• No results found

The Contractor EHS Management Process

N/A
N/A
Protected

Academic year: 2021

Share "The Contractor EHS Management Process"

Copied!
24
0
0

Loading.... (view fulltext now)

Full text

(1)

The Contractor EHS

Management Process

2012 EHSCP – Santa Rosa, CA

A process and philosophy to

manage

AND

influence

contractors, subcontractors and

non-company personnel.

Presented by: Kent Kunce

(2)

Objectives

– Why have a contractor EHS management

process

– Real world evolution

– The contractor EHS management process

– Challenges and learning points

– Success

– Benefits

(3)

Why be Interested?

Assumptions: $500 million capital budget 25% Labor

Ave Insurance Rate $10.75 per $100

Expected Credits: (($500M x .25)/100) x $10.75 =

$13,437,500 (approx. 2.6% of project)

Additional Consideration: Experience Modification Rate

Source: David Grenier, CFMA Building

(4)

Unawareness Recognition Getting Started Improvement Learning Success!

The Learning Curve

4

Why be Interested?

(5)

Unawareness Recognition

Getting Started

The “Real World” Learning Curve

5

Why be Interested?

Learning Improvement

(6)

The Process Balance

Too much

control, direct, take over

Just right

– manage, hold accountable

Not enough

hands off, comply

with given standards, laws

(7)

The Process

Administrative Section

– Policy Statement

– Goals for Process – Disciplinary Action – Emergency Procedures » News Media – Promotion, Signage – Partnerships – Recognition Program – Required Training

– Roles and Responsibilities – Work Hour Reporting

Technical Section

Written Contractor EHS Mgt Program

(8)

Pre-Work Activities

– EHS Project Checklist

• Review and Address Package/Project Logistics and Hazards

Contractor Prequalification System

• Written Safety Programs

• Experience Modification Rate • Incident Statistics

• Program Evaluations

• Implementation Evaluations

8

(9)

Pre-Bid Activity

Communicate “Unique”

Contract

Requirements:

• Subcontractor Prequal • Designated EHS Person • Training Certification • Incident Reporting

• Site Specific/Daily Plans • Equipment Inspection • Field EHS Reviews • EHS Committee

• Lead Team - Council • Vehicle Requirements

• Personal Protective Equipment • Permits

• Fall Protection • Recognition Plan • Orientation

• Substance Abuse

• Training and Tool Box Talks • Partnerships

• Communications

• Project EHS Requirements

9

(10)

Pre-work

Cont’d

Contracting

More Communication

– Confirm EHS Expectations » Subcontractor Information » EHS Plans

» Training Certifications » Designated EHS Person,

Committee members, etc.

Competent Persons Certifications Orientation Requirements Site Specific Plans

(11)

Work…almost

Site Communication

– Contractor Management and Onsite Supervision

• Site Programs/Standards/Req’ts./Procedures

• Purpose/Details of the Project

Leadership expectation

– Periodic

– Craft Persons

– EHS Orientation and Handbook

• Site Programs/Standards/Req’ts./Procedures • Purpose/Details of the Project

– Updates as needed

11

(12)

Contractor Performance

Ongoing Activities

– Permit System

• Hot Work, Lockout, Scaffolding, etc.

– Training, Learning

EHS Observations • Progress Meetings

• EHS Committee Meetings • Tool Box Talks

– EHS Plans

• Site Plans

• Substance Abuse Programs • Disciplinary Action

(13)

Process Verification

• Leading Metrics

– Systems » Prequalification » Orientation » Incident Reporting » Training » EHS Plans » Observations - Inspections » Substance Abuse Program

• Trailing Metrics

– Recordable and Lost Time Incidents

13

(14)

Communications

Organized Consistent System

Project Progress Meetings

– Field Conditions – Activities

Reports

– Prevention Techniques

– Learning Points / Incidences – Leading Metrics

Bulletin/EHS Boards

– Planned Activities – Recognition

(15)

Incidents

Management

• Treatment

• Reporting

Analysis

– Incidents, Near Hit/Observation

• Structured, Documented Review

with Contractor

(16)

The Challenges

Documented Process → Administrative → Planning → Prequalification → Contracting → Site Communication → Ongoing Field Activities → Verification → Incidences →Learning

16

Fundamental

– Contractor and Subcontractor Education

– Documented Program and Specifications

– Role/Responsibilities

• Owner • Construction Manager • General Contractor • Safety

– Financial Investment

• Administrative (Staff)

(17)

The Challenges

cont’d.

• Administrative

– Types of Contractors

– Contract Management

• # of Contracts, # of Project Managers/Engineers

– Medical

• Case Management – who does what? (CM, contractor, subcontractor)

• Onsite, Designated, etc

– Substance Abuse Programs

(18)

• Tangible

– Security

– Contractor Personnel Tracking

– Work Hour Collection

• Intangible

– Leadership Education and Execution

– Teamwork

– EHS Culture

18

(19)

Success

It’s Culture

Defined as the beliefs, values, and

behaviors that are

consistent

among

all members of a population

“the company with the best EHS record also had

the most consistent EHS culture”

(20)

We “DO” everything …

20

- talk EHS

- have a EHS person

- spend a fortune

- have a EHS program

- wear hard hats

- do tool box talks

- follow the rules

- perform audits

- have incentives

- have discipline

But we don’t get results!!!

Just tell me what to do!!!

(21)

21

• believing compliance is EHS

• exhibiting EHS performance is common sense

• discussing recordability in front of the injured

• discussing insurance ratings in front of the injured

• delegating EHS responsibilities

• believing discipline alone promotes EHS behaviors

• stating “incidents happen”

• etc., etc…,

Success?

(22)

The Answer

is…

22

**

**Source: Ed Oakley and Doug Krug, Enlightened Leadership, 2002

*

(23)

Benefits

23

Return on Investment

– Sense of DOING the RIGHT THING!!

• Improved EHS Performance

• $$ Savings to Contractor and subs

• External Recognition / Marketing

• Successful Contractor Performance

– Services – Projects

(24)

Summary

– Why be Interested?

– The Process

– The Challenges

– Success

– Benefits

24

References

Related documents

Success recognised at local Corporate events Success recognised at Regional events Success recognised at all Global events Success recognised at Team Elite Awards night and

College will notify student of transfer decision by: -- Transfer deadline for filing financial aid forms: -- Transfer priority financial aid deadline: --.. College will notify

Sum Assured, along with the guaranteed additions at the rate of 3.5% compounded annually for the first 4 years and the vested bonuses would be payable on death, irrespective

CNN articles that offered a challenge to the case for war generally centered on a direct challenge by Iraq itself (Iraq: Powell evidence untrue, Feb. 5, 2003) or another

For example, Paparoditis (2009) and Paparoditis (2010) compare nonparametric estimators of the spectral density of the stationary and locally stationary process, and as a

North Georgia Technical College North Metro Technical College Northwestern Technical College Ogeechee Technical College Okefenokee Technical College Sandersville Technical

This means that it should remain in the content after various types of manipulations, both intentional (known as attacks on the watermark) and

Deaf and hard-of-hearing individuals or people with hearing loss can participate in meetings (in-person or remote), phone calls, videoconferences and multi-party