600 m³

Dual fuel co-generator, 100 kW

Gas holder above digester Conception, permission, detailed final construction plans

Biogas Plant HOFFMANN

Germany 2001 cattle manure, dung stainless steel tank, 600 m³

Dual fuel co-generator, 100 kW

Solids input device, gas holder above digester

Conception, permission, detailed final construction plans

Biogas Plant NIJ BOSMA ZATHE

The Netherlands 2000 Manure, Gras Steeltanks, 2 x 80m³

Dual fuel co-generator, 37 kW

Preplanning, detailed final construction plans

Biogas Plant THIESSEN

Germany 2000 Manure, energy

crops

stainless steel tank, 600 m³

Dual fuel co-generator, 45 kW

Gas holder above digester Conception, permission, detailed final construction plans, start-up

Biogas Plant TOTTORI

Japan

1999-2000

Manure Steel tank,

3.100 m³

Dual fuel engine, 2 x 100 kW

Gas holder above 350 m³-manure storage tank

Planning and delivery of fermenter and gas holder/storage tank, dual fuel engines, gas system, consultant for plant layout, mixing in fermenter, dewatering, gas system and dual fuel engine

(10)

period Biogas Plant AGROKOMPLEX KOLINANY Slowacia 1996-1999

Manure, straw Steel tank, 100 m³

Gas engine, 15 kW

Research and development plant, sponsored by EU, gas holder above 300m³-manure storage plant

Conception, detailed final construction plans, assembly of mixer, heating system, supervision of construction, start-up (for TBW GmbH)

Biogas Plant ROHE

Germany 1996/

1997

Manure 400 m³ Diversion of existing tanks,

gas holder in container

Conception, permission plannings, detailed plannings, construction, start-up (for TBW GmbH)

Biogas Plant WERNE v., AANSE BOUDIN; PRASLIN

Seychelles 1996 pig manure Digestion

channel, 160 m³

Non-heated system, gas holder above fermenter, gas running cooling system

Conception, final plannings (for TBW GmbH)

Biogas Plant BLANC

Germany 1991 Manure, straw Concrete

tank, 300 m³

Gas engine, 15 kW

Gas bag Assembly of tubes, pumps, mixers,

heating and gas systems Biogas Plant

ZIPPER

Germany 1990 Manure, straw 2 Steel tanks,

60 m³ each

Gas engine, 15 kW

Solid/liquid separation, gas holder above 400 m³-manure storage tank

Detailed final construction plans, construction and start-up

Biogas Plant HEYNOLD

Germany 1986 Manure, straw Steel tank, 60

Gas engine, 15 kW

Gas holder above 400m³-manure storage tank

References

Related documents

To create a chargeable service or fee for which you want to issue an EMD, you can either enter a Special Service Request (SSR) element in the PNR for EMDs that are

“Lion Clip”: The Poodle, whether curly or corded, shall be clipped on the hindquarters up to the ribs. Also clipped: the muzzle, above and underneath from the lower

In this thesis, I share stories of my experiences as a high school science teacher, gymnastics coach, and track and field coach and I explore my discovery of the.. importance of

Out of total number 683 publications, 25 publications published in MANLIBNET conference, followed by 24 publications in CALIBER conference and 17 papers published in DESIDOC Journal

The first hypothesis stated that ACOAs will report less secure attachments with their parents, more romantic attachment related anxiety and avoidance, and no significant difference

Hometown – Cedar Falls, Iowa Major – Computer Science Mentor – Andrew Berns. Lightweight Formal Methods for Improving

In order to achieve integrated socio-cultural spaces that promote social interaction, the study area should promote the unique identity and cultural heritage of Doha, creating

Scheme 5 : Examples of a tautomeric equilibrium of conjugated mesomeric betaine 16a and its corresponding normal N -heterocyclic carbene ( n NHC) 16b and,